Lifting Engineering Capability & Experience

Transcript of Lifting Rev Rev 0oler.twservices.com.au/OLERWeb/content/WorleyParsons...Lifting Plans For routine...

Page 1: Lifting Rev Rev 0oler.twservices.com.au/OLERWeb/content/WorleyParsons...Lifting Plans For routine and non-routine lifts, we can carry out risk assessments and prepare from simple generic

Lifting EngineeringCapability & Experience

Page 2: Lifting Rev Rev 0oler.twservices.com.au/OLERWeb/content/WorleyParsons...Lifting Plans For routine and non-routine lifts, we can carry out risk assessments and prepare from simple generic

WorleyParsons2

Results for our customersThe WorleyParsons consulting group is a collaborative, multidisciplinary team with a broad range of strategic, technical and project delivery expertise. We combine this knowledge to help our clients meet the competing interests of; the project, environment, and community, thus mitigating and managing risk, saving time and cost whilst improving performance.

Page 3: Lifting Rev Rev 0oler.twservices.com.au/OLERWeb/content/WorleyParsons...Lifting Plans For routine and non-routine lifts, we can carry out risk assessments and prepare from simple generic

Lifting Engineering Capability & Experience 3

The Lifting Engineering (LE) Team is a specialist group within WorleyParsons providing technical support to the supply chain that links the point of supply to the workface; whether it is a drilling rig, offshore platform, supply vessel, FPSO vessel, supply base or onshore

The LE team evolved from the larger structural engineering discipline within the Hydrocarbons sector in 1995 to provide specialist services to the oil and gas industries in the areas of lifting and material handling. WorleyParsons’ Hydrocarbon sector services the oil and gas industry (upstream hydrocarbons) and the refining and petrochemical industry (downstream hydrocarbons).

With the experience gained over the last 10+ years and with the support from the global network of WorleyParsons, the LE team can add significant value to our customers. Specific areas in which the LE team can add value include:

Assessment of HSE systems and provide/strengthen gap analysis

Establish and maintain project-specific lifting register

Establish and maintain Owner Company lifting register

Establish standards and implement compliance

Risk assessment of lifting operations

Prepare and implement lifting plans

Prepare and implement engineered lifts of equipment JHAs

Ensure safe lifting operations are in place for irregular equipment

Design and verification of equipment

Manufacture of lifting equipment

Work effectively in remote locations

Introduction

Page 4: Lifting Rev Rev 0oler.twservices.com.au/OLERWeb/content/WorleyParsons...Lifting Plans For routine and non-routine lifts, we can carry out risk assessments and prepare from simple generic

Lifting Plans

For routine and non-routine lifts, we can carry out risk assessments and prepare from simple generic to highly sophisticate lifting plans for both small irregular pieces of equipment to 500t + pieces of equipment. This includes cranage, sea transport and installation aids.

Lifting Register

The LE team administers a web-based lifting register that is used by many clients and equipment vendors for drilling and subsea operations. It provides an efficient and effective process to underpin the lifting management system applied within a company, across various companies, or on a project that can be accessed in any place that has internet availability.

Lifting Management

By combining skilled engineers and proven processes, we can review, advise and assist with the lifting management from the assessment of the current system through to gap analysis and the implementation of corporate standards and operational plans.

Capability overview

WorleyParsons4

Page 5: Lifting Rev Rev 0oler.twservices.com.au/OLERWeb/content/WorleyParsons...Lifting Plans For routine and non-routine lifts, we can carry out risk assessments and prepare from simple generic

Heavy Lifts

WorleyParsons’ LE team can do design review of heavy lifts issue lift plans to ensure the lifts are completed in a safe, efficient and effective way.

Rigging

We have extensive expertise in selecting, designing and specifying the correct rigging assembly for the lift. The correct selection of chain, wire rope or soft slinging in conjunction with rigging attachments will help ensure the lift is efficient, cost effective and safe.

Offshore Lifted Equipment

The LE team specialises in engineering, manufacture, inspection, testing and maintenance of offshore lifted equipment such as cargo containers, equipment skips, offshore bins and mobile work shops. We currently have over 20 standard designs for lifted equipment ranging from workshops to longstock baskets.

Verification of Lifted Equipment

Verified over 8,000 individual items of lifted equipment for a broad cross section of customers in several industries has given WorleyParsons credibility to be the verifier of choice for many lifted equipment owners both in Australia and internationally.

Lifting Engineering Capability & Experience 5

Page 6: Lifting Rev Rev 0oler.twservices.com.au/OLERWeb/content/WorleyParsons...Lifting Plans For routine and non-routine lifts, we can carry out risk assessments and prepare from simple generic

WorleyParsons6

Previous performance

Pluto ProjectCUSTOMER: WOODSIDE ENERGY LTDLOCATION: NW SHELF, W.A.

Pluto project for Woodside Energy Ltd is an on going drilling campaign that our LE team is supporting and maintaining equipment register for all standard equipment and providing compliance for all non-standard items. All equipment is verified by LE before being shipped and all non standard equipment is review and tested to ensure the safety and efficiency for all parties involved with the project. A specialised lifting plan has been developed by the LE team and used for all major lifting operations both day and night time lifts.

Browse Basin CUSTOMER: SHELL DEVELOPMENT LOCATION: NW SHELF, W.A.

Browse Basin drilling campaign for Shell Development Australia is a drilling campaign using the drilling rig Songa Venus. Shell Development Australia relies on WorleyParsons LE team to maintain and verify all equipment prior to being shipping out from Supply Base at Broome. Maintenance reports were issued weekly during drilling operations to ensure all equipment is maintained and complying to EN12079, DNV2.7-1 and DNV2.7-3 standards. Reports were issued to the client and to all vendors directly to make sure that all outstanding tests were carried out and comply with standards.

Pyrenees ProjectCUSTOMER: BHP BILLITON LOCATION: NW SHELF, WA

A large scale drilling and subsea operation. WorleyParsons LE team provides support and verification for all the offshore equipment being installed subsea and on multiple platforms. This includes verification of all specialised equipment being used and installed on and from both platforms, Ocean Epoch, and the pipe laying barges Jascon 25 and Toisa Proteus. Lifting Engineering also keeps a complete and up to date register of all containers, baskets, workshops and equipment skids which enables maintenance and verification of equipment readily available. Reports are issued monthly at the clients request to show all equipment that is being used and all verification on equipment is processed quickly and as needed.

Page 7: Lifting Rev Rev 0oler.twservices.com.au/OLERWeb/content/WorleyParsons...Lifting Plans For routine and non-routine lifts, we can carry out risk assessments and prepare from simple generic

Lifting Engineering Capability & Experience 7

Page 8: Lifting Rev Rev 0oler.twservices.com.au/OLERWeb/content/WorleyParsons...Lifting Plans For routine and non-routine lifts, we can carry out risk assessments and prepare from simple generic

WorleyParsons8

Gas Cage Design and ComplianceCUSTOMER: BOC LTD LOCATION: AUSTRALIA

The WorleyParsons Lift Engineering team designed a 16 bottle gas cage with a 4 leg rigging set that was compliant to the EN12079 offshore standard. The LE Team issued a generic test clearance letter for the design of the cages with test procedures. The cages upon fabrication in were tested, checked and certified to EN12079. This has been the operation for the 3000+ gas cages that are currently in service to BOC Ltd in Australia and Oceania.

Hydraulic Workover Unit CUSTOMER: WOODSIDE ENERGY LTDLOCATION: NW SHELF, W.A.

The Woodside Hydraulic Workover Unit was designed by WorleyParsons in Melbourne to be used on various offshore platforms. The unit is comprised of 46 separate lifting items that can be broken down and shipped out as needed. The LE Team reviewed all of the containers, lift beams, rigging and specialised equipment. Those items complied to EN12079 were issued with Compliance Certification and the irregular items were issued engineering lifts. The items are also maintain on the LE online lifting equipment register so that they may be re-certified upon the need for the Hydraulic Workover Unit to be shipped.

Stybarrow ProjectCUSTOMER: BHP BILLITON LOCATION: NW SHELF, WA

The Stybarrow Project for BHP Billiton was a drilling project that was supported by the LE Team. This includes verification of all specialised equipment being used and installed on and from platform. Lifting Engineering also keeps a complete and up to date register of all containers, baskets, workshops and equipment skids which enables maintenance and verification of equipment readily available. Lifting Engineering was also needed to safely and securely transport and lift subsea equipment such as Xmas trees and BOPs. Reports are issued monthly at the clients request to show all equipment that is being used and all verification on equipment is processed quickly and as needed.

Page 9: Lifting Rev Rev 0oler.twservices.com.au/OLERWeb/content/WorleyParsons...Lifting Plans For routine and non-routine lifts, we can carry out risk assessments and prepare from simple generic

Lifting Engineering Capability & Experience 9

Cossack, Wanaea, Lambert & HermesCUSTOMER: WOODSIDE ENERGY LTDLOCATION: NW SHELF, W.A.

The CWLH Campaign for Woodside Energy Ltd was a project that was supported by the LE Team of offshore equipment. This included verification of all specialised equipment being used and installed on and from platform, verification and lifting plans for all equipment. Lifting Engineering also keeps a complete and up to date register of all containers, baskets, workshops and equipment skids which enables maintenance and verification of equipment readily available. Lift Engineering Team also advised on the transport and lift subsea equipment such as Xmas trees and BOPs for the security and safety. Reports are issued monthly at the clients request to show all equipment that is being used and all verification on equipment is processed quickly and as needed.

Stickle ProjectCUSTOMER: BHP BILLITON LOCATION: NW SHELF, W.A.

The Stickle Project for BHP Billiton was a drilling project that was supported by the LE Team. The services comprised of verification that all offshore equipment being used was to either EN12079 or DNV2.7-1 standards, to maintain that all equipment was kept up to date via the online lifting equipment register. LE Team was also needed to safely and securely transport and lift subsea equipment such as Xmas trees and BOPs. Reports are issued monthly at the clients request to show all equipment that is being used and all verification on equipment is processed quickly and as needed.

Mutineer Exeter 2007CUSTOMER: SANTOSLOCATION: NW SHELF, WA

The Mutineer Exeter for Santos was a drilling project that was supported by the LE Team. This included the issue of a lifting plan for all the various items of subsea equipment and used for installation of the subsea equipment. The 40t X-mas Trees lift plan was used to ensure that the equipment was lifted safely from the supply vessel to the platform. This project also included the verification and checking of all equipment supplied by Vetco Gray located in Singapore.

Page 10: Lifting Rev Rev 0oler.twservices.com.au/OLERWeb/content/WorleyParsons...Lifting Plans For routine and non-routine lifts, we can carry out risk assessments and prepare from simple generic

Corporate overview

Zero Harm is our corporate vision for health, safety and the environment (HSE).

We are committed to our vision and apply it to all operations, at all times, in all locations, and at all levels of responsibility. We will actively work to align our expectations and behaviors to achieve Zero Harm in our dedication to continuous improvement. These expectations are reflected in our integrity management framework, OneWay™, and linked to our global systems and procedures.

WorleyParsons is a leading global provider of professional services to the resources and energy sectors, and the complex process industries.

We cover the full asset spectrum, both in sise and lifecycle, from the creation of new assets, to services that sustain and improve operating assets

Our business has been built by working closely with our customers through long-term relationships, anticipating their needs, and delivering inventive solutions through streamlined, proprietary project delivery systems.Strong growth continues to characterise our performance both through organic development and through strategic acquisition as we strive to provide tailored services wherever our customers need us.

EcoNomics™ provides our customers with the systems, technologies and expertise to optimise and balance financial, social, and environmental outcomes, improving sustainability performance while enhancing profit and long-term viability.

WorleyParsons’ vision is to be a leader in sustainability by helping our customers capture new markets and business opportunities created by the new energy economy.

e

e

HYDROCARBONS

POWER

MINERALS, METALS & CHEMICALS

INFRASTRUCTURE & ENVIRONMENT

Page 11: Lifting Rev Rev 0oler.twservices.com.au/OLERWeb/content/WorleyParsons...Lifting Plans For routine and non-routine lifts, we can carry out risk assessments and prepare from simple generic
Page 12: Lifting Rev Rev 0oler.twservices.com.au/OLERWeb/content/WorleyParsons...Lifting Plans For routine and non-routine lifts, we can carry out risk assessments and prepare from simple generic

Lifting Engineering

Capability & Experience