Liberty Point International School 2012 Proposed Bond Projects

1
Liberty Point International School 2012 Proposed Bond Projects 6 Classroom Addition Eliminate s Modulars Renovation of Current School Restrooms Secure Entranc e Front Entrance Security o Enclosed vestibule to control access to the school. o Clear line-of-sight from office to entry doors and approach. o Doors electronically controlled by office staff. o Card-swipe keyless entry system. o ADA compliant door hardware and entry systems. Six Classroom Addition & Restrooms o Eliminate modular classrooms o Provide a secure 21 st Century learning environment Security Fencing Roof Repairs, Restroom Renovation & Fixture Replacement, Air Condition

description

Liberty Point International School 2012 Proposed Bond Projects. Front Entrance Security Enclosed vestibule to control access to the school. Clear line-of-sight from office to entry doors and approach. Doors electronically controlled by office staff. Card-swipe keyless entry system. - PowerPoint PPT Presentation

Transcript of Liberty Point International School 2012 Proposed Bond Projects

Page 1: Liberty Point International School 2012 Proposed Bond Projects

Liberty Point International School2012 Proposed Bond Projects

6 Classroom Addition

Eliminates Modulars

Renovation of Current School

RestroomsSecure

Entrance

Front Entrance Securityo Enclosed vestibule to control access to

the school.o Clear line-of-sight from office to entry

doors and approach.o Doors electronically controlled by office

staff.o Card-swipe keyless entry system.o ADA compliant door hardware and

entry systems. Six Classroom Addition & Restrooms

o Eliminate modular classroomso Provide a secure 21st Century learning

environment Security Fencing Roof Repairs, Restroom Renovation &

Fixture Replacement, Air Condition the Gym