LHCb Computing Project

Status report to LHCC referees

J.Harvey

Oct 22, 1998

J.Harvey : Status report to LHCC referees21/10/98 Slide 2

Focus of Talk

Organisation and strategy for building new software Update on developments in DAQ and Controls

First results from Myrinet evaluation Progress in the CERN Joint COntrols Project (JCOP)

A Process for Developing Software ManagePlan, initiate, track, coordinateSet priorities and schedules, resolve conflicts

SupportSupport development processesManage and maintain componentsCertify, classify, distributeDocument, give feedback

AssembleDesign applicationFind and specialise componentsDevelop missing componentsIntegrate components

RequirementsExisting software

systems

BuildDevelop models, Evaluate toolkitsArchitect components and systems Choose integration standardEngineer reusable components

ProjectOrganisation

Support

FacilitiesCPU farmsDesktopStorageNetworkSystem Man.

VendorsIT-IPT..

VendorsIT-PDP

VendorsIT-ASD

Support

SoftwareSDEProcessQualityLibrarianTrainingWebmaster

M

Data ManagementEvent, Geometry

M

M

Build

ArchitectureComponentsFrameworks

A

ToolkitsGUI, visual,…...

M

Reconstruction

M

Simulation

M

Analysis

M

Controls

M

Control Room

M

Assemble

DAQ

M

ManageSteering Group

M M C

Technical ReviewE M A

LHCb Computing...

Arch. ReviewM A E ... ...

M

A

C

E

Coordinator

Architect

Project Manager

Project Engineer

J.Harvey : Status report to LHCC referees21/10/98 Slide 5

LHCb Offline Software Road Map

200420022000

Working Prototype, ‘retire’ SICB

Detailed Implementation

Integration and Commissioning Exploitation

Rele

ase

Num

ber

2006

J.Harvey : Status report to LHCC referees21/10/98 Slide 6

Milestone 1- Working Prototype

By mid 2000, produce a new working prototype of LHCb software incorporating: model of the LHCb detector geometry database containing ~ 1,000,000 simulated events (~100 GB) framework for processing events detector response simulation toolkit pattern recognition algorithms for tracking, RICH, calorimetry,.. toolkit of analysis algorithms interactive framework for data analysis

When in production, stop development of SICB

J.Harvey : Status report to LHCC referees21/10/98 Slide 7

Strategy

We are convinced of the importance of the architecture Identify components, define their interfaces, relationships among them Build components

first look around and see what components we can use (Objectivity, OpenInventor, ROOT, WIRED,….)

Build frameworks from these components “framework artefact that guarantees the architecture is respected”

Common approach in different domains apply good principles system-wide and reuse ideas

Incremental approach to development new release every two months gradually add functionality rapid feedback

J.Harvey : Status report to LHCC referees21/10/98 Slide 8

Design Team

Architect and Project Leader experienced designer

Domain specialists data management visualisation algorithms

Team of seven people all located at CERN (optimal) Daily design sessions (4 - 7 p.m.) Consult with experts from other experiments

2 day meeting at Orsay/LAL with ATLAS domain architects external reviewers

J.Harvey : Status report to LHCC referees21/10/98 Slide 9

Current Architecture

TObjTObj

Obj2

AppManager

PersistencySvc

Algorithm1Algorithm1

Algorithm1

JobOptionsSvc

TObj

TObjContainerTObjContainer

ObjContainer

Obj3

MessageSvc

TObj1Obj1

DetDataSrv

TDetElem1TDetElem1

TDetElem1

PObjectPObjectPDetElem

EventDataSvc

AlgFactory

AnotherPercySvc

Transient Event Store

PObjPObj

PObj

PObjPObj

PObj

DetPerstySvc

Alg Properties

T Detector Store

T Histogram Store

HistogramSvc

Hist1Hist1

Hist1

HistPerstySvc PHistPHist

ConverterConverter

Converter ConverterConverter

Converter

EventSelector

Converter

TObjObj1

uses

creates

navigability

J.Harvey : Status report to LHCC referees21/10/98 Slide 10

Use Cases (scenarios) : AppManager : AlgorithmFactory : EventDataSvcB : AlgorithmA : Algorithm

1: CreateAlgorithm ( )

2: New

3: Initialize ( )4: CreateAlgorithm ( )

5: New

6: Initialize ( )

7: NextEvent ( )

8: DoEvent ( )9: DoEvent ( )

10: Find (char*)

12: Register ( )

11: Process

J.Harvey : Status report to LHCC referees21/10/98 Slide 11

LHCb Detector Description

Transient Detector Store

Detector DataService

PersistencyServiceDetElementDetElement

DetElement

DetElementDetElementDetElement

PersistencyDetector

Store

ConverterConverterConverter

Converter

ToGeant4Service

ConverterConverterConverter

Converter

Geant4Detector

description• Detector Elements need to be “identified”

• Strong hierarchical structure• Versioning

J.Harvey : Status report to LHCC referees21/10/98 Slide 12

Visualisation

Transient Event/Detector Store

Rep.Service

RepresentationsStore

(graphical, textual)

ConverterConverterConverter

Converter

Selector

Mark objects in Store

GraphStore

UserInterface

J.Harvey : Status report to LHCC referees21/10/98 Slide 13

Architecture Review Benefits

Force preparation for the review - Documentation! Early detection of problems with the existing architecture Validation of the requirements Improvement in Architectures in all experiments

Planned for last week in November Review team

Experience with software architectures Domain experts From other LHC experiments

J.Harvey : Status report to LHCC referees21/10/98 Slide 14

Development Environment

Development platform: NT Design tool: Rational Rose Coding/debugging: Visual C++ Code Management: Visual

SourceSafe Code repository: \\alnts1\Packages\

LHCb\ Web authoring: Front Page 98 Participate in SPIDER project

J.Harvey : Status report to LHCC referees21/10/98 Slide 15

LHCb OO Programming Course

Five day course to be held at CERN Dec 7-11 Covers OO Analysis and Design, and hands-on programming Establish use of common methods and notation 16 people registered to attend Second course already fixed for Jan 18-22, 1999

J.Harvey : Status report to LHCC referees21/10/98 Slide 16

Releases

Release 1.0 planned for end ‘98 allows user to : Access simulated event data produced by SICB (ZEBRA format) Output results in the form of HBOOK histograms and/or ntuples Typical “client”: Sub-detector expert developing a pattern recognition algorithm.

Future releases will evolve according to user needs, for example to add : transient model of the detector geometry persistent event data store using Objectivity visualisation component to permit event display ...

J.Harvey : Status report to LHCC referees21/10/98 Slide 17

Work Breakdown

J.Harvey : Status report to LHCC referees21/10/98 Slide 18

Project Tracking

Progress can be followed from Web page http://lhcb.cern.ch/computing/offline/html/TNS_Scrapboard.htm

1 week delay for the moment

ID Task Name1 User Requirements

2 Architecture Design

3 SDE preparation

4 Review Preparation

5 Architecture Review

6 Module Development

7 Module Design

8 Coding

9 Module testing

10 System Testing

11 Documentation

12 Release 1.0

25/11

18/12

24/8 31/8 7/9 14/9 21/9 28/9 5/10 12/10 19/10 26/10 2/11 9/11 16/11 23/11 30/11 7/12 14/12 21/12 28/12 4/1September October November December January

J.Harvey : Status report to LHCC referees21/10/98 Slide 19

Data Acquisition System

J.Harvey : Status report to LHCC referees21/10/98 Slide 20

Event Builder Project

PCI

MyrinetInterface

CPU

Mem

PCI-PCI ..To Farm CPUs

Link Interface

MemoryCPU

DMA

Myrinet Link

DMAPCI

Myrinet Link

Network Interfacese.g. Fast Ethernet

PCI

Myrinet Equipment received and installed. First program for interface processor written First measurements of raw speed done

J.Harvey : Status report to LHCC referees21/10/98 Slide 21

Myrinet interface-interface bandwidthMyrinet Interface to Interface Bandwidth

60

70

80

90

100

110

120

130

140

0 5000 10000 15000 20000 25000 30000 35000

Packet size [Bytes]

Ban

dw

idth

[M

Byt

es/S

ec]

Maximum obtainable speed: 132 MBytes/sec given by PCI speed

J.Harvey : Status report to LHCC referees21/10/98 Slide 22

JCOP : OPC Evaluation

ROC IOS

PLC PLC

IOS IOS IOS

LHC Exp. Sub-Detectors &Experimental equipment

I/O Servers distributed in the experimental area ( PC, VME,…)

PLC PLCAnalog/Digital channels, PLCs,Field buses, RS232, etc.

. . .

LAN

WAN

StorageO

the

r sy

ste

ms

(LH

C,

Sa

fety

, ..

.)

Servers & Workstations(Fault tolerant)

Configuration DB, Archives,Logfiles, etc.

Remote Workstations

ROC

Re

ad

ou

t sy

ste

m

OPC (OLE Process Control)

OPC interface

Industrial standard Customise interfaces Check interoperabilityWrite OPC server for CAEN I/f

J.Harvey : Status report to LHCC referees21/10/98 Slide 23

Controls Task Architecture

Operconsole

Otherconsoles

Susuisor

. . .

Operconsole

AlarmHandler

Subsystemsupervisor

IOS

DCSDatabase

DBEditor

Gen.UtilityProg.

Visuali-zation

Devserver

Devserver

Devserver

Devserver

Log+Dataarchive

DataArchiver

Servers

WS

ReportGenerator

Otherconsoles

Statusdisplays

ExternalSubSys

Othersystems

parameters

devices

Sub-systems

Expertsystem

J.Harvey : Status report to LHCC referees21/10/98 Slide 24

Controls Software Architecture

Hardware: I/O cards, FieldBus I/F, RS232, ...

DCS Services(Alarm Hand., Archiver, etc.)

InputOutput (interface drivers)

DeviceLib (device drivers)

Distributed I/O Servers

DCS DB

GUI Client Applications(Consoles, DataViewer, etc.)

Sub-System supervisors

DBMS

Generic

Specific

Object Network

parameters

devices Storage

Device API

subsystems

distributeddevices

Config.&

Utilitytools