Access System during the LHC Injection tests
P. Ninin, S. Grau - TS/CSE
Workshop Chamonix XV – 27 January 2006
Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682
LHC ACCESS SYSTEM
2
Agenda
• Introduction
• Motivation
• Requirements
• Interlock chains
• CCC
• Situation after the tests
• Planning
• Conclusions
Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682
LHC ACCESS SYSTEM
3
Motivation
• Protect personnel against radiation hazard during the tests- Access to underground areas around Points 8 and 7 (and the
arc in between) must be fully operational during the test
- Access doors must be interlocked to disable beam in a failsafe way if safety conditions are violated.
• Test the access control and safety system- Procedure:
• patrol, • nominal operation,• incident management
- Access Equipment - Interlock chains- Control system
Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682
LHC ACCESS SYSTEM
4
Access requirements
• Temporary interlocked gate in Sector 7-6: - To allow safe continued access to 6-7 the gate should be placed at
800 m from IP7(RP study). • Dead zone or confined space
- The machine access point at Point 7 (PM76) shall be operational. • The machine access point at Point 8 (PM85) shall be operational. • The access point between the experimental service cavern and
the LHCb experiment shall be operational and the shield wall in place (PZ85)
• Temporary interlocked gate in Sector 8-1
Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682
LHC ACCESS SYSTEM
5
Access system
• Injection Test zones limited to points LHC 7 & 8
• Deployment- Access safety system at
points 7 & 8- Access control system at
points 7 & 8- CCC control infrastructure- Redundant cable loop- Patrol
LHC 7 LHC8 CCC
Personnel Access 1 6
Material Access 1 5
Sector door 8 11
End of Zone door 2 13
Shielding walls 1 4
racks 12 20 6
sectors 5 13
CCC computers 10
Total 30 72 16
Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682
LHC ACCESS SYSTEM
6
Installation
• Underground access system equipment in sectors 7 / 8 shall be installed before the hardware commissioning.
• Pits head access equipment could be installed during cool down, expected lower traffic.
• During the PM installation the PZ will remain operational.
• Estimation of 500 people that needs the new access card
Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682
LHC ACCESS SYSTEM
7
CCCLASS operation mode selection
EIS-RF
ONOFF
RF
ON OFF
ACCESTUNNEL
POINT 1
ATLAS
ON OFF
ACCESTUNNEL
ON OFF
ACCESSERVICE
ON OFF
ACCESEXPERIENCE
ON OFF
ACCESTUNNEL
ON OFF
ACCESSERVICE
ON OFF
ACCES RF
ON OFF
ACCESTUNNEL
ALICE
ON OFF
ACCESEXPERIENCE
ON OFF
ACCESSERVICE
ON OFF
ACCESTUNNEL
CMS
ON OFF
ACCESEXPERIENCE
ON OFF
ACCESTUNNEL
ON OFF
ACCESSERVICE
ON OFF
ACCESTUNNEL
ON OFF
ACCESTUNNEL
LHC-B
ON OFF
ACCESEXPERIENCE
ON OFF
ACCESSERVICE
Electronsstoppers
ONOFF
Electron Sto.
ATLAS
YES NO
DELEGATION
YES NO
DELEGATION
YES NO
DELEGATION
YES NO
DELEGATION
YES NO
DELEGATION
POINT 2 POINT 3 POINT 4 POINT 5 POINT 6 POINT 7 POINT 8
LHC
OK OK
EIS-a
ON OFF
ACCES
Key release
ON
FAISCEAU
OFF
EIS-f
Key release
AlarmeFaisceauImminent
DélaiDécroissance
Radiation18 18
Commande pour établir un mode (= retirer un VETO)Allumé = confirmation que le VETO est retiré
Position sûre de tous les EIS (non alimenté, fermé etc.)
Commande pour annuler un mode (= mettre un VETO)Allumé = confirmation que le VETO est mis
MODEAllumé = Mode établiAucun VETO sur le groupe d’EIS correspondant
Position non sûre d’au moins un EIS (alimenté, ouvert, etc.)
Clignotement signalant un incident ou anomalie sur les EIScorrespondants (ex intrusion)
OFF
ON
18 Compteur décroissant
Clef en position insérée et verrouillée
EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a
EIS-a EIS-a EIS-a EIS-a EIS-a
ASB
TI2
EIS-f
FAISCEAU
Key release
OFF ON
ACCES Point 2
Key release
OFFON
EIS-a
TI8
EIS-f
FAISCEAU
Key release
OFF ON
ACCES Point 8
Key release
OFFON
EIS-a
Conditions for Beam Fulfilled ?
OK
MUST BE
Safe and closed
DENYTI8 : Injected Beam
OKSafe and closed
Safe and closed OK
OKSafe and locked
PM85 access point
OKSafe and locked
Sector 1 Safe and closed NOT OK
SELECT
For details select a zone
Point 8 : zone service
Sector 2
Sector 3
Sector 4
Sector 5
Point 8 : zone tunnel
OKSafe and closedUJ83 access point
Sector 8 Safe and closed NOT OK
OKSafe and closedUJ87 access point
Sector 9 Safe and closed NOT OK
Point 8 : zone LHC-BOKSafe and closedUX85 access point
Conditions for Beam Fulfilled ?
OK
MUST BE
Closed
Present
OK
OK
OK
PM85 access point
PM85 access keys
Closed
NOT OK
Point 8 : zone service NOT OK
YCPS01=PM85
YCAPG01=PM85
YCAPG02=PM85
YCAMG01=PM85
OKClosed
Sector 1YCPZ01=SD8
Closed
Closed
OK
OKClosed
YCPS01=US85
Sector 2YCPS01=PM85
Closed
OKYZSQ01=PM85 Reset
MACHINE RESULTANTS STATUS CONDITIONS
MachineAccessLHC TI2 E. S. RF TI8
ACCESS RESULTANTS STATUS
LHC zone Point 2 E.S. zone RF zone Point 8
conditions for TI8 injected beam
4
(5 chains 5 lists + 17 zones 17 lists)
PatrolRestrictedGeneral Closed
Mode selection
CANCEL VALIDATE
PM25
PM45
PM65
PM85
Point 1
Point 2
Point 3
Point 8
ULX15
Zone service Zone Tunnel Zone experimentale
Point 4
Point 5
Point 6
Point 7
USC55
PX24
UPX16
PZ45
UX85
Select ALL
PM56
UP23
PZ33
Uj47
UP55
UP63
UJ27
Ux46
UL55
UJ67
UJ87
UJ23
UJ43
UPX56
UJ63
PM76
UJ83
UJ14 UJ16PM15 PM18
P P
P
Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682
LHC ACCESS SYSTEM
8
Interlock Chains
G. Roy
Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682
LHC ACCESS SYSTEM
9
Interfaces
Access Safety Central Controller
LASS operation mode selection
EIS-RF
ONOFF
RF
ON OFF
ACCESTUNNEL
POINT 1
ATLAS
ON OFF
ACCESTUNNEL
ON OFF
ACCESSERVICE
ON OFF
ACCESEXPERIENCE
ON OFF
ACCESTUNNEL
ON OFF
ACCESSERVICE
ON OFF
ACCES RF
ON OFF
ACCESTUNNEL
ALICE
ON OFF
ACCESEXPERIENCE
ON OFF
ACCESSERVICE
ON OFF
ACCESTUNNEL
CMS
ON OFF
ACCESEXPERIENCE
ON OFF
ACCESTUNNEL
ON OFF
ACCESSERVICE
ON OFF
ACCESTUNNEL
ON OFF
ACCESTUNNEL
LHC-B
ON OFF
ACCESEXPERIENCE
ON OFF
ACCESSERVICE
Electronsstoppers
ONOFF
Electron Sto.
ATLAS
YES NO
DELEGATION
YES NO
DELEGATION
YES NO
DELEGATION
YES NO
DELEGATION
YES NO
DELEGATION
POINT 2 POINT 3 POINT 4 POINT 5 POINT 6 POINT 7 POINT 8
LHC
OK OK
EIS-a
ON OFF
ACCES
Key release
ON
FAISCEAU
OFF
EIS-f
Key release
AlarmeFaisceauImminent
DélaiDécroissance
Radiation18 18
Commande pour établir un mode (= retirer un VETO)Allumé = confirmation que le VETO est retiré
Position sûre de tous les EIS (non alimenté, fermé etc.)
Commande pour annuler un mode (= mettre un VETO)Allumé = confirmation que le VETO est mis
MODEAllumé = Mode établiAucun VETO sur le groupe d’EIS correspondant
Position non sûre d’au moins un EIS (alimenté, ouvert, etc.)
Clignotement signalant un incident ou anomalie sur les EIScorrespondants (ex intrusion)
OFF
ON
18 Compteur décroissant
Clef en position insérée et verrouillée
EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a EIS-a
EIS-a EIS-a EIS-a EIS-a EIS-a
ASB
TI2
EIS-f
FAISCEAU
Key release
OFF ON
ACCES Point 2
Key release
OFFON
EIS-a
TI8
EIS-f
FAISCEAU
Key release
OFF ON
ACCES Point 8
Key release
OFFON
EIS-a
Access Safety LHC8 Controller
Access Safety LHC7 Controller
18 KV
TED87765
MBIAH 8783M
MSIB 8813M
BIW
BIW
BIC
SPS Access
Access safety network
Access safety network
Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682
LHC ACCESS SYSTEM
10
Authorisation
• Authorisation during the tests will be given by the DSO or the GLIMOS, final decision by OP
• Enrolment campaign and new identifier distribution- New identifier included in the dosimeter
Biometry Enrolment Personal Dosimeter with identifier
Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682
LHC ACCESS SYSTEM
11
Access Procedure
• Before- If necessary access control with restricted list- Patrol
• During (17 days)- Access closed and interlocked- If access necessary : LHC access mode RESTRICTED
• After- Supervised Radiation Area
• Access doors NOT required to define these limits.• Personal Dosimeter required
- New LHC access system will be operational in 7 & 8
Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682
LHC ACCESS SYSTEM
12
Planning
Underground installation
ready
Surface installation
ready
Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682
LHC ACCESS SYSTEM
13
Follow-up tasks and linkmen• LACS installation and commissioning -> L. Scibile, F.Bonthond• LASS development -> T. Ladzinski• LASS installation and commissioning -> T. Ladzinski• Cabling -> J. F. Juget• Equipment Integration -> S. Di Luca• Interface with BIC and SPS access safety system -> T. Ladzinski• Redundant cable loop installation and commissioning -> M. Munoz • LACS, LASS, Cable Loop and Global Access tests -> L. Scibile, T. Ladzinski• Testing procedures and team definition -> L. Scibile, T. Ladzinski• Patrol and operational procedures definition -> P. Ninin• Access cards/dosimeters fabrication, enrolment (500 p) -> L. Scibile, R. Nunes• Training to CCC operators -> P. Ninin•INB documentation -> E.M. Poggioli• Document objectives, requirements, linkmen, milestones, operational modes acess vs.
test modes for the Injection Tests from access point of view -> S.Grau
Coordination – S.Grau
Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682
LHC ACCESS SYSTEM
14
Conclusions
• Goals- Ensure personnel safety (radiation hazards) during the tests- Test the access system itself
• More particularly the interlocks and supervision part
• Installation of access system equipment and necessary service is scheduled and organised to achieve this goal.
• 20 % of the final LHC access system- Little specific- Operational procedure to be prepared and tested
• Access system for LHC Injection Test will be coordinated by S.Grau.