LEVIATHAN...• Completed installation of the Subsea Distribution Assembly (SDA). • Completed...
Transcript of LEVIATHAN...• Completed installation of the Subsea Distribution Assembly (SDA). • Completed...
• Completed construction of the Platform skidways.
• Completed loadout of Liquid Storage Module (LSM) onto the transportation
barge.
• Completed removal of Living Quarters (LQ) and MEG Reclamation Unit
(MRU) from Domestic Supply Module (DSM).
• Completed all platform hydrotests, flushing, and leak testing activities.
• Completed safety planning workshops with Heerema for Transportation & Installation
(T&I) scope.
• Completed installation of the Subsea Distribution Assembly (SDA).
• Completed installation of 3 Well Jumpers and Wet Gas Flowmeter Modules.
• Completed flooding, pigging, and hydrotesting activities on the MEG
Pipelines.
• Completed hydrotesting of Gas & Condensate Pipelines from Jacket to DVS.
A Safe, Reliable, Environmentally Responsible Gas Supply
JUNE 2019
Sami Zatout is a fabrication company with experience in
fabrication and installation metal structures, facility piping and storage tanks in Israel. Past
clients include refineries, power plants and water treatment plants. As part of the Leviathan
Project, Noble Energy has contracted Zatout to fabricate and install the structural supports
and the interconnect piping (ICP) for the Hagit terminal.
Sami Zatout is another shining
example of a local Israeli contractor
successfully supporting and contributing
to the success of the Leviathan Project
as we are Energize the World and
Bettering People’s Lives.
LEVIATHAN
“As a leader for onshore engineering, I feel privileged to take part in an exciting and challenging project which will make a significant impact for Noble Energy (Israel and the region). It’s amazing to see across-the-ocean collaboration between engineers and contractors, from the US, Israel and other countries, all focusing on one big target, to bring Leviathan alive.”
- Simi Segal, Onshore Engineering Lead
Contractor Spot-
PROJECT HIGHLIGHTS:
PROJECT PROGRESS
UPDATE
Platform skidways completed
Living Quarters (LQ ) and MEG Reclamation Unit (MRU) removal from DSM
Subsea Distribution Assembly (SDA) installation completed
Liquid Storage Module (LSM) loadout completed