Lesson Three – Scenario Exercises, and Understanding P erformance R equirements
description
Transcript of Lesson Three – Scenario Exercises, and Understanding P erformance R equirements
![Page 1: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/1.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
CPCCBC4001A Apply building codes and standards to the construction
process for low rise building projects
Lesson Three – Scenario Exercises, and Understanding Performance Requirements
![Page 2: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/2.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Todays Lesson
• Handout (next section P36 to n44 )• Review Scenario 1• Understanding Performance (begin)• Scenario 2 in groups
![Page 3: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/3.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Scenario One
![Page 4: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/4.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Scenario One
• What's the problem ?• Site drainage problem– Causing water ponding in sub floor– Decay of stumps– Decay of timber joists and bearers
• What class of building ?• Class 1a, residential house
![Page 5: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/5.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
BCA Specific
• BCA 3.1.2.3 Surface water must be diverted away from class 1 buildings as follows:– (c) The ground beneath suspended floors must be
graded so that the area beneath the building is above the adjacent external finished ground level and surface water is prevented from ponding under the building (see figure 3.1.2.3)
– Continues next slide
![Page 6: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/6.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
BCA Specific (2012 page 118)
![Page 7: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/7.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
BCA Specific (BCA 2012, page 118)
• Also consider• 3.1.2.4 Subsoil drainage• Where a subsoil drainage system is installed to
divert subsurface water away from the area beneath a building, the subsoil drain must……
• Anything else ??
![Page 8: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/8.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Review What BCA Applies to
• The application of the BCA is determined by each State or Territory• Generally – the BCA applies to the
construction of all new buildings • The BCA can also apply to additions and
alterations to existing buildings• The BCA, or parts of it, can also apply to
proposals to change the use of a building
![Page 9: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/9.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Understanding Performance Requirements
from P 36 text
![Page 10: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/10.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Understanding Performance Requirements – from P 36 text
• Requirements are mandatory and Deemed-to-Satisfy Provisions are optional
• However complying with the BCA without using Deemed-to-Satisfy Provisions – Means: developing Alternative Solutions
• We’ve broken this into three sections– Prescription ‘v’ performance– Developing Alternate Solutions– Assessment of Alternate Solutions
![Page 11: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/11.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Prescription ‘v’ Performance
• The old system (Prescription)– When something must be done– What must be done– How it must be done
• A minimum necessary standard P 37• In this system, alternative methods were sought
through the courts• Example of prescriptive clause on P 38• Now look at the alternate clause P 38 written as a
performance requirement (the current BCA)
![Page 12: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/12.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Performance & Alternate Solutions
• No longer need to apply to Tribunals or Courts• Most Certifying Authorities can now approve
Alternative Solutions • Performance regulations reduce the need to;– lodge objections to regulations– apply for a modification or variation of a code– appeal decisions of Certifying Authorities
• What do you see as the benefit of doing things the way you like ? P 39
![Page 13: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/13.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
BCA language & Performance
• we need to understand what’s actually required in order to comply P 39
• must understand the wording and the language used to express Performance Requirement.
• There are two ways– QUALITATIVE terms or – QUANTITATIVE terms
![Page 14: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/14.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Qualitative
• This means that requirements are described using words
• The wording does not propose any particular means of compliance
• The designer has flexibility to use any acceptable means
![Page 15: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/15.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Quantitative
• This means that requirements are described using numbers
• That provide an absolute measure of performance
• This Performance Requirement specifies the intensity of rainfall that must be accommodated in the design of a surface water system
![Page 16: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/16.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Two key phrases
• To the degree necessary……• Appropriate to …….
• Look over page 40 to 42
![Page 17: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/17.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Developing Alternatives
• It’s often preferable to design something different to DTS • to develop an Alternative Solution. P 42• Full compliance with the DTS is usually the simplest way
to design a building• following the DTS pathway may not be the most cost-
efficient or practical• It may also not be possible to do so if a client wants
something out of the ordinary. • Part A0.5 provides two pathways to demonstrate
compliance of Alternative Solutions
![Page 18: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/18.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Part A0.5 (BCA 2012, Vol 1, P 19)
1. Developing an Alternative Solution to meet the Performance Requirements2. Developing an Alternative Solution to at least equate to DTS Provisions
We’ll carry on with this next week P 43
![Page 19: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/19.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Scenario Two
![Page 20: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/20.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
BCA Standard Specific
• 3.1.3 (BCA 2012, from P 123)
![Page 21: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/21.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Other AS Standards
• AS3660.1 – 2000 Termite Management – New Building Work
• AS3660.2 – 2000 Termite Management – In and around existing buildings and structures – Guidelines
• AS3660.3 – 2000 Termite Management – Assessment criteria for termite management systems
• AS 4349.3 – 1998 Inspections of Buildings – Timber pest inspections
![Page 22: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/22.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
http://www.timber.net.au/index.php/termite-management-for-builders.html
![Page 23: Lesson Three – Scenario Exercises, and Understanding P erformance R equirements](https://reader038.fdocuments.net/reader038/viewer/2022103102/56815bd8550346895dc9c7c0/html5/thumbnails/23.jpg)
Michael Martin - Cert IV - Codes and Standards 2012
Reference list
• ABCB National Construction Code Awareness Resource Kit
• http://www.timber.net.au/index.php/termite-management-for-builders.html
• http: www.google.com.au (for some images)