Lesson 17 Flow Mudcap Snub Closed Systems
Transcript of Lesson 17 Flow Mudcap Snub Closed Systems
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
1/40
ATMPETE 689 UBDATM
ATM ATM
Lesson 17
Flow Drilling
Mudcap Drilling
Snub Drilling
Closed SystemsRead: UDM Chapter 2.8-2.11
pages 2.180-2.219
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
2/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Flow Drilling
Flow drilling refers to drilling operations in
which the well is allowed to flow to surface
while drilling.
All UBD operations are really flow drilling
operations, but the term is usually applied to
drilling with a single phase mud, and no gasis injected except by the formation.
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
3/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
4/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Drilling fluid selection
Density is determined by:
maximum pressure
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
5/40
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
6/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Surface Equipment
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
7/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Surface
Equipment
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
8/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Surface Equipment - RBOP
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
9/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Surface Equipment - RBOP
sealing element
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
10/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Surface Equipment
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
11/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Sizing Flare line
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
12/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Sizing Flare line
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
13/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Sizing Flare line
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
14/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Sizing Flare line
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
15/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Surface Pits
Primary Oil Separation Pit
Secondary Oil Separation Pit
Skimmer System Safety
Drilling Fluid Pit
Oil Transfer Tank
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
16/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Operating Procedures
Mechanical objective is to control the well
at the surface to maintain underbalanced
conditions. Maximum tolerable surfaces pressures
should be established before drilling starts.
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
17/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Mudcap Drilling
Utilized with uncontrollable loss of
circulation during flowdrilling operations.
Higher pressures than can be safely handledwith the rotating head or RBOP.
Not necessarily underbalanced.
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
18/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Mudcap Drilling
Driller loads the annulus with a relatively
high density high viscosity mud and closes
the choke with surface pressure maintained Drilling is then continued blind by
pumping a clear non-damaging fluid down
the drillstring through the bit and into thethief zone.
TPETE 689 UBDT
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
19/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Mudcap Drilling
Applications:
Sustained surface pressures in excess of 2000
psiSour oil and gas production
Small diameter wellbores
TPETE 689 UBDT
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
20/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Mudcap drilling
TPETE 689 UBDT
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
21/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
TPETE 689 UBDT
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
22/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Fluid Volume Requirements
TPETE 689 UBDT
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
23/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Fluid Volume Requirements
TPETE 689 UBDT
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
24/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Fluid Volume Requirements
Annular volumes will depend upon whether
the operator desires continuous or periodic
injection of annular fluids or whether afloating mudcap is to be used.
TPETE 689 UBDT
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
25/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Fluid Volume Requirements
TPETE 689 UBDT
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
26/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Fluid Volume Requirements
ATMPETE 689 UBDATM
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
27/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Fluid Volume Requirements
ATMPETE 689 UBDATM
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
28/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
Snub Drilling
UBD operation utilizing a snubbing unit or
coiled tubing unit.
Expense is justifiable if very high formationpressures are anticipated, and uncontrollable
loss of circulation is expected.
ATMPETE 689 UBDATM
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
29/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
ATMPETE 689 UBDATM
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
30/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department of
Petroleum Engineering
ATMPETE 689 UBDATM
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
31/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department ofPetroleum Engineering
ATMPETE 689 UBDATM
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
32/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department ofPetroleum Engineering
ATMPETE 689 UBDATM
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
33/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department ofPetroleum Engineering
ATMPETE 689 UBDATM
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
34/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department ofPetroleum Engineering
ATMPETE 689 UBDATM
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
35/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department ofPetroleum Engineering
Closed Systems
Refers to UBD operations with a specific
surface system.
A pressurized, four phase separator and afully closed surface system, is used to
handle the returned fluids.
ATMPETE 689 UBDATM
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
36/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department ofPetroleum Engineering
ATMPETE 689 UBDATM
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
37/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department ofPetroleum Engineering
Fig. 2.70
ATMPETE 689 UBDATM
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
38/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department ofPetroleum Engineering
Fig. 2.71
ATMPETE 689 UBDATM
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
39/40
ATMPETE 689 UBDATM
ATM ATMHarold Vance Department ofPetroleum Engineering
Fig. 2.72
-
7/27/2019 Lesson 17 Flow Mudcap Snub Closed Systems
40/40