![Page 1: LEROY CENTRAL SCHOOL DISTRICT 2020 Asset Preservation Projectbataviaslist.com/.../FactSheet_LeRoyCSD_FINAL-1-1.pdf · planning initiatives we began with the R.I.T.E. project. We encourage](https://reader034.fdocuments.net/reader034/viewer/2022051605/600de29d17e7e50f0c148f7f/html5/thumbnails/1.jpg)
Project Financing Proposition 2 can only pass if Proposition 1 also passes
The average annual tax increase determination is based on a full value $100,000 home with STAR.
Absentee ballot applications are available on request from the District Clerk. Visit www.leroycsd.org or call 585-768-8133 for more information.
PROPOSITION 1 PROPOSITION 1 + PROPOSITION 2 (TOTAL PROJECT)
Detailed information about the proposed capital project is available through the following resources:
In your mailbox:An informational newsletter will be mailed to all district households in early October
On our website:Visit www.leroycsd.org for related project documents and video
On social media:Twitter: @LeRoy_Knights @LeRoyWSSInstagram: leroy_knights
Public Information Meeting:Wednesday, October 14 at 7:00 p.m. in the Jr.-Sr. High School Auditorium
LEROY CENTRAL SCHOOL DISTRICT
2020 Asset Preservation Project
On Wednesday, October 28, residents of the LeRoy Central School District will be asked to participate in a capital project referendum. Two separate capital project propositions will be offered on the ballot for your consideration and vote.
Proposition 1 consists of district-wide building and site improvements focused on safety, asset preserva-tion, and academic program enhancements. Critical needs addressed in this part of the project include exterior building reconstruction, such as masonry repointing, window replacements, roof replacements at the Wolcott Street School and the Jr.-Sr. High School, and reconstruction of the deteriorating parapet at the Wolcott Street School. Water accumulation in the Wolcott Street School boiler room and at the Lapp Building would also be addressed, as well as age-related deterioration to various stairways and entryways at both schools. Window film would be applied at both school buildings to enhance student safety and security. Program enhancements would include gymnasium refinishing and locker room improvements at the Wolcott Street School, plus improvements to the existing soccer field at the Jr.-Sr. High School, including a multi-purpose playing surface, lighting, and new bleachers. Both schools would also receive auditorium house lighting upgrades, plus theatrical lighting improvements at the High School.
Proposition 2, which is contingent on approval of the first proposition, incorporates additional improve-ments to our physical education and athletic programs. A multi-purpose playing surface would be added inside the existing track at the Jr.-Sr. High School, along with new stadium field lighting and a pedestrian path leading from the school to the field. This work would put the final touches on our stadium.
Both propositions put forth in this proposed project represent an important continuation of the facilities planning initiatives we began with the R.I.T.E. project. We encourage you to learn more about the project propositions at the public information meeting on October 14, and to cast your vote on October 28.
Project Overview
Proposition 1 Cost $16,239,350Proposition 1 average annual tax increase $10.91
Total Project Cost (Prop. 1 + Prop. 2) $18,927,500Total average annual tax increase $48.16
ASSET PRESERVATION RENOVATIONS AT ALL BUILDINGS AND SITES PROP. 1 PLUS THE PROP. 2 PHYS. ED. & ATHLETIC FIELD IMPROVEMENTS
6% Capital Reserve Fund
88% State Building Aid
6% Remaining Local Share
5% Capital Reserve Fund
75% State Building Aid
20% Remaining Local Share
Public Information MeetingPublic Information MeetingWhen: Wednesday, October 14 7:00 p.m.Where: Jr.-Sr. High School Auditorium
OCTOBER
14Wednesday
Capital Project ReferendumCapital Project ReferendumWhen: Wednesday, October 28 8:00 a.m. to 8:00 p.m.Where: Wolcott Street School Gymnasium Corridor
OCTOBER
28Wednesday
![Page 2: LEROY CENTRAL SCHOOL DISTRICT 2020 Asset Preservation Projectbataviaslist.com/.../FactSheet_LeRoyCSD_FINAL-1-1.pdf · planning initiatives we began with the R.I.T.E. project. We encourage](https://reader034.fdocuments.net/reader034/viewer/2022051605/600de29d17e7e50f0c148f7f/html5/thumbnails/2.jpg)
• New multi-purpose field inside of track• Replace stadium field lights• Pedestrian path from High School to field
PROPOSITION 1 Asset Preservation & Renovation $16,239,350
PROPOSITION 2 $2,688,150 Multi-purpose Phys. Ed./Athletic Field
In order to pass, Proposition 2 also requires voter approval of Proposition 1
Wolcott Street Elementary SchoolWolcott Building:
• Reconstruct building parapet• Roof replacement• Brick repointing• Precast window sill reconstruction• Replace exterior windows• Rooftop unit replacement• Boiler room dewatering• Stair tread replacements
Lapp Building:
• Repair water leak in tunnel between building and library
Trigon Building:
• Toilet room renovation• Locker room / PE office / storage renovations• Refinish gym floor• Remove divider partition• Auditorium entrance door replacements• Auditorium entrance stair repairs• Replace auditorium house lighting with LED
Building Wide:
• Convert controls to DDC• Install security window film on first floor
Site:
• Lapp parking lot replacement
Junior-Senior High SchoolBuilding:
• Roofing replacements• Install security window film• Auditorium house and theatrical lighting replacement• Relocate existing generator
Site:
• New multi-purpose field at existing soccer field• New field lights to support new layout• Relocate scoreboard• Relocate storage shed and team dugouts• New bleachers
Bus Garage• Emergency generator
Woodward Memorial Library• Entrance stair repairs