Zura Hall Refresh Site Logistics and Safety Plan 03-14-2014 Trim tree to allow for scaffold - possibly remove completely - Neil to verify through grounds ALL VINES TO REMAIN IN TRELLIS PLANTER, TYP. Remove 2 columns along with wood trellis and vines. trellis to be re-installed at completion of project. Remove and replace existing concrete paving in this area along with 2 trees. Remove, store and reinstall 3 benches and 1 table in this area. Remove and replace existing 3x3 steel fence embedded in concrete, 2 pine trees and 1 bollard. AC Patch curb with pipe Staging/Laydown Area LEGEND: Construction Vehicle Path Emergency Vehicle Path Pedestrian Walkway Limit of Work (Fence w/ privacy screen) Staging/Laydown Area Construction Gates Manlifts Trash Chutes (during Demo) Covered Pedestrian Tunnel Wood Fence OLMECA HALL MAYA HALL ZURA HALL N TULA HALL TENOCHCA HALL EAST CAMPUS DRIVE MONTEZUMA ROAD EAST CAMPUS DRIVE ZURA WAY COLLEGE AVENUE COLLEGE AVENUE COLLEGE AVENUE LINDO PASEO 4 WAY GATE FOR CONSTRUCTION & PED ACCESS Basement Vent for material removal and new equipment Remove wood roof trellis, vines and wood door/gate at enclosure Tower C Tower B Removal of palm trees to be stored on campus and reinstalled after construction for access to material/man lift and trash shoot Wood fence Possible area for storing 12 existing palm trees for re-installation Tower A BBC TRAILER Toilets and handwash station Mangate Vehicle Entrance Vehicle Entrance Shade and Lunch Area Employee Parking Upper Level Only FIRST AID Fire Extinguisher EVACUATION ZONE WASTE / RECYCLING Fence relocation during student move in of adjacent dorms (8/11 thru 8/24)

Transcript of LEGEND: Construction Vehicle Path Emergency Vehicle Path ...

Page 1: LEGEND: Construction Vehicle Path Emergency Vehicle Path ...

Zura Hall Refresh SiteLogistics and SafetyPlan 03-14-2014

Trim tree to allowfor scaffold -possibly removecompletely - Neilto verify throughgrounds

ALL VINES TOREMAIN INTRELLISPLANTER, TYP.

Remove 2 columnsalong with woodtrellis and vines. trellis to bere-installed atcompletion of project.

Remove and replaceexisting concrete pavingin this area along with 2trees. Remove, storeand reinstall 3 benchesand 1 table in this area.

Remove and replace existing3x3 steel fence embedded inconcrete, 2 pine trees and 1bollard. AC Patch curb with pipe

Staging/LaydownArea

LEGEND: Construction Vehicle Path Emergency Vehicle Path Pedestrian Walkway Limit of Work (Fence w/ privacy screen)

Staging/Laydown Area Construction Gates Manlifts Trash Chutes (during Demo) Covered Pedestrian Tunnel Wood Fence

OLMECA HALL

MAYA HALL

ZURA HALL

N

TULA HALL TE

NO

CH

CA

HA

LL

EA

ST

CA

MP

US

DR

IVE

MONTEZUMA ROAD

EA

ST

CA

MP

US

DR

IVE

ZURA WAY

COLLEGE A

VENUE

COLLEGE A

VENUE

CO

LLE

GE

AV

EN

UE

LINDO PASEO4 WAY GATE FORCONSTRUCTION& PED ACCESS

Basement Ventfor materialremoval andnew equipment

Remove woodroof trellis,vines and wooddoor/gate atenclosure

Tower C

Tower B

Removal of palm trees to bestored on campus andreinstalled after constructionfor access to material/man liftand trash shoot

Wood fence

Possible area forstoring 12existing palmtrees forre-installation

Tower A

BBC TRAILER

Toilets andhandwash station

Mangate

Vehicle Entrance

Vehicle Entrance

Shade and Lunch Area

Employee Parking UpperLevel Only

FIRST AID

FireExtinguisher

EVACUATIONZONE

WASTE /RECYCLING

Fence relocationduring student movein of adjacent dorms(8/11 thru 8/24)