Lee’s Summit Road Improvements NW Anderson Dr. to NW Lakewood Blvd Project Manager: Kim Pemberton, City of Kansas City, MO Project Descripon This project will realign and improve Lees Summit Road from NW Anderson Dr. to NW Lakewood Blvd. Design is currently underway. The project is in the right-of-way acquision phase Construcon funding is available in 2021 Upgrades include: Widened & realigned roadway with new pavement Curb and guer A mul-use trail and bike lanes Retaining walls New sidewalks Project website: Visit KCMO.gov and search for: Lees Summit RoadFunding Informaon Project funding is provided by voter-approved GO Bond funding. CONTACT: Maggie Green Public Information Officer Kansas City Public Works Office – 816-513-2612 E-mail [email protected]

Transcript of Lee’s Summit Road Improvements

Lee’s Summit Road Improvements

NW Anderson Dr. to NW Lakewood Blvd

Project Manager: Kim Pemberton, City of Kansas City, MO

Project Description

This project will realign and improve Lee’s Summit Road from NW Anderson Dr. to NW Lakewood Blvd.

Design is currently underway.

The project is in the right-of-way acquisition phase

Construction funding is available in 2021

Upgrades include:

Widened & realigned roadway with new pavement

Curb and gutter

A multi-use trail and bike lanes

Retaining walls

New sidewalks

Project website:

Visit KCMO.gov and search for: “Lee’s Summit Road”

Funding Information Project funding is provided by voter-approved GO

Bond funding.

CONTACT:

Maggie Green

Public Information Officer Kansas City Public Works Office – 816-513-2612

E-mail – [email protected]

Fact Sheet Project Number 89008194 Lee's Summit Road, NW Lakewood Blvd to Anderson Dr City of Kansas City, Missouri - Dept. of Public Works  Probable Project Schedule 

● October 2020 - Completion of new waterline system ● 2021 - Construction begins  

○ Phase 1 - Lee's Summit Road, NW Lakewood Blvd to Space Center Dr ○ Phase 2 - Lee's Summit Road, Space Center Dr to Anderson Dr 

● Fall 2022 - Construction ends   Project Cost 

● $9.3 million / $7.4 million for construction  Project Details 

● New Alignment  ● New 12” Pavement  ● 5’ Sidewalk, 5’ Bike Lanes, and 10’ Path ● New Concrete Driveways Approaches ● New Storm Sewer and Street Lights ● Proposed Right-of-Way 

○ 4 New Retaining Walls ○ Fence Relocation to Property Line ○ Mailboxes Relocations 

■ If you want to buy yourself a new mailbox to replace the existing one, do so before Oct 2020 and contact us so we can let the contractor know to install it 

 Traffic Details 

● Total Daily Traffic Volume - 5,208 vehicles (2020), 6,011 vehicles (2040) ● Speed Limit - 40 mph, Change to 35 mph per City Standards ● Construction Traffic Patterns 

○ 2 Phases, No Thru Traffic ○ Continuous Access to Space Center Dr ○ Continuous Access to Residences