BSS502BSS502CONSTRUCTION TECHNOLOGY 1CONSTRUCTION TECHNOLOGY 1
PURPOSEPURPOSETo determine the site’s suitability for building and the nature and the extent of preliminary work that will be needed
Why it is important?It will shows the detailed to many physical aspect such as subsoil composition, demolition and the legal aspect such as planning permission, right of access and preservation order
2
OBJECTIVESOBJECTIVES• To assess the general suitability of
the site with the proposed works• To help produce a design which is
adequate and economic• To help overcome possible
difficulties & delays that may arise during construction period due to ground and other local conditions
• To predict possible changes that may occur/cause of all changes in site condition
• To maximize potential of the site
3
DESCRIPTIONDESCRIPTION
A combination process which range from looking at published information such as maps to arrange laboratory test on the soil
4
Information required from a site Information required from a site investigation:investigation:a. Information affecting the design
of the structure: shear strength and compressibility of the soil
b. Information affecting the construction of the works: the extent and properties of material to be excavated, or to be used for fill or for road bases or concrete aggregates
5
Information required from a site Information required from a site investigation:investigation:c. Information on ground water
conditions: the level and seasonal variation of the water table, the pressures in the soil water, and the permeability of the soil.
6
Planning an investigation:Planning an investigation:• In the earlier stages of an
investigation, the information available is often inadequate to allow a detailed plan to be made.
• The investigation must therefore proceed in 3 stages:
1. Desk study2. Site reconnaissance3. Detail Examination of Tests and
Programs
7
INFORMATION/ISSUES TO INFORMATION/ISSUES TO CHECKCHECK
1. Site Location Nearest town and city Schools, emergency services,
entertainment, recreation, shops, transport and employment
Distance from head office (client & builders) & traveling time
Distance from nearest railway station to the site
8
INFORMATION/ISSUES TO INFORMATION/ISSUES TO CHECKCHECK2. Accessibility Approach and site access roads,
width, gradient, bends, sharp corners, condition and construction relative to transport heavy plant and equipment
Bridges, strength, width and clearance height
Temporary roads, rolled metal tracts or consider preparing sub base for new roads as temporary access
9
INFORMATION/ISSUES TO INFORMATION/ISSUES TO CHECKCHECK3. Availability of spaceSite offices, canteen, stores and
compoundMaterial storage areas and
handlingConstruction area and assembly
areasPlant location
10
INFORMATION/ISSUES TO INFORMATION/ISSUES TO CHECKCHECK4. Services Water, drainage, electricity, gas
& telephoneLocation will be determined from
maps by consultation with the appropriate local authorities
An estimate of buildings usage is also for ascertaining the demand on sewers and drains
11
INFORMATION/ISSUES TO INFORMATION/ISSUES TO CHECKCHECK5. Ground composition Boreholes are required to
determine :Changes in strataStrength of subsoilToxicity of subsoilStability of excavationWater table (depth below
surfaces)12
INFORMATION/ISSUES TO INFORMATION/ISSUES TO CHECKCHECK6. Site clearance and demolition
A plan of the site should indicate trees, shrubs and existing buildings and a site survey will reveal the extent of necessary leveling Demolition and excavation
Method and costEffect of trees and structural
prevention orders
13
INFORMATION/ISSUES TO INFORMATION/ISSUES TO CHECKCHECKReuse of materialsProtection of adjacent buildingSpecial insurance requirementCompensation payment and
liability for damageDistance to spoil tips and charge
14
IN GENERAL…IN GENERAL…• Dealt with local planning authority to
ascertain whether there are special/significant restrictions which could adversely affect the development of site building line position
• Survey should include details of neighboring development, future development and the position with regard to facilities in the area
• Should enquire the existence of any restrictive covenants such as right of way, light & drainage which may restrict the development
15
THE PROCESSTHE PROCESS• Desk Study• Site Reconnaissance/ Walk over
survey• Preliminary report or feasibility study• Preliminary Ground Investigation -
Planning of main Preliminary report• Main Ground Investigation• Laboratory testing• Financial Report (Return of
Investment)• Final report
16
DESK STUDIESDESK STUDIES• It is important to collect all
available information about the site before starting work.
• A desk study is the collation and review of information already available about a site, and is carried out at an early stage of site appraisal to inform and guide the remainder of the site investigation.
17
DESK STUDIESDESK STUDIES• Collect as much material as
possible about the site such as-Maps (geological, ordinance
survey, etc)Air photographGeological books & journalMining records & reports of
previous site investigationLibrary, news paper, adjacent
buildings, etc.
18
DESK STUDIESDESK STUDIES
19
SITE RECOINAISSANCE / WALK SITE RECOINAISSANCE / WALK OVER SURVEYOVER SURVEY
The initial document search should be followed by a walk-over survey of the site and its surroundings.
This should be a methodical examination of the site, based on defined classes of information, which complements the desk study and typically provides valuable information on matters such as:
Topography: indications of slope instability, spoil heaps or signs of ground subsidence resulting from mining.
20
SITE RECOINAISSANCE / WALK SITE RECOINAISSANCE / WALK OVER SURVEYOVER SURVEY
Geology: exposures of soils and rocks which can be examined and sampled.
Surface water and ground water: signs of flooding; springs; water logging
Vegetation: signs of vegetation die-back or restricted vegetation as a result of
contamination of the ground; presence of invasive species such as Japanese Knotweed; trees which may cause shrinkage and swelling of clay soils.
21
SITE RECOINAISSANCE / WALK SITE RECOINAISSANCE / WALK OVER SURVEYOVER SURVEY
22
The invasive root system and strong growth can damage foundations, buildings, flood defences, roads, paving, retaining walls and architectural sites. It can also reduce the capacity of channels in flood defenses to carry water
SITE RECOINAISSANCE / WALK SITE RECOINAISSANCE / WALK OVER SURVEYOVER SURVEY
Ecology: indicators of protected species, newts, badgers, bats, nesting birds.
Contamination: indications of spills, disturbed ground, areas of fill or spoil heaps, old fuel or oil tanks.
Structures: settlement of existing structures or the use of asbestos; indicators of archaeological value.
23
SITE RECOINAISSANCE / WALK SITE RECOINAISSANCE / WALK OVER SURVEYOVER SURVEY
Local Knowledge: anecdotal information on past uses of the site or past problems in the area.
Access & services: information such as access for site equipment and location of buried or overhead services
24
DETAIL EXAMINATION OF DETAIL EXAMINATION OF TESTS AND PROGRAMS/ TESTS AND PROGRAMS/ DETAILED EXPLORATIONDETAILED EXPLORATION
The principal objectives of the detailed soil
test/investigation are as follows:a. To determine in detail the geological
structure of the site, including the thickness, sequence and extent of the strata.
b. To determine the ground water conditions
25
c. To obtain disturbed and undisturbed samples for identification and laboratory testing
d. To carry out tests to determine the mechanical properties of the soil insitu
26
DETAIL EXAMINATION OF TESTS DETAIL EXAMINATION OF TESTS AND PROGRAMS/ DETAILED AND PROGRAMS/ DETAILED EXPLORATIONEXPLORATION
There are two principal methods of investigating the ground conditions, trial pits and boreholes
27
DETAIL EXAMINATION OF TESTS DETAIL EXAMINATION OF TESTS AND PROGRAMS/ DETAILED AND PROGRAMS/ DETAILED EXPLORATIONEXPLORATION
GROUND INVESTIGATIONGROUND INVESTIGATIONTrial Pits Trial pits are shallow excavations
going down to a depth not greater 6m.
The trial pit as such is used extensively at the surface for block sampling and detection of services prior to borehole excavation.
Can be dug by hand or mechanical excavator
28
GROUND INVESTIGATIONGROUND INVESTIGATIONTrial Pits Only suitable in dry area as they
allow hand cut samples to be taken which minimize the disturbance of sample
Most suitable use in exploring back filled area and sites overlain by variable natural deposits
29
GROUND INVESTIGATIONGROUND INVESTIGATION
30
GROUND INVESTIGATIONGROUND INVESTIGATION
Boreholes• A borehole is used to determine the
nature of the ground (usually below 6m depth) in a qualitative manner
• Recover undisturbed samples for quantitative examination. Where this is not possible, for in gravelly soils below the water table, in-situ testing methods are used.
31
GROUND INVESTIGATIONGROUND INVESTIGATION• Obviously the information gained from
a borehole is an extremely limited picture of the subsurface structure. It is therefore essential to compare the results obtained with those that could have been expected from the desk study. The greater the number of boreholes the more certain it is possible to be of the correlation and thus to trust in the results.
• The two principal types of boring machine used for Site Investigation which is light percussive and drilling machines.
32
GROUND INVESTIGATIONGROUND INVESTIGATION
33
TASK 1Your team are appointed as a project leader to a proposed mix development project in Sri Iskandar, Perak. The site is located on existing 300 acre of ex-mining area. You are required to conduct the site exploration according to phase by phase. Assumption can be made to suit to your project and site.(1 hour task, 30 minutes for presentation)