    Lecture 18a

    Sub-structure:

    Design of Piers

  • 7/28/2019 Lecture18 - Piers

    2/57

  • 7/28/2019 Lecture18 - Piers

    3/57

  • 7/28/2019 Lecture18 - Piers

    4/57

  • 7/28/2019 Lecture18 - Piers

    5/57

  • 7/28/2019 Lecture18 - Piers

    6/57

  • 7/28/2019 Lecture18 - Piers

    7/57

  • 7/28/2019 Lecture18 - Piers

    8/57

  • 7/28/2019 Lecture18 - Piers

    9/57

  • 7/28/2019 Lecture18 - Piers

    10/57

  • 7/28/2019 Lecture18 - Piers

    11/57

  • 7/28/2019 Lecture18 - Piers

    12/57

  • 7/28/2019 Lecture18 - Piers

    13/57

  • 7/28/2019 Lecture18 - Piers

    14/57

  • 7/28/2019 Lecture18 - Piers

    15/57

  • 7/28/2019 Lecture18 - Piers

    16/57

    Pier for S-826 connector at NW 103 Street, Miami.

  • 7/28/2019 Lecture18 - Piers

    17/57

  • 7/28/2019 Lecture18 - Piers

    18/57

    Expansion of the deck from one-lane to two-lanes for the I-75 ramp from S-826 at Hialeah.

  • 7/28/2019 Lecture18 - Piers

    19/57

    The new piers for the I-494 WakotaBridge over the Mississippi River at South St Paul, Minnesota. The

    new bridge consists of twin long-span, cast-in-place, segmental concrete bridges. Each bridge is 98 feet inwidth with five lanes and two full-width shoulders. The five spans clear 1,879 feet with the maximum spanof 466 feet. Substructure used 4 ksi concrete and the superstructure 6 ksi. Post-tensioning consists of 270-ksi seven wire super strand with 23 x 0.6 in-diam. strand tendons in the longitudinal direction and 4 x 0.6in-diam. strand tendons in the transverse direction. The piers shown above flare up to match the box girdersoffitand web incline angle. Note the icebreaker section. The box girders are attached to the stem walls

    with the reinforcing steel from the stem wall extending into thebox girder diaphragm walls.

  • 7/28/2019 Lecture18 - Piers

    20/57

  • 7/28/2019 Lecture18 - Piers

    21/57

  • 7/28/2019 Lecture18 - Piers

    22/57

    Lake Maracaibossegmental box girder bridge.

  • 7/28/2019 Lecture18 - Piers

    23/57

  • 7/28/2019 Lecture18 - Piers

    24/57

  • 7/28/2019 Lecture18 - Piers

    25/57

  • 7/28/2019 Lecture18 - Piers

    26/57

  • 7/28/2019 Lecture18 - Piers

    27/57

  • 7/28/2019 Lecture18 - Piers

    28/57

  • 7/28/2019 Lecture18 - Piers

    29/57

    Seismic Effects upon Piers

  • 7/28/2019 Lecture18 - Piers

    30/57

    Route 5 (Truck Lane)/ 405 Separation. This was a cast-in-place pre-stressed box girder with two 177

    spans on a curved skewed alignment. The bridge collapsed at thebent, which consisted of two columnswith #4 ties at 12. The structure was a complete loss and was immediately demolished and removed.

  • 7/28/2019 Lecture18 - Piers

    31/57

    San Fernando Road Overhead (Route 210). Two-span, cast-in-place pre-stressed concrete box girder

    with single column bents. Approach fills settled on foot. Bridge sagged four feet at base due toshattering of column at base.

  • 7/28/2019 Lecture18 - Piers

    32/57

    San Fernando Road Overhead (Route 210) Column Failure. Close up of column base. Concretecore at base was lost and #18 bars buckled (ties were #4 @ 12). Structure was entirely replaced.

  • 7/28/2019 Lecture18 - Piers

    33/57

    Column shear and buckling failure at 5/210 Interchange Foothill Boulevard Underpass,

    four-span reinforced concrete box girder with four column bents. Thesuperstructureappeared to have no damage.

  • 7/28/2019 Lecture18 - Piers

    34/57

    Column shear and buckling failure. Foothill Boulevard Under-crossing. Octagonal tied columns (#4@ 12 inches).

  • 7/28/2019 Lecture18 - Piers

    35/57

    Shear failure at the top ofthe column.Foothill Boulevard Under-crossing.

  • 7/28/2019 Lecture18 - Piers

    36/57

    Anchorage failure.

    Route 210/ Separation &Overhead.

    Bars pulled out of thepile shaft.

  • 7/28/2019 Lecture18 - Piers

    37/57

    Cypress Creek Viaduct, I-880, collapsed by the Loma PrietaEarthquake, Oakland, California.

  • 7/28/2019 Lecture18 - Piers

    38/57

    The Cypress Street Viaduct, I- 880 (Nimitz Freeway). This photo of the East side of freeway showsthe collapsed structure. The reinforced box girder structure had spans varying from 71 to 90 feet in

    length (80 feet average). The curb-to-curb width of the bridge was approximately 52 feet. Thecolumns (both lower and upper level) were separated about 15 feet in height.

  • 7/28/2019 Lecture18 - Piers

    39/57

    Cypress Street Viaduct, I-880(NimitzFreeway).

    Detailed view of the collapsedupper level, with the columnshowing longitudinal steel.

    The confinement was #4 bars at12-inch spacing.

    The hinge at the right was

    retrofitted with cable restrainers.

  • 7/28/2019 Lecture18 - Piers

    40/57

    Cypress Street Viaduct, I-880 (Nimitz Freeway). Photo shows the East side of the freeway at 32ndStreet. The upper level column was tapered at the base and joined to the lower level column as ahinge connection. Note that the shear key and dowels are shown.

  • 7/28/2019 Lecture18 - Piers

    41/57

    Bull Creek Canyon Channel Bridge Failed columns by the channel paving.

  • 7/28/2019 Lecture18 - Piers

    42/57

    Mission-Gothic Under-crossing. Columnfailure under the architectural flare.

  • 7/28/2019 Lecture18 - Piers

    43/57

    La Cienega Venice under-crossing. Column failure.

  • 7/28/2019 Lecture18 - Piers

    44/57

    Fairfax Washington Under-crossing.

    Column failure.

  • 7/28/2019 Lecture18 - Piers

    45/57

    J an. 1995 Earthquake. Map showing the Hanshin Expressway and thePort of Kobe City.

  • 7/28/2019 Lecture18 - Piers

    46/57

    Failure of the column connections and thecollapse of the super-structure spans.

    Hanshin Expressway

  • 7/28/2019 Lecture18 - Piers

    47/57

    Hanshin Expressway.

    Buckled steel piers.

    Close-up of buckled portion of steel piers.

  • 7/28/2019 Lecture18 - Piers

    48/57

    Hanshin Expressway.

    Shear failure of a massive rectangularreinforced concrete pier.

  • 7/28/2019 Lecture18 - Piers

    49/57

    Hanshin Expressway. Failure of the butt welds in the longitudinal reinforcement.

  • 7/28/2019 Lecture18 - Piers

    50/57

    Hanshin Expressway. Failure of the transverse confining reinforcement.

  • 7/28/2019 Lecture18 - Piers

    51/57

    Hanshin Expressway. Shear failure of a massive rectangular reinforced concrete pier.

  • 7/28/2019 Lecture18 - Piers

    52/57

    Hanshin Expressway. Pier failure.

  • 7/28/2019 Lecture18 - Piers

    53/57

    Hanshin Expressway. Failure of single pier bents.

  • 7/28/2019 Lecture18 - Piers

    54/57

    Bearings

  • 7/28/2019 Lecture18 - Piers

    55/57

    Hanshin Expressway. The spherical housing for the fixed bearing failed at the support for thearch bridge.

  • 7/28/2019 Lecture18 - Piers

    56/57

    Hanshin Expressway. Shear failure of bolts connecting the transverse keeper plate to the bearingassembly.

    Hanshin Expressway.

  • 7/28/2019 Lecture18 - Piers

    57/57

    The new bearings delivered to the jobsiteto replace those that failed were in-kindtype replacements.