Extracting static and dynamic model elements from textual specifications in humanities
Lecture 2 Building Elements Trades and Specifications(2)
Transcript of Lecture 2 Building Elements Trades and Specifications(2)
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
1/21
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
2/21
Propose the Schedule of
Elements, Sub-Elements of
the building
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
3/21
Contents:
1.0 Building Elements
2.0 Building Trades
3.0 Specifications
Copyright ©Fadzil CPIM UiTM2011
Email: [email protected]
Tutorial 1: Building Elements, Sub-
Elements, Trades & Specifications
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
4/21
At the completion of this lecture, students are expected to be
able to:
Identify the building elements and sub-elements of a
building
The trades that are involved in the construction of each
building element and sub-element
Write a brief specification for each building element
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
5/21
Why need specification?
To get contractors to understand and agree upon all requirements of theproject.
What is a Specification?
A type of a standard which is often referenced by a contract or tenderdocument. It provides the necessary details about the specificrequirements.
What needs to be included in a Specification?- Title and scope of the specification- Importance of the specification and its intended use.
- Terminology and definitions - clarify the meanings of thespecification
- Materials, labour or workmanship, environmental, safetyrequirements and testing (Certification) of materials or equipmentused in the project
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
6/216
Building Elements
• Building Components can be systematically broken down
into elements and sub-elements
• Purpose – to facilitate the development of each detail
design and to specify each of them
• Serves to breakdown the typical Building Construction
Cost Components
• Format/structure of the breakdown of the building
elements and sub-elements are carried through in theBills of Quantities in the Tender Documents and Contract
Documents
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
7/21
Building Elements Building Sub-Elements
Building Trades
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
8/21
A. Substructure:
Piling
Excavation for Pile Cap/Pad Foundation (Concrete,
Formwork & Reinforcement)
Column Stump (Concrete, Formwork & Reinforcement)
Ground Beam (Concrete, Formwork & Reinforcement)
Ground Floor Slab (Hardcore, Concrete, Formwork &Reinforcement)
Building Works
Elemental Sub-components
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
9/21
B. Superstructure:
Ground-1st Floor Columns: Reinforced Concrete
(Concrete, Formwork & Reinforcement), Steel,
1st Floor Beams: Ditto
1st Floor Slab: Reinforced Concrete (Concrete, Formwork
& Reinforcement), Steel Decking Floor
Staircase; Reinforced concrete (Concrete, Formwork &Reinforcement), Steel, Timber
(Ditto – Repeat if more than 2-storey)
OR
Brickwall/reinforced concrete
Building Works
Elemental Sub-components
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
10/21
C. Roof:Roof Truss (Timber or metal truss)Roof Coverings (Concrete Tiles, Clay Tiles, Metal Sheet Roof etc.)
Rainwater Goods (Rainwater Gutter/Downpipe, Flashings)
D. Walls
Monolithic concreteBrickwork / Blockwork (Bricks/Blocks and mortar)
Panel walls (Timber or metal)
E. DoorsDoor Leaf
Door FrameIronmongery
Building Works
Elemental Sub-components
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
11/21
C. Roof:Roof Truss (Timber or metal truss)Roof Coverings (Concrete Tiles, Clay Tiles, Metal
Sheet Roof etc.)
Rainwater Goods (Rainwater Gutter/Downpipe,
Flashings)
Building Works
Elemental Sub-components
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
12/21
D. WindowsWindow Leaf (Casement/Louvres/Sash)
Door Frame (Timber/metal)
Ironmongery
Building Works
Elemental Sub-components
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
13/21
E. DoorsDoor Leaf
Door Frame (Timber/metal)
Ironmongery
Building Works
Elemental Sub-components
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
14/21
F. FinishesFloor
Wall
Ceiling
Building Works
Elemental Sub-components
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
15/21
I. Services:Plumbing & Sanitary
Electrical Works
Air-Conditioning
Building Works
Elemental Sub-components
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
16/21
J. External Building Works: Apron
External Finishes
Building Works
Elemental Sub-components
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
17/21
A. Driveway &Pavement
Excavation
Base-course
Sub-base/Sub-grade
PremixPavement Blocks)
B. External DrainageDrains
Culvert
Sump
Building Works
Elemental Sub-components
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
18/21
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
19/21
Building Trades are the classification of works inconstruction undertaken by specific construction worker groups/specialists.
May comprise of teams of workers headed by‘Kepala’
Can be skilled or semi-skilled or just ‘general worker’
Forms a key terms of reference in the calculationof ‘Daywork Rates’ and ‘Schedule of Rates’ in
construction contracts
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
20/21
Classification of Trades: Excavator Bricklayer/Block layer Mason Carpenter Joiner Ceiling Fixer Tiler Electrician Foreman Ganger Groundworker Labourer Painter/Decorator Plasterer Plumber Scaffolder Steel Fixer
-
8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)
21/21
Copyright ©Fadzil CPIM UiTM2011
THANK YOU