    Propose the Schedule of

    Elements, Sub-Elements of

    the building 

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    3/21

    Contents:

    1.0 Building Elements

    2.0 Building Trades

    3.0 Specifications 

    Copyright ©Fadzil CPIM UiTM2011 

    Email: [email protected]

    Tutorial 1: Building Elements, Sub-

    Elements, Trades & Specifications 

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    4/21

     At the completion of this lecture, students are expected to be

    able to:

    Identify the building elements and sub-elements of a

    building

    The trades that are involved in the construction of each

    building element and sub-element

    Write a brief specification for each building element

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    5/21

    Why need specification?

    To get contractors to understand and agree upon all requirements of theproject.

    What is a Specification?

     A type of a standard which is often referenced by a contract or tenderdocument. It provides the necessary details about the specificrequirements.

    What needs to be included in a Specification?- Title and scope of the specification- Importance of the specification and its intended use.

    - Terminology and definitions - clarify the meanings of thespecification

    - Materials, labour or workmanship, environmental, safetyrequirements and testing (Certification) of materials or equipmentused in the project

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    6/216

    Building Elements

    • Building Components can be systematically broken down

    into elements and sub-elements

    • Purpose –  to facilitate the development of each detail

    design and to specify each of them

    • Serves to breakdown the typical Building Construction

    Cost Components

    • Format/structure of the breakdown of the building

    elements and sub-elements are carried through in theBills of Quantities in the Tender Documents and Contract

    Documents

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    7/21

    Building Elements Building Sub-Elements

    Building Trades

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    8/21

     A. Substructure:

    Piling

    Excavation for Pile Cap/Pad Foundation (Concrete,

    Formwork & Reinforcement)

    Column Stump (Concrete, Formwork & Reinforcement)

    Ground Beam (Concrete, Formwork & Reinforcement)

    Ground Floor Slab (Hardcore, Concrete, Formwork &Reinforcement)

    Building Works

    Elemental Sub-components 

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    9/21

    B. Superstructure:

    Ground-1st Floor Columns: Reinforced Concrete

    (Concrete, Formwork & Reinforcement), Steel,

    1st Floor Beams: Ditto

    1st Floor Slab: Reinforced Concrete (Concrete, Formwork

    & Reinforcement), Steel Decking Floor

    Staircase; Reinforced concrete (Concrete, Formwork &Reinforcement), Steel, Timber

    (Ditto –  Repeat if more than 2-storey)

    OR

    Brickwall/reinforced concrete

    Building Works

    Elemental Sub-components 

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    10/21

    C. Roof:Roof Truss (Timber or metal truss)Roof Coverings (Concrete Tiles, Clay Tiles, Metal Sheet Roof etc.)

    Rainwater Goods (Rainwater Gutter/Downpipe, Flashings)

    D. Walls

    Monolithic concreteBrickwork / Blockwork (Bricks/Blocks and mortar)

    Panel walls (Timber or metal)

    E. DoorsDoor Leaf

    Door FrameIronmongery

    Building Works

    Elemental Sub-components 

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    11/21

    C. Roof:Roof Truss (Timber or metal truss)Roof Coverings (Concrete Tiles, Clay Tiles, Metal

    Sheet Roof etc.)

    Rainwater Goods (Rainwater Gutter/Downpipe,

    Flashings)

    Building Works

    Elemental Sub-components 

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    12/21

    D. WindowsWindow Leaf (Casement/Louvres/Sash)

    Door Frame (Timber/metal)

    Ironmongery

    Building Works

    Elemental Sub-components 

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    13/21

    E. DoorsDoor Leaf

    Door Frame (Timber/metal)

    Ironmongery

    Building Works

    Elemental Sub-components 

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    14/21

    F. FinishesFloor

    Wall

    Ceiling

    Building Works

    Elemental Sub-components 

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    15/21

    I. Services:Plumbing & Sanitary

    Electrical Works

     Air-Conditioning

    Building Works

    Elemental Sub-components 

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    16/21

     J. External Building Works: Apron

    External Finishes

    Building Works

    Elemental Sub-components 

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    17/21

     A. Driveway &Pavement

    Excavation

    Base-course

    Sub-base/Sub-grade

    PremixPavement Blocks)

    B. External DrainageDrains

    Culvert

    Sump

    Building Works

    Elemental Sub-components 

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    18/21

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    19/21

    Building Trades are the classification of works inconstruction undertaken by specific construction worker groups/specialists.

    May comprise of teams of workers headed by‘Kepala’ 

    Can be skilled or semi-skilled or just ‘general worker’ 

    Forms a key terms of reference in the calculationof ‘Daywork Rates’ and ‘Schedule of Rates’ in

    construction contracts

  • 8/18/2019 Lecture 2 Building Elements Trades and Specifications(2)

    20/21

    Classification of Trades: Excavator Bricklayer/Block layer Mason Carpenter  Joiner Ceiling Fixer Tiler Electrician Foreman Ganger Groundworker Labourer Painter/Decorator Plasterer Plumber Scaffolder Steel Fixer