Leading Schools Digitally: School Planning and Budgeting ...

53
Leading Schools Digitally: Evaluation of the Electronic School Planning and Budgeting System (e-RKAS) in Indonesia THE WORLD BANK JULY 8, 2020 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of Leading Schools Digitally: School Planning and Budgeting ...

Page 1: Leading Schools Digitally: School Planning and Budgeting ...

 

 

  

Leading Schools Digitally: Evaluation of the Electronic

School Planning and Budgeting System (e-RKAS) in Indonesia

 

 

THEWORLDBANK

JULY8,2020

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: Leading Schools Digitally: School Planning and Budgeting ...

 

1  

This report is a product of the staff of the World Bank, supported by funding from the Australian Government. The findings,  interpretations, and conclusions expressed in this report do not necessarily reflect the views of the Executive Directors of the World Bank or the governments they represent, or the Australian Government. The World Bank does not guarantee the accuracy of the data  included  in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of  the World Bank  concerning  the  legal  status of any  territory or  the  endorsement or acceptance of  such boundaries.  © 2020 The World Bank  1818 H Street NW, Washington DC 20433  Telephone: 202‐473‐1000 www.worldbank.org  The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission maybe a violation of applicable law. The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of this work promptly.   For permission to photocopy or reprint any part of this work, please send a request with complete information to the Copyright Clearance Center, Inc., 222 Rosewood Drive, Danvers, MA 01923, USA, telephone 978‐750‐8400, fax 978‐750‐4470, http://www.copyright.com/.  All queries on rights and licenses, including subsidiary rights, should be addressed to World Bank Publications, The  World  Bank  Group,  1818  H  Street  NW,  Washington,  DC  20433,  USA;  fax:  202‐5222625;  e‐mail: [email protected].  

 

Page 3: Leading Schools Digitally: School Planning and Budgeting ...

 

2  

CONTENTS

CONTENTS ............................................................................................................................................................ 2 

Acronyms ............................................................................................................................................................. 3 

Executive Summary .............................................................................................................................................. 4 

Background ...................................................................................................................................................... 4 

Evaluating e‐RKAS ............................................................................................................................................ 5 

Review Workshop Findings .......................................................................................................................... 5 

Interview Findings ........................................................................................................................................ 6 

Evaluating the impact of e‐RKAS on student achievement ......................................................................... 6 

Recommendations ........................................................................................................................................... 7 

Introduction ......................................................................................................................................................... 9 

Background ...................................................................................................................................................... 9 

The Theory of Change Behind e‐RKAS ........................................................................................................... 11 

History of e‐RKAS Implementation ................................................................................................................ 13 

Development of a MoHA System ............................................................................................................... 15 

Deployment by the Ministry of Religious Affairs ....................................................................................... 15 

Research Methodology ...................................................................................................................................... 15 

Pilot and Evaluation ....................................................................................................................................... 16 

Qualitative Evaluation Methodology ............................................................................................................. 20 

Quasi‐experimental Impact Evaluation.......................................................................................................... 21 

Key Findings ....................................................................................................................................................... 21 

Feedback on Planning Documents ................................................................................................................. 21 

Implementation of e‐RKAS ............................................................................................................................. 25 

Impact of e‐RKAS on student achievement ................................................................................................... 27 

Conclusion .......................................................................................................................................................... 33 

Appendix 1: The National Education Standards ................................................................................................ 37 

Appendix 2: Numbers of Participants in Pilot Activities .................................................................................... 39 

Appendix 3: Pilot Schools ................................................................................................................................... 40 

Appendix 4: Identification of the treatments .................................................................................................... 42 

Appendix 5: Average UN scores of the eight sample school districts by subject: 2013‐2018 ........................... 51 

Appendix 6: Portrait of BOS Spending in 8 Districts/Cities ................................................................................ 52 

 

Page 4: Leading Schools Digitally: School Planning and Budgeting ...

 

3  

Acronyms

AKB  Anggaran Kas Bulanan / Monthly Budget 

ARKAS  Aplikasi RKAS / School Activity and Budget Planning Application 

BOS  Bantuan Operasional Sekolah / School Operational Assistance  

BOSDA  Bantuan Operasional Sekolah Daerah / Local School Operational Assistance 

BPKAD  Badan Pengelolaan Keuangan dan Aset Daerah / Regional Financial and Asset Management Office a.k.a District/Province Financial Office 

Dapodik  Data Pokok Pendidikan / Education Basic Data 

DEO  District Education Office 

DFAT  Department of Foreign Affairs and Trade 

DP2KAD  Dinas Pendapatan Pengelolaan Keuangan dan Aset Daerah / Local Income and Finance and Asset Management Unit 

EDM  Evaluasi Diri Madrasah / Madrasah Self‐Evaluation 

EDS  Evaluasi Diri Sekolah / School Self‐Evaluation 

e‐RKAM  Elektronik Rencana Kegiatan Anggaran Madrasah / Electronic Based Madrasah Activity and Budget Plan 

e‐RKAS  Rencana Kegiatan dan Anggaran Sekolah Berbasis Elektronik / Electronic‐Based School Activity and Budget Plan 

FY  Fiscal Year 

LPMP  Lembaga Penjaminan Mutu Pendidikan / Provincial Education Quality Assurance Institution 

MSS  Minimum Service Standard 

MoEC  Ministry of Education and Culture 

MoF  Ministry of Finance 

MoHA  Ministry of Home Affairs 

NES  National Education Standard 

NIP  Nomor Induk Pegawai / Personnel Identification Number 

PAUD  Pendidikan Anak Usia Dini / Early Childhood Education 

PEO  Provincial Education Office 

PER  Public Expenditure Review 

PISA  Programme for International Student Assessment 

PMP  Penjaminan Mutu Pendidikan / Education Quality Assurance 

RKA  Rencana Kegiatan dan Anggaran/ Activity and Budget Plan 

RKAS  Rencana Kegiatan dan Anggaran Sekolah / School Activity and Budget Plan 

RKS  Rencana Kerja Sekolah / School Work Plan 

RKT  Rencana Kerja Tahunan / Yearly Work Plan 

SD  Sekolah Dasar / Primary School 

Sidrap  Sidenreng Rappang 

SIMDA  Sistem Informasi Manajemen Daerah / Regional Management Information System 

SIPBOS  Sistem Informasi Pengelolaan BOS / BOS Management Information System 

SLB  Sekolah Luar Biasa / Special School 

SMA  Sekolah Menengah Atas / Senior High School 

SMK  Sekolah Menengah Kejuruan / Senior Vocational School 

SMP  Sekolah Menengah Pertama / Junior High School  

SSE  School Self‐Evaluation 

TA  Technical Assistance 

ToT  Training of Trainers 

TPA  Tim Perencanaan dan Anggaran / Planning and Budgeting Team 

UN  Ujian Nasional / National Examination 

 

Page 5: Leading Schools Digitally: School Planning and Budgeting ...

 

4  

Executive Summary

Background

The education system under the Ministry of Education and Culture (MoEC) is highly decentralized. Most school costs under MoEC are covered by  fiscal transfers  from the centre to provincial and district  levels, some of which are earmarked  for education use. One such  type of  transfer  is school operational grants, known as Bantuan Operasional  Sekolah  (BOS) or  school operational  assistance. BOS  funds  are managed directly by schools, which have been delegated the autonomy to receive, plan and budget, spend, administer, and report their use. Experience has shown that many schools lack the capacity to use BOS funds effectively and efficiently to deliver better learning outcomes for students, while there have been no planning systems to manage use of BOS funds towards achieving the National Education Standards (NES) for individual schools. Under the BOS program, each school is required to conduct a School Self‐Evaluation (SSE) against the NES and use the results to develop its spending plans accordingly. However, most schools develop the SSE only when required to fulfil accreditation requirements. There has been no systematic review on the implementation and impacts of the SSE across schools. Thus, the only way to obtain data on school progress towards the eight standards is through the school accreditation process, which is only conducted in a sample of schools every five years. There is also no intensive monitoring and evaluation of how schools spend BOS funds.   Every  school has  also been  advised  to develop  a planning  and budgeting  system  (Rencana  Kegiatan  dan Anggaran Sekolah or RKAS) to allocate and manage BOS funds. The concept of performance‐based planning and budgeting was introduced to ensure that schools use the RKAS to improve their performance. A World Bank review of BOS in 20141 revealed that only some schools develop an RKAS annually, while others simply copy  the previous year’s data. Further, where  they are developed,  the RKAS  is  typically not based on  the school’s SSE results, which means that it is not systematically aligned with the eight NESs.  To support implementation of the RKAS, an application called the Rencana Kegiatan dan Anggaran Sekolah Berbasis Elektronik (e‐RKAS or electronic school plan) has been developed. This tool enables schools to input and manage the RKAS electronically, which is more efficient, better structured, and in line with a performance‐based planning approach. A first version of the e‐RKAS was created by the Education Office in Surabaya, East Java,  to  simplify  the  approval  process  of  school  plans  and  budgets.  A more  advanced  version was  then developed by the World Bank team and piloted in schools in DKI Jakarta province in 2015‐2016. In 2017, the World  Bank  and MoEC  piloted  the  e‐RKAS  program  for  schools  in  Bali  province,  Central  Java  province, Gorontalo district, Sidenreng Rappang (Sidrap) district, and Mojokerto city. In 2018, MoEC tried to replicate the World Bank e‐RKAS system using a system that requires  internet connectivity  for use but realized that many schools have no access  to  the  internet. Consequently,  referring  to  the e‐RKAS system developed by Gunung Kidul district  in Yogyakarta province, MoEC developed a partly online RKAS  tool  called  the MoEC Aplikasi RKAS  (ARKAS).  The  application  is  an offline  tool  that  can downloaded  from  the  Education Office website and used by public and private schools, in areas with low or no internet connectivity.   In addition, since 2015, other electronic school planning and budgeting applications have been developed by district  or  province  education  offices.  Typically,  applications  developed  by  districts  have  the  same  basic functions: planning use of BOS and Bantuan Operasional Sekolah Daerah (BOSDA or local government BOS) funds; reporting use of funds against budgets; asset management; and financial administration (bookkeeping). In March  2019,  the Ministry  of Home  Affairs  (MoHA)  introduced  a  fully  online  application  called  Sistem Informasi Pengelolaan BOS  (SIPBOS or BOS management  information  system), which  focuses on planning, monitoring, and expenditure reporting of school BOS funds. MoHA considers this system to be a refinement of MoEC’s ARKAS as it has more complete electronic management and administrative systems for BOS, from school level to district/province level.  

 1 Assessing the Role of the School Operational Grant Program (BOS) in Improving Education Outcomes in Indonesia, The World Bank, 2014.  

Page 6: Leading Schools Digitally: School Planning and Budgeting ...

 

5  

 In 2018, the World Bank Team also implemented a school planning and budgeting application for the Ministry of Religious Affairs (MoRA)’s religious schools. Having completed pilots successfully, MoRA has adopted the program and will  implement  it nationally  to 50,000 madrasahs  through  the Realizing Education’s Promise project implemented in 2020 to 2024, which is funded by the World Bank.  

Evaluating e‐RKAS

To assess the preliminary effects of  introducing different e‐RKAS applications on the role and behaviour of stakeholders,  as  well  as  challenges  experienced  during  implementation,  the World  Bank  conducted  an evaluation of the e‐RKAS program. The evaluation explored school perceptions of e‐RKAS, challenges faced, and  differences  in  education  outcomes  and  BOS  spending  experienced  caused  by  use  of  the  different applications. The initiatives evaluated include the pilot program implemented by MoEC and the World Bank and e‐RKAS applications implemented by local governments in eight districts.   The evaluation comprised various methodologies: 1) A review workshop on the e‐RKAS pilot implementation. 2) Qualitative evaluation undertaken through in‐depth interviews guided by questionnaires, conducted in a 

sample of 56  randomly selected schools,  including primary and secondary schools  in  four districts and senior high schools in three provinces. 

3) A quasi‐experimental research exercise undertaken to compare differences in education outcomes as the result of the different types of e‐RKAS implementation, using data collected in eight sample areas. 

 

Review Workshop Findings The workshop determined that benefits of the e‐RKAS training noted by districts/cities, education offices, and schools included: 1) Assisting districts/cities, particularly in the planning sector (Bappeda) and Local Income and Finance and 

Asset Management Unit (DP2KAD), to monitor planning, budgeting and use of education budgets. 2) Enabling  the  education  office  to  monitor,  evaluate,  and  supervise  school  planning,  budgeting,  and 

reporting on use of school funds and achievements of the NES for each school. 3) Supporting schools to  improve school planning and budgeting based on school quality scores, financial 

administration, reporting, achieving the targets of the NES, and focusing on achieving student  learning outcomes. 

 During  the  workshop,  problems  and  challenges  experienced  during  implementation  of  the  pilot  were identified. Challenges faced by Education Offices at districts and provinces included the following: (1) due to limited  financial capacity,  the Education Offices could not provide  servers, conduct  training at all  schools, provide  technical  assistance  during  school‐level  implementation,  conduct monitoring  and  evaluation,  or regularly edit  local prices  in  the  system within a  single year;  (2)  it was difficult  to  coordinate with Badan Pengelolaan Keuangan dan Aset Daerah (BPKAD) or Local Finance Office to set up and regularly update local prices used for goods and services; and (3) there is no mechanism to analyse the school NES score provided by the MoEC team and provide recommendations on how schools might improve their performance based on the scores.  Problems faced by schools included the following: (1) not all schools had the opportunity to participate in e‐RKAS training; (2) during the e‐RKAS training, not all schools had the NES score to use as the basis for school planning;  (3)  they  struggled  to  differentiate  between  activities  and  sub  activities;  (4)  they  experienced problems in constructing outputs and outcomes for activities; (5) they found it difficult to estimate the number of goods and services needed for each activity/sub activity in the expenditure plan; and (6) they had limited understanding about cash inflow and cash outflow management, as well as bookkeeping concepts.  

Page 7: Leading Schools Digitally: School Planning and Budgeting ...

 

6  

Interview Findings Interviews were conducted in schools in the five pilot areas as well as in DKI Jakarta province and Gunung Kidul district. They aimed to verify the availability of key planning documents, notably the Rencana Kerja Sekolah (RKS or school four‐year plan), Rencana Kerja Tahunan (RKT or annual school plan), Rencana Kegiatan dan Anggaran Sekolah (RKAS or school annual activity and budget plan), and the Evaluasi Diri Sekolah (EDS) or School Self‐Evaluation (SSE). They also reviewed the experience of schools in using the e‐RKAS application and the effect this had on school behaviors.   With respect to planning documents, the evaluation found that: • Most schools (92%) had developed an RKS, though only 80% were able to show evaluators the document. 

Where schools had developed an RKS, the principals felt that the document is important and should be produced and available. However, as schools perceived that there are no incentives to produce an RKS or consequences if there is not one, seven percent of the evaluated schools had not produced one. 

• Most schools evaluated (89%) had developed an RKT. Only 50% of schools indicated that they send the RKT to the relevant Education Office, so it appears that these Offices do not require schools to submit an RKT. Where it was received, the Education Office filed the RKT to monitor and review school planning. 

• All schools in the study indicated that they had developed an RKAS, but only 73% were able to produce the document when requested to do so. Thus, it appears that some schools struggle to administer school planning documents effectively. Only half of schools indicated that the school supervisor played a role in ensuring that RKAS activities would contribute to achieving the NES and  improving  learning quality. As with the RKS and RKT, it seems that school supervisor participation in the development of RKASs is not optimal. 

• All  sampled  schools had  completed  the  SSE, but only  a  small percentage use  it  as  a  reference when developing the RKAS. It seems that school see SSE as a separate document, not part of the whole system of planning and budgeting. 

• Most schools (62%) felt that SSE contains too many indicators while 38% indicated that the number was adequate. Generally, though, most schools felt that SSE is very useful.  

 With respect to implementation of e‐RKAS, the evaluation found the following: • More than half of the schools in the study (52%) had used an e‐RKAS application. • Most schools noted that using e‐RKAS made them more disciplined in terms of time, which was important 

because the system applies a structured schedule in the input process. However, some schools reported problems  keeping  to  the  schedule, either because of  connectivity problems or due  to  revision of  the application. 

• A local regulation on RKAS is important as a legal framework to require schools to develop the documents. However, some schools did not know local government had developed such regulations, which could be because dissemination of the regulation was weak or not effective. 

• Implementing  e‐RKAS:  improved  school  discipline  in  the  process  of  developing  the  RKAS  document (95.51%  of  sampled  schools);  made  it  easy  to  monitor  progress  (95.51%);  and  gave  schools  clear management guidance on using the budget (95.51%). Other improvements noted were that schools could define their priorities (93.26%) and determine the associated activities to implement (89.89%). 

 

Evaluating the impact of e‐RKAS on student achievement Additional analysis was undertaken to  identify the  impact of e‐RKAS  implementation on  learning outcomes and to determine whether the varying types of e‐RKAS application impacted  learning outcomes differently. The evaluation focused on availability and completeness of functions in the application. Because different e‐RKAS applications were used by local governments across different areas in Indonesia, the study’s hypothesis was that the more complete the application’s functionality, the more positive the effect would be on learning outcomes. Three groups were created to test this hypothesis, an  ‘advanced e‐RKAS’ group, an  ‘medium e‐RKAS’ group, and a control group. Analysis was conducted for the e‐RKAS applications implemented in eight 

Page 8: Leading Schools Digitally: School Planning and Budgeting ...

 

7  

sampled  areas,  namely,  DKI  Jakarta  province,  Bogor  city,  and  Bekasi  city,  Bogor  district,  Bekasi  district, Tangerang city, Tangerang district, and Depok city.   While e‐RKAS can make a positive contribution to  improved student achievement  in theory,  it  is not really possible to isolate use of e‐RKAS as the only variable that would drive changes in student achievement given numerous social, economic and educational factors that might also have an effect. These would include factors such  as  teacher  competency,  teaching  and  learning  strategies,  curriculum,  learning  assessment  systems, equipment and facilities, and supervision from government. To eliminate potential confounding variables, the difference‐in‐differences method,  or  interrupted  time  series, was  selected  as  the  empirical  identification strategy to disentangle changes in student achievements caused by the adoption of e‐RKAS.  As all the data for intermediate outcomes were not available to be analysed, the exercise focused on student learning results only. To analyse the impact of differences that e‐RKAS implementation has had on learning results, an econometric model was applied. The result of this analysis was that neither the advanced e‐RKAS nor the medium e‐RKAS had a significant impact on student achievement. For both treatment groups, there was no significant variation in shift in either the level of student achievement or annual changes in the trend. There were no notable differences on learning results between schools that applied the advanced e‐RKAS or medium e‐RKAS, when compared with those not using e‐RKAS. Having noted the various  limitations  in this exercise,  the  results produced  so  far do not provide  clear evidence  that adoption of e‐RKAS does  indeed improve student achievement as per our hypothesis. This should not, however, be taken imply that e‐RKAS definitively does not contribute to improving student achievement, but rather just that this first investigation does not provide supporting evidence for that hypothesis. 

Recommendations

Schools clearly perceive that the SSE instrument is useful for them to evaluate their performance, but there are too many indicators Likewise, the e‐RKAS application, in any forms, improves school discipline in planning processes. However, the role of school committees and school supervisor in these planning processes seems weak. Most participants in the pilot believed that using e‐RKAS would lead to more timely school development, greater ease in determining activities and setting priorities, more accurate budgeting, and more accountable and transparent financial reports that are also easier to create.  Based  on  the  experiences  of  these  pilots,  the  following  recommendations  are  offered  to  guide  further implementation:  1) Strengthen and simplify the SSE and e‐RKAS program and applications. SSE results are a key factor  in 

development of an RKAS as they are used as the basis for determining school activities to achieve the NES targets. Therefore, the SSE instrument needs to be revisited in terms of the number of the indicators and the measurement methods  to ensure  the validity of evaluation  results.  In  further developing  the SSE, indicators should be simpler reflecting the most important and relevant criteria. The MoEC ARKAS should incorporate functions to record SSE results and detailed activities to  improve NES performance, as well functions to analyze school NES achievements and Minimum Service Standard (MSS) results annually and in  four‐yearly  cycles.  The MoHA  SIPBOS  should  include  functions  to  capture  SSE  results,  school NES achievement results per year and four years, teacher and school principal performance, and MSS results so that MoHA can see the school performance as a whole.  

 2) Eliminate unnecessary duplication between systems. To avoid confusion and additional administration, 

District  Education Offices  (DEOs)  and  Provincial  Education Offices  (PEOs)  should  use  the  applications issued by MoEC and MoHA. It will also be beneficial to link the e‐RKAS to MoEC’s SSE application. Likewise, if MoEC and MoHA continue to implement both ARKAS and SIPBOS, these two applications should also be linked to prevent schools having to input the same data twice and to eliminate duplicate functionality.   

Page 9: Leading Schools Digitally: School Planning and Budgeting ...

 

8  

3) Training on the applications should be widely conducted and cover all schools. Training can be done efficiently through a cascade training system. At the central level, there should be a national team that will train provincial teams, which could in turn become trainers of district teams. District team would then train school  teams. Training  for schools should be  implemented by and under  the coordination of  the PEO/DEO. It could be financed by PEO/DEO or the school itself. Formative evaluations of training should be conducted by PEOs/DEOs, in collaboration with MoEC‐MoHA to assess school understanding of ARKAS and SIPBOS, challenges  faced, and recommendations  for  improving both applications. Regular capacity building is also needed for PEOs/DEOs on how to conduct their roles and functions in the development of school planning and budgeting. This should be conducted by MoHA in collaboration with MoEC to ensure that PEO/DEO staff are able to supervise schools effectively. Cascade training is needed to ensure that: there is affordable, continuous training and capacity development for schools; quality control takes place in the system; the e‐RKAS program can become sustainable in the long term; and government structures (especially PEOs and DEOs) can monitor school progress and performance. The cascade approach can also be  optimised  by  using  cluster‐based  approaches,  such  as  principal  and  teacher  working  groups,  to discussing implementation, challenges, and actions taken. To be successful, it should also be supported by provision  of  regular  technical  guidance  to  schools  by  the  relevant  education  office,  including  school supervisors.  

4) PEOs/DEOs should provide supporting facilities to  implement ARKAS and SIPBOS.  In  line with current trends of conducting business affairs online and to support implementation of e‐government, PEOs and DEOs should provide servers or cloud‐based hosting to store all school planning and budgeting data and to facilitate the operation of ARKAS and SIPBOS. PEOs/DEOs should also assign a team to review the status of NES and MSS measured through the SSE, school activities and budget plans, NES targets to be achieved, and  the  achieved  NES  and MSS  at  the  end  of  the  fiscal  year,  as well  as  the  involvement  of  school stakeholders in implementation of ARKAS/SIPBOS. Based on these reviews, they should provide schools recommendations and strategies to improve NES achievements and how this should translate into school plans and budgets. PEO/DEO reports analyzing school spending, school achievements, and recommended actions need to be shared with MoEC and MoHA annually as an attachment accompanying the proposed BOS allocations.   

5) Develop regulations at all levels to smooth the implementation of e‐RKAS. MoEC should explicitly state in the BOS manual that ARKAS should be used as a tool to develop the plans for BOS use. The guideline should specify the school stakeholders  that are required  to be  involved  in the development of ARKAS. MoEC  and MoHA  need  to  reinforce  the  implementation  of  the  circular  letters  in  the  field,  evaluate implementation, and use evaluation results to improve the circular letters. Both Ministries should apply mechanisms to incentivize schools to apply e‐RKAS. These might include: i) making implementation of e‐RKAS and  improved NES  achievement  indicators of  success  in a BOS performance  scheme;  ii) making implementation  of  e‐RKAS  one  of  the  requirements  for  receiving  the  BOS  affirmative;  and  iii)  not distributing  BOS  funds,  except  for  the  school  fixed  cost  component,  where  e‐RKAS  has  not  been implemented. Likewise, regulations at local government level are also needed. Finally, MoEC could make the ARKAS‐based BOS plans and reports produced by the application a requirement for BOS disbursement to ensure that all schools use the application. The planned school planning application will become an important mechanism  in BOS policy, enabling direct  transfer of  funds  from  the  centre  to  schools and providing a marketplace where schools spend BOS funding. The marketplace could usefully be integrated with the planning application electronically to become one integrated tool for school planning.  

 

 

Page 10: Leading Schools Digitally: School Planning and Budgeting ...

 

9  

Introduction

Background

About 53 percent of total government spending in Indonesia—excluding subsidies and interest payments—is conducted by subnational governments, with district governments managing about 38 percent and provincial governments the remaining 15 percent.2 There are 34 provinces and 514 districts in the country.  The government budget has more than doubled in real terms over the past 15 years (from 2003 to 2018) in tandem with economic growth, which has benefited all  sectors and particularly education. Growth of  the government budget, coupled with a constitutional mandate to allocate 20 percent of the budget to education, expanded education resources significantly. The overall education budget grew threefold in real terms during this 15‐year period, increasing to IDR 492.5 trillion (US$32.8 billion) in 2019.3   The education system under the Ministry of Education and Culture (MoEC) is highly decentralized. Most school costs under MoEC4 are covered by fiscal transfers from the centre to provincial and district  levels, some of which are earmarked for education use. One type of transfer is the school operational grant, known as Bantuan Operasional Sekolah (BOS) or school operational assistance. These are provided to all formal public and private schools on a per‐student basis.  BOS is transferred directly from the Ministry of Finance (MoF) to school accounts, public and private. In Law 23/2014, Special Needs Schools or Sekolah Luar Biasa (SLB), Senior Secondary Schools or Sekolah Menengah Atas  (SMA),  and  Senior  Secondary  Vocational  Schools  or  Sekolah  Menengah  Kejuruan  (SMK)  are  the responsibility of provincial governments, while Early Childhood Education Centers or Pendidikan Anak Usia Dini  (PAUD), Primary  Schools or  Sekolah Dasar  (SD),  and  Junior  Secondary  Schools or  Sekolah Menengah Pertama  (SMP) are the responsibility of district governments.  In Ministry of Home Affairs  (MoHA)5 circular letter No. 910/106/SJ/2017,  it  is stated that BOS funds received by public schools must be recorded  in the planning and budgeting document or Rencana Kegiatan dan Anggaran  (RKA) of District Education Offices (DEOs) and Provincial Education Offices (PEOs), while BOS spending must be recorded in DEO and PEO financial reports.  BOS  funds  also  must  be  included  in  the  district/provincial  Annual  Budget  Plan  or  Anggaran Pendapatan dan Belanja Daerah (APBD) and financial report.  According  to  the MoEC’s  BOS  Guidelines  for  Schools, 6  BOS  aims  to  increase  access  and  raise  education outcomes  through:  (1) direct  support  for  school operating  costs;  (2)  exemption of  tuition  fees  for public primary and junior secondary students; (3) easing the cost burden on public senior secondary students and private  school  students  in achieving quality education; and  (4)  financial assistance  for  children  from poor households. The BOS guidelines note that use of these funds should be aligned with school priorities and to accelerate achievement of the National Education Standard (NES).   BOS funds are managed directly by schools, which have been delegated the autonomy to receive, plan and budget, spend, administer, and report their use. BOS  is governed by  its own operations manual, which has been updated and improved annually since 2005. It has become the main source of school revenue, especially for public schools where it is mandatory to receive BOS funds. Public SDs and SMPs are not allowed to receive tuition  fees  from  parents,  other  than  voluntary  contributions.  SMAs  and  private  schools  (at  all  levels), 

 2 Indonesia Economic Quarterly, World Bank. 2017. Link: http://pubdocs.worldbank.org/en/657051513163708686/IEQ‐Dec‐2017‐ENG.pdf  3 All conversions of US dollars are made using the 2019 national budget assumption of IDR 15,000 per US$1.00.  4 One of MoEC responsibilities is formulating and establishing policies in the field of education at all levels from ECE, Basic and Secondary Education to Higher Education. 5 One of the responsibilities of MoHA is formulating, establishing policies for the local government in delivering services and for the local government development. 6 Permendikbud No. 1 Tahun 2018, Attachment, pp 10‐11. 

Page 11: Leading Schools Digitally: School Planning and Budgeting ...

 

10  

conversely, can charge tuition  fee to parents, even where they receive BOS funds. This  is because BOS  for SMAs and SMKs covers fewer than 50 percent of total costs. The tuition fee at private schools is typically used to pay honoraria to teachers and education personnel, as well as to improve school facilities.   An  Education  Public  Expenditure  Review  (PER)  conducted  by  the World  Bank  in  2016  showed  that  BOS spending has increased eightfold in nominal terms and nearly quadrupled in real terms over the last ten years (2015‐2016). It identified BOS overspending on honoraria (at 17 percent, exceeding the maximum threshold of 15 percent as set out in the guidelines) combined with under‐allocation of funds for teacher professional development (a low 5 percent) and support for poor students (a mere 2 percent). A World Bank review of the participation of school committees in overall school accountability7 conducted in 2016‐17 also showed that, because of the lack of clear guidance, school committees had virtually no opportunity to be involved in school planning, budgeting, and  implementation of  school activities nor  in  the evaluation of  school achievement through the School Self‐Evaluation (SSE).8   From the perspective of school‐based management, involvement of parents and community representatives is  crucial,  both  in  general  and  in  school  committees,  as  it  helps  to  ensure  that  school  planning  and implementation  activities  are  transparent,  accountable,  and  participative.  It  provides  communities opportunities to provide inputs on and review the development of school self‐evaluation processes, review the results, contribute to decision about key priorities, develop school plans, support activities that require additional funding, monitor implementation progress, and engage more deeply in learning processes. In this way, school management, including quality management, becomes not only the responsibility of the school team (teacher, principals, and other personnel), but also of parents and the community.  Experience has shown that many schools lack the capacity to use BOS funds effectively and efficiently to deliver better learning outcomes for students, while there have been no planning systems to manage use of BOS funds towards achieving the NES for individual schools. Under the BOS program, each school is required to conduct an  SSE  against  the eight  standards of NES  and use  the  results  to develop  its  spending plans  accordingly. However, most schools develop the SSE only when required to fulfil accreditation requirements. There has been no systematic review on the implementation and impacts of the SSE across schools. Thus, the only way to obtain data on school progress towards the eight standards  is through the school accreditation process, which  is only conducted  in a sample of schools every  five years. There  is also no  intensive monitoring and evaluation of how schools spend BOS funds.   Link between the SSE and NES  were documented in a study conducted by the World Bank (2018),9 which used a randomized control trial to evaluate the introduction of an SSE system in DKI Jakarta intended to improve planning and use of school operations funds to support achievement of the NES. The intervention included a non‐monetary  incentive  performance  contract  between  50  randomly  selected  schools  and  district government. The study found that overall, on an aggregate measurement which averaged performance across the  eight  standards,  no  significant  impact was measured  from  having  a  performance  contract with  the government of DKI Jakarta. However, when looking at the subcomponents that make up the NES, the study found some differences between schools that signed a performance contract and those that did not. As there was one full cycle of school budget planning and  implementation  in the evaluation period, this  limited the validity of the study findings, but the paper provided some insights into NES achievements and the schools’ approaches to this. Having limited evidence on these issues, this report of e‐RKAS evaluation will significantly give input on the future development of performance‐based planning and budgeting in school level.  

 7 Review of Community Participation on School Autonomy and Accountability (World Bank, December 2016 – July 2017). 8 The MoEC SSE instruments can be found here: https://pmp.dikdasmen.kemdikbud.go.id/assets/files/unduhan/2019/02‐perangkat‐instrumen‐2019‐jenjang‐smp.pdf  9 Tazeen Fasih, Unika Shrestha, Santoso, Wisno Harto Adi Wijoyo, Performance Contracts for Schools in DKI Jakarta – early results from an experiment, The World Bank, 2018.  

Page 12: Leading Schools Digitally: School Planning and Budgeting ...

 

11  

The Theory of Change Behind e‐RKAS

Although BOS constitutes only approximately 10% of total education budget, it is the main direct income for public school and small private schools. Thus, school‐level decisions about how to spend BOS and other school resources can make a major contribution to the quality of  learning. Every school has also been advised to develop a planning and budgeting system (Rencana Kegiatan dan Anggaran Sekolah or RKAS) to allocate and manage BOS  funds. The World Bank  review of BOS  in 2016  revealed  that  some  schools develop an RKAS annually, while others simply copy the previous year’s data. Further, where they are developed, the RKAS is typically not based on the school’s SSE results, which means that it is not systematically aligned with the eight NESs. Finally, since government fiscal year (FY) 2017, MoHA, as the institution supervising local government expenditure, requires that BOS expenditure be reported in three categories: (i) investment; (ii) payments; and (iii) goods and services. Unfortunately, the RKAS and its reports had still not been classified into these three categories by FY 2019. BOS  is provided  in the form of a block grant, while schools report BOS expenditure based on 11 eligible expenditure components.   The concept of performance‐based planning and budgeting was  introduced to ensure that schools use the RKAS  to  improve  their performance. The RKAS  functions as a  school  strategic planning  instrument.  It  lists activities that will be implemented in a fiscal year and is thus an important reference for a school to ensure that activities will support learning processes and lead to performance achievements that meet the NES. The idea is to link the SSE to the eight areas of the NES, identify NES targets at the school, and plan activities to achieve these targets. In 2016, the education quality assurance body of the Directorate General of Basic and Secondary Education, MoEC developed and issued an electronic SSE tool called Penjaminan Mutu Pendidikan (PMP or education quality assurance system). The output of the PMP is a school quality report that describes school achievements against each indicator of the NES. Using this tool, individual schools can set NES targets for the following year, based on the score of the existing SSE, and then translate the NES targets into activities and accompanying budget line items in the RKAS. At the end of the year, the SSE is conducted again to verify whether the targets were achieved.  Most schools manage SSE and RKAS manually, while some do not develop it or simply copy RKAS data from previous years or from other schools. Further, manual systems make it difficult for education authorities to verify that performance‐based planning and budgeting has taken place and to review its quality. To solve these problems,  the  concept  of  an  application  called  the  Rencana  Kegiatan  dan  Anggaran  Sekolah  Berbasis Elektronik (e‐RKAS or electronic school plan) was developed. This tool enables schools to input and manage the RKAS electronically, which is more efficient as it can report in real time on expenditure, while also providing a systematic structure to link activities and expenditure, in line with a performance‐based planning approach. The idea of e‐RKAS was to enable schools to develop, store, and manage school plans, as well as to monitor implementation  of  school  activities.  It  would  also  increase  transparency  and  accountability  in  financial management  at  the  school  level  as  information  captured online  can be monitored by  the district or  city education office, provincial education office, and the central government (Ministry of Education).   Thus, in summary, the e‐RKAS application was expected to improve the quality and frequency of proper school budgeting that aligns BOS allocations with school‐level strategies to achieve the NES and thereby improve their SSE scores. In parallel, online access to information would increase the transparency of school BOS budgeting and enable  local government both  to verify and  review  schools’ achievements  in  this  regard. The e‐RKAS theory of change then assumes that budget allocations that are better aligned with achieving the NES will improve the quality of the school across the eight standards, which should in turn lead to improvement of the performance,  and  especially  educational  results of  the  school over  time.  This  theory of  change  assumes, therefore that the standards defined in the NES were selected with improvement in educational performance as a key criterion. It can be summarized as follows: 

Page 13: Leading Schools Digitally: School Planning and Budgeting ...

 

12  

Table 1 E‐RKAS Theory of Change 

Problem  Intervention  Output  Intermediate outcomes 

Outcomes 

Schools are not allocating BOS funds purposefully to achieve NES, with negative effects on overall quality and performance 

Introduce e‐RKAS and link its use with SSE Make e‐RKAS data available online to district and provincial governments to ensure its use 

• Schools produce school plans on time every year 

• Schools use e‐RKAS to determine spending priorities, aligned with NES and intended to improve SSE scores 

• Education office and supervisor are able review and monitor school progress in use of e‐RKAS 

• School spending is more efficient and effective 

• School budgets and annual plans are geared towards attainment of NES 

• Implementation of school plans leads to improved SSE scores over time 

• School spending is more transparent and accountable 

• School attainment NES improves, leading to improved educational quality and better learning results 

 Thus,  it was anticipated that adoption of e‐RKAS could be expected to  lead to changes  in the  intermediate outcomes and ultimate outcome through multiple mechanisms. First, the school planning function of e‐RKAS enables schools to use the SSE to identify and prioritize areas to focus on for continuous improvement, while engaging school  leaders, school committee members, teachers, and parents  in school planning by allowing them to propose their needs for the following year. Second, since schools are required to align spending with their planning and e‐RKAS would provide government officials at different levels real‐time access to the budget and the expenditure to monitor use of school resources, the system is expected to help schools to improve fiscal  responsibility,  budget  discipline,  transparency,  and  accountability.  Third,  the  inputs  of  schools  are synchronized in the system, improving the accuracy of national, provincial, and district‐level budgeting. Fourth, the system eliminates the burden of creating reports manually or inputting the same data in different systems for reporting purposes. Fifth, the prices and calculations are built  into the system, which helps to minimize human errors and improve the accuracy of budgetary data. Given this, use of e‐RKAS has potential to improve the transparency and accuracy of budgetary planning, increase efficiency of resource allocation and enhance the collaboration of stakeholders  in this process. All these  immediate outcomes  in school management are expected to lead to better student achievement.  Analysis of reports on the use of BOS funds in eight districts/cities shows that the highest percentage of BOS funds  is spent on  library development  (14%), school management  (15.8%), payment of honoraria  (14.5%), extracurricular  activities  (14.1%),  and  maintenance  of  facilities  and  infrastructure  (11.7%).  Meanwhile, spending on professional development of teachers and education personnel is very low (3.2%),10 which may help to explain the lack of impact of BOS Funds on student learning outcomes. Because schools are not using e‐RKAS,  they  do  not make  a  link  between  school  planning  and  school  quality  scores,  increased  focusing primarily on activities that do not have a direct correlation with improved student learning outcomes. By using the e‐RKAS application, which links school quality improvement with school planning and budgeting, schools should hopefully become more targeted in use of BOS funds, focusing on activities that have a direct effect on student learning outcomes (for example, increasing budget allocations for teacher and education personnel professional development).  

 10 MOEC Report on BOS Spending 2018 and 2019. 

Page 14: Leading Schools Digitally: School Planning and Budgeting ...

 

13  

Figure 1 summarizes a more detailed theory of change on the impact of e‐RKAS on student achievement.   Figure 1 Theory of change on the impact of e‐RKAS on student achievement 

                          There is some evidence that implementation of site‐based budgeting programs led to, at the very least,  

increased awareness of  the budget‐making process on  the part of  teachers and parents.11 A quantitative analysis of data on the relationship of performance‐based budgeting and student achievement reveals that performance‐based budgeting has a positive correlation to student achievement, although this correlation is not  considered  statistically  significant.  In  addition,  a  Center  on  Educational  Policy  report  confirmed  that student achievement has increased (and the achievement gap has decreased) since the enactment of the No Children Left Behind program and its many interconnected policies and programs, one of which appears to be more focused budgeting methods and practices that aim to increase achievement.12 The Performance Driven Budgeting (PDB) implementation variable had positive and statistically significant effects on grade four reading and  math  scores  and  grade  five  reading  scores.  Schools  that  implemented  PDB  in  1997‐1998  showed standardized test scores higher by approximately .06 than non‐implementing schools. Small positive impacts found when the effect of both planning and implementing for the PDB schools was tested jointly.13 

History of e‐RKAS Implementation

A first version of the e‐RKAS was created by the Education Office in Surabaya, East Java, to simplify the approval process of school plans and budgets. Using this online application, the Head of Education Office at Surabaya 

 11 Michele Moser, "School‐based Budgeting: Increasing Influence and Information at the School Level in Rochester, New York," Journal of Education Finance 23, no. 4(1998): 507‐53 1. 12 School District Budgeting and Student Achievement, Scott Alan Burckbuchler, SCHOOL BUSINESS AFFAIRS, MAY 2009 . 13 School Budgeting and School Performance: The lmpact of New York City's Performance Driven Budgeting Initiative, Leanna Stiefel, Amy Ellen Schwartz, Carole Portas, and Dae Yeop Kim, Journal of Education Finance 28 (Winter 2003), 403‐424. 

Function  Working Mechanism  Intermediate 

Outcome Outcomes 

School 

planning 

Performance‐based planning: Schools use school self‐ 

evaluation (SSE) to identify and prioritize area to improve 

Stakeholder engagement: school leaders, school 

committee, teachers and parents are engaged in school 

planning by proposing their needs for the following year 

Fiscal responsibility and budget discipline: Schools are 

required to spend on their planning 

Transparency and Monitoring: DEO, provinces and central 

government have on‐time access to the budget and the 

expenditure to monitor the use of school resources 

Informed budgeting for BOS and BOP: Improve the 

accuracy of national, provincial and district‐level budgeting 

through synchronization 

Reduction of repetitive labor: The system eliminates the 

burden of creating reports manually or inputting the same 

data in a separate software for reporting purpose 

Accuracy of data: The prices and calculations are built in 

the system in order to minimize human errorrs 

Budgeting 

Financing 

Reporting 

Assets 

management 

and 

inventories 

Transparency: 

Audit findings 

Efficiency of 

resource 

allocation: 

School 

performance 

Collaboration: 

Teacher 

disposition/ 

satisfaction 

Student 

Achievement 

Page 15: Leading Schools Digitally: School Planning and Budgeting ...

 

14  

could monitor, analyse, and approve  the RKAS and  reports directly through  the application. Following this deployment, in 2015 to 2016, the e‐RKAS application was further developed and introduced to all schools in DKI  Jakarta, with  support  from  the World Bank. After observing  implementation  in Surabaya city and DKI province, MoEC showed interest in implementing the e‐RKAS program more widely.   Consequently, in 2017, through the Pillar 2 ID‐TEMAN Trust Fund financed by the Australian Department of Foreign Affairs and Trade (DFAT), the World Bank and MoEC piloted the e‐RKAS program for schools in Bali province, Central Java province, Gorontalo district, Sidenreng Rappang (Sidrap) district, and Mojokerto city. The piloting aimed to test the adequacy of the tool to accommodate schools’ needs in planning and to identify challenges in use of the system. Follow up communication from MoEC indicated that the government plans to implement  e‐RKAS  nationwide  because  the  pilot  activities  supported  by  the World  Bank  have  provided evidence  that  use  of  e‐RKAS  improves  government  planning  and  efforts  to  develop  electronic  tools  and systems  for  school  planning.  Use  of  e‐RKAS  by  schools  has  gained  political  support  in  the  House  of Representatives and is recommended to be implemented immediately at schools and at all education levels in Indonesia, because the Government allocated funds for education are very large (comprising 20% of the total state budget). In this context, an evaluation of the e‐RKAS piloting and the system is strategically important to provide information and insights into how a nationwide e‐RKAS should be developed and applied.  In  2018, MoEC  tried  to  replicate  the World  Bank  e‐RKAS  system  using  a  system  that  requires  internet connectivity for use but realized that many schools have no access to the internet. Consequently, Gunung Kidul district in Yogyakarta province developed a partly online RKAS tool called the MoEC Aplikasi RKAS (ARKAS). The application is an offline tool that can be downloaded from the Education Office website and used by public and private schools, in areas with low or no internet connectivity. Each Education Office at district level has a server used to store school data. MoEC used the ARKAS application to track school expenditures against the eight NESs. In 2018, ARKAS was piloted in 105 schools in nine districts from eight provinces, providing training to the participating districts (which were in turn expected to be responsible for training other schools in 2019).   In addition to the above, since 2015, other electronic school planning and budgeting applications have been developed by district or province education offices. Typically, applications developed by districts have  the same  basic  functions:  planning  use  of  BOS  and  Bantuan  Operasional  Sekolah  Daerah  (BOSDA  or  local government  BOS)  funds;  reporting  use  of  funds  against  budgets;  asset  management;  and  financial administration (bookkeeping). There are two broad kinds of applications developed by districts: 1. A  complete  menu  of  options,  including  planning  and  budgeting,  financial  administration,  budget 

realization, and reporting (with ledger and sub‐ledger, bank, cash, tax, and settlement reports). This type of application has been implemented in three districts (DKI Jakarta, Kota Bogor, and Kota Bekasi). 

2. An application with only planning and reporting functions. This application has been implemented in five districts (Bogor district, Bekasi district, Tangerang city, Tangerang district, and Depok city). 

 Although  these  districts  have  their  own  application which  their  schools  use  to  report  their  RKAS  to  the district/province, these schools are also expected to develop an RKAS report using ARKAS and upload this to the MoEC BOS Website. ARKAS reporting is a requirement to receive the national BOS.  Most districts/cities have separated the roles of the school and Education Office in using the application. In Bekasi City, for example, schools input activities into the application while the Education Office conducts online verification and approval.  In Tangerang District and Tangerang City, schools develop a school plan using an offline system and submit  this  to  the PEO/DEO  for verification and approval.  In Bekasi District,  the school inputs data  into  the application, while  the  regional Tim Perencanaan dan Anggaran  (TPA or Planning and Budget Team) approves school plans. The TPA team is formed by the Regent and includes personnel from the local Finance Office (Dinas Pendapatan Pengelolaan Keuangan dan Aset Daerah or DP2KAD), local Planning Office (Bappeda), and the Regional Secretary. The PEO/DEO does not have access to the application, but, if it 

Page 16: Leading Schools Digitally: School Planning and Budgeting ...

 

15  

wants to see the recapitulation of the school planning and reporting of BOS  funds, these can be accessed through the District Communication and Information Office.  

Development of a MoHA System In August 2018, when conducting ARKAS  training within  the  identified provinces, MoEC shared  the ARKAS system with MoHA to introduce it and explain its functionality. However, MoHA observed that the ARKAS did not link to the asset management system, local account codes, district information system, or existing audit systems and requested review and improvement of ARKAS to rectify these issues. In 2019, MoEC improved the ARKAS by providing reporting facilities required by MoHA and scaled it up nationally through the issuance of a circular (SE No. 4313/D/PR/2019 dated 10 April 2019), with districts and provinces advising schools to implement ARKAS. MoEC trained 52 districts in 29 provinces in support of this rollout. The remaining districts used their own school planning and budgeting applications while awaiting further instruction from MoEC and MoHA on the application to be used. In February 2020, MoEC announced that, in FY 2020, all schools should implement ARKAS to manage school BOS funds.   In March 2019, MoHA introduced a fully online application called Sistem Informasi Pengelolaan BOS (SIPBOS or BOS management information system), which focuses on planning, monitoring, and expenditure reporting of  school BOS  funds. MoHA  considers  this  system  to be a  refinement of ARKAS as  it has more  complete electronic management and administrative systems for BOS, from school level to district/province level. It has more a comprehensive  reporting system,  including asset management  reports and  reports based on  local account codes, while  it also  links with district  information systems and audit systems. SIPBOS  is managed centrally by MoHA and data is stored on the MoHA Cloud Server. On April 30, 2020, MoHA issued a Ministerial Regulation No. 24/2020 on BOS Management for Local Government, which became effective on May 14, 2020. Consequently, from June 2020, schools are required to do double data entry, for both ARKAS and SIPBOS.   

Deployment by the Ministry of Religious Affairs In 2018, the World Bank Team also implemented a school planning and budgeting application for the Ministry of Religious Affairs (MoRA)’s religious schools. Through the Pillar 2 ID‐TEMAN Trust Fund financed by DFAT, the Bank  team  provided  technical  advice  and  support  for  implementation of MoRA’s  Elektronik  Rencana Kegiatan Anggaran Madrasah (e‐RKAM or performance‐based school budgeting) in 30 madrasahs, 20 public and 10 private, in Jombang District. Following this, the MoRA office in East Java used its own funds to train all 38 districts in the province on use of e‐RKAM involving 6,219 madrasahs in total.   In 2019, another 460 madrasahs in Jombang district have used e‐RKAM to develop BOS plans and budgets for FY 2020. In 2019, MoRA, using its own funds and with technical support from a World Bank Team, trained 120 core teams at central office and 34 provinces on use of e‐RKAM. A provincial team from nine provinces (Aceh, South  Sulawesi, Central  Java, East  Java, West Kalimantan, Bali, Papua, West Papua, and Banten)  joined a central team as trainers  in delivering training on e‐RKAM to 2,000 madrasahs within those nine provinces. Having completed these pilots successfully, MoRA has adopted the program and will implement it nationally to 50,000 madrasahs through the Realizing Education’s Promise project implemented in 2020 to 2024, which is funded by the World Bank. In phase one of this project in 2020, MoRA plans to train approximately 17,000 madrasahs on use of e‐RKAM. MoRA’s e‐RKAM also includes its own SSE, called Evaluasi Diri Madrasah (EDM), which also uses the NES as a basis for planning and budgeting, as well as for setting targets to be achieved. Phase one madrasahs will  implement EDM and e‐RKAM  in year 2020, while those  in Phase 2 and 3 will be trained in 2021 and 2022 respectively. 

Research Methodology

To assess the preliminary effects of introduction of different e‐RKAS applications on the role and behaviour of stakeholders,  as  well  as  challenges  experienced  during  implementation,  the World  Bank  conducted  an evaluation of the e‐RKAS program, the results of which are presented in this report.  

Page 17: Leading Schools Digitally: School Planning and Budgeting ...

 

16  

 The  first evaluation explored school perceptions of e‐RKAS, challenges  faced, and differences  in education outcomes and BOS spending experienced caused by use of the different applications. The initiatives evaluated include the pilot program implemented by MoEC and the World Bank in five areas. This evaluation consisted of two phases, an evaluation of e‐RKAS implementation and a qualitative evaluation.   The second was evaluation of the e‐RKAS applications  implemented by local governments  in eight districts. Three types of applications were developed by districts: online, offline‐online, and offline.   1) Online applications are those that can be used directly by schools to input activities for the use of BOS and 

BOSDA funds, while the Education Office conducts monitoring, verification, and approval for all schools. This type of this application was  implemented  in four Districts (DKI Jakarta province, Bogor City, Bogor District, and Bekasi City). The application names are e‐RKAS (DKI), SIRKAS SIREAL (Bogor City), SIRKAS SIBOS (Bogor District) and SIMBOS (Bekasi City). 

 2) Partly online (offline‐online) applications are those that can only be used by the Education Office, not by 

schools.  For  this  application,  schools  developed  their  activities manually  (creating  a  digital  file  and  a printed document) and send the documents to PEO/DEO, after which the PEO/DEO teams will input data from all schools. This application is connected to the Regional Management Information System or Sistem Informasi Manajemen Daerah (SIMDA), so that local government can monitor and evaluated use of BOS and BOSDA funds by schools. This type of application was implemented in three Districts. The application names are SIMDA (Bekasi District), SPEKTRA (Tangerang City), and SIMRAL (Tangerang District). 

 3) Offline applications are those that are developed as an MS Excel spreadsheet. In this type of application, 

schools input their activities into the spreadsheet and submit it to the Education Office in both digital and printed formats, after which are aggregated and analyzed by the Education Office for all schools. This type of application was implemented in one district (Depok City).   

Evaluation of the e‐RKAS Pilot

Evaluation of the e‐RKAS Pilot comprised two steps, an evaluation of the e‐RKAS  implementation progress after schools attending the training and interviews conducted after school implementing the e‐RKAS in school.   As has been described  in  the  Introduction,  the World Bank and MoEC conducted a pilot of e‐RKAS  in  five selected areas, comprising three districts (Mojokerto, Gorontalo, and Sidrap) and two provinces (Central Java and Bali).  The  objective  of  the  pilot  was  to  test  implementation  of  e‐RKAS  at  the  school  level  to  determine  its applicability, identify problems in implementation, and collect inputs from schools, districts, and provinces on how  to  improve  the  system.  The pilot project  team developed  an e‐RKAS  application  to  assist  schools  in preparing plans and budgets based on school quality report cards, set NES targets to be achieved for continued improvement,  identify  activities  to  be  implemented  next  year,  and  develop  a  budget  using  local  price standards. The e‐RKAS application also provides functions to manage the school monthly cash spending, to manage school assets, as well as to provide necessary financial reports. The e‐RKAS structure is shown in Figure 2 below.   

Page 18: Leading Schools Digitally: School Planning and Budgeting ...

 

17  

Figure 2 e‐RKAS Structure: illustrative example 

Input Structure: School inputs activities and budget in the system 

 

 

Note: Included in the components are local prices for each component. 

 

Planning and Reporting Output: School prints or saves outputs of e‐RKAM 

 

 

 

 

 

 

 

 

 

 

 

 

Output: 8 National 

Standards Output: 3 types of 

expenditure 

Output: BOS type of 

expenditure 

1.  Content 

2.  Infrastructure 

3.  Competency of 

graduates 

4. Financing 

5. Education & 

educational 

Personnel 

6.Management 

7. Education 

evaluation 

8.Process 

1.Personnel 

Expenditure 

2.Good and 

services 

expenditure 

3.  Capital 

expenditure 

1. Library development  

2. Stationaries 

3.Power and services 

4. Enrolment activities 

5. Learning & 

extracurricular 

6. Evaluation 

7. School management 

8. Teacher and staff 

development 

9. School maintenance 

10. Teacher fees 

11. Learning tools 

12. others 

Output: RKAS & Monthly 

Expenditure Plan 

RKAS: List of 

school activities 

and budget in a 

year. 

Monthly 

Expenditure 

Plan: monthly 

disbursement 

plan based on 

RKAS. 

Page 19: Leading Schools Digitally: School Planning and Budgeting ...

 

18  

Asset Report. School report for all asset they own, updated annually 

            

The pilot started with coordination meetings at central level, which included MoEC representatives from the Secretariat  General  of  Basic  Education,  Directorate  of  Junior  Education,  Directorate  of  Primary  School, Directorate of Senior Education, and Directorate of Vocational Education. The meetings, which  took place between  March  and  September  2017,  introduced  and  reviewed  the  e‐RKAS  program  and  application, explained the link between e‐RKAS and SSE results in the Rapor Mutu produced by the MoEC PMP team, and identified the provinces and districts that would participate in the pilot.   Following this, the World Bank team held a workshop with stakeholders at central and local levels in October 2017, which included representatives from MoEC, the PMP team, the heads of relevant DEOs/PEOs, and heads of relevant District and Provincial Financial Offices. During  the workshop, the World Bank and MoEC  team introduced  the e‐RKAS program, presented plans  to conduct pilots  in  the  field, and asked participants  for technical  and  policy  support  for  pilots.  The  local  government  team  promised  to  complete  necessary preparations for implementation of the pilot.  The e‐RKAS pilot commenced with workshops involving district and province officials in the five targeted areas. During the workshops, the Bank‐MoEC team, including PMP representatives, met relevant officials at district and  province  level  from  the  Education  and  Finance Offices,  as well  as  five  representatives  from primary schools,  junior  secondary  schools,  primary madrasahs,  and  junior  secondary madrasahs.  The  number  of participants  in each district/province  ranged between 28 and 50. The central  team  introduced  the e‐RKAS program,  detailed  pilot  plan,  outlined  required  assistance  from  the  local  team,  and  requested  their involvement in the pilot. Workshops were held between December 2017 and February 2018. The participating district/province teams received the pilot well and provided necessary assistance.   After the workshops with province and district teams, Training of Trainers (ToT) was undertaken from May to June 2018 to introduce the e‐RKAS program to district and province technical teams and train them in use of the application. Through the ToT, DEO, and PEO teams were expected to be able to assist schools in e‐RKAS deployment, provide necessary guidance, monitor  implementation, and evaluate  school achievement and performance against  the NES. All  trained  schools were guided  to develop  school plans  for BOS and other funding sources for the following fiscal year using the e‐RKAS program. The trained teams were expected to then be able to train other schools in their region in use of the e‐RKAS program.   TOT participants comprised the PEO/DEO officials, Office Heads, Heads of Basic Education Divisions, Heads of Planning  Divisions,  Budgeting  Operators,  District/Provincial  Financial  officials,  and  the  provincial  quality assurance  institutions.  Also  included were  school  teams,  comprising  the  principal,  treasurer,  and  school operator of 25 selected school per district/province,  the school operator being  the person  responsible  for inputting school data into the Data Pokok Pendidikan (Dapodik or Education Main Database). A breakdown of participants is presented in Table 2 below.  

Input school Asset 

1. Asset name 

2. Specification 

3. amount 

4. date of 

procurement 

5. condition 

School Asset Report Asset reconciliation 

at district level 

1. Asset name 

2. Specification 

3. amount 

4. date of 

procurement 

5. condition 

1. Asset name 

2. Specification 

3. amount 

4. date of 

procurement 

5. condition 

Page 20: Leading Schools Digitally: School Planning and Budgeting ...

 

19  

Table 2 List of ToT Activities implemented in the pilot areas 

No  Pilot Area  Participants  Workshop  TOT 

1  Sidrap district  District team 15 primary school  10 junior (jr) secondary school  

Dec 19‐21, 2017  May 30‐June 1, 

2018  

2  Mojokerto city  District team 15 primary school  10 jr secondary school 

Jan 23‐25, 2018  May 22‐24, 2018 

3  Gorontalo district  District team 15 primary school  10 jr secondary school 

Jan 9‐11, 2018  May 14‐16, 2018 

4  Bali Province  Province team  10 senior secondary (sr) school  10 sr secondary vocational  5 special needs school  

Feb 5‐7, 2018  May 3‐5, 2018 

5  Central Java Province  Province team  10 senior secondary school  10 sr secondary vocational  5 special needs school 

Jan 16‐18, 2018  May 7‐9, 2018 

 

ToT included detailed training materials as follows: A. Introduction of e‐RKAS program: 

Explained the concept of performance‐based planning and reporting of school achievements against the eight national education standards, including targets categorized as outputs as well as outcomes. 

Explained how to operate the e‐RKAS system and functions in the application – such as dashboard, references, incomes, expenditure, realization, reporting. 

Introduced the e‐RKAS website. 

Explained how to input activities and budget in the system, including programs under the School Unit and the eight National Education Standards, detailed activities categorized under Activity and Sub Activity, and budget items (goods and services) under component, account codes, and volume.  

 B. Practise use of e‐RKAS system and application: 

Created  login and password using  the Nomor  Induk Pegawai  (NIP)  for each  school principal and operator. 

Provided principal logins and password. School principals had responsibility to decide on activities in each national standard based on results of the SSE, while the school operator  is required to input detailed activities, good and services needed to conduct the activities, and prices. 

Linked and used quality report (the report of school achievement on eight national standards and indicators) to define school challenges and select priorities of school activities in coming year. 

 C. Developed e‐RKAS for each school: 

Created budget plan: revenue, activities to be done for 1 year, and Anggaran Kas Bulanan (AKB) or monthly cash planning that will also show monthly expenditure. 

Provided an exercise for schools to follow the bookkeeping process step by step. including to input cash inflow and outflow, create a balance, and note transactions, as well as to document tax.  

Developed a document of actual expenditure in the system.   After the ToT, at the request of DEO and PEO officials, the Bank Team provided technical assistance (TA) while the trained schools disseminated e‐RKAS to other schools within the region. Three districts requested support from  central  team  assistants:  Gorontalo  district,  Sidrap  district,  and Mojokerto municipality,  which  was 

Page 21: Leading Schools Digitally: School Planning and Budgeting ...

 

20  

provided between May to July 2018. TA provided included guidance in filling out the application step by step, inputting activities into the application, and solve technical and other substantive problems.   

Evaluation of e‐RKAS Pilot with stakeholders A review workshop on the e‐RKAS pilot implementation was held in Jakarta in August 2018. The objectives of the workshop were to review progress  in using e‐RKAS to develop RKAS 2019, share constraints, problems, and  challenges  experienced,  and  discuss  follow‐up  plans  at  both  school  and  education  office  levels.  The workshop was organized by  the Bank‐MoEC  team and attended by  representatives  from DEOs, PEOs, and District Finance Offices  related  to planning and budgeting. During  the workshop, problems and challenges experienced during the implementation of the pilot were identified. For example, the central government in encouraging provinces and districts  to  implement  the e‐RKAS program, while  financial constraints made  it difficult to provide a large server to host e‐RKAS within the ministry, and prevented the delivery of training to more schools and education offices to ensure that all schools would use the system.  

Phase 2: Interviews

Beyond  the  review workshop outlined  above,  a qualitative  evaluation was undertaken, where data were collected through in‐depth interviews guided by questionnaires, between October 2018 and February 2019. A sample of 56 schools was randomly selected,  including primary and secondary schools  in four districts and senior high schools  in three provinces. Eight schools were selected from each district/province, comprising four  elementary  and  four  junior  secondary  schools  at  district  level  and  four  senior  secondary  and  four vocational senior secondary schools at provincial level. The sample was selected from the list of schools that participated in training during the pilot to ensure that sampled schools had experience  in using the e‐RKAS application. For the non‐pilot areas, DKI Jakarta and Gunung Kidul, the sample was selected randomly from the school population. The detailed sample of schools was as follow:  Table 3 Participating schools in e‐RKAS interviews 

  Study Areas  School  Total 

No  SD/SMP  SMA/SMK 

    Small  Large  Small  Large 

1  Gorontalo  4  4      8 

2  Sidrap  4  4      8 

3  Mojokerto  4  4      8 

4  Gunung Kidul  4  4      8 

5  Bali      4  4  8 

6  DKI Jakarta      4  4  8 

7  Central Java      4  4  8 

  Total          56 

Notes: SD = primary school; SMP = junior secondary school; SMA =senior secondary school; SMK = sr. secondary vocational school 

 In each school, there were three respondents: the school principal, a treasurer, and the operator.  The evaluation aimed to verify the availability of key planning documents, notably the Rencana Kerja Sekolah (RKS or school four‐year plan), Rencana Kerja Tahunan (RKT or annual school plan), RKAS, and the SSE (also known as the Evaluasi Diri Sekolah or EDS).  It also reviewed the experience of schools  in using the e‐RKAS application  and  the  effect  this  had  on  school  behaviors.  The  evaluation  also  explored  the  successes  and challenges of the process of scaling up the e‐RKAS system and explored what models for delivering assistance might have the best results in terms of uptake and use. 

Page 22: Leading Schools Digitally: School Planning and Budgeting ...

 

21  

Quasi‐experimental Impact Evaluation

To deepen understanding of  the effects of e‐RKAS  implementation,  the evaluation program used a quasi‐experimental method to compare differences in education outcomes as the result of the different types of e‐RKAS  implementation. Data were collected  in eight sample areas covering DKI Jakarta province, Bogor city, Bogor  district,  Bekasi municipality,  Bekasi  district,  Tangerang municipality,  Tangerang  district,  and Depok municipality from September to December 2019. Data were collected through interviews with planning and budgeting officials  in  the  target districts and provinces,  study of documentations, and analysing DAPODIK (MoEC main education data). Data was then analysed using inferential statistics and descriptive analyses. The exercise focused on junior secondary education because reliable student achievement (learning results) data are not available for primary schools, while senior secondary schools are managed at the province level rather than by the district.   The objective of the analysis was to  identify  the  impact of e‐RKAS  implementation on  learning results and attempt  to  determine  whether  the  varying  types  of  e‐RKAS  application  impacted  learning  outcomes differently. The evaluation focused on availability and completeness of functions in the application. Because different e‐RKAS applications were used across different areas in Indonesia, as outlined in the previous section, there were different tools with varying functions including school planning, budgeting, financing, reporting, and asset management and inventories. The study’s hypothesis was that the more complete the application’s functionality, the more positive the effect would be on learning results (as summarized in the Theory of Change presented in Figure 1).  

Key Findings

Feedback from the review workshop with Stakeholders

Challenges  faced by Education Offices at districts and provinces  included  the  following:  (1) due  to  limited financial capacity,  the PEO and DEO could not provide servers, conduct  training at all schools, provide TA during school‐level implementation, conduct monitoring and evaluation, or regularly edit  local prices in the system within a  single year;  (2)  it was difficult  to coordinate with Badan Pengelolaan Keuangan dan Aset Daerah (BPKAD) to set up and regularly update  local prices used for goods and services (components); and (3) there is no mechanism to analyse the school NES score (school quality report) provided by the MoEC PMP team and provide recommendations on how schools might improve their performance based on the scores.  Problems faced by schools included the following: (1) not all schools had the opportunity to participate in e‐RKAS training; (2) during the e‐RKAS training, not all schools had the NES score to use as the basis for school planning;  (3)  they  struggled  to  differentiate  between  activities  and  sub  activities;  (4)  they  experienced problems in constructing outputs and outcomes for activities; (5) they found it difficult to estimate the number of goods and services needed for each activity/sub activity in the expenditure plan; and (6) they had limited understanding about cash  inflow and cash outflow management, as well as bookkeeping concepts such as creating balances, note transactions and tax documents.  

Feedback on Planning Documents

Education  Minister  Decree  (Permediknas)  No.  19/2007  requires  schools  to  develop  several  planning documents, namely: the RKS, which needs to be developed once every four years; the RKT, which lists activities for the year derived from the RKS; and the RKAS, which presents detailed activities and a budget for the period.  Most schools (92.45%) had developed an RKS, though only 80% were able to show evaluators the document. Typically, the RKS is developed at the beginning of the four‐year period of as school principal and functions as a reference guide for school management to determine the direction of school development. Where schools had  developed  an  RKS,  the  principals  felt  that  the  document  is  important  and  should  be  produced  and 

Page 23: Leading Schools Digitally: School Planning and Budgeting ...

 

22  

available. They  felt  that  it provides school management  (particularly principals) a vision  for managing and developing the schools, guides development of schools’ yearly plans (RKAS), and ensures that school plans and budgets can be made available whenever requested by a supervisor or auditor. However, as schools observed that there are no financial incentives to produce an RKS or consequences if there is not one (in other words, that BOS funds are allocated regardless of whether or not the RKS is produced), seven percent of the evaluated schools had not produced one.   Where an RKS had been developed, principals  (100%),  teachers  (83.84%),  treasurers  (90.91%),  the  school committee (76.77%), and school supervisors (64.65%) made up the core team responsible for its development. However, not many schools (only 16%) involved the Education Office in developing the document. It seems that Education Office officials generally do not engage with school planning processes. The RKS was signed by the principal, while some were also signed by the school committee. In a small number of schools, supervisors and the education office also signed it.  The process to develop an RKS is as follow:  Figure 3 RKS development process 

  

       

Establish the team to develop RKS 

Review and analysis the previous RKS on the achievement and challenges, the result of SSE, and school environment  

Each of member of the team propose ideas, then the team develop draft of each component of RKS.  

Discuss the draft of RKS to school stakeholders (teachers, education staffs, school committee, supervisors 

Agree on the contents and legalize the RKS document. 

 The RKT records activities that will be conducted during a given school year and is derived from the RKS. The RKT provides  the primary  reference  for schools  to develop  their RKAS. Most  schools evaluated  (89%) had developed an RKT. This indicates that most, but not all, schools perceive the document to be important.   The process to develop an RKT is as follow:  Figure 4 RKT development process 

  

       

Review the previous RKT and conduct the SSE. 

Develop draft of RKT. Discuss the draft with school stakeholders. 

Discuss the activities list with stakeholders and identify priorities. 

Share the content by school supervisor for review and receive feedback.  

Agree and legalize the RKT document. 

 The school team that develops the RKT includes the school principal (93.8%), teacher (93.9%), treasurer (80%), and school committee (85.4%). Only half of public schools (49.4%) indicated that the school supervisor was involved  in  its development, again suggesting  that school supervisors are often not  intensively  involved  in planning development, but rather in reviewing teaching‐learning processes.   Only 50% of schools indicated that they send the RKT to the relevant Education Office, so it appears that these Offices do not require schools to submit an RKT. Where it was received, the Education Office filed the RKT to monitor and review school planning.  

Page 24: Leading Schools Digitally: School Planning and Budgeting ...

 

23  

All schools in the study indicated that they had developed an RKAS, but only 73% were able to produce the document when requested to do so. Thus, it appears that some schools struggle to administer school planning documents effectively. For example, at some schools, the document  is stored on a personal laptop and the person was not available when the interview took place.  The process of developing the RKAS is as follow:  Figure 5 RKAS development process 

  

       

Constitute team and discuss the activities to be implemented in the year. 

Discuss and draft the goods and services required and the budget needed. 

Develop draft RKAS. Input into RKAS application if available. 

Review the draft and discuss with the Education Office. 

Approve and Legalize the RKAS. 

 Typically, the principal and school committee had signed the RKAS document, but only half of school indicated that the Education Office had signed it. A signature from the Education Office is not an obligation but helps to ensure that their attention is given to the school’s planning. Education Office should ideally monitor schools as they develop their RKAS and supervise how schools use their budget and manage activities.  Only half of schools indicated that the school supervisor played a role in ensuring that RKAS activities would contribute to achieving the NES and improving learning quality. As with the RKS and RKT, it seems that school supervisor participation in the development of RKASs is not optimal. Around 95% of schools send the RKAS to the Education Office. Reasons given for submission were that: it is a requirement for BOS disbursement (16%); submitted as a monitoring and evaluation document (66%); for filing (9%); and to comply with the regulation (91%). Where schools did not send the RKAS to the Education Office, this was because they believed that there is not a regulation which requires this and they perceived that RKAS is a school document that anybody who wants  to  check  can  review at  the  school  itself. According  to  schools,  the  role of Education Offices  in  the development of RKAS are to: 1) train schools on RKAS development (75%); 2) manage the schedule of RKAS input (67%); and 3) review RKAS document (75%).   All sampled schools had completed the SSE, using either the  instrument developed by PMP or  instruments developed by local government. The main reasons schools identified for conducting the SSE were to: use it as a  basis  for  planning  and  budgeting  (32%);  understand  school  conditions  (18%);  and  to  identify  school achievement on the NES (27%). Thus, as can be seen, although all schools interviewed stated that they develop an SSE, only a small percentage use it as a reference when developing the RKAS. It seems that school see SSE as a separate document, not part of the whole system of planning and budgeting.   Stakeholders participating  in  teams  responsible  for SSE development  included: principals  (100%),  teachers (100%),  treasurer  (100%),  school  committee  (86%),  supervisor  (54%),  and  students  (61%).  As with  other planning documents, involvement of school supervisors in the SSE is minimal.   In 2017, MoEC  introduced PMP as a quality assurance  instrument  to  replace  the various SSE  instruments applied by districts. All schools are required to complete the PMP electronically. The instrument consists of many indicators and needs to be completed by the school principal, teacher, student, and school committee. The instrument for the school principal, for example, contains 120 indicators and 163 sub‐indicators, while the instrument for teacher includes 104 indicators and 143 sub‐indicators. Half of the instrument is automatically completed using Dapodik data, while the other half is completed by a school stakeholder team. According to interview  data,  90%  of  schools  indicated  that  the  quality  assurance  instruments  reflect  actual  school achievement, while about 10% felt it did not, as can be seen from Figure 6 below.  

Page 25: Leading Schools Digitally: School Planning and Budgeting ...

 

24  

Figure 6 Extent to which schools perceive that SSE represents school achievement 

 Most schools (62%) felt that SSE contains too many indicators while 38% indicated that the number was adequate. Generally, though, most schools felt that SSE is very useful.   Figure 7 School perceptions on number of indicators of SSE instrument  

  Figure 8 School perceptions on the usefulness of SSE as an instrument  

  At a district level, only DKI has a link to the PMP Application, while the seven do not. Those districts that do not have a link to the PMP application conduct an assessment, through SSE, to measure NES achievement at the end of each year. The NES score is assessed by the school principal and supervisor and then verified by the Education Office.   

32.14%

57.14%

9.52%

1.19%

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

Totally reflect Quite reflect Less reflect Not reflect

61.54%

38.46%

0%0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

too many enough Less

62.82%

34.62%

2.56%

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

very useful useful not really

Page 26: Leading Schools Digitally: School Planning and Budgeting ...

 

25  

The Education Office and Quality Assurance Unit use the results of SSE collected from schools. However, the study showed that there are variations regarding the involvement of both institutions, as presented in Figure 9. In Bali, Gorontalo, West Java, Central Java, and South Sulawesi, the role of the Lembaga Penjaminan Mutu Pendidikan (LPMP or Education Quality Assurance Institution) based in the province is typically more dominant than that of the Education Office (with the exception of Yogyakarta, where the Education Office plays a greater role than the LPMP.  Figure 9  Institution responsible for managing the result of SSE 

 

Implementation of e‐RKAS

More than half of the schools in the study (52%) had used the e‐RKAS application. During the period when the study was conducted, various e‐RKAS applications were being tested and implemented in the field, including an application developed by the World Bank, one developed by MoEC, and tools developed by local Education Offices. In the pilot districts and provinces, only Bali and Sidrap were still using the World Bank version of e‐RKAS, while MoEC version was being used mostly in Sidrap (in addition to the World Bank tool) and parts of Gunung Kidul and Gorontalo. DKI Jakarta, Gunung Kidul, and Mojokerto were using a tool developed by the Education Office. The DKI Jakarta tool was based on a World Bank e‐RKAS application piloted in 2015‐2016, which  it had  improved by  linking e‐RKAS  reporting with  an online  reporting  system used  in  the Province Finance Office. Only a limited number of schools were using an e‐RKAS application because there many e‐RKAS tools were introduced at the same time, leading to confusion at local education offices and schools regarding which one needed  to be  implemented. Consequently,  some DEOs, PEOs  and  schools decided  to wait  for authorities to determination which application should be used. In some cases, schools did not engage with an e‐RKAS application due to their lack of understanding of how to use it.  Table 4 e‐RKAS applications in use in sampled schools 

  As can be seen from the above table, most sampled schools used tools developed by the Education Office. DKI Jakarta  and Gunung  Kidul were  not  included  in  the  five  areas  of  the World Bank  pilot, while Mojokerto 

66.67% 66.67%

0%

37.50%

75%

16.67%

80%75%

41.67%

25%

75%

100%

25%

100%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Bali DIYogyakarta

DKI Jakarta Gorontalo JawaTengah

Jawa Timur Sulawesi

Education Office LPMP (Quality Assurance Unit)

Bali Gunung Kidul DKI Jakarta Gorontalo Mojokerto Sidrap Total

The World Bank 2 0 0 0 0 2 4

MoEC 0 1 0 1 0 6 8

Both 0 0 0 0 0 6 6

Edu Office 1 14 5 0 6 0 26

Page 27: Leading Schools Digitally: School Planning and Budgeting ...

 

26  

observed, during the training period, that it had developed its own tool. Some schools involved in the World Bank pilot training (12 out of 56) indicated that they no longer use the e‐RKAS application and have instead reverted to using manual tools (in MS Excel).  All pilot areas indicated that they had attended the World Bank team’s e‐RKAS training, including schools in DKI Jakarta, while only one school in Bali and one in Sidrap stated that they had received training from MoEC. Gunung Kidul, DKI Jakarta, and Mojokerto education office also conduct e‐RKAS training to schools.   Table 5 e‐RKAS training received by schools  

  Most schools noted that using e‐RKAS made them more disciplined  in terms of time, which was  important because  the  system  applies  a  structured  schedule  in  the  input process. However,  some  schools  reported problems  keeping  to  the  schedule,  either  because  of  connectivity  problems  or  due  to  revision  of  the application.   A local regulation on RKAS is important as a legal framework to require schools to develop the documents. DKI Jakarta Province has issued a regulation on e‐RKAS, while some schools in Bali and Gunung Kidul indicated that they believed the local government has such a regulation. Gorontalo, Central Java, Mojokerto, and Sidrap did not, however, produce such a regulation.  In schools that did not know  local government had developed a regulation where it did exist, this could be because dissemination of the regulation was weak or not effective.   Table 6 Existence of regulations on e‐RKAS 

  It was anticipated that implementation of e‐RKAS would change school management behavior in various ways. The e‐RKAS application was developed to help schools to manage its activities and budgets and to enable them to  improve  accountability  and  quality.  Interview  findings  suggested  that  implementing  e‐RKAS:  improved school discipline in the process of developing the RKAS document (95.6%); made it easy to monitor progress (95.51%); and gave schools clear management guidance on using the budget (95.6%). Other  improvements noted were  that  schools  could define  their priorities  (93.26%)  and determine  the  associated  activities  to implement (89.9%).  Table 7 Reported benefits of using e‐RKAS 

No  Changes in School Behavior  % 

1  Define priorities  93.3% 

2  Determine associated activities to implement  89.9% 

3  Improved school discipline in developing the RKAS document  95.5% 

4  Made it easy to monitor progress  95.5% 

5  Gave schools clear management guidance on using the budget  95.5% 

6  Schools could record transactions easily  85.2% 

7  Made it easy to develop reports  84.1% 

Bali Gunung Kidul DKI Jakarta Gorontalo Central Java Mojokerto Sidrap Total

The World Bank 10 0 4 5 6 6 9 34

Both 2 0 0 0 0 0 6 6

MoEC 1 0 0 0 0 0 1 2

Edu Office 1 15 12 2 0 7 0 37

Bali Gunung Kidul DKI Jakarta Gorontalo Central Java Mojokerto Sidrap Total

Yes 4 4 11 0 0 1 0 20

No 10 11 4 6 6 14 16 67

Page 28: Leading Schools Digitally: School Planning and Budgeting ...

 

27  

Impact of e‐RKAS on student achievement

E‐RKAS applications have five possible functions, each with their own working mechanisms: school planning, budgeting, financing, reporting, and asset management. Together, these are expected to make schools more transparent,  more  efficient  in  resources  allocation,  and  better  in  collaboration  with  school  staff  (the intermediate outcomes). School transparency can be assessed  in the result of audits. Efficiency of resource allocation  can  be measured  in  school  performance,  one  indicator  of which  is  achievements  in  the  NES. Collaboration can be measured through teacher disposition or satisfaction, which might be seen in the results of teacher competency tests, teacher performance assessments, or simply even levels of teacher absenteeism. The outcome, student achievement, can be measured in learning results.    While e‐RKAS can make a positive contribution to  improved student achievement  in theory,  it  is not really possible to isolate use of e‐RKAS as the only variable that would drive changes in student achievement given numerous social, economic and educational factors that might also have an effect. These would include factors such  as  teacher  competency,  teaching  and  learning  strategies,  curriculum,  learning  assessment  systems, equipment and facilities, and supervision from government. It can also be anticipated that use of e‐RKAS might not yield  immediate  improvements  (say, within one year of use) as  it  is  likely that there would be a delay between initial use and evidence of effects.  For example, in terms of school resources, as is illustrated in Figure 10, the average student‐teacher ratio, the number of  laboratories,  libraries, and classrooms per school all reverse their trend  in 2017, the same time period when districts gradually transferred to the e‐RKAS system. It is difficult to know how these might have influenced learning achievements as much as, if not more than, implementation of e‐RKAS (or the extent to which implementation of e‐RKAS might have contributed to these trends).  Figure 10 Changes in school resources (2015‐2018) 

  

Page 29: Leading Schools Digitally: School Planning and Budgeting ...

 

28  

To eliminate potential confounding variables, the difference‐in‐differences method, or interrupted time series, was selected as the empirical identification strategy to disentangle changes in student achievements caused by the adoption of e‐RKAS. The difference‐in‐differences method can be used to determine the causal effect of  e‐RKAS,  because  e‐RKAS  was  implemented  at  a  specific  moment  (to  generate  the  before‐and‐after difference) and a group of schools was identified to serve as a control group. According to this method, student achievement trends before and after the e‐RKAS implementation timeframe for the control group represents the impact of all the other economic, social and educational factors on student achievement in the absence of e‐RKAS (as is illustrated in Figure 11). Therefore, deviations in the treatment group from that of the control group could be considered the impact of e‐RKAS.   Figure 11 The logic of difference‐in‐differences  

  While the  logic of the difference‐in‐differences method  is  intuitive and simple, there are several difficulties when applying it to measure the impact of e‐RKAS on learning achievements in the Indonesian context. First, as revealed in the qualitive interviews, the treatment schools to be evaluated are varied as many applications of the electronic school planning and budgeting system were adopted by school districts and provinces. All these applications may differ in terms of available functions, user‐friendliness, and technical support provided, and therefore may have had different impacts on student achievement. If the treatment group is assumed to be homogenous, impact might be obscured as the impact of effective applications is reduced by ineffective ones.   This problem was  resolved by  specifying  the  characteristics of  the different e‐RKAS applications and  then grouping  those  systems with  similar  characteristics  into different  treatment groups. With  the help of  the district  education  officials,  the  e‐RKAS  applications  were  classified  according  to  four  dimensions.  Each dimension is characterized by the functions embedded in the application, input mechanisms, administration structure, and the role of the DEO. These dimensions are expected to be predictive of the impact of e‐RKAS.   Based on these four dimensions, interviews were conducted with the district officials of eight districts in and around  the  capital  area  to  collect  information  on  the  characteristics  of  their  e‐RKAS  systems  between November 2019 and February 2020. These eight school districts were selected due to their proximity to the researchers given tight timelines for data collection. They were Bogor district, Bogor city, DKI Jakarta province, Bekasi city, Bekasi district, Tangerang city, Tangerang district, and Depok city.  As has been outlined above, the planning and budgeting tools used in the eight districts in the sample reflect a  considerable  variation  in  e‐RKAS  functions  across  districts,  ranging  from  online  applications  to  offline systems. Based on the self‐reported characteristics of different district e‐RKAS applications, the eight school districts were categorized into three groups.  

Page 30: Leading Schools Digitally: School Planning and Budgeting ...

 

29  

1) Bogor  district,  Bogor  city,  and  DKI  Jakarta  used  e‐RKAS  applications  that  allow  schools  to  create  a budgetary plan, record financial transitions, generate budgetary reports and conduct asset management in  the  system.  All  their  applications  are maintained  online  and  can  be  integrated with  other  school management  software  or  applications.  Therefore,  these  school  districts  were  classified  as  the  first treatment group, namely, ‘advanced e‐RKAS’.  

2) The e‐RKAS applications used by Bekasi city, Bekasi district, Tangerang city and Tangerang district do not provide  all  the  functions  as  the  ‘advanced  e‐RKAS’,  some  are maintained  offline  and  none  can  be integrated with other school management software or applications. Therefore, these four districts were classified as the second treatment group, called ‘medium e‐RKAS’.  

3) Depok city is still using an Excel version file for budget planning and could thus serve as the control group.  The characteristics of e‐RKAS of the eight school districts in the same are summarized in Appendix 4.  In addition to difficulties  in  identifying the treatment groups, challenges were encountered collecting data related to the ultimate and intermediate outcomes. The ultimate outcome, namely student achievement, is measured by the Ujian Nasional  (UN or National Examination). Students  in  junior secondary education are tested annually in Bahasa Indonesia, English, Mathematics, and Science.   Figure 12 shows the average UN scores of students for these four subjects in the eight school districts from 2013 to 2018. The district average is a weighted average of average school scores, with weights proportional to the number of students served by the schools. The test scores were also weighted by the integrity index when it was available in the dataset (i.e. the 2018 test scores).   Figure 12 Average UN scores in Bahasa Indonesia, English, Mathematics and Science) of the sample schools 

per district (2013‐2018) 

  As can be seen, this indicates a declining trend in UN test scores from 2013 to 2018, a pattern which applies to each of the four subjects when disaggregated (see Appendix 5 for details). This is partially because the UN test moved from a paper‐based test to a computer‐based test in 2018. To check the extent to which the trend in UN test scores captures a general decline of student achievement given the change in test administration, the UN test scores of Bahasa Indonesia, Mathematics, and Science from 2013 to 2018 were compared with the Programme for International Student Assessment (PISA) test scores in Reading, Mathematics, and Science from 2012 to 2018. Figure 13 shows that trends in UN scores align quite well with PISA score trends for each of the three subjects, indicating a high criterion‐validity for the UN test despite the change in the method of test administration.  

Page 31: Leading Schools Digitally: School Planning and Budgeting ...

 

30  

Figure 13 Comparison of PISA test scores (2012‐2018) and UN test scores (2013‐2018) 

 In addition to student achievement, this process would  ideally aim to test whether e‐RKAS  implementation has a positive impact on intermediate outcomes to understand the mechanisms through which adoption of e‐RKAS could affect the ultimate outcome. These  intermediate outcomes  include transparency of the budget planning process, measured by reduction of budgetary errors revealed during auditing; efficiency of school resource allocation, measured by  school performance  indicators; and  the  collaboration of  stakeholders  in budget planning processes, measured by teacher satisfaction or disposition.   Unfortunately, the data on any of these intermediate outcomes could not be collected. Table 7 below outlines challenges that made this difficult. For example, schools are audited once every five years, it was not possible to create a time series of audit findings before and after the year in which e‐RKAS was implemented. The only available  longitudinal  measure  of  the  intermediate  outcomes  were  the  school  performance  indicators collected  through  the SSE by  the MoEC PMP  team. However,  these self‐reported data do not show much variation over time. The school performance indicators are also collected through the accreditation process. Although more objective than the self‐reported data, the accreditation results are only available when a school is accredited every five years, making it impossible to create a time series that spans the year in which e‐RKAS was implemented.  Table 8 Sources of data for intermediate outcomes and challenges in collection 

Outcome of interest  Source of data  Potential Challenges 

Reduction in budgetary errors (e.g. number of errors found during auditing, 

Audit Findings  Only available when a school is audited, so it is not possible to create a time series of the audit 

Page 32: Leading Schools Digitally: School Planning and Budgeting ...

 

31  

Outcome of interest  Source of data  Potential Challenges 

discrepancy between the correct number and the submitted number 

findings before and after the year in which e‐RKAS was implemented 

School performance indicators that are supposed to be affected by e‐RKAS 

School Self Evaluation 

Available each year but self‐reported 

Accreditation result  More objective than school self‐evaluation but only available when a school is accredited (once every five year), so it is not possible to create a time series of accreditation result before and after the year in which e‐RKAS was implemented 

Teacher satisfaction/disposition   Not available  NA 

 The third challenge is that student achievement of the three groups does not seem to be paralleled before the adoption of e‐RKAS, as indicated in Figure 12. Unlike most diff‐in‐diffs studies, we were not able to check the assumption of paralleled pre‐treatment trends until we completed data collection on the characteristics of e‐RKAS systems used by the eight districts in the sample, as identification of the treatment arms is built upon the characteristics. Given  this  situation, we chose  to control  the pre‐treatment  trend  in  the  regression by allowing each treatment group to have a different slope of change.   While  acknowledging  the methodological  challenges  explained  above,  the  following model was  used  to estimate the causal impact that e‐RKAS implementation has had on learning results:   

 where 𝑌  is the UN average test scores for district d in year t; 𝑌𝐸𝐴𝑅  is the trend variable that is defined as the year of the test minus 2012 so that it starts with a value of 1 in 2013. 𝑃𝑜𝑠𝑡_𝑒𝑅𝐾𝐴𝑆  is a dummy variable that equals to 1 for observations starting one year after the year that an e‐RKAS system was established in this district, assuming that e‐RKAS started to impact the student achievement in the second year; 0 otherwise. In our sample, three districts started to use e‐RKAS in 2016, three districts in 2017, and one district in 2015. We centered the starting point by creating the variable 𝑌𝑅_𝑆𝐼𝑁𝐶𝐸_𝑒𝑅𝐾𝐴𝑆 , which is defined as the year of the test minus the year in which e‐RKAS was used, so that this variable takes on a value of 1 for the second year when e‐RKAS was used, 2 for the third year when e‐RKAS was used; years before e‐RKAS was used is coded as 0. 𝜇  represents the district fixed effect that captures the time‐invariant characteristics of each school district. Ƹ  is the stochastic error term that has a mean of 0 and a standard deviation of 1. 𝑇  represents two dummies to  indicate whether  a  district  adopts  the  “advanced  e‐RKAS”  or  the  “medium  e‐RKAS”  respectively.  The reference group is the control group that does not use e‐RKAS.   Acknowledging that the three groups do not have the same trend of change, we added a term of 𝑌𝐸𝐴𝑅  to capture the average time trend and an  interaction term between 𝑌𝐸𝐴𝑅  and the treatment dummies (i.e., 𝑇 𝑌𝐸𝐴𝑅 ) to reflect the deviation from the average time trend for each treatment group. In this regression, 𝛽  is the change in the level of student achievement induced by a specific treatment (i.e., the change in the intercept), while 𝛽  is the annual change of the trend of student achievement induced by a specific treatment (i.e., the change in the slope). For example, the impact of “advanced e‐RKAS” on student achievement in the second year that e‐RKAS is used is  𝛽 𝛽  for the dummy of “advanced e‐RKAS”, and that in the fifth year that e‐RKAS is used is 𝛽 4𝛽  for the dummy of “advanced e‐RKAS”.   We applied the econometric model to the longitudinal dataset of the eight districts from 2013 to 2018, as can be seen in Table 9 below.  

𝑌 𝛽 𝛽 𝑌𝐸𝐴𝑅 𝛽 𝑃𝑜𝑠𝑡_𝑒𝑅𝐾𝐴𝑆 𝛽 𝑌𝑅_𝑆𝐼𝑁𝐶𝐸_𝑒𝑅𝐾𝐴𝑆 𝛽 𝑇 𝑌𝐸𝐴𝑅 ) 

𝛽 𝑇 𝑃𝑜𝑠𝑡_𝑒𝑅𝐾𝐴𝑆 )   𝛽 𝑇 𝑌𝑅_𝑆𝐼𝑁𝐶𝐸_𝑒𝑅𝐾𝐴𝑆 )  𝜇   Ƹ  

Page 33: Leading Schools Digitally: School Planning and Budgeting ...

 

32  

As all  the data  for  intermediate outcomes were not available  to be analysed,  the exercise  focused on  the  outcome  only.  To  analyse  the  impact  of  differences  that  e‐RKAS  implementation  has  had  on  learning outcomes, an econometric model was applied. The dependent variable is the learning outcome as represented by examination scores (UN score). The independent variables were the type of e‐RKAS implemented: advanced e‐RKAS and medium e‐RKAS, with e‐RKAS not implemented as the control variable. The detailed econometric model is presented in Appendix 6.  We applied the econometric model to the longitudinal dataset of the eight districts from 2013 to 2018, as can be seen in Table 8 below.   Table 9 Estimated effects of e‐RKAS on UN average scores 

Independent  Implications Estimate of the coefficient (Dependent: UN average 

scores) 

𝑌𝐸𝐴𝑅   Linear year trend ‐1.15 (1.32) 

𝑃𝑜𝑠𝑡_𝑒𝑅𝐾𝐴𝑆  Shift before and after the e‐RKAS independent of the treatments 

‐4.92 (3.47) 

𝑌𝑅_𝑆𝐼𝑁𝐶𝐸_𝑒𝑅𝐾𝐴𝑆   Linear year trend for post‐e‐RKAS years only ‐4.05** (1.35) 

𝑇 𝑌𝐸𝐴𝑅  Linear year trend for the districts with advanced e‐RKAS 

1.79 (1.77) 

𝑇 𝑌𝐸𝐴𝑅   Linear year trend for the districts with medium e‐RKAS 0.24 (1.75) 

𝑇 𝑃𝑜𝑠𝑡_𝑒𝑅𝐾𝐴𝑆  Change in the level of student achievement induced by advanced e‐RKAS 

(Dropped due to multicollinearity) 

𝑇 𝑃𝑜𝑠𝑡_𝑒𝑅𝐾𝐴𝑆  Change in the level of student achievement induced by medium e‐RKAS 

5.06 (7.58) 

𝑇𝑌𝑅_𝑆𝐼𝑁𝐶𝐸_𝑒𝑅𝐾𝐴𝑆  

Annual change of the trend of student achievement induced by advanced e‐RKAS 

(Dropped due to multicollinearity) 

𝑇𝑌𝑅_𝑆𝐼𝑁𝐶𝐸_𝑒𝑅𝐾𝐴𝑆  

Annual change of the trend of student achievement induced by medium e‐RKAS 

0.00 (4.49) 

School district fixed effect    Yes 

N    48 Note. The standard errors reported in the parenthesis are the Newey‐West standard errors to address the autocorrelation of time series data. *** p <‐ 0.01, ** p < 0.05, * p <0.01.  

 The result of this analysis was that neither the advanced e‐RKAS nor the medium e‐RKAS had a significant impact on student achievement. For both treatment groups, there was no significant variation in shift in either the  level of  student  achievement or  annual  changes  in  the  trend.  There were  no notable differences on learning outcomes between schools that applied the advanced e‐RKAS or medium e‐RKAS, when compared with those not using e‐RKAS. Having noted the various limitations in this exercise, the results produced so far do not provide clear evidence that adoption of e‐RKAS does indeed improve student achievement as per our hypothesis. This  should not, however, be  taken as an  implication  imply  that e‐RKAS definitively does not contribute to  improving student achievement, but  rather  just  that  this  first  investigation does not provide supporting evidence for that hypothesis.  The absence of a noticeable difference in learning outcomes may be for various reasons. First, as stated above, the potential impact of e‐RKAS may be obscured by a general declining trend in UN test scores caused by the change of the test administration method occurring in the same period when e‐RKAS was being introduced. As was shown in Table 8, this trend is captured by the significantly negative coefficient of 𝑌𝑅_𝑆𝐼𝑁𝐶𝐸_𝑒𝑅𝐾𝐴𝑆 , 

which indicates the linear year trend in the post‐e‐RKAS period. Second, in terms of organizational change, it is very  likely  that  the  impact of e‐RKAS on student achievement would not be  fully  felt  immediately after 

Page 34: Leading Schools Digitally: School Planning and Budgeting ...

 

33  

implementation, as it can take some years for school districts/provinces and DEOs/PEOs to improve practices. Third,  the  results may  also be  a  function of  the  small  sample  size of 48  schools.  Fourth,  the  absence of measurable NES targets to be achieved in school plans may also be a contributing factor explaining the absence of any correlation between implementation of e‐RKAS and improved learning result. Fifth, the prioritization of school expenditure mostly on school maintenance and  low prioritization school quality  improvement could explain the absence of link between e‐RKAS and learning results. 

Conclusion and Recommendations

Based on evaluation of the e‐RKAS pilot implemented by the World Bank, the ARKAS implemented by MoEC, and the online planning and budgeting systems developed by local governments, several conclusions can be drawn.   Schools clearly perceive that the SSE instrument is useful for them to evaluate their performance, but there are too many indicators Likewise, the e‐RKAS application, in any forms, improves school discipline in planning processes. However, the role of school committees and school supervisor in these planning processes seems weak.  The World Bank e‐RKAS, which was  introduced one year before  the evaluation, was  intended  to  improve school  capacity  to  develop  activities  and  budget  plans  of  school  resources  based  on  their  existing  NES achievements and  to decide NES  targets  to be achieved annually and over  four years using a  fully online system, the objective being to enable schools to plan their use of funding efficiently and effectively to achieve targeted improvements. Most participants in the pilot believed that using e‐RKAS would lead to more timely school development, greater ease  in determining activities and setting priorities, more accurate budgeting, and more accountable and transparent financial reports that are also easier to create.   MoEC’s partly online ARKAS and MoHA’s online SIPBOS programs  focused on how the school, district, and province  teams plan, manage, administer, and  report BOS  funds correctly using an electronic system. The systems aimed to ensure good governance in managing BOS funds. Both applications emphasized that the BOS plan should support the acceleration of achieving NES by the school. The local governments school planning and budgeting systems were used to systematically link school BOS planning and budgeting with the Education Office and Finance Office at district/province  level. The system aimed to feed the  local government SIMDA with information related to school planning and budgeting, as well as reporting.   Thus,  the World Bank e‐RKAS  intended  to  improve  school capacity  to plan and develop budgets, monitor implementation, and  report  results as a  strategy  to  register  improvements  in  the NES. MoEC, and MoHA applications aimed to  improve good governance  in managing BOS, while  local government school planning and budgeting systems were intended to enable systematic information‐sharing of school plans with education offices and other offices at district/province level.  The functions of these different applications also varied. The WB e‐RKAS consisted of very detailed functions providing  information on SSE results,  lists of outputs and outcomes  related  to NES  to be achieved,  lists of programs  and  activities  to  improve  each  standard,  activities  and  budget  plans  based  on  the  local  price standards, monthly cash spending plans, and financial reports based on BOS components, MoHA’s three main categories, and  the eight NES  standards. The MoEC ARKAS  incorporated  functions on activity and budget planning, as well as  financial  reports based on  the  three  core  classifications, BOS  components, and eight national standards. The MoHA SIPBOS contained the same functions as ARKAS, but with more comprehensive reporting  functions.  The  Bogor  district  application  included  a  cashless  purchasing  system  and  asset management system, while the DKI Jakarta province e‐RKAS application linked to the MoEC SSE application. Thus, different systems, had different strengths and limitations.  

Page 35: Leading Schools Digitally: School Planning and Budgeting ...

 

34  

The only schools that have the human capacity to operate e‐RKAS, ARKAS, and/or partly and fully online school planning and budgeting systems were those involved in the World Bank e‐RKAS pilot, ARKAS training, and local government systems  training. Most districts/provinces had  limited  financial capacity  to  train other schools within the areas to use the application. Likewise, districts/ provinces had limited financial capacity to provide the required server infrastructure to store e‐RKAS data and provide internet connectivity (except big provinces like DKI  Jakarta). Financial constraints also  limited  the provision of  technical assistance  to schools. Lack of directions and guidelines meant that the district/province did not analyze school NES achievements or provide recommendations on how to improve school planning and budgeting for better school performance.   Before MoEC  and MoHA  issued  the  circular  letter  on  ARKAS/SIPBOS,  the  school  planning  documents  as required  in  Permendiknas  19/2007 were  not  developed  by  all  schools, while  not  all  schools  submitted  a detailed  school  plan  to  the  PEO/DEO.  The  PEO/DEO  only  signed  50  percent  of  submitted  school  plans, indicating  that a  school plan verification  system at PEO/DEO did not exist. Given  the  two  circular  letters, schools,  districts,  and  province  now  have  a  legal  requirement  to  develop  school  plans  accordingly  and regularly. MoHA circular letters, in particular, are usually considered a regulation for local governments. The regulations  issued by the Governor and the Head of DEO and PEO  in DKI Jakarta province also contributed significantly  to  institutionalizing  the use of e‐RKAS  for  school planning and budgeting development  in  the province.   Based  on  the  experiences  of  these  pilots,  the  following  recommendations  are  offered  to  guide  further implementation:  1) Strengthen and simplify the SSE and e‐RKAS program and applications. SSE results are a key factor  in 

development of an RKAS as they are used as the basis for determining school activities to achieve the NES targets. Therefore, the SSE instrument needs to be revisited in terms of the number of the indicators and the measurement methods to ensure the validity of the evaluation results. In further developing the SSE, indicators should be simpler reflecting the most important and relevant criteria. For example, in the MoRA e‐RKAS application, there are only five main SSE indicators: 1) school actors are disciplined in delivering their tasks; 2) teachers and education personnel attend professional development; 3) learning assessment is applied correctly; 4) teachers and students have access to and use full sets of learning materials; and 5) the school  is planning and budgeting for BOS  in efficient and accountable ways. MoEC and MoHA have agreed  to  improve  their  applications  so  that  they  can  be  used  by  the  school,  district,  and  province effectively and both applications can produce data and  information needed  for education quality and resource management improvement. The MoEC ARKAS should incorporate functions to record SSE results and detailed activities to improve NES performance, as well functions to analyze school NES achievements and Minimum Service Standard (MSS) results annually and in four‐yearly cycles. The MoHA SIPBOS should include functions to capture SSE results, school NES achievement results per year and four years, teacher and school principal performance, and MSS results so that MoHA can see the school performance as a whole.  

 2) Eliminate unnecessary duplication between systems. To avoid confusion and additional administration, 

DEOs and PEOs should use the applications issued by MoEC and MoHA. It will also be beneficial to link the e‐RKAS to MoEC’s SSE application. Likewise, if MoEC and MoHA continue to implement both ARKAS and SIPBOS, these two applications should also be  linked to prevent schools having to  input the same data twice and to eliminate duplicate functionality. For example, if ARKAS contains a detailed list of activities to be implemented by schools and a school plan/expenditure report broken down by the eight areas in NES, then SIPBOS should be able to use this data and reporting system. Since SIPBOS incorporates local price standard data and school audit results, ARKAS should have access to this data and reporting facility.   

3) Training on the applications should be widely conducted and cover all schools. Training can be done efficiently through a cascade training system. At the central level, there should be a national team that 

Page 36: Leading Schools Digitally: School Planning and Budgeting ...

 

35  

will train provincial teams, which could in turn become trainers of district teams. District team would then train school  teams. Training  for schools should be  implemented by and under  the coordination of  the PEO/DEO. It could be financed by PEO/DEO or the school itself. For example, the MoRA East Java office trained MoRA district office  representatives using  its own  funds. Likewise, schools  in  Jombang district attended e‐RKAS  training  in DEO office using  their own  funds. ARKAS/SIPBOS  training  could either be online, a combination of online and offline training, and face‐to‐face training as and when the situation permits. To overcome problems in implementation of ARKAS and SIPBOS, on‐the‐spot technical assistance should be provided regularly by the PEO/DEO team. Formative evaluations of training should be conducted by PEOs/DEOs, in collaboration with MoEC‐MoHA to assess school understanding of ARKAS and SIPBOS, challenges faced, and recommendations for improving both applications. Regular capacity building is also needed for PEOs/DEOs on how to conduct their roles and functions in the development of school planning and budgeting. This should be conducted by MoHA in collaboration with MoEC to ensure that PEO/DEO staff  are  able  to  supervise  schools  effectively.  Cascade  training  is  needed  to  ensure  that:  there  is affordable, continuous training and capacity development for schools; quality control takes place in the system;  the  e‐RKAS  program  can  become  sustainable  in  the  long  term;  and  government  structures (especially PEOs and DEOs) can monitor school progress and performance. The cascade approach can also be  optimised  by  using  cluster‐based  approaches,  such  as  principal  and  teacher  working  groups,  to discussing implementation, challenges, and actions taken. To be successful, it should also be supported by provision  of  regular  technical  guidance  to  schools  by  the  relevant  education  office,  including  school supervisors.  

4) PEOs/DEOs should provide supporting facilities to  implement ARKAS and SIPBOS.  In  line with current trends of conducting business affairs online and to support implementation of e‐government, PEOs and DEOs should provide servers or cloud‐based hosting to store all school planning and budgeting data and to  facilitate  the operation of ARKAS  and  SIPBOS.  PEOs/DEOs  should  also  assign  a  team  comprising  a representative of the LPMP with experience in analyzing the SES results and using it for NES improvement, university and education experts, and school supervisors. This team should review the status of NES and MSS measured through the SSE, school activities and budget plans, NES targets to be achieved, and the achieved NES and MSS at the end of the fiscal year, as well as the involvement of school stakeholders in implementation of ARKAS/SIPBOS. Based on these reviews, they should provide schools recommendations and strategies to improve NES achievements and how this should translate into school plans and budgets. PEO/DEO reports analyzing school spending, school achievements, and recommended actions need to be shared with MoEC and MoHA annually as an attachment accompanying the proposed BOS allocations. Data from these reports can be used as inputs for the intermediate outcome related to transparency and efficiency of audit data. School achievements on the NES can be used to measure school performance, which is the second intermediate outcome. The local Planning Office (Bappeda) should regularly monitor school NES achievements and compare  these achievements with education targets  in district/province five‐year strategic plans.  

5) Develop regulations at all levels to smooth the implementation of e‐RKAS. MoEC should explicitly state in the BOS manual that ARKAS should be used as a tool to develop the plans for BOS use. The guideline should specify the school stakeholders  that are required  to be  involved  in the development of ARKAS. MoEC  and MoHA  need  to  reinforce  the  implementation  of  the  circular  letters  in  the  field,  evaluate implementation, and use evaluation results to improve the circular letters. Both Ministries should apply mechanisms to incentivize schools to apply e‐RKAS. These might include: i) making implementation of e‐RKAS and  improved NES  achievement  indicators of  success  in a BOS performance  scheme;  ii) making implementation  of  e‐RKAS  one  of  the  requirements  for  receiving  the  BOS  affirmative;  and  iii)  not distributing  BOS  funds,  except  for  the  school  fixed  cost  component,  where  e‐RKAS  has  not  been implemented. Likewise, regulations at local government level are also needed. Finally, MoEC could make the ARKAS‐based BOS plans and reports produced by the application a requirement for BOS disbursement to ensure that all schools use the application. The planned school planning application will become an 

Page 37: Leading Schools Digitally: School Planning and Budgeting ...

 

36  

important mechanism  in BOS policy, enabling direct  transfer of  funds  from  the  centre  to  schools and providing a marketplace where schools spend BOS funding. The marketplace could usefully be integrated with the planning application electronically to become one integrated tool for school planning. 

 

The Governor or the Mayor and Head of province/district could provide a decree informing stakeholders about ARKAS and SIPBOS and the need for schools to use them in planning, managing, administering, and reporting BOS and other funding resources received. The Head of the PEO/DEO could  issue decrees on when the schools should commence planning and budgeting, when to revise budgets in the system, and when to submit financial statements (expenditure report) to the PEO/DEO. Finally, MoEC could make the ARKAS‐based BOS plans and reports produced by the application a requirement for BOS disbursement to ensure that all schools use the application. MoEC could make  the ARKAS‐based BOS plans and reports produced  by  the  application  a  requirement  for BOS  disbursement  to  ensure  that  all  schools  use  the application. The planned school planning application will become an important mechanism in BOS policy, enabling direct transfer of funds from the centre to schools and providing a marketplace where schools spend  BOS  funding.  The  marketplace  could  usefully  be  integrated  with  the  planning  application electronically to become one integrated tool for school planning. 

 

 

Page 38: Leading Schools Digitally: School Planning and Budgeting ...

 

37  

Appendix 1: The National Education Standards

Law No.  20/2003  on  the National  Education  System, which  defines  a  number  of  key  areas  of  education including the function and purposes of education, curriculum, education personnel, and others, also set the basic  foundation  for  establishment  of  the  National  Education  Standards  (NES).  It  was  followed  up  by Government Regulation No. 19/2005 on National Education Standards, which defines the national standard in the following eight areas: • Content • Process • Graduate competency • Teacher standards • School facilities • Education management • Funding, and • Assessment  The  regulation  also mandates  the  establishment of National  Education  Standards Board  (BNSP), which  is tasked with preparing the detailed education standards and overseeing their implementation. There is also an accreditation process for schools, which is executed by the National Accreditation Board for Secondary School (BAN‐SM). The most recent change of accreditation standard was to include adjustment to the 2003 law and NES implementation in schools. The structure of the accreditation instrument follows the order of the eight areas of NES.   Eight National Education Standards and Criteria  Graduate competence 1.1.  Graduates possess attitude dimension of performance 1.2.  Graduates possess knowledge dimension of performance 1.3.  Graduates possess skill dimension of performance  Education Content 2.1.  Learning materials are in line with graduate competence formulation/design 2.2.  School‐based curriculum is developed according to the stipulated procedure 2.3.  School is implementing the curriculum according to the regulation(s)  Learning Process 3.1.  Schools plan learning process according to the regulation(s) 3.2.  Learning process is implemented accurately 3.3.  Supervision and authentic assessment are conducted during learning process  Education Assessment 4.1.  Education assessment is implemented according to competence domain 4.2.  Assessment technique(s) is/are objective and accountable 4.3.  Education assessment is to be followed up 4.4.  Assessment instrument(s) is/are to be in line with assessment aspects 4.5.  Assessment needs to follow the procedure  Teachers and Education Personnel 5.1.  Teachers availability and competency are aligned with the regulation 5.2.  Principals availability and competency are aligned with the regulation  5.3.  Administration staff availability and competency are aligned with the regulation  

Page 39: Leading Schools Digitally: School Planning and Budgeting ...

 

38  

5.4.  Laboratory staff availability and competency are aligned  5.5.  Librarians availability and competency are aligned with the regulation   Facilities and infrastructure 6.1.  Sufficient school student intake capacity 6.2.  Schools possess proper and sufficient facilities and infrastructure 6.3.  Schools possess complete and proper facilities and infrastructure   Management 7.1.  Schools conduct implementation planning 7.2.  Program management is implemented according to the regulation 7.3.  Principals are to show good performance in his/her school leadership 7.4.  Schools manage MIS  (Education) Funding 8.1.  Schools provide cross‐subsidy service 8.2.  School operational load is aligned with the regulation 8.3.  School implement sound fund management 

 

Page 40: Leading Schools Digitally: School Planning and Budgeting ...

 

39  

Appendix 2: Numbers of Participants in Pilot Activities

 

No  Participants  Gorontalo  Sidrap  Mojokerto  Central Java 

Bali 

F  M  F  M  F  M  F  M  F  M 

  District Level 

1  MoEC  1  1  2  1  1  1  2  2  2  1 

2  Education Office 

9  3  4  1  2  3  10  2  12  7 

3  MoRA   6    1  1  4  1  5  1  4   

4  BPKD  3    2    2  1  3    1   

  BP2MK              5  1     

  Diskominfo              2       

  School Level 

5  SD  4    4  2  1  2      1   

6  SMP  4    4  2  2  2      4   

7  MI  2  2  1  1  4        4   

8  MTs  1  1  1  1  2        1  3 

10  SMA                4  2   

11  SMK               5  1     

12  MA              2    31  11 

13  SLB              4       

  Total   30  7  19  9  18  10  38  11  62  22 

  Total Per Area 

37  28  28  49  84 

     

Page 41: Leading Schools Digitally: School Planning and Budgeting ...

 

40  

Appendix 3: Pilot Schools

 

No  Gorontalo  Sidrap  Mojokerto  Central Java  Bali 

1  SDN 9 TOLANGOHULA 

SD NEGERI 1 ALLAKUANG 

SD NEGERI MENTIKAN 6 

SLB NEGERI SUKOHARJO 

SLB NEGERI 1 KARANGASEM 

2  SDN 9 TILANGO  SD NEGERI 1 ARAWA 

SD NEGERI MENTIKAN 4  SLB N SRAGEN 

SLB NEGERI 1 DENPASAR 

3  SDN 1 BILUHU  SD NEGERI 1 BILOKKA 

SD NEGERI KRANGGAN 5 

SLB NEGERI JEPARA 

SLB NEGERI 1 BULELENG 

4  SD NEGERI 9 TABONGO  SD NEGERI 1 KULO 

SD NEGERI KRANGGAN 2 

SLB NEGERI SURAKARTA 

SLB NEGERI 1 BANGLI 

5  SD NEGERI 8 BATUDAA 

SD NEGERI 1 RAPPANG 

SD NEGERI KRANGGAN 1 

SLB Negeri Semarang 

SLB Negeri 1 Badung 

6  SD NEGERI 7 LIMBOTO BARAT 

SD NEGERI 1 WATANG SIDENRENG 

SD NEGERI KEDUNDUNG 2  SMA NEGERI 1 

BERGAS 

SMAN 1 TABANAN 

7  SD NEGERI 7 BOLIYOHUTO 

SD NEGERI 11 PANGKAJENE 

SD NEGERI KEDUNDUNG 1 

SMA NEGERI 1 CANDIROTO 

SMAN 1 MENGWI 

8  SD NEGERI 3 TALAGA JAYA 

SD NEGERI 2 BELAWAE 

SD NEGERI GEDONGAN 1  SMAN 1 WELERI 

SMAN 1 BLAHBATUH 

9  SD NEGERI 24 PULUBALA  SD NEGERI 2 KULO 

SD NEGERI BALONGSARI 5  SMAN 2 KUDUS 

SMAN 1 BANGLI 

10  SD NEGERI 2 TELAGA 

SD NEGERI 2 MACORAWALIE 

SD NEGERI BALONGSARI 2 

SMAN 1 BLORA  SMAN 1 AMLAPURA 

11  SD NEGERI 2 MOOTILANGO 

SD NEGERI 2 MOJONG 

SD NEGERI SURODINAWAN 

SMAN 1 MUNTILAN 

SMAN 2 BANJAR 

12  SD NEGERI 2 BILATO  SD NEGERI 2 WATANG SIDENRENG 

SD NEGERI SENTANAN 

SMAN 1 BANJARNEGARA  SMAN 2 NEGARA 

13  SD NEGERI 18 TELAGA BIRU 

SD NEGERI 3 MOJONG 

SD NEGERI MIJI 4 MOJOKERTO 

SMAN 1 REMBANG 

SMAN 2 SEMARAPURA 

14  SD NEGERI 13 LIMBOTO 

SD NEGERI 3 OTTING 

SD NEGERI MIJI 3  SMA NEGERI 1 BATANG 

SMAN 3 DENPASAR 

15  SD NEGERI 11 BATUDAA PANTAI 

SD NEGERI 3 WATANG SIDENRENG 

SD NEGERI MERI 1 

SMA NEGERI 05 

SMAN BALI MANDARA 

16  SMP NEGERI 4 SATAP MOOTILANGO 

SD NEGERI 5 AMPARITA  SD NEGERI WATES 6  SMA NEGERI 05 

SMK NEGERI 3 SINGARAJA 

17  SMP NEGERI 3 SATAP TABONGO 

SD NEGERI 5 BARANTI 

SD NEGERI WATES 4 SMA NEGERI 05 

SMKN 1 DENPASAR 

18  SMP NEGERI 3 SATAP ASPARAGA 

SD NEGERI 5 LANCIRANG  SMP NEGERI 1  SMA NEGERI 05 

SMKN 1 GIANYAR 

19  SMP NEGERI 1 TIBAWA 

SD NEGERI 5 PASSENO 

SMP NEGERI 2  SMA NEGERI 05 

SMKN 1 KLUNGKUNG 

20  SMP NEGERI 1 TELAGA 

SD NEGERI 5 WATANG SIDENRENG 

SMP NEGERI 3  

SMK NEGERI 03 

SMKN 1 KUTA SELATAN 

21  SMP NEGERI 1 PULUBALA  SD NEGERI 6 BATU 

SMP NEGERI 4 SMK NEGERI 01 

SMKN 1 SUKASADA 

22  SMP NEGERI 1 LIMBOTO BARAT 

SD NEGERI 7 BENTENG  SMP NEGERI 5  SMK NEGERI 02 

SMKN 1 NEGARA 

Page 42: Leading Schools Digitally: School Planning and Budgeting ...

 

41  

No  Gorontalo  Sidrap  Mojokerto  Central Java  Bali 23  SMP NEGERI 1 

LIMBOTO SD NEGERI 8 WATANG SIDENRENG 

SMP NEGERI 6 

SMK NEGERI 06 

SMKN 1 MANGGIS 

24  SMP NEGERI 1 DUNGALIYO 

SMP NEGERI 1 DUA PITUE  SMP NEGERI 7  SMKN 1 DEMAK 

SMKN 1 TEMBUKU 

25  SMP NEGERI 1 BONGOMEME 

SMP NEGERI 1 PANCA LAUTANG  SMP NEGERI 8  SMKN 1 BAWEN 

SMKN 3 TABANAN 

26    SMP NEGERI 1 PANCA RIJANG  SMP NEGERI 9  SMKN 1 KENDAL 

 

27    SMP Negeri 1 Pangsid 

 SMKN 2 KENDAL 

 

28    SMP NEGERI 1 TELLU LIMPOE 

  SMK NEGERI 7 SEMARANG 

 

29   SMP NEGERI 1 WATANG PULU 

  SMK NEGERI SATU ATAP TUNTANG 

 

30    SMP NEGERI 2 BARANTI 

     

31    SMP NEGERI 2 PITU RIASE 

     

32    SMP NEGERI 3 PANCA RIJANG 

     

33    SMP NEGERI 4 DUA PITUE 

     

 

Page 43: Leading Schools Digitally: School Planning and Budgeting ...

 

42  

Appendix 4: Identification of the treatments

 

Characteristics of e‐RKAS applications for districts categorized as ‘Advanced’ 

 Question  Bogor District  Bogor City  DKI Jakarta Province 

A  Application Profile           

1  Name of application  SIRKAS SIREAL  SIRKAS SIBOS  e‐RKAS 

2  Type of connection   Online  Online  online 

3  Since   2017  2016  2015 

4  Developer  District Education office  District Education office  Individual Consultant 

5  Integrated to other applications such as SIMDA (District Financial Management System), DAPODIK, asset and inventory system 

Integrated to Dapodik, Sirkas/Sireal, Lapor BOS, and SIPLAH in 2019 through window menu SIMAKLAH. SIPLAH is application for online and cashless purchasing system 

Integrated to SIMDA and SIPLAH, online purchasing and cashless system 

Indirect integration through injection mechanism to: 1) SIAP BOS/BOP; 2) SIMKD; 3) e‐asset; and 4) SSE (LPMP DKI Jakarta) 

6  Coverage of users: public, private, primary, and junior secondary  

Public: primary and junior secondary   Public: primary and junior secondary  

Public: ECD, primary, junior, senior secondary, vocational school, and non‐formal  

B  Functions in applications           

   Functions for planning:   Sub menu: school revenue (source of funds), expenditures, check balance to check balance between revenue and expenditures, final output is RKAS 

revenue, source of fund and expenditures. Final output is RKAS 

revenue, source of fund and expenditures. Final output is RKAS and AKB (monthly cash management) 

   Functions for budget realization and financial administration 

• Bookkeeping menu to record all transactions whether cash and transfer through bank (General bookkeeping/ledger, subledger for cash, bank, and tax) 

• Payment: combination between cash and bank 

• Bookkeeping menu to record all transactions whether cash and transfer through bank (General bookkeeping/ ledger, subledger for cash, bank, and tax) 

• Payment: cashless 

• For budget realization and financial administration, it is process through SIAP BOS/BOP application 

• Payment: cashless 

   Functions for reporting   Reporting menu to print budget realization report referring format report in BOS Guidelines including sub menu reporting for asset, 

Menu for budget realization of BOS/local BOS 

9 reports generated through SIAP BOS/BOP and SIMKD (local government financial information system) SIMKD is connected DEO and DFO financial report. 

Page 44: Leading Schools Digitally: School Planning and Budgeting ...

 

43  

 Question  Bogor District  Bogor City  DKI Jakarta Province 

number of students, quarterly and six‐monthly report   

   Functions for asset management  There is menu to record asset purchasing 

Not link yet  Link to e‐asset (application for asset management  

   Functions for SSE (School Self Evaluation) Application 

Not link  Not link  There is SSE template in e‐RKAS application. Cooperation with LPMP Prov DKI (Local SSE team)  SSE assessment is completed but it is not show real conditions of school, therefore the SSE still cannot be used for school planning and budgeting 

   Other functions   N/A  N/A  N/A 

   Are all functions in one application?  Yes, in SIRKAS SIREAL  Yes, in SIRKAS   In some applications, e‐RKAS, SIAP BOS/BOP, SIMKD, e‐asset, SSE template 

C  Input mechanism          

1  Register  First login using NPSN (school primary number) and then change password. After register completed, school should update its school profiles. 

Using username and password 

Register number is given by Communication and Information office 

2  Input mechanism for planning and budgeting 

        

   a. Program, activity and sub activity should be (1) typed manually or (2) available in database 

Available in database, school just chooses from database 

Available in database, school just chooses from database 

Available in database, school just chooses from database 

   b. Goods and services item, and its price: (1) typed manually, or (2) available in database 

Available in database, school just chooses from database 

Available in database, school just chooses from database. Link also to online shops (SIPLAH) 

Available in database, school just chooses from database 

3  Input mechanism for budget realization and financial administration:  

        

   a. Generating Receipt/Nota   No Nota     Nota is available in SIAP BOS/ BOP 

   b. Bookkeeping (ledger and sub ledger) 

Sub menu of bookkeeping: bank and cash.  

Sub menu of bookkeeping: bank and cash.  

Bookkeeping is available in SIAP BOS/ BOP 

   c. others           

4  Mechanism for generating report         Report is produced from SIAP BOS/BOP dan SIMKD 

Page 45: Leading Schools Digitally: School Planning and Budgeting ...

 

44  

 Question  Bogor District  Bogor City  DKI Jakarta Province 

   a. Automatic generated  yes  yes  Yes. Generated automatically through SIAP BOS/BOP and SIMKD 

   b. Can be downloaded to excel or pdf 

to excel  to excel  to excel 

   c. Report submission (from, to, type of report, how, and duration)  

submission automatically from school to DEO, real time 

submission automatically from school to DEO, real time 

submission automatically from school to DEO and DFO, real time 

5  Link mechanism to asset management and inventory  

The application has asset management menu 

not link   Inject from SIAP BOS/BOP to e‐asset 

6  Link SSE application  not link   not link   not link  

D  Admin structure           

1  Level of admin  1) School: principal and operator  2) District Education office 

1) School: principal and operator  

2) District Education office 

1) School: principal and 8 staffs 2) District Education office 3) Communication and Information office 

2  Role  1) School: preparing RKAS, spending, financial administration, and reporting  

2) District Education office:  maintenance and monitoring 

1) School: preparing RKAS, spending, financial administration, and reporting  

2) District Education office:  maintenance and monitoring 

1) School: preparing RKAS, spending, financial administration, and reporting  

2) District Education office: open and close of input schedules 

3) Communication and Information office: maintenance and update the application, providing register number of schools 

E  District Education office           

1  Authority of District Education office   maintenance dan monitor RKAS input  

maintenance dan monitor RKAS input  

open and close schedule for input, reset password, monitoring of planning, budgeting, financial administration, and reporting process  

2  Type of report generated by system          

   a. Per school  Yes  Yes  Per school and per chart of account 

   b. Recap/consolidated to all schools   Yes  Yes  Yes, generated by DFO 

              

   Challenges          

    

Page 46: Leading Schools Digitally: School Planning and Budgeting ...

 

45  

Characteristics of e‐RKAS applications for districts categorized as ‘Medium’ 

No  Question   Bekasi City  Bekasi District  Tangerang City  Tangerang District 

A  Application Profile              

1  Name of application  • SIMBOS for BOS National 

• SIMDA for Local BOS  

SIMDA (BOS dan BOSDA)  • 2016‐2017: SIPKD (Sistem Informasi Pengelolaan Keuangan Daerah / Local Government Financial Information System) 

• Th 2019‐ SPEKTRA (Sistem Pengelolaan, Penatausahaan dan Pelaporan Keuangan Kota Tangerang / Financial Management, administration, and reporting System of Tangerang City) 

SIMRAL (Sistem Informasi Managemen Perencanaan, Penganggaran dan Pelaporan). 

2  Type of connection   Online  Offline (2016‐2019) (Th 2020 will be online) 

School: Offline District Education Office: Online to District Finance Office 

School: Offline District Education Office: Online to District Finance Office 

3  Since   2017  2016  2016  2017 

4  Developer  District Education Office and District Finance Office 

District Education Office and District Finance Office 

District Finance Office  District Finance Office 

5  Integrated to other applications such as SIMDA (District Financial Management System), DAPODIK, asset and inventory system 

Not integrated but referring to:  1. SIM PMP (score of 8 

NES) 2. SIPLAH (for online 

purchasing) 

Not integrated  Not integrated  Not integrated 

6  Coverage of user: public, private, primary, and junior secondary  

Public: primary and junior secondary  

Public: primary and junior secondary  

Public: primary and junior secondary  

Public: primary and junior secondary  

Page 47: Leading Schools Digitally: School Planning and Budgeting ...

 

46  

No  Question   Bekasi City  Bekasi District  Tangerang City  Tangerang District 

B  Functions in applications              

   Functions for planning:   SIMBOS = planning and budgeting for BOS national SIMDA = planning and budgeting for local BOS 

Only planning and budgeting menu for BOS national and local BOS 

Planning and budgeting menu for BOS national  

Planning and budgeting menu for BOS national  

   Functions for budget realization and financial administration 

• Budget realization and financial administration (bookkeeping) is already included in this application (ledger and sub ledger, bank, cash, taxes, settlement report) 

• Payment: cashless, except for electricity, internet, and cleaning service 

Payment: combination between cash and bank 

Payment: combination between cash and bank 

Payment: combination between cash and bank 

   Functions for reporting   Budget realization report and Investment Expenditure Report  

N/A, generated manually  N/A, generated manually  N/A, generated manually 

   Functions for asset management  N/A  N/A  N/A  N/A 

   Functions for SSE (School Self Evolution) Application 

Not link  Not link  Not link  Not link 

   Other functions   N/A  N/A  N/A  N/A 

   Are all functions in one application? 

in 3 applications (SIMBOS, SIMDA dan SIMPMP)  

Only one application for planning and budgeting 

Only one application for planning and budgeting 

Only one application for planning and budgeting 

C  Input mechanism             

1  Register  username and password  Using NPSN  Password   Password from DEO 

2  Input mechanism for planning and budgeting 

           

   a. Program, activity and sub activity should be (1) typed manually or (2) available in database 

Available in database, school just chooses from database.  

Available in database, school just chooses from database 

Available in database, school just chooses from database 

typed manually 

Page 48: Leading Schools Digitally: School Planning and Budgeting ...

 

47  

No  Question   Bekasi City  Bekasi District  Tangerang City  Tangerang District 

   b. Goods and services item, and its price: (1) typed manually, or (2) available in database 

Price is typed manually  Price is typed manually  Price is typed manually  Price is typed manually 

3  Input mechanism for budget realization and financial administration:  

         Masih manual menggunakan excel  

   a. Generating Receipt/Nota         No receipt    

   b. Bookkeeping (ledger and sub ledger) 

Bookkeeping is available in the system  

is still generating manually  Bookkeeping is available in the system  

is still generating manually using excel 

   c. others              

4  Mechanism for generating report  

           

   a. Automatic generated  Yes  Generated manually       

   b. Can be downloaded to excel or pdf 

Print and should be stamped by Head of DEO and principal and filed by school.  

   Print and should be stamped by Head of DEO and principal and filed by school.  

Print and should be stamped by Head of DEO and principal and filed by school.  

   c. Report submission (from, to, type of report, how, and duration)  

      Sent to DEO to get stamp and sign, and DFO to get initial. Sent in soft file and print out. 

Sent to DEO to get stamp and sign, and DFO to get initial. Sent in soft file and print out. 

5  Link mechanism to asset management and inventory  

N/A  N/A  N/A  N/A 

6  Link SSE application  not link   not link   not link   not link  

D  Admin structure              

1  Level of admin  1) School: principal and operator 

2) School supervisor 3) District Education office 

District Education office  School: BOS treasurer District Finance office: Team BOS 

DEO and DFO: Team BOS  

2  Role  1) School: preparing RKAS, spending, financial administration, and reporting 

N/A  1) School: preparing RKAS, spending, financial administration, and reporting  

1) School: submit school planning  

2) District Education office:  Input data, Verification and Approval 

Page 49: Leading Schools Digitally: School Planning and Budgeting ...

 

48  

No  Question   Bekasi City  Bekasi District  Tangerang City  Tangerang District 

2) School supervisor: verification and monitoring 

3) District Education office: Verification, Monitoring and Controlling. 

2) District Finance office: verification and approval 

3) District Education: verification and approval 

3) District Finance office: verification and approval 

E  District Education office              

1  Authority of District Education office  

Maintenance Monitoring Verification Controlling 

Input Monitoring Verification Controlling 

Planning and reporting in excel 

Planning and reporting in excel 

2  Type of report generated by system 

Individual school report and recapitulation of all school reports  

individual school plan and recapitulation of all school plans  

     

   a. Per school  Yes   Yes, but only for planning and budgeting document 

Yes   Yes  

   b. Recap/consolidated to all schools  

Yes   Yes, but only for planning and budgeting document 

Yes   Yes  

   Challenges  School should input 3 times into BOSNAS, BOSDA and PMP MoHA will release new application for BOS. Current applications will not be used anymore and district should do capacity building for new application 

Not online system DEO will be overload during planning and budgeting process 

DEO will be overload during planning and budgeting process 

DEO and school will be overload during planning and budgeting process. Some school must stay overnight to complete RKAS.  

    

Page 50: Leading Schools Digitally: School Planning and Budgeting ...

 

49  

Characteristics of e‐RKAS applications for districts categorized as ‘Non e‐RKAS’ 

No  Question  Depok City 

A  Application Profile     

1  Name of application  2019: Manual (Excel)  

      2020:  RKAS application from MoEC ARKAS for school MARKAS for DEO 

2  Type of connection   Excel = offline Using upload, download, and synchronization mechanism 

3  Since   Excel 2019 and earlier 

4  Developer  NA 

5  Integrated to other applications such as SIMDA (District Financial Management System), DAPODIK, asset and inventory system 

Not integrated 

6  Coverage of user: public, private, primary and junior secondary   Public: primary and junior secondary  

B  Functions in applications     

   Functions for planning:   RKAS format in excel 

   Functions for budget realization and financial administration  Payment: combination between cash and bank transfer 

   Functions for reporting   N/A, generated manually 

   Functions for asset management  N/A 

   Functions for SSE (School Self Evaluation) Application  Not link 

   Other functions   N/A 

   Are all functions in one application?  No application 

C  Input mechanism    

1  Register  Excel = no register 

2  Input mechanism for planning and budgeting    

   a. Program, activity and sub activity should be (1) typed manually or (2) available in database 

typed manually 

   b. Goods and services item, and its price: (1) typed manually, or (2) available in database 

Price is typed manually 

3  Input mechanism for budget realization and financial administration:     

   a. Generating Receipt/Nota     

Page 51: Leading Schools Digitally: School Planning and Budgeting ...

 

50  

No  Question  Depok City 

   b. Bookkeeping (ledger and sub ledger)  is still generating manually using excel 

   c. others     

4  Mechanism for generating report     

   a. Automatic generated  generated manually 

   b. Can be downloaded to excel or pdf  Should be printed and stamped by Head of DEO and principal and filed by school  

   c. Report submission (from, to, type of report, how, and duration)     

5  Link mechanism to asset management and inventory   N/A 

6  Link SSE application  not link  

D  Admin structure     

1  Level of admin  No admin for Excel  

2  Role  School: input  District Education office: receive planning document from school 

E  District Education office     

1  Authority of District Education office   Recap school planning to DEO planning  

2  Type of report generated by system    

   a. Per school  Yes  

   b. Recap/consolidated to all schools   N/A 

   Challenges    

 

Page 52: Leading Schools Digitally: School Planning and Budgeting ...

 

51  

Appendix 5: Average UN scores of the eight sample school districts by subject: 2013‐2018

 

Page 53: Leading Schools Digitally: School Planning and Budgeting ...

 

52  

Appendix 6: Portrait of BOS Spending in 8 Districts/Cities  No  Type of Activities   DKI  Kota Bekasi  Kab Bekasi  Kota 

Tangerang Kab Tangerang  Kota Bogor   Kab Bogor  Kota Depok  Average 

    2018  2019  2018  2019  2018  2019  2018  2019  2018  2019  2018  2019  2018  2019  2018  2019  2018  2019 

1  Library Development   14.6  15.3  18.9  18.2  18.9  13.5  11.1  10.4  13.1  15.1  13.5  14.2  17.6  16.6  11.5  8.9  14.9  14.0 

2  Activity related to new student admissions 

1.8  1.9  1.3  1.5  1.2  1.6  1.2  1.2  1.3  1.4  0.7  0.7  0.8  1.0  1.3  1.4  1.2  1.3 

3  Learning and extracurricular activities  

12.9  11.0  13.1  14.4  12.7  17.2  13.9  14.9  13.4  13.2  11.2  14.1  13.2  15.4  12.7  12.8  12.9  14.1 

4  Learning evaluation activities 

6.8  7.3  11.7  13.3  11.1  14.0  11.9  12.3  14.6  14.9  13.8  11.6  10.8  11.3  16.7  18.3  12.2  12.9 

5  School management  9.3  11.5  17.8  17.9  18.9  19.4  17.2  16.8  15.0  14.7  12.2  12.0  15.7  17.5  13.6  16.8  15.0  15.8 

6  Professional development for teacher and education personnel 

1.8  1.7  3.0  1.7  3.8  3.9  2.4  2.8  3.4  3.4  3.2  2.4  4.6  5.2  4.6  4.6  3.4  3.2 

7  subscriptions to power and services 

4.3  4.4  7.8  9.2  4.3  5.1  7.4  9.3  5.8  5.7  5.2  5.7  4.1  4.2  7.6  8.7  5.8  6.5 

8  Maintenance of facilities and infrastructure 

16.7  16.1  9.7  13.8  5.7  6.8  10.0  12.1  10.0  10.5  10.4  15.9  9.0  9.4  7.5  9.1  9.9  11.7 

9  Payment of honoraria  15.5  14.8  12.6  5.7  19.5  14.4  18.4  15.2  16.2  16.8  22.4  18.5  20.4  16.9  16.0  13.3  17.6  14.5 

10  Purchase and maintenance of learning tools 

12.4  16.0  2.8  4.3  3.0  4.0  4.2  5.1  3.5  4.3  3.8  4.9  2.2  2.6  3.9  6.1  4.5  5.9 

11  others   3.8    1.3    0.8    2.4    3.9    3.7    1.4    4.5    2.7  0.0 

  Total   100  100  100  100  100  100  100  100  100  100  100  100  100  100  100  100  100  100