What’s Been Happening???• November 10
--All OhioLINK systems turned over to the new ETD for operations and maintenance
Lead Implementors – February 2010Lead Implementors – February 2010
What’s been restored since:• Access to the Central Catalog for III and staff (non-root)• EJC for loading and indexing• EBC for loading and indexing• OSearch databases for loading and indexing• OLINKS• DRC for staff access• ETD for staff and end-user uploading• Access to central web server for staff
Lead Implementors – February 2010Lead Implementors – February 2010
What’s still not restored:• Blackwell Table of Contents loads• EJC claiming of missing issues via the
Serials machine• Digital Video Collection – new content not
being loaded• LANDSAT images not working. No new
content being loaded
Status of Discovery Layer ITNStatus of Discovery Layer ITN
Status of the Discovery Layer
• Index Data selected
• First step: replacement for MetaLib
• Development work on hold while waiting for
the Share Infrastructure to be available
Index Data informally selected
Wider “Educational Technologies Division” interested in Index Data’s
software
Discussions Occurring about How to Pay For DLTF Work Using a
Broader Scope of Work
Lead Implementors – February 2010
Lead Implementors – February 2010Lead Implementors – February 2010
OhioLINK 2.0• Equinox development proceeding this
spring• First meeting of the Implementation
Steering Committee delayed• PCIRC/Circulation and OPAC/Cataloging
committees told to get started (need to review Equinox development)
Lead Implementors – February 2010Lead Implementors – February 2010
What’s New with DRC Developments?• Staff access just turned back on• Still waiting on Share Infrastructure for
additional server and disk space• New content is still not being loaded• New DRC instances not being created• Naxos is still waiting to be loaded• Need developers to replace the ones lost in past
year
Lead Implementors – February 2010Lead Implementors – February 2010
Shared Depository System• Development on hold awaiting the availability of the Shared
Infrastructure• Install III system• Load data for a test system• After successful test, load full data from the 13 libraries• Suppress/delete holdings in the Central Catalog from local
catalog• Contribute holdings from Shared Depository system• PCIRC begins on Shared Depository system.
Lead Implementors – February 2010Lead Implementors – February 2010
• Major migrations• EJC• OSearch databases
On hold awaiting availability of Shared Infrastructure
Lead Implementors – February 2010Lead Implementors – February 2010
• III Issues & Updates• SkyRiver test• Anything to share?• Other updates?
Lead Implementors – February 2010Lead Implementors – February 2010
• Remaining Meeting Dates for 2010:
May 6 (videoconference)
August 5 (in person)
November 4 (videoconference)