Lead Implementors – February Lead Implementors – February 2010 2010 What’s Been Happening??? November 10 --All OhioLINK systems turned over to the new ETD for operations and maintenance

description

Lead Implementors – February 2010. What’s Been Happening??? November 10 --All OhioLINK systems turned over to the new ETD for operations and maintenance. Lead Implementors – February 2010. What’s been restored since: Access to the Central Catalog for III and staff (non-root) - PowerPoint PPT Presentation

Transcript of Lead Implementors – February 2010

Page 1: Lead Implementors – February  2010

Lead Implementors – February 2010Lead Implementors – February 2010

What’s Been Happening???• November 10

--All OhioLINK systems turned over to the new ETD for operations and maintenance

Page 2: Lead Implementors – February  2010

Lead Implementors – February 2010Lead Implementors – February 2010

What’s been restored since:• Access to the Central Catalog for III and staff (non-root)• EJC for loading and indexing• EBC for loading and indexing• OSearch databases for loading and indexing• OLINKS• DRC for staff access• ETD for staff and end-user uploading• Access to central web server for staff

Page 3: Lead Implementors – February  2010

Lead Implementors – February 2010Lead Implementors – February 2010

What’s still not restored:• Blackwell Table of Contents loads• EJC claiming of missing issues via the

Serials machine• Digital Video Collection – new content not

being loaded• LANDSAT images not working. No new

content being loaded

Page 4: Lead Implementors – February  2010

Status of Discovery Layer ITNStatus of Discovery Layer ITN

Status of the Discovery Layer

• Index Data selected

• First step: replacement for MetaLib

• Development work on hold while waiting for

the Share Infrastructure to be available

Index Data informally selected

Wider “Educational Technologies Division” interested in Index Data’s

software

Discussions Occurring about How to Pay For DLTF Work Using a

Broader Scope of Work

Lead Implementors – February 2010

Page 5: Lead Implementors – February  2010

Lead Implementors – February 2010Lead Implementors – February 2010

OhioLINK 2.0• Equinox development proceeding this

spring• First meeting of the Implementation

Steering Committee delayed• PCIRC/Circulation and OPAC/Cataloging

committees told to get started (need to review Equinox development)

Page 6: Lead Implementors – February  2010

Lead Implementors – February 2010Lead Implementors – February 2010

What’s New with DRC Developments?• Staff access just turned back on• Still waiting on Share Infrastructure for

additional server and disk space• New content is still not being loaded• New DRC instances not being created• Naxos is still waiting to be loaded• Need developers to replace the ones lost in past

year

Page 7: Lead Implementors – February  2010

Lead Implementors – February 2010Lead Implementors – February 2010

Shared Depository System• Development on hold awaiting the availability of the Shared

Infrastructure• Install III system• Load data for a test system• After successful test, load full data from the 13 libraries• Suppress/delete holdings in the Central Catalog from local

catalog• Contribute holdings from Shared Depository system• PCIRC begins on Shared Depository system.

Page 8: Lead Implementors – February  2010

Lead Implementors – February 2010Lead Implementors – February 2010

• Major migrations• EJC• OSearch databases

On hold awaiting availability of Shared Infrastructure

Page 9: Lead Implementors – February  2010

Lead Implementors – February 2010Lead Implementors – February 2010

• III Issues & Updates• SkyRiver test• Anything to share?• Other updates?

Page 10: Lead Implementors – February  2010

Lead Implementors – February 2010Lead Implementors – February 2010

• Remaining Meeting Dates for 2010:

May 6 (videoconference)

August 5 (in person)

November 4 (videoconference)