Transcript of LCLS Undulator Systems TDR Charge [email protected] Linac Coherent Light Source Stanford...
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center
LCLS Undulator Systems ReviewJohn N. Galayda, SLAC
March 3, 2004
LCLS Undulator Systems ReviewJohn N. Galayda, SLAC
March 3, 2004
Project DescriptionProject Description ScheduleSchedule Long-Lead ProcurementsLong-Lead Procurements Charge to CommitteeCharge to Committee
Project DescriptionProject Description ScheduleSchedule Long-Lead ProcurementsLong-Lead Procurements Charge to CommitteeCharge to Committee
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center
The World’s First Hard X-ray LaserThe World’s First Hard X-ray LaserThe World’s First Hard X-ray LaserThe World’s First Hard X-ray Laser
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center
CapabilitiesCapabilities
Spectral coverage: 0.15-1.5 nm
Peak Brightness: 1033
Average Brightness: 3 x 1022
Pulse duration: <230 fsec
Pulse repetition rate: 120 Hz
Photons/pulse: 1012
To 0.5 Ǻ in 3rd harmonic
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center
Linac CenterLine
Sector 20 Linacs
Straight AheadTune-Up Dump
Sector 21-1B
5 meters
Scale:
L0-1
L0-2
RF TransverseDeflector
EmittanceWire Scanners Energy Wire
Scanner & OTR
Matching Section
Quadrupole,typ.
RFGun
Cathode LoadLock
DL1 Bend
Linac Solenoid
Gun Solenoid
Gun-to-Linac
L0 Linacs
Linac Coherent Light Source
Project Description
SLAC Linac
Two Chicanes for bunch compression
FFTB TunnelUndulator Hall
Near Hall
Far Hall
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center
Photon Beam Handling Systems
X-ray Transport, Optics and DiagnosticsFront end systems – attenuators, shutters, diagnosticsOptics – the prerequisites for LCLS experiments
X-ray Endstation Systems Hutches, Personnel Protection
Computer facilities for experimentsLaser for pump/probe experimentsDetectors matched to LCLS requirements
Systems for first experiments in A/M/O physics
Linac Coherent Light Source
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center
TransportTransport
UndulatorUndulator
Hall AHall A
TunnelTunnel
Hall BHall B
3 Beams/mirror3 Beams/mirror
ExpansionExpansion
Conventional ConstructionConventional Construction
Room for 8 additional undulator lines
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center
LCLS OrganizationLCLS Organization
Chief Engineer – Mark ReichanadterChief Engineer – Mark Reichanadter US CMS Project EngineerUS CMS Project Engineer
Joins SLAC June 2003Joins SLAC June 2003
LLNL-LCLS Project DirectorLLNL-LCLS Project Director
Richard M. BiontaRichard M. Bionta
ANL-LCLS Project DirectorANL-LCLS Project Director
Stephen V. MiltonStephen V. MiltonLEUTL FEL accelerator research program at ANL-APSLEUTL FEL accelerator research program at ANL-APS
Chief Engineer – Mark ReichanadterChief Engineer – Mark Reichanadter US CMS Project EngineerUS CMS Project Engineer
Joins SLAC June 2003Joins SLAC June 2003
LLNL-LCLS Project DirectorLLNL-LCLS Project Director
Richard M. BiontaRichard M. Bionta
ANL-LCLS Project DirectorANL-LCLS Project Director
Stephen V. MiltonStephen V. MiltonLEUTL FEL accelerator research program at ANL-APSLEUTL FEL accelerator research program at ANL-APS
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center
Estimated Cost, Revised ScheduleEstimated Cost, Revised Schedule
$220M-$260M Total Estimated Cost range$265M-$315M Total Project Cost range
FY2005 Long-lead purchases for injector, undulatorFY2006 Construction beginsJanuary 2008 FEL Commissioning beginsSeptember 2008 Construction complete
2002 2003 2004 2005 2006 FY2008 FY2009
ConstructionConstruction OperatioOperationn
FY2001 FY2002 FY2003 FY2004 FY2005 FY2006 FY2007
CD-1 CD-2aCD-2b
CD-3a
CD-3bCD-0Title IDesignComplete
XFELCommissioning
CD-4
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center
Recent EventsRecent Events
Critical Decision 1 ApprovedCritical Decision 1 Approved 10/200210/2002
Guidance for Funding Profile Updated Guidance for Funding Profile Updated 1/20031/2003
BES 20-year Roadmap ReviewBES 20-year Roadmap Review 2/20032/2003
Environmental Assessment ApprovedEnvironmental Assessment Approved 3/20033/2003
Authorization to spend PED fundsAuthorization to spend PED funds 3/20033/2003
SC-81 Lehman/Carney ReviewSC-81 Lehman/Carney Review 5/20035/2003
Critical Decision 2A ApprovedCritical Decision 2A Approved 7/20037/2003
Critical Decision 2B ApprovalCritical Decision 2B Approval 5/20045/2004
Critical Decision 3A ApprovalCritical Decision 3A Approval 9/20049/2004
Critical Decision 1 ApprovedCritical Decision 1 Approved 10/200210/2002
Guidance for Funding Profile Updated Guidance for Funding Profile Updated 1/20031/2003
BES 20-year Roadmap ReviewBES 20-year Roadmap Review 2/20032/2003
Environmental Assessment ApprovedEnvironmental Assessment Approved 3/20033/2003
Authorization to spend PED fundsAuthorization to spend PED funds 3/20033/2003
SC-81 Lehman/Carney ReviewSC-81 Lehman/Carney Review 5/20035/2003
Critical Decision 2A ApprovedCritical Decision 2A Approved 7/20037/2003
Critical Decision 2B ApprovalCritical Decision 2B Approval 5/20045/2004
Critical Decision 3A ApprovalCritical Decision 3A Approval 9/20049/2004
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center
FY2005 Long Lead Procurements ($K, as spent)FY2005 Long Lead Procurements ($K, as spent)
Item Estimate Conting. Total FY2005 Spares Request Included in Total
1.2.1 Injector $11,732 $3,093 $14,825
1.2.2 Linac $3,435 $1,702 $5,137 $1,369
1.4.1 Linac alcove $1,356 $222 $1,578
1.2.3 Undulator mat'ls $5,484 $1,083 $6,567 $1,149
1.2.3 Mag Meas Device $784 $336 $1,120
1.4.7 Magnet Meas Rm. $1,200 $300 $1,500
Total $23,991 $6,736 $30,727 $2,518
To be reimbursed to TEC when Special SparesFunds are allocated.
28% Contingency (67% contingency onSuperconducting wiggler & spare)
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center
Long-Lead Procurements, FY2005 - Undulator SystemsLong-Lead Procurements, FY2005 - Undulator Systems
Undulator HardwareUndulator HardwareMagnet BlocsMagnet Blocs
Magnet PolesMagnet Poles
StrongbackStrongback
Undulator Measurement SystemUndulator Measurement System
Final “shimming” of magnets at SLACFinal “shimming” of magnets at SLAC
Undulator HardwareUndulator HardwareMagnet BlocsMagnet Blocs
Magnet PolesMagnet Poles
StrongbackStrongback
Undulator Measurement SystemUndulator Measurement System
Final “shimming” of magnets at SLACFinal “shimming” of magnets at SLAC
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center
LCLS Undulator Systems Review: ChargeLCLS Undulator Systems Review: Charge
To review the LCLS undulator system and to provide advice on the overall system and the various subsystem designs and their suitability to meet the performance specifications, on the installation and commissioning plan, and on the overall project management of the LCLS undulator system.
Commissioning: are the diagnostics “adequate” for commissioning and operations problems?Will we be able to troubleshoot the undulator systems, and rapidly identify out-of-tolerance subsystems?
Gain vs. z is an excellent all-purpose tuning signalSASE gain at long wavelength should not be very difficultSASE gain at short wavelength – beam travels 50m before gain is evidentTo K or not to K?To rollaway or not to rollaway?Intra-undulator x-ray diagnostics are very challenging, not amenable to scheduling
To review the LCLS undulator system and to provide advice on the overall system and the various subsystem designs and their suitability to meet the performance specifications, on the installation and commissioning plan, and on the overall project management of the LCLS undulator system.
Commissioning: are the diagnostics “adequate” for commissioning and operations problems?Will we be able to troubleshoot the undulator systems, and rapidly identify out-of-tolerance subsystems?
Gain vs. z is an excellent all-purpose tuning signalSASE gain at long wavelength should not be very difficultSASE gain at short wavelength – beam travels 50m before gain is evidentTo K or not to K?To rollaway or not to rollaway?Intra-undulator x-ray diagnostics are very challenging, not amenable to scheduling
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center
LCLS Undulator Systems Review: ChargeLCLS Undulator Systems Review: Charge
Review and evaluate the complete system design. Is the maturity of the design known to the level of detail to justify setting the cost and schedule performance baseline at this time?
Identify any open design issues that should be addressed prior to setting the baseline.
Is the management team adequately structured for completing the LCLS design?
Are there adequate resources and of the correct skill type to meet the needs of the project?Is the project progressing adequately?
Review and evaluate the complete system design. Is the maturity of the design known to the level of detail to justify setting the cost and schedule performance baseline at this time?
Identify any open design issues that should be addressed prior to setting the baseline.
Is the management team adequately structured for completing the LCLS design?
Are there adequate resources and of the correct skill type to meet the needs of the project?Is the project progressing adequately?
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center
LCLS Undulator Systems Review: ChargeLCLS Undulator Systems Review: Charge
A written report of the committee’s findings, A written report of the committee’s findings, comments and recommendations is requested.comments and recommendations is requested.
Please highlight areas of risk and any questions requiring Please highlight areas of risk and any questions requiring follow-up.follow-up.
This report will be very helpful in preparing for a This report will be very helpful in preparing for a DOE Performance Baseline review in April 2004.DOE Performance Baseline review in April 2004.
We thank the committee in advance for taking time out of We thank the committee in advance for taking time out of their busy schedules to provide us with this important their busy schedules to provide us with this important feedback on the LCLS Undulator Systems design. feedback on the LCLS Undulator Systems design.
A written report of the committee’s findings, A written report of the committee’s findings, comments and recommendations is requested.comments and recommendations is requested.
Please highlight areas of risk and any questions requiring Please highlight areas of risk and any questions requiring follow-up.follow-up.
This report will be very helpful in preparing for a This report will be very helpful in preparing for a DOE Performance Baseline review in April 2004.DOE Performance Baseline review in April 2004.
We thank the committee in advance for taking time out of We thank the committee in advance for taking time out of their busy schedules to provide us with this important their busy schedules to provide us with this important feedback on the LCLS Undulator Systems design. feedback on the LCLS Undulator Systems design.
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center
End of Presentation
Technical Review, March 3, 2004Technical Review, March 3, 2004 John Galayda, SLACJohn Galayda, SLAC
LCLS Undulator Systems TDR ChargeLCLS Undulator Systems TDR Charge [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Linear Accelerator Center