Lcj-con-glo-mst000-01 Method Statement Template
-
Upload
anatolie-cuaresma-amper -
Category
Documents
-
view
214 -
download
1
description
Transcript of Lcj-con-glo-mst000-01 Method Statement Template
![Page 1: Lcj-con-glo-mst000-01 Method Statement Template](https://reader036.fdocuments.net/reader036/viewer/2022072008/55cf8ff7550346703ba1cbcb/html5/thumbnails/1.jpg)
(Please type Method Statement Title)
© Leighton-China State-John Holland Joint Venture Page 1 of 2 LCJ-CON-GLO-MSTxxx-xx; dd-mmm-yy
Method Statement
(Please type Method Statement title)
for
City of Dreams Casino & ResortCotai, Macau
The Project Manager is responsible for updating and maintaining this document which has been signed by the Construction Manager to indicate approval. The status of this document is identified by a revision number and date in the footer on each page. Approved changes to the document are identified by a vertical line in the right hand margin.
This document is the property of Leighton-China State-John Holland Joint Venture and hard copies are issued with a red controlled stamp. The latest revision is available electronically on the project server and CoD intranet. The status of any hard copy should be verified against the electronic version before use. If you have any enquiry regarding the content of this document, please contact the Project Manager.
You may change the words Project Manager to LCJ staff responsible for updating and maintaining the Method Statement.
You may change the words Construction Manager to LCJ staff who approves the Method Statement.
Method Statement number has to be assigned by QA Dept., please e-mail Glenn Misa at [email protected] for the MS no.
Please delete this Orange Box if Method Statement is supplied by the SubCon.
Date of Issue should match with date on footer
Revision Date Prepared By Reviewed By Approved By Section / Description
00 dd-Mmm-yy Initial Issue
![Page 2: Lcj-con-glo-mst000-01 Method Statement Template](https://reader036.fdocuments.net/reader036/viewer/2022072008/55cf8ff7550346703ba1cbcb/html5/thumbnails/2.jpg)
(Please type Method Statement Title)
List of Contents
Section Title Page
1.0 SCOPE OF WORKS
2.0 CONSTRUCTION PROCEDURES
3.0 INSPECTION AND TESTING REQUIREMENTS
4.0 CONFORMANCE CRITERIA
5.0 MATERIALS
6.0 PERSONNEL ROLES AND RESPONSIBILITIES
7.0 ENVIRONMENTAL REQUIREMENTS
8.0 HEALTH AND SAFETY
9.0 PLANT AND EQUIPMENT
10.0 SUB-CONTRACTORS / SUPPLIERS
11.0 STORAGE AND HANDLING
12.0 REFERENCE
13.0 ATTACHMENT
A. MATERIAL SAFETY DATA SHEET (MSDS)(if applicable)
© Leighton-China State-John Holland Joint Venture Page 2 of 2 LCJ-CON-GLO-MSTxxx-xx; dd-mmm-yy