LBT Q2 2007 Engineering LBT Q2 2007 Engineering ReviewReview
PSPI: PEPSI installation PSPI: PEPSI installation preparation, includes all of preparation, includes all of
the pier modificationsthe pier modifications
![Page 2: LBT Q2 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.](https://reader036.fdocuments.net/reader036/viewer/2022071807/56649e1a5503460f94b07ff9/html5/thumbnails/2.jpg)
22
Highlights (Q2/2007)Highlights (Q2/2007)
Install 47 deg coolant to PEPSI bridge locationInstall 47 deg coolant to PEPSI bridge location Install clean dry air to PEPSI bridge locationInstall clean dry air to PEPSI bridge location Schedule PEPSI team, Frank and Emil visit first of July 2007Schedule PEPSI team, Frank and Emil visit first of July 2007
![Page 3: LBT Q2 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.](https://reader036.fdocuments.net/reader036/viewer/2022071807/56649e1a5503460f94b07ff9/html5/thumbnails/3.jpg)
33
Open IssuesOpen Issues
TechnicalTechnical Definition of power at connection pointDefinition of power at connection point
ScheduleSchedule Part scheduledPart scheduled
FinancialFinancial Cost of paint and materialsCost of paint and materials
ResourceResource Identify paint and paint contractorIdentify paint and paint contractor
![Page 4: LBT Q2 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.](https://reader036.fdocuments.net/reader036/viewer/2022071807/56649e1a5503460f94b07ff9/html5/thumbnails/4.jpg)
44
Progress (Q2/2007)Progress (Q2/2007)
Install 47 deg coolant to PEPSI bridge locationInstall 47 deg coolant to PEPSI bridge location Install clean dry air to PEPSI bridge locationInstall clean dry air to PEPSI bridge location
![Page 5: LBT Q2 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.](https://reader036.fdocuments.net/reader036/viewer/2022071807/56649e1a5503460f94b07ff9/html5/thumbnails/5.jpg)
55
Planning (Q3/2007)Planning (Q3/2007)
Terminate fibersTerminate fibers Define and install the connection point boxDefine and install the connection point box Install more servicesInstall more services Move J box in pier up to 4 M, Q3 2007Move J box in pier up to 4 M, Q3 2007 Move florescence lights in pier up to 4 M, Q3 2007Move florescence lights in pier up to 4 M, Q3 2007 Installing energy chain/ cable chainInstalling energy chain/ cable chain Installing AZ hole support structureInstalling AZ hole support structure Installing gallery bracketsInstalling gallery brackets
![Page 6: LBT Q2 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.](https://reader036.fdocuments.net/reader036/viewer/2022071807/56649e1a5503460f94b07ff9/html5/thumbnails/6.jpg)
66
Planning (before 2008)Planning (before 2008)
Install servicesInstall services install E-net, install E-net, install E-stopinstall E-stop install telephoneinstall telephone install power and conduitinstall power and conduit
Insulate all pipe carrying liquidsInsulate all pipe carrying liquids Epoxy paint entire floorEpoxy paint entire floor Paint walls with epoxy paintPaint walls with epoxy paint