Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.

13
Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers

Transcript of Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.

Page 1: Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.

Lausanne Metro Tunnel Collapse 2005

James McMulkin, Claire Rose, Ashley Rogers

Page 2: Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.

Lausanne

Page 3: Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.

Lausanne

Page 4: Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.

Lausanne Metro

Page 5: Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.

Foreland

Basin

/

Molasse

Deposit

Page 6: Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.

Foreland Basin/Molasse Deposit

Page 7: Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.

Moraine

Page 8: Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.

Umbrella Vault NATM

Page 9: Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.

22nd February 2005

Earlier in the day• In rush of water

from the moraine layer led to work stopping

• Investigations were being carried out by the contractor for Lot 1200 to determine the cause

18:00 MET• Tunnel collapse

occurred• 50m3 entered the

tunnel• Large crater below

Rue Saint Laurent

Page 10: Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.

What Water?

Page 11: Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.

Engineering Solutions for Specific Problem:Identifying Problem

Page 12: Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.

• Improving soil strength should have been essential to allow for safe tunnelling

Engineering Solutions for Specific Problem:Solving the Problem

Page 13: Lausanne Metro Tunnel Collapse 2005 James McMulkin, Claire Rose, Ashley Rogers.

Actual Solution After Collapse

• Collapsed void first reinforced by 11 drilled piles (CFA likely) and grouting

• 800m³ of crushed glass sand used as infill due to good compactability

• Slope design changed due to need to go deeper