Latest Developments on the E mbedded A ssembly Sy stem Power Supply for LHC Experiments

23
Latest Developments on the Embedded Assembly System Power Supply for LHC Experiments Giovanni GRIECO CAEN SpA [email protected] 9th Topical Seminar on Innovative Particle and Radiation Detectors 23 - 26 May 2004 Siena, Italy

description

Latest Developments on the E mbedded A ssembly Sy stem Power Supply for LHC Experiments. Giovanni GRIECO CAEN SpA [email protected] 9th Topical Seminar on Innovative Particle and Radiation Detectors 23 - 26 May 2004   Siena, Italy. Summary. Background / previous CAEN HV/LV activities - PowerPoint PPT Presentation

Transcript of Latest Developments on the E mbedded A ssembly Sy stem Power Supply for LHC Experiments

Page 1: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Latest Developments on the Embedded Assembly System

Power Supply for LHC Experiments

Latest Developments on the Embedded Assembly System

Power Supply for LHC Experiments

Giovanni GRIECO

CAEN [email protected]

9th Topical Seminar on Innovative Particle and Radiation Detectors23 - 26 May 2004   Siena, Italy

Page 2: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

2

SummarySummary

• Background / previous CAEN HV/LV activities

• Birth of the EASY System• EASY specifications• EASY modules• EASY integration in DCS

Page 3: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

3

BackgroundBackground

• CAEN’s Power Supplies R&D activities in the last 8 years:– SY1527/2527 family– OPC Server for the SY1527/2527 – SASY2000 for Radiation Tolerant and Magnetic Field

solutions tested working devices up to: • 7 kGauss• 1*1011 p/cm2 TD - 15 kRad TID• 2*1012 n/cm2 TD

• Result: – existence of a series of building blocks for a new

power supply concept

Page 4: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

4

Hostile Area Experience Milestones

Hostile Area Experience Milestones

Feb ‘97

First COTS rad-tolerance tests (ENEA - La Casaccia)

Tests with p and n in Louvain-la-Neuve of A877( CMS Muon Chambers)

May ‘99

New design (Patented) for a family of High and Low voltage DC/DC converters

Nov 01 Today

EASY 3000/4000

Start of Special material research

Apr 00

First SASY 2000 functional prototype

May 02

SASY 2000 tested under Radiation in LLN

Aug 02

SASY 2000 tested in Magnetic field in

CERN

Sept 02

SASY 2002 (CMS Tracker PS Proto)

tested under Radiation in LLN

May 03

SASY 2002 (CMS Tracker PS Proto)

tested in Magnetic field in CERN

Jul 03

Page 5: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

5

Why the EASY ?Why the EASY ?

• The LHC experiments need common solutions:– Reduce R&D costs (Hardware & Software)– Reduce Hardware/Software proliferation:

• Use of the same crates for all Sub-detectors• Use of the same modules where possible• Use of a Common Control System

– Reduce Maintenance costs:• Use of Common spare units

• CAEN proposes a “catalog” approach with a limited set of modules

Page 6: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

6

Syste

m P

hilosop

hy

Syste

m P

hilosop

hy

CO

NT

RO

LL

OG

IC

V+

V-

S+S-

V+

V-

S+S-

V+

V-

S+S-

DC-DC

DC-DC

DC-DC

CO

NT

RO

LL

OG

IC

V+

V-

S+S-

V+

V-

S+S-

V+

V-

S+

S-

DC-DC

DC-DC

DC-DC

HOSTILE AREAS

Y1

52

7 S

YS

TE

M M

AIN

FR

AM

E

CONTROL ROOM

SY1527

EASY Module

EASY Module

48VPOWERSOURCE

48VSERVICEPOWERSOURCE

BR

AN

CH

CO

NT

RO

LL

ER

- A

16

76

INTERRUPTPOWER FAILURE

Control Bus

Po

wer

Lin

e

P.

Ser

vice

Lin

e

48VBACKUPBATTERY

Page 7: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

7

EASY3000/EASY4000EASY3000/EASY4000S

tan

dalo

ne

Sta

nd

alo

ne EASY

3000

19" (21 slots)

6 U EASYEASY

30003000

Rack

Rack M

ou

nt

Mou

nt

EASY4000

EASY3000

EASY4000

EASY3000

EASY4000

EASY4000

Radiation & Magnetic Field

OptionalWhen

NO magnetic field is present

Page 8: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

8

EASY Main FeaturesEASY Main Features

• Full integration in SY1527/SY2527 (it appears as a single SY1527 board)

• 48V DC input• 21 slots per crate• 3 kW Maximum Output Power• Magnetic field capability: 2 kGauss• Expected rad.tol.: 1*1011 p/cm2 TD

2*1012 n/cm2 TD15 kRad TID

Page 9: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

9

EA

SY

Mod

ule

sEA

SY

Mod

ule

sModel Ch. per

moduleMax

Output Voltage per Ch.

Max Output Current per Ch.

Max Output Power per ch.

Width (slots)

Modules per

Crate

MAX Channels per Crate

Hostile Area

A3009 12 2-8V 9A 45 W 4 5 60 YesA3016 6 2-8V 16A 90 W 4 5 30 YesA3025 4 2-8V 25A 150 W 4 5 20 YesA3050 2 2-8V 50A 300 W 4 5 10 YesA3100 1 2-8V 100A 600 W 4 5 5 YesA3507 12 700V 15mA 11 W 2 10 120 YesA3540 12 4kV 1mA 4 W 2 10 120 YesA3512 6 12kV 1mA 12 W 3 7 42 Yes

A4601H 2 complex 2 10 20 complex Yes8.5V 15A Yes7.3V 8A Yes600V 20mA Yes

A4601F 2 complex 2 10 20 complex No8.5V 15A No7.3V 8A No600V 20mA No

Page 10: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

10

A3009 - A3016A3009 - A3016• Reversible polarity• VMon and VSet accuracy

+/- (30mV + 3% Vout)• IMon and ISet accuracy

+/- (50mA + 3% Iout)• Ripple < 20mVpp (10Hz-15MHz)• VMax & IMax by trimmer per ch.• Channel alarms:

– Load and Connector Over-Voltage, – Over-Current, Over-Temperature, Over-Power

• On/off per Ch.• LDR trimmer on the board panel• Board enable (interlock)• 48V Service local & remote on/off • DB50 connectors

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

CH5

CH4

CH3

CH2

CH1

CH0

Comm SlotOKPowerGood

Interlock

48Vs On/Off

Loc Rem

on

off

EARTH

C.A.E.N.Mod. A3016

6 CH8V/15A/90W

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

ImaxOn

VmaxLDR

CH11

CH10

CH9

CH8

CH7

CH6

CH5

CH4

CH3

CH2

CH1

CH0

Comm SlotOKPowerGood

Interlock

48Vs On/Off

Loc Rem

on

off

EARTH

C.A.E.N.Mod. A3009

12 CH8V/5A/25W

Page 11: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

11

A3025 – A3050 – A3100A3025 – A3050 – A3100• Reversible polarity• VMon and VSet accuracy

+/- (30mV + 3% Vout)• IMon and ISet accuracy

+/- (50mA + 3% Iout)• Ripple < 20mVpp (10Hz-15MHz)• VMax & IMax by trimmer per ch.• Channel alarms:

– Load and Connector Over-Voltage, – Over-Current, Over-Temperature, Over-

Power• On/off per Ch.• LDR trimmer on the board panel• Board enable (interlock)• 48V Service local & remote on/off • Hex head bolt connector (A3050, A3100)

C.A.E.N.Mod. A3025

4 CH8V/25A/150W

On

Imax

LDR

V+

V-

CH0

Vout+

Vout-Sense+

Sense-

Vmax

On

Imax

LDR

V+

V-

CH1

Vout+

Vout-Sense+

Sense-

Vmax

On

Imax

LDR

V+

V-

CH2

Vout+

Vout-Sense+

Sense-

Vmax

On

Imax

LDR

V+

V-

CH3

Vout+

Vout-Sense+

Sense-

Vmax

Comm SlotOKPowerGood

Interlock

48Vs On/Off

Loc Rem

on

off

EARTH FAGND

C.A.E.N.Mod. A3050

2 CH8V/50A/300W

On

Vmax

Imax

LDR

Vout+

Vout-

Vout+

Vout-Sense+

Sense-

CH0

Vout+

Vout-Sense+

Sense-

On

Vmax

Imax

LDR

Vout+Vout-

CH1

Comm SlotOKPowerGood

Interlock

48Vs On/Off

Loc Rem

on

off

EARTH FAGND

C.A.E.N.Mod. A3100

1 CH8V/100A/

600W

On

Vmax

Imax

LDR

Vout+

Vout-

Vout+

Vout-Sense+

Sense-

Comm SlotOKPowerGood

Interlock

48Vs On/Off

Loc Rem

on

off

EARTH FAGND

Page 12: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

12

A3507 - A3540 – A3512A3507 - A3540 – A3512• Polararized Floating Channels• VMon and VSet accuracy

(A3540 & A3512) +/- (2V + 0.1% Iout)(A3506) +/- (1V + 0.1% Iout)

• IMon and ISet accuracy(A3540 & A3512) +/- (2uA + 1% Iout)

(A3507) +/- (5uA + 1% Iout)

• Ripple (A3540 & A3507) < 20 mV (10Hz-15MHz)

(A3512) < 100 mV (10Hz-15MHz)

• VMax & IMax by trimmer per board• Channel alarms: Over-Voltage,

Over-Current, Over-Temperature• On/off per Ch. & Board enable

(interlock)• 48V Service local & remote on/off • SHV or CPE(A3512) HV connectors

C.A.E.N.Mod. A3540

12 CH4KV/1mA

On

CH0

On

CH1

On

CH2

On

CH3

On

CH4

On

CH5

On

CH6

On

CH7

On

CH8

On

CH9

On

CH10

On

CH11

Comm SlotOKPowerGood

Interlock

48Vs On/Off

Loc Rem

on

off

Imax Vmax

EARTH FAGND

C.A.E.N.Mod. A3512

6 CH12KV/1mA

On

CH0

On

CH1

On

CH2

On

CH3

On

CH4

On

CH5

Comm SlotOKPowerGood

Interlock

48Vs On/Off

Loc Rem

on

off

Imax Vmax

EARTH FAGND

C.A.E.N.Mod. A3506

12 CH600V/20mA

On

CH0

On

CH1

On

CH2

On

CH3

On

CH4

On

CH5

On

CH6

On

CH7

On

CH8

On

CH9

On

CH10

On

CH11

Comm SlotOKPowerGood

Interlock

48Vs On/Off

Loc Rem

on

off

Imax

EARTH FAGND

Vmax

Page 13: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

13

First EASY module: A4601H/FFirst EASY module: A4601H/F

• Developed for CMS Tracker• Can be used in hostile area

or in counting room• Currently under test in CAEN

Page 14: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

14

• Full integration with the software developed for SY1527/SY2527:– OPC Server– Wrapper libraries (Linux/Win32)

• Full integration with the software developed for SY1527/SY2527:– OPC Server– Wrapper libraries (Linux/Win32)

EASY IntegrationEASY Integration

• Controlled by SY1527/SY2527 power supplies

• Controlled by SY1527/SY2527 power supplies

Page 15: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

15

CAEN OPC Server MilestonesCAEN OPC Server Milestones

Mar 99

CAEN delivers the 1° SY1527 to CERN

Oct 99

CAEN and IT/CO start the collaboration

May 00

Presentation of the CAEN OPC Server project to the JCOP Meeting

Sep 00

OPC Server rel. 1.0(SY1527 via TCP/IP)

Nov 00

Permanent Test Bench (CAEN PS +

OPC) at IT/CO Labs

Sep 01

Integration of SY1527 into

the JCOP Framework

Jan 02

Presentation of the CAEN OPC Server

rel. 2.0 new features

Today

200 Downloads from CAEN web

site(25% by CERN)

Page 16: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

16

EASYEASY

EASYEASY

EASYEASY

EASYEASY

EASYEASY

EASYEASY

EASY ArchitectureEASY Architecture

+DCSDCS

• CAN Bus based link• Ad-hoc protocol• Speed and reliability• No interoperability issues• Can work in hostile area

Page 17: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

17

EASY Channels RepresentationEASY Channels Representation

Channel 00Channel 01Channel 02

Channel 00Channel 01Channel 02

Channel 03Channel 04Channel 05

Channel 03Channel 04Channel 05

Channel 06Channel 07Channel 08

Channel 06Channel 07Channel 08

Channel 09Channel 10Channel 11

Channel 09Channel 10Channel 11

Channel 12Channel 13Channel 14

Channel 12Channel 13Channel 14

Channel 15Channel 16Channel 17

Channel 15Channel 16Channel 17

EA

SY

EA

SY

3000

3000

EA

SY

EA

SY

3000

3000

EA

SY

EA

SY

3000

3000

EA

SY

EA

SY

3000

3000

…Board 01 - Channel 000Board 01 - Channel 001Board 01 - Channel 002Board 01 - Channel 003Board 01 - Channel 004Board 01 - Channel 005 Board 01 - Channel 006Board 01 - Channel 007Board 01 - Channel 008Board 01 - Channel 009Board 01 - Channel 010Board 01 - Channel 011Board 01 - Channel 012Board 01 - Channel 013Board 01 - Channel 014Board 01 - Channel 015Board 01 - Channel 016Board 01 - Channel 017

…Board 01 - Channel 000Board 01 - Channel 001Board 01 - Channel 002Board 01 - Channel 003Board 01 - Channel 004Board 01 - Channel 005 Board 01 - Channel 006Board 01 - Channel 007Board 01 - Channel 008Board 01 - Channel 009Board 01 - Channel 010Board 01 - Channel 011Board 01 - Channel 012Board 01 - Channel 013Board 01 - Channel 014Board 01 - Channel 015Board 01 - Channel 016Board 01 - Channel 017

Page 18: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

18

A1676 Branch ControllerA1676 Branch Controller

• Single slot on SY1527/SY2527 systems:

– 16 boards per SY1527

– 6 boards per SY2527

• Up to 6 independent EASYs

• CANBus based bus protocol

• Up to 720 indipendent ch. per branch

• Up to 11.520 indipendent ch. per system

Page 19: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

19

EASY Module FeaturesEASY Module Features

• Local microcontroller• Firmware remotely upgradable• Hardware Imax• Per low voltage channel:

– Independent ON/OFF– Vmon (Connector and Load)– Imon– Vset (Software or Hardware)– Programmable Trip– Sense wires– Status Signals

Page 20: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

20

SY1527 / SY2527 (front view)SY1527 / SY2527 (front view)

SY1527 SY2527

• Modular and Expandable

• Flexible: HV, LV & branch controller boards

• Reliable

• Remote Firmware upgrading & Maintenance

Page 21: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

21

SY1527 / SY2527 (rear view)SY1527 / SY2527 (rear view)

3GND3GND3GND3GND

DB091GND2GND3GND4GND5GND

Branch Controller

Branch Controller

DB

091G

ND

2GN

D3G

ND

DB

09

1GN

D2G

ND

3GN

D

4GN

D5G

ND

SY1527

SY2527

Page 22: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

22

SY1527/SY2527 ConnectivitySY1527/SY2527 Connectivity

Telnet Client LabView onPC/Mac/Linux

OPC Server

LAN Ethernet

LAN Ethernet

OPC Client OPC Client

Router

Internet

Firewall

Page 23: Latest Developments on the  E mbedded  A ssembly  Sy stem  Power Supply for LHC Experiments

Siena, 23-26 May '04 Latest Developments on the EASY Power Supply for LHC Experiments

23

ConclusionsConclusions

• CAEN has completed all developments in Magnetic Field and Radiation

• Integration in DCS (OPC Server + SY1527) is well established and already in use

• The architectures of the EASY System and modules are completely defined