Landsat 9 Project Status · Landsat 9 Project Status . Landsat Science Team Meeting July 11, 2017...

13
Landsat Science Team Meeting Sioux Falls, SD 11July 2017 Presented By: NASA Landsat 9 Project Manager: Del Jenstrom USGS Landsat 9 Project Manager: Jim Nelson Landsat 9 Project Status

Transcript of Landsat 9 Project Status · Landsat 9 Project Status . Landsat Science Team Meeting July 11, 2017...

Page 1: Landsat 9 Project Status · Landsat 9 Project Status . Landsat Science Team Meeting July 11, 2017 Landsat 9 Mission Overview ... Mission Category 1, Risk Class B

Landsat Science Team Meeting

Sioux Falls, SD

11July 2017

Presented By:

NASA Landsat 9 Project Manager: Del Jenstrom

USGS Landsat 9 Project Manager: Jim Nelson

Landsat 9 Project Status

Page 2: Landsat 9 Project Status · Landsat 9 Project Status . Landsat Science Team Meeting July 11, 2017 Landsat 9 Mission Overview ... Mission Category 1, Risk Class B

Landsat Science Team Meeting July 11, 2017

Landsat 9 Mission Overview

Mission Objectives

• Provide continuity in the multi-decadal Landsat land surface observations to study, predict, and understand the consequences of land surface dynamics

• Core Component of Sustainable Land Imaging Program

Increase in pivot irrigation in Saudi Arabia from 1987 to 2012 as recorded by

Landsat. The increase in irrigated land correlates with declining groundwater

levels measured from GRACE (courtesy M. Rodell, GSFC)

Instruments

• Operational Land Imager 2 (Ball Aerospace) • Reflective-band push-broom imager (15-30m res)

• 9 spectral bands at 15 - 30m resolution

• Retrieves data on surface properties, land cover, and vegetation condition

• Thermal Infrared Sensor 2 (NASA GSFC) • Thermal infrared (TIR) push-broom imager

• 2 TIR bands at 100m resolution

• Retrieves surface temperature, supporting agricultural and climate applications, including

monitoring evapotranspiration

Spacecraft & Observatory I&T

• Orbital ATK (same spacecraft vendor as Landsat 8)

Launch Services

• Competitively Procured: TBD

Mission Parameters

• Single Satellite, Mission Category 1, Risk Class B

• 5-year design life after on-orbit checkout

• At least 10 years of consumables

• Sun-synchronous orbit, 705 km at equator, 98°inclination

• 16-day global land revisit

• Partnership: NASA & United States Geological Survey (USGS)

• NASA: Flight segment & checkout

• USGS: Ground system and operations

• Launch: FY2021 (Targeting December 15, 2020), Category 3 Vehicle

Mission Team • NASA Goddard Space Flight Center (GSFC)

• USGS Earth Resources Observation & Science (EROS) Center

• NASA Kennedy Space Center (KSC)

2

Page 3: Landsat 9 Project Status · Landsat 9 Project Status . Landsat Science Team Meeting July 11, 2017 Landsat 9 Mission Overview ... Mission Category 1, Risk Class B

Landsat Science Team Meeting July 11, 2017

Operational Land Imager 2 (OLI-2)

•Contract with Ball Aerospace in Boulder CO established in December 2015

•OLI-2 successfully completed Critical Design Review in August 2016

• Instrument in fabrication at Ball Aerospace

•On target for mid-2019 delivery to spacecraft Assembled Landsat 8 OLI at Ball Aerospace facility

OLI-2 will, to the extent possible, be a copy of OLI for Landsat 9 to

maintain data continuity with Landsat 8 and to minimize cost and risk

3

Page 4: Landsat 9 Project Status · Landsat 9 Project Status . Landsat Science Team Meeting July 11, 2017 Landsat 9 Mission Overview ... Mission Category 1, Risk Class B

Landsat Science Team Meeting July 11, 2017

OLI-2 Is Coming Together Quickly!!

4

Installing the Tertiary Mirror

into the OLI-2 Optical Bench

at Ball Aerospace

OLI-2 Flight Focal Plane

Assembly (FPA) and Ball

Aerospace FPA Assembly

Team

OLI-2 Optical Bench OLI-2 Baseplate

Page 5: Landsat 9 Project Status · Landsat 9 Project Status . Landsat Science Team Meeting July 11, 2017 Landsat 9 Mission Overview ... Mission Category 1, Risk Class B

Landsat Science Team Meeting July 11, 2017

Thermal Infrared Sensor 2 (TIRS-2)

•NASA GSFC TIRS-2

team formed in 2015

•TIRS-2 successfully

completed Critical

Design Review in

February 2017

• Instrument in fabrication

at NASA GSFC

•On target for mid-2019

delivery to spacecraft

TIRS-2 Improvements

• Increased redundancy to satisfy Class B reliability standards

• Improved stray light performance through improved telescope baffling

• Improved position encoder for scene select mirror to address problematic encoder on Landsat 8 TIRS

TIRS-2 will be a rebuild of Landsat 8 TIRS except TIRS-2 will be upgraded

from Risk Class C to Class B for Landsat 9

Landsat 8 TIRS at NASA/GSFC

5

Page 6: Landsat 9 Project Status · Landsat 9 Project Status . Landsat Science Team Meeting July 11, 2017 Landsat 9 Mission Overview ... Mission Category 1, Risk Class B

Landsat Science Team Meeting July 11, 2017

TIRS-2 Is Moving Just As Quickly!!

6

Flight TIRS-2 FPA

Flight Telescope

Integrated Main Electronics

Box (MEB) Testbed

Fully Assembled TIRS-2 Flight Structure

Page 7: Landsat 9 Project Status · Landsat 9 Project Status . Landsat Science Team Meeting July 11, 2017 Landsat 9 Mission Overview ... Mission Category 1, Risk Class B

Landsat Science Team Meeting July 11, 2017

Spacecraft Bus

•Contract competitively awarded to Orbital ATK in Gilbert, AZ in October 2016

•Spacecraft successfully completed System Requirements Review in February 2017

•Preliminary Design Review planned for July 18-20, 2017

•Targeting readiness to integrate OLI-2 and TIRS-2 in mid-2019

Landsat 9 spacecraft will be similar to that of Landsat 8, and it will also draw on

component heritage from ICESat-2 and JPSS-2 missions

Landsat 8 Spacecraft at launch facility

7

Page 8: Landsat 9 Project Status · Landsat 9 Project Status . Landsat Science Team Meeting July 11, 2017 Landsat 9 Mission Overview ... Mission Category 1, Risk Class B

Landsat Science Team Meeting June 15, 2017

Landsat 9 Master Schedule

8

2015 2016 2017 2018 2019 2020 2021 2022 2023

MAM J J A SOND J FMAM J J A SOND J FMAM J J A SOND J FMAM J J A SOND J FMAM J J A SOND J FMAM J J A SOND J FMAM J J A SOND J FMAMJ J ASOND J FMAM

Landsat 9 Master Schedule (current)

LRD 2020WBS

NASA Project Phases

NASA HQ Milestones

Major Reviews

Instrument Development5.0

OLI-2 Instrument5.3

TIRS-2 Instrument5.4

Spacecraft6.0

Spacecraft Procurement

Spacecraft Development

Observatory Integration & Test10.0

Launch Site Operations

Mission Operations7.0

Launch Vehicle Services8.0

Ground Systems9.0

KDP-B KDP-C (CR) KDP-D KDP-E

SRR/MDR PDR IBR MOR

FOR

PLAR

PDR

PDR CDR

GCDR GRT1 2 3 4 5

GRT DITL

Date Format: mm/yy

Status Date: 5/31/17

Phase B Phase C Phase D

9/17 3/18

Phase A

12/15/20

12/15

Contract Award

HeritageReview

4/16

CDR

8/16

Instrument Build

11/15

HeritageReview

CDR

2/17

Cryocooler Award

5/16

Instrument Build

Release Study RFO

11/15

Study DOAward

12/15

ReleaseRFO

5/16

Final ProposalEvaluations

9/16

3/17 7/17 2/18

9/25/20ship

SC @ Launch Site

USGS ASM

10/152/1812/16 8/18

8/16

6/16

6/16

10/19

8/26/19SC to I&T

12/19

Phase E

12/20

SEB

9/17

3/20

11/20

9/204/18

ORRPSR LRR/FRR

LRD 3/21

12/17

4/19

7/19 10/19 12/19 3/21

GPDR

12/20

MOSsStart

8/19

2/18

12/15/20 LRD

7/18

4/20

MOSsEnd

IBR

8/16

6/17

PER

SRR

GSRR

PER

6/19

MRTsStart

7/20

MRTsEnd

PER

OLI-2 Delivery9/15/19

TIRS-2 Delivery8/15/19

Obs I&T

2/20

Early Integ.LV Selection

3/18

Std. Integ.kickoff

12/18

MSRR

6/19

MSPDR

19

19

12/19

MSCDR MSSAR

6/19

SIR

12/19

CDR

SC build

Page 9: Landsat 9 Project Status · Landsat 9 Project Status . Landsat Science Team Meeting July 11, 2017 Landsat 9 Mission Overview ... Mission Category 1, Risk Class B

Landsat Science Team Meeting July 11, 2017

Mission Operations Center (MOC)

•Flight Operations Team performs mission planning and scheduling, command and control, health and status monitoring, orbit and attitude maintenance, mission data management

•Landsat Mission Operations (LMO) contract supports Landsat 8 and 9

LMO contract awarded to General Dynamics Mission Systems (GDMS) on June 22, 2017 (same development contractors as LDCM/L8)

Planning to consolidate mission operations and external interfaces across missions

•Landsat Multi-Satellite Operations Center (LMOC) facility will be at GSFC in space currently occupied by the Landsat 7 MOC

Landsat 7 MOC relocation efforts underway

•System Requirements Review planned for August 2017

9

Landsat 8 Mission Operations Center

Page 10: Landsat 9 Project Status · Landsat 9 Project Status . Landsat Science Team Meeting July 11, 2017 Landsat 9 Mission Overview ... Mission Category 1, Risk Class B

Landsat Science Team Meeting July 11, 2017

Ground Network Element (GNE)

•Ground Network Element provides space to ground communications with the Landsat 9 observatory

•All Landsat 9 Ground Stations currently used operationally on Landsat 8

Launch and Early Orbit stations and Operations Readiness stations

•Status:

System Requirements Review completed in April 2017

Subsystem Requirements Engineering Peer Reviews completed in May/June 2017

On track for Preliminary Design Review in Nov 2017

GLC – Gilmore Creek, AK

LGS – EROS, Sioux Falls, SD

SGS – Svalbard, Norway

ASN – Alice Springs, Australia (Ops Readiness)

NSN – Neustrelitz, Germany (Ops Readiness)

Note: Working to obtain L9 downlink licensing early in the L9 development

lifecycle by collecting necessary ground station information from the ICs

10

Page 11: Landsat 9 Project Status · Landsat 9 Project Status . Landsat Science Team Meeting July 11, 2017 Landsat 9 Mission Overview ... Mission Category 1, Risk Class B

Landsat Science Team Meeting July 11, 2017

Data Processing and Archive System (DPAS)

•Provides science data ingest, storage and archive, image assessment, product generation, and data access and distribution

• Landsat 9 building upon system developed for Landsat 8

Multi-mission DPAS development Phase 1 nearing completion; Phase 2 on track for early 2018 delivery

•Status:

System Requirements Review completed in April 2017

Subsystem Requirements Engineering Peer Reviews completed in May 2017

On track for Preliminary Design Review in Dec 2017

11

Page 12: Landsat 9 Project Status · Landsat 9 Project Status . Landsat Science Team Meeting July 11, 2017 Landsat 9 Mission Overview ... Mission Category 1, Risk Class B

Landsat 9 Ground System & Operations Schedule

12

2015 2016 2017 2018 2019 2020 2021

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Current as of 6/30/2017

Landsat 9 Ground System & Operations Master Schedule

Task Name

Mission Reviews

Ground System and Operations Reviews

Mission Operations Center

Ground Network Element

Data Processing and Archive System

Ground System Tests

Operations Readiness

6/16

SRR/MDR

8/16

KDP-B

9/17

PDR

12/17

KDP-C

3/18

CDR

10/19

SIR

12/19

KDP-D

9/20

ORR

11/20

KDP-E

12/20

Launch

12/20

LRR

3/21

PLAR/MTR

10/15

USGS ASM

12/16

GSRR

2/18

GPDR

8/18

GCDR

6/19

MOR

3/20

FOR

1/16

RFI

12/16

LMORFP

6/17

LMO Award

8/17

MOC SRR

1/18

MOC PDR

8/18

MOCCDR

1/19

MOC B1

4/19

MOC B2

7/19

MOC B3

12/19

MOC B4

4/17

GNE SRR

11/17

GNE PDR

5/18

GNE CDR

11/18

GNE B1

7/19

GNEB2

4/17

DPAS SRR

12/17

DPAS PDR

4/18

DPAS CDR

2/19

DPAS B1

8/19

DPAS R2

4/19

GRT 1

7/19

GRT 2GRT 3

GRT 4

2/20

GRT 5

MRTs Start

8/19 4/20

MOSs Start

7/20

MRTs End

12/20

MOSs End

20d Reserve

20dReserve

20dReserve

20dReserve

10d Reserve

10dReserve

10dReserve

10dReserve

12/1910/19

Page 13: Landsat 9 Project Status · Landsat 9 Project Status . Landsat Science Team Meeting July 11, 2017 Landsat 9 Mission Overview ... Mission Category 1, Risk Class B

Landsat Science Team Meeting June 15, 2017

Summary

• Instrument development is proceeding rapidly!!!

On-orbit performance should be excellent!!!

•Spacecraft development is on-plan for instrument integration in 2019

•Ground System is making excellent progress

Landsat Mission Operations contract awarded and moving quickly

•Strong NASA-USGS relationship is well defined and operating effectively

•Landsat 9 has been making excellent progress against an aggressive plan

Mission on target for launch in December 2020