land scaping
-
Upload
linamohdzhor4815 -
Category
Documents
-
view
216 -
download
0
Transcript of land scaping
-
8/21/2019 land scaping
1/59
ConsolidatedEngin
eeringConstruction
QCS 2
1.
1.11.1.11.1.21.1.31.1.41.1.5
1.21.2.11.2.21.2.3
1.31.3.11.3.21.3.3
1.3.41.3.51.3.61.3.71.3.81.3.91.3.101.3.111.3.121.3.131.3.141.3.15
1.3.161.3.171.3.181.3.191.3.201.3.211.3.221.3.231.3.24
1.41.4.1
1.4.21.4.31.4.41.4.5
1.51.5.11.5.21.5.31.5.41.5.51.5.61.5.71.5.81.5.9
010 Se
QCS 2010
LANDSC
GENERAScope .....ReferencQuality ASubmittalJob Cond
SHIPPINShippingStorage ...Handling .
PRODUCGeneral ...Plants......Labels .....
WorkmanSoil PrepSubsoil PSpreadinSoil SpeciAlternativSoil AdditiSoil AdditiAlternativCompostContractoThe Supe
ChemicalPlantingPlantingDry PlantTurf FertilMulch ......Guys andEdging MIrrigation
SITE PRGeneral
Sub-SurfaFinishedPlantingProtection
PLANTINPlant PitsBackfill MInstallatioInstallatioCultivatioSeeding ..SpriggingTurfing ....Plant List,
ction 28
PE PLAN
REQUIR.................s ..............surance ...................
itions .........
, DELIVEnd Deliver..................................
S ...............................................................
hip / Qualiration .......eparation .and Prepfication .....Soil Specves Procve - ProceSoil Additpecificati
rs Responrvising Offi
Testing foroil Mixtureoil MixtureFertiliser ...iser ............................Stakes .....terial ........ater ........
PARATIOequiremen
ce Gradingrading .....perationsof Existing
................................ixture ........for Treesof Palmsof Turf Ar
.................
.................
.................Spacing a
Part
ING ..........
MENTS .............................................................................................
Y, STORy ....................................................
..................
..................
..................
..................
fications ........................................ration of T..................ification .....edure A .....ure B ........
ive Specifins .............ibilities .....ers Resp
Fertiliser E..................(Sweet Soi............................................................................................................
FOR PLAts ..............
...................................nd LayoutVegetatio
..................
..................
..................and Shrub..................as ............
..................
..................
..................d Sizes ....
1 L
.................
.................
.................
.................
.................
.................
.................
GE AND H...................................................
.................
.................
.................
.................
..................................
.................psoil ........
.................
.................
.................
.................ations .........................................nsibilities .
quivalence.................l) ....................................................................................................................
NTING AR.................
..................................
.................................
.................
.................
.......................................................................................................................................
ndscape
..................
..................
..................
..................
..................
..................
..................
ANDLING .......................................................
..................
..................
..................
..................
....................................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
of the Co................................................................................................................................................
EAS ............................
....................................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
Planting
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
....................................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
post ..........................................................................................................................................................
..................
..................
....................................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
..................................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
..................................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
age 1
........... 3
........... 3
........... 3
........... 3
........... 5
........... 5
........... 6
........... 6
........... 6
........... 7
........... 8
........... 8
........... 8
........... 8
........... 9
........... 9......... 10
......... 10
......... 10
......... 11
......... 12
......... 13
......... 14
......... 15
......... 16
......... 18
......... 19
......... 19
......... 20
......... 20
......... 20
......... 20
......... 20
......... 20
......... 21
......... 21
......... 21
......... 21
......... 21......... 22
......... 22
......... 22
......... 22
......... 22
......... 23
......... 24
......... 24
......... 24
......... 25
......... 25
......... 25
......... 25
-
8/21/2019 land scaping
2/59
ConsolidatedEngin
eeringConstruction
QCS 2
1.61.6.11.6.21.6.31.6.41.6.51.6.61.6.7
1.71.7.11.7.21.7.31.7.41.7.5
1.81.8.1
1.8.21.8.31.8.41.8.51.8.61.8.71.8.81.8.91.8.10
1.91.9.11.9.21.9.31.9.41.9.51.9.61.9.7
1.101.10.1
1.111.11.11.11.2
1.11.31.11.41.11.5
1.121.12.11.12.21.12.3
1.13
1.14
010 Se
QCS 2010
ANCILLAEdging PlMulch ......WateringPruning ...Anti-DesiClean upMaintena
EXISTINCare of EIdentificatFertilizingFertilizingPruning a
PLANTINGeneral ...
NomenclaGuarantieAccessoriTransplanPlantingWater CoPercolatioInstallatioInstallatio
GRASS ...MaterialsWorkmanSoil PrepDelivery ...Seeding ..PreparatiWatering,
APPLICAGeneral
WARRANPlant EstPlant Mai
ReplacemLawn MaiFinal Acc
MAINTENGeneral ...AppearanGrass Ma
APPENDI
APPENDI
ction 28
IES TO Pant Beds ....................of Plants ....................cant Appliand Site Rce during
LANDSCisting Lan
ion of ExistExisting TrExisting Snd Cavity
MATERI.................
ture ..........s Plantines .............ting Plantsime...........sumption .
n Test .......for Treesof Palms
.................and Produhip ...........ration .........................................n and InstCutting, a
ION OF Pequiremen
TEE, MAIblishmenttenance d
ent Plantstenance dptance .....
ANCE .......................ce of the Gintenance .
X A Land
X B Land
Part
ANTING ..........................................................................ation .........storation ...lanting O
PING .......scaping ....
ing Plants ..ees ...........rubs andork ...........
LS .............................
..................Material ..
..................
..................
..................
..................
..................and Shrub..................
..................ts ......................................................................................llation of Cd Completi
ESTICIDE .ts ..............
TENANCEnd Warraring the E
during theuring Plant..................
..................
..................round ..........................
scaping D
scaping D
1 L
.................
.................
.................
.................
.................
.................
.................erations ...
.................
.................
.................
.................roundcov
.................
.................
.................
..................................
.................
.................
.................
.................
..................................................
.................
.................
.................
.................
.................
.................arpet Grason .............
.................
.................
AND HANty Period ..tablishme
stablishmEstablish.................
.................
.................
.................
.................
tails 1 .......
tails 2 .......
ndscape
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................r Beds ........................
..................
..................
....................................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................s .................................
..................
..................
DOVER ......................t Period ....
nt Period .ent Period..................
..................
..................
..................
..................
..................
..................
Planting
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
....................................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
....................................
..................
..................
..................
..................
..................
..................
..................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
..................................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
..................................
.................
.................
.................
.................
.................
.................
.................
age 2
......... 35
......... 35
......... 35
......... 36
......... 36
......... 36
......... 36
......... 36
......... 37
......... 37
......... 37
......... 37
......... 37
......... 37
......... 37
......... 37
......... 38......... 38
......... 39
......... 40
......... 40
......... 40
......... 41
......... 41
......... 42
......... 42
......... 42
......... 43
......... 43
......... 43
......... 43
......... 44
......... 44
......... 45
......... 45
......... 45
......... 45
......... 45
......... 46......... 46
......... 46
......... 46
......... 46
......... 48
......... 50
......... 55
......... 57
-
8/21/2019 land scaping
3/59
ConsolidatedEngin
eeringConstruction
QCS 2
1.
1.1
1.1.11
2
3
4
1.1.2
1
010 Se
QCS 2010
LANDS
GENER
ScopeWork covenecessary
Landscapeof soil, layplantings,warranty,operationsDocument
The detailContractor
Related SSection 6
Section 12
Reference
The followi
ASTM C51
ASTM C54
ASTM C13
ASTM D42
ASTM D26
ASTM D29
ASTM D29
ASTM D29
AS 3743 --AS 4419 --
BS 1377 --
BS 3998 --
BS 4043 --
BS 3882 --
BS 3936 --
BS 4428 --
ction 28
CAPE P
L REQUI
red under tto perform a
planting isut of plantshrub plantippliances ain a worktion.
pertainingshall execut
ctions are aRoad w
Earthwo
s
ng standard
6 -------------
9 -------------
6 -----------
2 -----------
07 -----------
74 -----------
76 -----------
77 -----------
------------------------------
---------------
---------------
---------------
---------------
---------------
---------------
Part
LANTIN
EMENT
is sectionll operations
inclusive buand areas, tng, tree plad servicesanship lik
to this scope his work a
follows:rks
ks Related t
are referre
pecification
pecification
tandard M
ggregates
tandard Me
tandard Croducts
tandard Meat Materia
tandard Me
tandard Me
otting mixeoils for lanustralia
ethod of te
ree Work
ransplantin
opsoil
ursery Stoc
eneral Lan
1 L
onsists ofrequired fo
t not limitedurfing, seednting, landsnecessary f manner,
e of work as per the de
o Buildings
d to in this P
for Vermicu
for Perlite L
thods of Si
thods of Pa
lassification
thod of Tels
thod of Test
thod of Test
. Standarddscaping a
t of soils fo
Trees
k and Shru
scape Ope
ndscape
urnishing alllandscapin
to finisheding and spriape edges,r and incideaccording t
re herein Aails in Appe
art:
lite Loose Fi
oose Fill Ins
ve and Scr
ticle Size A
of Peat,
t for Moist
for pH of P
for Particle
Australia, Sd garden u
civil engine
s
ration
Planting
labour, eqherein spe
rading, supging of ne maintenanntal to com the provi
pendix A andix A and
ll Thermal In
ulation
en Analysi
alysis of soi
Mosses, H
re, Ash, a
at Materials
Size Range
ydney Austrse. Standar
ering purpo
ipment andcified.
plying andlawns, gro
ce period, lleting all thions of th
nd Appendippendix B.
sulation
of Fine an
l
umus, and
d Organic
of Peat Mat
aliads Australia
es
age 3
material
preadingnd coverndscapeplantingProject
B. The
d Coarse
Related
Matter of
rials
, Sydney
-
8/21/2019 land scaping
4/59
ConsolidatedEngin
eeringConstruction
QCS 2
010 Se
QCS 2010
BS 5236 --
ANSI Z60-
Official Me
The AustrGovernme
Standard
Grade anAgriculture
EnvironmeSewage Sl
EnvironmeProtection
KirchhoffWater Quaof Texas,
RaymentChemical
RHS Com
RHS Ency
The RoyalSociety, U
Post, Geor
Sunset We
Wyman, DYork, U.S.
Tropica Co
ction 28
---------------
1 -------------
hod of Anal
lian Dangert of Australi
lant Names
Standard, Florida, U
ntal Regulatudge, Unite
ntal GuideliAgency, NS
, Malina Jlity Improveustin
E and Higethods. Ink
lete Garden
lopaedia of
Horticultur
ge E., Flora
stern Garde
onald, Wym., Colliers
lor Encyclo
Part
ultivation aategory
merican St
sis, Associ
ous Goodsa
American J
for NurseA
ions and TeStates Env
nes, Use, Australia
nd Barrett (ents. CRW
inson FR (1ata Press, N
ers Manual,
Plants and
l Society A
of Syria, Pal
n Book, Lat
ans Gardeacmillan Pu
edia of Exot
1 L
nd Planting
ndard for N
tion of Anal
ode (ADG)
oint Commit
y Trees
chnology,ironment Pr
and Dispo
2003) CharR On-line R
992) Austrorth Ryde S
, Royal Horti
lower, Roy
-Z Encyclo
estine and
st Edition.
ing Encyclblishers, Lo
ic Plants an
ndscape
of Trees in
ursery Stoc
tical Comm
, Departme
tee on Horti
Part II: P
ontrol of Ptection Age
al of Bio
acteristics oeport, Centr
lian Laboratydney Austr
cultural Soci
l Horticultur
aedia of G
inai, Americ
pedia, Macdon, Secon
Trees, Alfr
Planting
the Extra
unities (AO
t of Infrastr
ultural Nom
lms and T
thogens anncy, Cincinn
solids Prod
Compost:for Water
ory Handbolia
ety, UK
l Society, U
rden Plant
an Universit
illan Publid Edition, 1
d Byrd Gra
Large Nurs
C Internatio
cture and
enclature (A
rees, Depa
d Vector Attati, OH, US
ucts, Envir
oisture Hoesources,
ok of Soil a
K
, Royal Ho
y of Beirut.
hing Comp86.
f
age 4
ry Stock
nal)
ransport,
JCHN)
tment of
raction in
onmental
lding andniversity
nd Water
rticultural
ny, New
-
8/21/2019 land scaping
5/59
ConsolidatedEngin
eeringConstruction
QCS 2
1.1.3
1
2
3
4
1.1.4
12
3
4
5
6
7
010 Se
QCS 2010
Quality As
Landscapirespective
Landscapelandscape
All landscEngineer.provided.
Defective
(a) Deathe f
(b) Not i
Submittal
The ContrThe Contrcertificateused in the
The Contrand that th
The Controf the Engi
The Contrstart of thincluded in
Qatar. Thnurseries,
The Contrschedule sfor compleweekly barecommen
A soils repurposes iprepare aanalyst shlike. The r
case of imreport shaminimum, t
(a) Tota
(b) Soil
(c) Exc
(d) Avai
(e) Org
(f) Avai
(g) Tota
ction 28
surance
g, plantingstandards, u
work muswork. Work
pe materialManufactur
lant materia
, dying orirst leafing o
n accordan
ctor shall suctor shall sf origin formanufactur
ctor shall se same are
ctor is to suneer.
ctor shall s Contract.the Works
schedulerowers and
ctor shall shall identifyting the tasis identifyindations addi
ort is to bethe Works.
physical anll also proviport shall b
ported soil,ll identify the soil shall
l salts (Elect
pH
angeable S
lable Phosp
nic matter
lable Zinc,
l Sulphates
Part
and soil prenless other
t be underthall be perf
shall be srs certifie
l shall be co
therwise dut, whichev
e with the P
bmit catalogubmit manuall chemicalers country.
bmit certificree from ins
bmit his met
bmit a Planhis schedu
and highligh
hall be doplant materi
bmit a weeasks to beks. The Cotasks comional to a m
submittedThe Contra chemical
de recomme submitted
the report se source(s)be analyse
ro-Conducti
odium, Calci
ates
s a percent
anganese, I
1 L
aration shaise directed
aken by aormed and
hipped withanalysis
nsidered to
fective upor is later
roject Docu
ue data andfacturers cls and pesti
ates confirects and dis
hod statem
t Procuremle shall idets plants th
umented wial sources.
ly work schompleted o
ntractor willleted, task
onthly repor
y the Contrctor shall arnalysis ofndations onto the Engi
hall be sub from whicfor:
ity of soil s
um, Magne
ge
ron and Bor
ndscape
ll conform tby the Engi
experiencupervised a
certificatesfor standar
e any tree,
completion
entation.
literature ofrtified analycides shoul
ing the origease.
nt for his fe
nt Schedultify the sout must be i
ith the listin
edule for apa weekly bthen modifto be compcontains all
actor for allrange for anhe soil andsoil amendeer for app
itted at leah imported
lution)
ium and Po
on
Planting
the relevanneer.
d subcontrall times b
of inspectiod package
hrub or pla
of the Wor
manufactursis of all st clearly sta
in, size, age
tilizer applic
within fourrce of ever
ported du
g of names
roval beforasis and the and submileted, problthe above i
soils to beapproved inirrigation went, fertilis
roval before
st 10 dayssoils are t
assium
t requireme
actor speciqualified p
n as requir products
nt which is:
ks or six w
ers and supndard prode that the
of all plant
ation for the
teen (14) d plant specto non-ava
and locati
work is staanticipatedit the schedms encoun
n details.
used for landependentater to be ur applicatio
soil is plac
prior to deli be furnish
age 5
ts of the
lising inrsonnel.
d by theshall be
eks after
liers.cts. Theroduct is
materials
approval
ys of theies to beilability in
ns of all
rted. Thescheduleule on aered and
dscapingnalyst to
sed. Theand the
d. In the
ery. Theed. At a
-
8/21/2019 land scaping
6/59
ConsolidatedEngin
eeringConstruction
QCS 2
7
8
9
1.1.5
1
2
3
4
1.2
1.2.1
1
010 Se
QCS 2010
The soilquantitiesvigorous pl
Additionalthe Engineconsistenc
An operatishall be fuminimum, t
(i) irrig
(ii) fertil
(iii) sali
(iv) pestproc
(v) turf
verti(vi) pro
(vii) genprot
(viii) equimai
(ix) land
Job Condi
The Contrportions oflandscape
No plantinduring inteSeptember
When speplanting scthe plantinmaintenan
Planting of
SHIPPIN
Shipping
Prior to saccordancdelivery scAll unaccemay requereserves tthe Project
ction 28
nalysis shahich when
ant growth.
oil sampleer and analand comp
ons and marnished forhe manual
tion details:
isation: inclu
ity control: i
icide/fungiciedures, and
grass man
cal mowingagation and
ral maintenctive fencin
pment invtenance m
scape maint
tions
ctor shall pr the Site bework requir
shall be cnse daytimeand mid-M
ial conditiohedule shall
will be inse and warr
trees and s
G, DELIV
nd Deliver
hipping allwith stand
hedule in adptable plantt inspectioe right to reDocumenta
Part
ll also incluincorporate
shall be tased. The retibility of su
intenanceear round cill include t
including w
ding fertilise
cluding lea
e/herbicideschedules
agement: i
or thatch reseasonal re
ance: includg and gradin
ntory: inclnual
enance per
oceed withcome availd.
rried out dheat. Planty.
s warrant abe submittealled at nonty remain t
rubs will oc
RY, STO
plants shallard practicevance so thmaterial shat the sour
ject any plation.
1 L
de fertiliserwith the s
en at the rsults will beply.
anual is toare of instale following:
ater applicat
r descriptio
hing metho
applicatio
cluding m
oval, rollinplacement
ing pruning,g
uding mai
onnel requi
nd completble, workin
ring periodand trees
variance tod to the Enadditional che same as
cur prior to l
RAGE A
be inspecs and procplant mate
all be remoce of the plt material t
ndscape
s and otheil will provi
te of one incompared
be provideled plants t
ion rates an
s, applicatio
ds and leac
ns: includi
wing proce
, overseedif all flowers
stakes and
tenance p
ements and
planting opwithin sea
of heavy rhall only b
the plantingineer for rest and all cspecified h
wn planting
D HANDL
ed, dug, adures. Therial may be ied from thnts prior toat does not
Planting
r amendmee the requi
every 20 loith the origi
by the Cobe followe
maintena
n rates and
ing progra
ng safety
dures, aeri
g and sprigand flowerb
ties, replac
rocedures
job descripti
erations asonal limitati
in, sandstomoved or
time and ciew and apnditions anrein.
s.
ING
d made rEngineer snspected uSite immeelivery to tmeet the q
nt requiremred nutrient
ads or as dinal sample
tractor. Inby the Ow
ce procedu
application
monitoring
applicatio
ication, top
gingeds
ement and
and manu
ions.
rapidly as pions for eac
rms, heavylanted bet
nditions, aroval. In su
d obligation
ady for shall be notifion arrival aiately. Thee Site. Theality requir
age 6
ents andlevels for
rected byo ensure
tructionsner. As a
es
chedule
rates,
dressing,
clean-up,
facturers
ssible ash type of
winds, oreen mid-
proposedh cases,such as
ipping ined of thethe Site.
EngineerEngineerments of
-
8/21/2019 land scaping
7/59
ConsolidatedEngin
eeringConstruction
QCS 2
2
3
4
1.2.2
1
2
3
4
5
6
010 Se
QCS 2010
The Contrdesiccatiovehicles wi
Fertiliser,original unname, tradin bulk andfertiliser sh
Palms shaltime of loafollowing
(a) Wheanduse
(b) WraPeritime
(c) Do n
(d) Do n
(e) Do n
(f) Use
(g) A bpaltheshall
(h) The
(i) Thetarp
(j) The
Storage
Plants shalprotected fon the dayand waterthe plantsplanting.
Root balleballs cover
Bare rooteagricultural
Seed anddesignatedgerminatio
Soil, compseparatelysoil mixing
Fertilisers,manufactu
ction 28
actor shallof leaves.
th the load
esticides, fopened coe name, or ta certificatall be kept d
l be shippedding until aanner:
n the palmstighten the.
the root bdically, the
.
ot damage t
ot water the
ot permit th
only sharp t
d of 150ms shall be hed of the tr
l be placed
entire load s
palms shallulin and dr
palms shall
l be installerom exposuof arrival shd to good hdo not dry
and contaed with appr
d trees ansoil or peat
fertilizers s or approvand the pu
ost, fertilisein approveoperations
antidessicaers unop
Part
protect planAll plant mroperly cov
ngicides, ctainers bearademark. Iindicating try and prote
by coveredrival at the
are to be shwrapping a
ll with a minburlap mus
he growth b
trunk of the
root ball to
ols in cuttin
of moist ooisted by mck. They shver the root
hall be cove
be secureding the pal
be unloaded
as soon are to wind aall be storedorticultural sout. No pla
iner grown toved soil, p
shrubs shand kept m
hall be keped by therity percent
s and othe locations aommence.
ts, pesticidned contai
1 L
ts to preveterial shallred in transi
hemicals anring the mlieu of con
he above incted from c
truck. Suchsite. The p
ipped, gentld tying of
imum of twot be watere
ud in any m
palm.
become dry
g and trimm
rganic soileans of nyloall be laid cto keep th
red snugly
in such as.
using nylon
possible afnd direct suin shadedtandards unnt shall be
rees and plat or straw
all be heeldium moist
t in dry stEngineer.ges.
amendmend in a ma
s and otherners, each
ndscape
nt damagebe deliveret for protecti
d seed shanufacturerainers, fertilormation shntamination
transportatilms shall b
y place therond. At le
layers burl. Do not a
nner.
.
ing.
hall be placn or canvasarefully in am moist.
ith two laye
anner so a
or canvas s
ter delivery tnlight prior treas, protectil planted.stored on si
ants shall bnd kept me
d into prepuntil planted
rage awayll seed co
ts shall bener to avoi
chemicals sfully labe
Planting
to the rootin a close
on from dryi
l be deliver guaranteeisers and sll accompa
n shall nottransporte
alm horizost two laye
p. Saturatellow the bur
ed on the flslings andalternating
s of tarpauli
s to prevent
lings.
o the Site.o installatioted from theare shall bte for more
placed clodium moist
ared trench.
from contantainers sh
delivered to contamina
hall be delivlled, confo
balls, contd vehicle ong winds.
ed to the Sd chemicaled may be
ny each deli
xceed 24 hd and handl
tal on a levrs of burlap
with water alap to dry o
oor of the tlaced horizfashion. Mo
n.
wind from
lant materia. Plants notwind and mtaken to enthan 3 day
se togetherntil planted.
es and cov
minants inall show cl
the Site ation and we
ered to theming to
age 7
ainers orin open
ite in theanalysis,furnishedery. The
urs fromed in the
l surfacemust be
nd cover.ut at any
uck. Thentally on
ist burlap
lifting the
l shall beinstalled
aintainedsure that
prior to
with root
red with
areas asarly the
d storedtting until
ite in thepplicable
-
8/21/2019 land scaping
8/59
ConsolidatedEngin
eeringConstruction
QCS 2
1.2.3
1.
2.
1.3
1.3.1
1
2
3
1.3.2
1
2
3
4
5
6
7
8
9
010 Se
QCS 2010
regulationsby the Con
Handling
Care shallBalled andearth ball.handled by
Chemicalsor work of
PRODU
General
All plantsDocument
Substitutioand the Eobtainable.
Plants shal
Plants
Only nurse
Plants to b
be sound,eggs, and
Deciduousindicated,
Symmetricfree from o
Groundcovspecified.
Trees shall
Shrubs, vi
containersPalms shaeaten by pplanted. Pof an adultgrown pal
The diggin
(a) Refron
(b) Trimgro
(c) Satu
ction 28
and bearintractor on-si
be taken toburlapped
Containerthe trunk or
shall be stony kind sh
TS
nd turf mation and be
s shall onlngineer aut
l be supplie
ry grown pl
e used in th
igorous anave a norm
and evergrnd display
ally developbjectionable
er and vine
be earth ba
es and gro
or formed hll have straiests or withlms shouldpalm and ps are avail
and lifting
ove all sucs
remaining fing tip. Wra
rate the enti
Part
the tradee shall rem
void injuryplants shallrown plantsstem.
red in a mall be permitt
erial will cotrue to the b
be madeorises a ch
from localit
nts shall be
e Works sh
free from dal healthy a
en trees sho weak crot
d trees anddisfigureme
shall be pr
lled and burl
und cover p
mogenousght parallelroot systemhave vigorooper hardinble. Off sho
f palms sh
ers, all flo
ronds to 65in burlap cl
re root ball
1 L
ame and win his respo
o the plantsbe handle shall be h
nner to avoied within sto
nform to thotanical na
hen a plantange order
ies similar t
provided ex
ll be well br
isease, sund non-brok
ll be a singlches.
shrubs shant.
ovided with
lapped cove
lants shall
soil sectionssides and
extendingus root systss. Palms sts are not a
ll take plac
ering and
% of originloth and sec
ith water pr
ndscape
arranty of thnsibility.
. Material s carefully tndled by t
d cross contrage area.
varieties se as listed i
(or alternatiproviding f
the climati
ept for pal
anched and
cald, windbn root syste
le trunk with
ll be provid
he number
red or pot gr
e provided
.ealthy stemabove the lm, a crown
hall be ballecceptable.
in accordan
ruiting parts
l length, lifturely tie in p
ior to excav
Planting
e producer.
all not be d avoid crace container
amination.
pecified orn publicatio
e as specifr use of th
conditions
species.
formed plan
urn, abrasiom.
a single lea
d with unifo
and length
own.
in well esta
s that are nvel which thof new leav
d and burla
ce with the
and appro
ronds to enlace
tion
All product
ropped fromking or bre. Plants sh
o measurin
shown in ths.
ied) is not oe nearest e
f the Projec
ting stock.
ns, harmful i
der, unless
rm habit an
f runners fo
blished in r
ot rotted, ine palm wases, leaves tped unless
ollowing pro
imately 30
close and p
age 8
if stored
vehicles.king thell not be
g, mixing
e Project
btainablequivalent
t.
hey shall
nsects or
therwise
shall be
r the size
movable
fected ororiginallyhe colourcontainer
cedure:
% of the
otect the
-
8/21/2019 land scaping
9/59
ConsolidatedEngin
eeringConstruction
QCS 2
10
11
12
13
14
1.3.3
1
1.3.4
1
010 Se
QCS 2010
(d) Digcutti
(e) Undhear
(f) Wra
maxiThe minimconform tothan specif
Containerhold theContainers
A plant sch
(a) Bota
(b) Co
(c) Qua
(d) Size
(e) Con
(f) Addi
Plants whioutside coare not roon plantdrawings.
It is the C
The EnginContractor
Labels
Each plantshall be lecorrect plaand not re
Workman
The Contrstandard panalysis is
(a) Soil
(b) Peat
(c) Ferti
(d) Org
(e) Soil
(f) Pest
(g) Gra
ction 28
ith hand tg roots no
r cut rootst
root ball
imum soil mm accepta
the measuied may be
grown treesarth intactshall be suf
edule is to
nical Name
mon Name
ntity
ition
tional Pertin
h are providitions aret bound. Graterials sc
ntractors r
eer can rejresponsibil
, or group oibly tagged
nt name anoved.
hip / Qualif
ctor shall sroducts, theto be provid
Mix
lizer
nic Manure
Conditioner
icides
el Mulch
Part
ols a verticloser than 2
and careful
with burlap
isture.le sizes ofements spesed with th
, shrubs, grwhen remoficiently rigid
e provided l
ent Data
ed in potsacceptableound coveredule, suffi
sponsibility
ct any planity.
f plants orwith a dura
d reference
ications
ubmit samp manufactued by recog
1 L
al sided tre50 mm from
ly lift tree,
and secure
ll plants mecified in the
approval o
undcoverved from tto hold ball
isting the de
or other conrovided theplants shallicient to co
for potting
t that is ro
ontainer ofble, waterprnumber if
les of mateers analysiized labora
ndscape
ch to a mithe stem
voiding an
with wire
asured befoProject Dothe Engine
nd vines she containeshape and
signated pla
tainers andare equal i
be of the ser fully th
n plants as
t bound. A
the same soof and wepplicable. L
rials for apps will be acories.
Planting
imum dept
shock whi
mesh to co
e pruning inumentation.r, at no ext
all have sufrs, but shalrotect root
nts and follo
which haven quality toecies, sizes designated
required to
ll costs of
ecies, varither resistaabels shall
roval as peeptable. F
of 750 m
ch may da
ntain soil a
normal posPlants larga cost.
ficient rootll not be r
ass during
wing inform
been acclifield grown, and spaci area as s
prevent roo
otting on w
ty, and sizet label indi
be securely
r the list ber all other
age 9
, cleanly
age leaf
nd retain
ition shallr in size
rowth tootbound.shipping.
tion:
atised totock andg shownhown on
binding.
ill be the
of plant,ating theattached
low. Foraterials,
-
8/21/2019 land scaping
10/59
ConsolidatedEngin
eeringConstruction
QCS 2
2.
3.
1.3.5
1
2
3
4
5
6
7
1.3.6
1.
2.
3.
4.
1.3.7
1.
2.
010 Se
QCS 2010
(h) Woo
(i) Prun
(j) Gyp
(k) Woo
Soil sampllocation, s
Samplingno addition
(a) Testspe
(b) Copi
Soil Prepa
Soil prepar
Soil: soil isapproved
Drainageforeign su
Stone Mulforeign su
Wood Barmm x 50 m
Permeablewith perm
resistant tunaffected
Nursery: sof proven
Subsoil Pr
The Contrlevels and
Break up sorder to ac
Where theminimum d
Root Barriand hardfoundation
Spreading
Topsoil Filleach layer
Final Grad
Drawings.
ction 28
d Mulch
ning Paint
um Paint
d Stakes
es will bemples will b
nd testingal cost to th
s shall be pified require
es of the te
ration
ation materi
composedite. Clay is f
tone: Crustances and
h: washestance, eve
Mulch: com pieces wi
Membraneability to w
all naturallby direct su
hall be Qatxperience.
eparation
ctor shall eprofiles requ
oil for a dehieve tolera
topsoil is toepth of 200
r (Root conlandscapeto prevent
and Prepa
ing: spreadby watering
ing: when
Part
aken by the tested at
hall be theClient, by
erformed inments.
t results sh
ls and prod
of a mixturrom Govern
hed hard devenly gra
white stonly graded 2
iferous woth a pH of 4.
non-woveter of 80 litr
y occurringlight for up
ri based co
cavate andired.
th of 200 mces specifi
be laid on rmm.
rol system)structure sustructural da
ation of To
over preparlightly befor
topsoil is r
1 L
e Engineercertified soi
responsibilitn approved
sufficient n
ll be furnish
ucts shall c
of sand anent approv
rable stoneed from 20
e pebbles,5 to 50 mm.
d bark, free5 as minimu
n, 70% poles/m2/sec a
soil aciditieto one mont
pany speci
Provide Ea
m and gradd for the fini
ck sub-stra
is to pad thch as sidemage due t
psoil
d subsoil inspreading
asonably d
ndscape
upon his ril lab at the
of the Concommercial
mber to en
ed to the En
nfirm to the
d clay. Saned site.
washed fremm minimu
washed fre
of diseasem.
propylene,t 100 mm h
and to teah.
alizing in gr
rth filling as
to levels ashed level o
a, break up
trees pits,walks, pavroot penetr
layers not ethe next.
ry and wor
Planting
quest andontractors
tractor andtesting labo
sure that th
ineer for a
description
is dune sa
e of loam,to 30 mm
of loam, s
and pests, n
.3 mm thicead of wate
ring and str
wing and c
necessary t
nd profilestopsoil.
and loosen
renches, ovments, andation as per
xceeding 20
able, grade
P
at randomexpense.
hall be perratory.
e materials
proval.
erein after.
nd from Go
and, clay,maximum si
and, clay,
ot shredded
k, weighingr. Membran
ess and is t
ltivating of t
o achieve th
hown on dr
the rock sur
er the servi concretethe details
0 mm and fi
to levels s
age 10
time and
ormed at
meet the
ernment
nd othere.
nd other
, min. 10
70 g/m2,is to be
o remain
he plants
e subsoil
wings in
ace for a
es pipesbuildingsrawings.
rm gently
hown on
-
8/21/2019 land scaping
11/59
ConsolidatedEngin
eeringConstruction
QCS 2
3.
4.
1.3.8
1.
2.
3.
4.
5.
010 Se
QCS 2010
Finished Lmm belowlevel of adj
Fallow Perfallow for scultivation
Soil Speci
The contrmoundinggrading wo
Soil mix sh
(a) 80%
(b) 100
Dune San
weeds, stremoved s
Dune sandbefore pla
Dune sand
(a) Phy
(b) Loa
(c) Che
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
(x)
ction 28
vels: unleadjacent paoining buildi
iod: whereeveral montor by applic
fication
ctor shalland finisherk.
all consist o
sand and 2
sand for g
: shall be
nes or othrface crust
shall be obtting on pur
shall posse
ical Charac
N
N
y sand, cla
ical Chara
Salinity (E
SAR (Sod
Boron (sa
pH:
Free carb
Chlorides:
Sulphates
Nitrates:
Phosphor
Exchange
Part
s otherwiseving or curbgs married-
possible cas. During thtion of herbi
e responsi grading.
a mix of du
% clay for
rass in footb
suitable for
r foreign mand gypsofe
ained fromose of salt
s the follow
eristics (Ta
Table 1: Du
ieve Size
o 10 sieve
o 35 sieve
o 140 sieve
o 200 sieve
to be less
teristics:
CE x 1000):
ium Absorpti
uration extr
nates:
:
us:
able sodium
1 L
stated, finiss not less tin with adjoi
rry out cultiis period, prcides if per
le for thehe specifie
ne sand and
ll plants in
all and spor
inclusion int
atter takenrrous accu
n approvedashing of s
ing physical
le 1):
ne Sand Gr
%
han 0.002
ion Ratio):
ct):
:
ndscape
hed levels oan 150 mm
ning soil are
vation of toevent growtitted.
rocurementd mix shall
clay with th
arks, roads
s fields.
o the soil m
from a maulations.
source. Irrignd.
and chemic
ding Criteri
of Material
100%
85 to 10
5 to 25
0 to 10
m
less than 4
less than 2
less than 1.
between 6.
less than 0.
less than 2
less than 1
less than 7
10 15 pp( hour sh
less than 1acetate
Planting
f topsoil aftbelow finisas
soil sufficieand seedin
, transportabe strictly c
following p
and open ar
ix and free
imum dept
ate at maxi
l characteri
assing
%
0 ppm
7.5
5% air dried
0 ppm in sa
% in neutra
ppm in sat
in 1.5 amke)
5% in neutr
P
r settlemented ground
ntly early fg of weeds
tion, mixing,ontrolled ov
roportion:
eas.
from excess
of 500 m
um rate for
stics.
soil
turation extr
l saturation
uration extra
onium nitra
al normal a
age 11
to be 70loor slab
r it to liey further
placing,er all the
ive salts,
having
two days
act
xtract
ct
te extract
monium
-
8/21/2019 land scaping
12/59
ConsolidatedEngin
eeringConstruction
QCS 2
6.
7.
1.3.9
1
23
4
5
010 Se
QCS 2010
(xi)
(xii)
Clay shall
Clay shallroots, stonnoxious wundesirablthoroughly
Al ternativ
Alternativeladmixturessubstance
The ContrMaterial shcompactio
The soil sh
(a) pH v
(b) elec
(c) free
(d) chlo
(e) sulp
(f) exch(g) boro
The soil sh
ction 28
Potassiu
Magnesiu
e obtained
have unifores, clods leds, sticks
insects abroken up.
Soil Speci
ly (to Claus of subsoilthat may be
ctor shall fuall be storeand maint
all comply
alue:
ro-conducti
carbonates:
ides:
ates:
angeable sn:
all comply
Si
Part
:
:
rom an app
compositirger than 5and other
nd plant di
fication
e 1.3.8) soi, foreignharmful to p
rnish agriculin piles lesined free of
ith the follo
not
ity: les
les
les
les
dium: lesles
ith the gradi
Table
ve Size (m
5.000
2.380
1.180
0.600
0.300
0.150
0.075
1 L
roved sourc
n and struc0 mm in glitter. It shsease orga
l shall beatter, toxiclant growth
tural soil fros than 1 mcontaminati
ing chemic
less than 6.
than 4 m
than 0.5 %
than 200 p
than 200 p
than 15 %than 1.5 p
ng criteria in
2: Grading
) % by
ndscape
100 400extract (
25 100extract (
.
ure, a Leaneatest dimll not be innisms. Prio
weet sandsubstance
pon the En
approvedtre high. Piln and cons
l criteria:
5 nor more t
mhos/cm s
air dried.
pm in satur
pm in satur
in neutral nm, hot wate
Table 2.
riteria
Mass Pass
100
65 to 100
45 to 100
35 to 80
5 to 48
0 to 15
0 to 3
Planting
ppm in 1.our shake)
ppm in 1.our shake)
clay characnsion, pockfected with
to mixing
or washed, weedsineers app
ites.es shall beruction debr
han 8.5
aturated ext
ted extract.
ted extract.
rmal ammor soluble.
ing
P
5 ammoniu
ammoniu
ter, and beets of coarnematodesall lumps
marine sannd any mroval.
protected fris.
ract at 25oC
ium acetat
age 12
nitrate
nitrate
free frome, sand,or othershall be
d free ofterial or
m undue
.
-
8/21/2019 land scaping
13/59
ConsolidatedEngin
eeringConstruction
QCS 2
1.3.10
1
2
3
4
5
6
7
8
9
10
11
12
13
010 Se
QCS 2010
Soil Additi
There areprocedure
Procedure
Peat shall
water site.and conditifrom sticksthan 4 andbasis. Pea
Manure shsheep, horand a pHmaterial.health certused on th
VermiculitC516.
Perlite shal
Fertilizer srelease 2analysis.
Granular fby weight,grass usepotassium
Plant DerivIt shall bcharacteris
(a) Org
(b) C:N
(c) Parti
(d) Hu
(e) pH
Dry Plant
(a) Ferti
(b) Pacof a
(c) Granitro
(d) Con10may
Turf Fertilithe manuf
Edging Maor other adrawings.
Irrigation
Engineer alife. Water
ction 28
ves Proc
two applic(B).
A Consists
be a natur
Peat shalloned in stor, stones, ronor more tshall be del
all be the dses, goat, calue of 6.0anure shall
ificate shalltop dressi
shall be h
ll conform to
hall be commonth mini
rtilizer for tr5 % nitrogeminimum 1
and micro n
ed Fertilizer heat treatics.
nic content:
ratio more t
cle size not
ic Acid mor
-6.
ertilizers sh
liser shall b
ets of slowalysis.
ular fertilisegen (N), 10
rolled releaavailablebe in packe
er shall becturers gua
terial shallapproveddging anch
ater shall b
s being suitsources sh
Part
dure A
ble proced
f the followi
l product of
e shreddedage piles forts, and othean 7.5. Thivered in un
ecomposedow or chickto 7.5. Manbe heat trebe submitteg of grass a
rticultural gr
ASTM C54
mercial gradmum and
ees, shrubs,(N), 10 %1 % nitrogtrients.
s: shall be ued, free fr
more than
an 20%
bigger than
than 10%
ll have follo
commercia
release ferti
r for trees aavailable
e fertiliser shosphoric aor tablet fo
commercialranteed stat
e galvanizey the Engin
ors shall be
e provided
ble for irrigll not excee
1 L
re, contrac
ng compon
sphagnum
and granulat least 6r objectionaminimum
damaged co
animal mann manurere shall beated, free fd for the prrea.
ade and fre
.
e and unifohall bear t
ground covavailable phen (N), 11
sed in all sm seeds
0%
2 mm for 80
wing proper
l grade and
liser shall b
nd shrubs sphosphoric
hall consistcid (P) andm.
grade, freeement of an
d steel, poleer. The mas recomme
y the Contr
tion. Waterd the followi
ndscape
ors shall fo
nts:
peat moss/
ated to pasonths afterle matter. Itrganic contmmercial ba
ure of fullyith nitrogenfree of ston
rom pathogoposed sa
e of any toxi
rm in comphe manufac
ers and seaosphoric aci% availabl
il mix as altnd nemato
of the mix
ies:
uniform in c
ear the man
hall consistcid (P) and
f, by perce5 % potassi
flowing andlysis.
ethylene, eterial shallnd by the m
actor from a
shall be freeg paramete
Planting
llow EITHE
eat humus
through axcavation.shall havent shall beles in air dry
fermented, phosphories, sticks an, weeds aple. Animal
c material a
sition. Fertiturers guar
onal shall cd (P) and 5
phosphori
rnative optides and p
mposition.
ufacturers
f, by perce5 % potassi
tage by weim (K). Con
uniform in
ectrostaticale to the sinufacturer.
n off-site so
from substrs:
P
R procedur
derived fro
12 mm mehe peat shpH value o85% on a dcondition.
re-dried heacid andd non-biodnd other pomanure sh
nd conform
lizer shall banteed stat
onsist of, p% potassiu acid (P)
on to animalssess the
uaranteed
ntage by wem (K).
ght, 5 % nitrtrol release
omposition
lly paintedes designat
urce approv
nces harmf
age 13
(A) OR
a fresh
h screenll be freef not lessry weight
t treatedotassiumgradablellutant. All not be
to ASTM
of slowment of
rcentage(K). Fornd11 %
manure.following
tatement
ight, 5 %
ogen (N),fertiliser
and bear
luminiumed in the
d by the
l to plant
-
8/21/2019 land scaping
14/59
ConsolidatedEngin
eeringConstruction
QCS 2
1.3.11
1.
2.
3.
4.
Pla
Pal
Tre
ShrLar
ShrSm
He
GroCoSe
La
010 Se
QCS 2010
(a) pH:
(b) total
Soil Additi
There areprocedure
Procedure
Manure: ssheep, horand a pHmaterial.health certused on th
Soil conditi
(a) Soilpeat
(b) Mat
(i)
(ii)
(iii)
(iv)
nt Type
s
s
ubse
ubsall
ges
under &sonal
n
ction 28
to 7
dissolved s
ve - Proced
two applic(B).
B Consists
all be theses, goat, calue of 6.0anure shall
ificate shalltop dressi
oner: shall
conditionermoss, it mu
Ta
rials shall N
classifiedCommissi
classifiedGoods (A
classifiedTransport
flammabl
Soilonditioner
NA
NA
NA
NA
NA
6 ltr/m2
6 ltr/m2
Part
lids: less th
ure B
ble proced
f the followi
ecomposedow or chickto 7.5. Manbe heat trebe submitteg of grass a
e as detaile
shall be adst meet the
le 3: Soil A
OTbe:
as hazardoon, Australi
as a dangG code) or
as a dangof Dangero
or explosiv
Peat
100ltr/Tree
100ltr/Tree
20ltr/Shrub
20ltr/Shrub
10 ltr/linear m
20 ltr/m2
20 ltr/m2
1 L
an 1000 pp
re, contrac
ng compon
animal man manurere shall beated, free fd for the prrea.
in the follo
ed with thequirement
ditives Pro
us accordin(NOHSC)
rous goodequivalent
erous goods goods by
e
Orga
Animal
25 kg/Tre
12.5 kg/Tr
7 kg/Shru
5 kg/Shru
5 kg/linear
5 kg/m2
5 kg/m2
ndscape
ors shall fo
nts:
ure of fullyith nitrogenfree of ston
rom pathogoposed sa
ing paragr
organic mbelow (Ta
ortion for Pl
g to Nationriteria or eq
by the crite
for transpRoad and R
ic Fertilize
or Pla
5 Kg/T
e 5 Kg/T
1 Kg/S
0.5 Kg/S
m 0.5 kg/lin
0.5 kg
1 kg/
Planting
llow EITHE
fermented, phosphories, sticks an, weeds aple. Animal
phs.
nure only,le 3).
nts
l Occupatiivalent
ria of the
ort by Austail or equiva
InoFernt
ree 100
ree 50
rub 25 g
hrub 25
ear m 25 g/
m2 25
2 50
P
R procedur
re-dried heacid andd non-biodnd other pomanure sh
as a replac
nal Health
ustralian D
ralian Codlent
ganictilizer
MiD
g/Tree 4
/Tree 4
/Shrub 3
g/m2 3
linear m 2
g/m2 2
g/m2 2
age 14
(A) OR
t treatedotassiumgradablellutant. All not be
ment for
& Safety
ngerous
for the
xingpth
cm
cm
cm
cm
cm
cm
cm
-
8/21/2019 land scaping
15/59
ConsolidatedEngin
eeringConstruction
QCS 2
1.3.12
1
2
3
4
010 Se
QCS 2010
(v)
(c) Coprocconcomenvicont
(d) Accicontfor d
(e) Han
(i)
(ii)
(f) The
(g) Fertiwhicwaswatorga
(h) Disp
(i)
(ii)
(i) MatSub
Al ternativ
Should themay use th
Preamble
The followiagent. Her
Definition
HACCPchemical aproduct ins
Supply Co
(a) Allequi
(b) It is
phymus
ction 28
poisonouSchedulin
position / Iess must bistent withponents, aonmentallyain chemical
dental Releent above 3isposal. Av
ling and st
Handling:safe worinhalationeating. P
Storage:sources.damage a
Contractor s
lizers/planth might caued throughrways whicnisms.
osal Consid
Waste Di
material ian approv
Legislatio
rial shall ctances (AI
Soil Addit
Engineer de specificati
ng is a specinafter des
Hazard Annd biologicapection.
ditions
roducts supalent stand
noted that
ical and ch not comp
Part
or allocateg of Drugs a
nformation derived frrganic prinimal by-prsafe and iss or genetic
se Measur2%. Ventilaid generatin
rage
Before usepracticesObserve
ohibit eating
tore in wellEnsure connd sealed w
hall ensure
utrients muse reducingsoil to watmight cau
rations
isposal: Re
covered wied landfill si
: Dispose o
ntain onlyS) or equiv
ive Specific
cide on anon listed bel
ification forribed as th
alysis and Cl controls as
plied shallard subject t
the compos
emical pararomise the
1 L
a poison snd Poisons
on ingrediem naturally
cipals. It shducts, manot harmful
ally modified
s and Spillte spillageg dust.
contractorsare recomgood perso, drinking a
ventilated atainers arehen not in u
he safety of
st be benefi growth orrways. Cone algal bloo
use or rec
th moist soile.
f in accorda
hemicals lilent.
ations
alternative sow hereinaft
ompostedcomposte
ritical Contra means o
onform fullo the agree
ted product
meters statagronomic
ndscape
chedule nu(SUSDP) or
nts: The m occurringall NOT coure or m
to animals,materials.
ge: The soirea. Collect
shall carefulended toal hygiene,d smoking i
rea, removeadequatelye. Check r
the workers
cial to plantburns in seractors shalms, with po
ycle where
to prevent
ce with Qat
ted on the
oil Additiveer.
roducts suitproduct.
l Points is aprevention
, to the staent of the
may vary,
ed within thcharacteris
Planting
ber by Staequivalent
aterials usnd sustaintain synthenure by-pr plants or h
l conditioneand place i
ly read theavoid eyeincluding wcontamina
d from oxidilabelled, prgularly for l
and the en
at low levsitive specil minimizeential for to
possible.
ust generat
ari local legi
ustralian I
to Clause 1
ble for use
method tharather than
ndards indiupervising
(within acc
is specificaics of the
P
dard for th
d in the pble sourcesic chemicaloducts. Itumans and
must haven sealable c
roduct labeor skin conashing hanted areas.
sing agentstected fromeaks or spill
ironment at
ls, not in hies. Excessertilizers re
xic effects o
lternatively
ion and dis
lation.
ventory of
.3.11), the
as a soil am
t addressesinspection o
ated hereinfficer (SO).
eptable limi
tion. Suchproduct an
age 15
Uniform
roductionand are, animal
must beshall not
moistureontainers
l. Use oftact ands before
and heatphysical.
all times
gh levelsshall be
leased ton aquatic
, ensure
ose of to
Chemical
ontractor
elioration
physical,f finished
or to an
s) to the
ariationsd where
-
8/21/2019 land scaping
16/59
ConsolidatedEngin
eeringConstruction
QCS 2
1.3.13
1
2
3
010 Se
QCS 2010
variof th
(c) The(Thwithplacprin
(d) Thethespe
(e) Theandbasiplacbe g
(f) Theman
Asrequ
Compost
All compoand 5. Thefor a top-duse).
Table
Heavy Mecontamina
Arsenic
Cadmiu
hromium (t
Copper
Lead
Mercury
Nickel
SeleniuZinc
As a minimeet the tpathogen
Pathogenthermophilithe windro(131oF) ormaintained(USEPA).
ction 28
tions in anae product.
contractorSuppliers
the agreemdocumentiples of HA
contractor supplier thaification.
supervisingdocumentati the Contrment to all
ranted or wi
whole quaufacture an
uch writtenested by th
pecificatio
ted productparticle sizessing prod
4: Contami
alnt con
otal)
um requiremperature,isinfection
disinfectionc decompow compostihigher for 1at 55oC (1
Part
lysis occur t
hall demon) of the coent of the stion of a sitCP is nece
hall supplyshall clear
officer mayion) is deector mustw for interph-held as a
tity require/or source.
evidencesupervising
ns
s must confdistributio
uct (Table 5,
nant acceptconditi
maximumcentration
20
1
100
100
150
1
60
5200
ment, all cotime and tund vector re
and weeition of orgg method,
5 consecutiv1oF) or high
1 L
e supervisi
strate to thposted proupervisinge based prosary.
ppropriately indicate t
reject any ped not to cubmit all dretation of tpropriate.
d to complNo change
f the sourofficer.
orm to thegrades of t
as specifie
nce concenioners (NS
g/kgO
mposted prrning frequduction.
seed rednic matterthe tempere days or ler, there sh
ndscape
g officer m
e supervisinuct have Hfficer. Whe
duct manag
production ahat the pro
roduct or bnform to stcumentatioe analyses
te the projof source w
e of the c
minimum rehe compostin AS 441
tration limitsEPA).
ganic checontamina
DT/DDD/D
Aldrin
Dieldrin
Chlordane
Heptachlo
HCB
Lindane
BHCPCBs
ducts to bency as spe
uction shalhich produ
ature of thenger. Durinll be a mini
Planting
st be inform
g officer thCCP accre
e HACCPment plan t
nd samplinguct confor
tch that (onndards spe 10 (ten)and for app
ect must bill be permit
mpost mu
uirementsd productsoils for lan
for compost
icalt
maxi
E
used as aified by the
be achieces a humu
windrow isthe periodum of 5 tu
P
ed prior to p
at the manditation orccreditationhat demons
documents to the c
the basis ocified hereiorking day
roval of pla
of the sated without
t be suppli
specified inust meet t
dscaping an
ed soil
mum concmg/kg
0.5
0.02
0.02
0.02
0.02
0.02
0.02
0.02not detecta
soil conditioUSEPA sta
ed by thes-like materi maintainedwhen the crnings of th
age 16
lacement
facturersquivalentis not inrates the
tion frommposted
analysis. On this
prior toement to
me type,approval.
ed when
Tables 4e criteriad garden
ntration
ble
ner mustndard for
aerobic,al. Usingat 55oCmpost iswindrow
-
8/21/2019 land scaping
17/59
ConsolidatedEngin
eeringConstruction
QCS 2
T
(f
A
4
5
010 Se
QCS 2010
Tacom
Compost
Partic
Heavy metachemical c
p
Electrical
Wett
otal water h
Chl
% organ
ffective CatCapacit
Exchangea
om exchan
received m
(i)
(ii)
(iii)
Contaminagreen-wasindicate pdeleteriousplastic or s
In additionand organiand Table(e.g. NSWhigher con1,500 mg/
compound
ction 28
ble 5: Cheosted soil c
prop
Parameter
le size
l and organintaminants
H
onductivity
ability
lding capac
ride
ic carbon
ion Exchang(ECEC)
le sodium
eable catio
oisture cont
Methods ithe Austr
Referencparamete
Methodsthe chemHigginson
methods.tion of thee and/or thor compostmaterial (ftones) will b
, the fines oc contamin5) for minimEPA - thre
centrationsg and 2,80
are permitt
Part
ical testingnditioner to
erties of the
NS
ity
*
e *1 M
s)
*1 M
nt
ndicated bylian Standar
to AS 37requiremen
receded byical properti (1992), Au
ompost marough pooring practicer example srejected b
f the componts, to veri
izing the cohold levelsf trace elemg/kg ma
ed, at a 0.2
1 L
results requiverify the scomposted
Test M
Top Dressi
EPA - thrgrade A
1:5 soil wa
1:5 soil wa
Appendix
Appendix
*1:5 soil w
Dichromate
ammoniumpretreatm
ammoniumpretreatm
*Oven-dry
a hatch (#)d AS 4419 -
3 - pottingts are base
an asteriskes of soil,tralian Lab
occur duecontrol in tand procedoil, sharpsthe supervi
st ( 40%
< 600 mg
>15% by
> 40 meq/1
< 15%
< 40% by
ements ared garden us
he methodard (AS 374
ecognised fe text Rayl and water
ion as withg productio
hes found tontaminant
nalyzed forhold levels
azardous suse can bee beneficial. No detect
age 17
irements
5mm,
a 5 mmmm sieve
e 4
5
m
es
kg
ass
00g
ass
based one.
and the3).
r testingent and
chemical
unicipaln. These
containsuch as
chemical(Table 4bstancesade that
, limits ofble PCB
-
8/21/2019 land scaping
18/59
ConsolidatedEngin
eeringConstruction
QCS 2
6
7
8
9
1.3.14
1
2
3
010 Se
QCS 2010
Attributesof Qatar, t
(a) a hipeat
(b) a hi
part(c) a lo
mini
(d) a hithegrou
Application
(a) Theche
(b) Co
for ais inmaiappli
(c) Thefertilicomwithshallenafor e
(d) The
the rThe contrarandom sacompositecompost ssieving. Th
Internationcertificatesupervisin
Contracto
The contrbased siterecords cothe relevan
The contracalculate teach speciexpressed
The contrcompostedmajor nutrifertilizer ap
ction 28
f the Compe composte
h total wat
h cation ex
as a replac chlorideize the sal
h proportioslow-releasndwater
rates shall
compostedical propert
posted prod
pplication toorporation itenance opied to the su
rate of applizer equivalposite sampthe particlebe undertale the calcuase of appli
maximum a
esults of chctor shall emples eachsample ofmple shall
e size of a b
ally accepteof analysisofficer.
rs Respon
ctor shall v and produmply with tht sections o
ctor shall ue plant-ava
fic batch ofon the oven
ctor shallsoil conditi
ent (most cplication rec
Part
st shall bed product m
r holding ca
change cap
ment for spion concentconcentrati
of the nitro organic f
e as follow
product willies at rates
ucts verifyin
soils in Qatnto the soil,ration such
rface of the
ication to sence of thele shall beretained onen on the clation of fertation.
plication ra
mical testinsure that th
having a volnot less thbe air driedatch will be
d testing msupplied wi
ibilities
erify that tht manage
e USEPA pthe specific
e the resultilable (immcompost intdry mass b
lso calculatner on the
ommonly phommendati
1 L
appropriateust be verifi
pacity to fu
acity (nutrie
agnum pearation andon in the ro
gen and phrm, to red
:
be incorpoetermined
g complianc
ar as a soilto a depthas pluggingoil as a top
il of a com product.creened ththe sieve empost (ref
ilizer equiva
e permitted
g of the rece supplier tume of not ln 2 ltr (Apovernight (rdetermined i
ethods musth each co
e compostent plan, athogen disi
ation.
s of the chdiate fertilizended for usis of the