Land Development and Development Review Process 2
description
Transcript of Land Development and Development Review Process 2
![Page 1: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/1.jpg)
Land Development
and Development
Review Process 2
Planning and Growth Management Department Presentation to Planning Committee
February 14th, 2011
![Page 2: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/2.jpg)
2
Heritage Designation under the Ontario Heritage Act
l Most of the designated heritage properties in Ottawa are located in 16 heritage conservation districts designated under Part V of the Ontario Heritage Act. There are approximately 3500 properties in those districts.
l Approximately 350 properties are designated individually under Part IV of the Ontario Heritage Act.
![Page 3: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/3.jpg)
3
Heritage Designation under the Ontario Heritage Act
Reports to Council arising from authority vested in the City of Ottawa under the Ontario Heritage Act (OHA).
l Designation of individual heritage properties under Part IV of OHA;
l Applications to alter or demolish properties designated under Part IV of OHA;
l Recommendations to study and designate heritage conservation districts under Part V of OHA;
l Applications to alter or demolish properties under Part V of OHA:
l Applications for new construction in areas designated as heritage districts under Part V of OHA;
![Page 4: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/4.jpg)
4
How do applications flow through the system ?l Application l Heritage Unitl Planning and Growth Management
Departmentl Ottawa Built Heritage Advisory Committee
(OBHAC) l Planning Committee or l Agriculture and Rural Affairs Committeel City Council ( within 90 days of application
or deemed approved)
![Page 5: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/5.jpg)
5
What is OBHAC?
• Formerly known as the Local Architectural Conservation Advisory Committee
• OBHAC is a Council-appointed advisory committee established under the authority of the Ontario Heritage Act.
• OBHAC comments on all heritage applications before they proceed to Planning Committee and Council.
![Page 6: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/6.jpg)
6
St. Clare’s Church
![Page 7: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/7.jpg)
7
Ornate House- Laurentian Club?
Laurentian Club
![Page 8: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/8.jpg)
8
Fraser Schoolhouse
![Page 9: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/9.jpg)
9
Minto Bridges
![Page 10: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/10.jpg)
10
What criteria are used in designating a property individually under the OHA ?
Ontario Regulation 09/06l Enacted in 2006 after amendments to the
Ontario Heritage Act in 2005.l Meant to standardize evaluation process
across the provincel Regulation requires that a property may be
designated under the OHA if one of three criteria is met:l Design or physical valuel Historical or associative valuel Contextual Value
![Page 11: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/11.jpg)
11
Statement of Reason
Statement of Reason for Designation/Statement of Cultural Heritage Value or Interestl A document used to identify the key
heritage values of an historic placel Three key elements:
l Description of historic placel Statement of heritage valuel Character Defining Elements/Heritage
Attributes
![Page 12: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/12.jpg)
12
Statement of Reason continued
Exterior:l Cross gambrel roof,
decorative brickwork, Leaded glass double door, Use of materials
Interior:l Plaster decoration, eight
fireplaces with mantles, wood panelling, newel posts and balustrades
Carriage House:l Corner towers, decorative
brickwork, hipped Roof
![Page 13: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/13.jpg)
13
Process to designate under Part IV
Bylaw passed after 30 day appeal period
30 day appealperiod
Property EvaluationAnd Staff Report
Reviewed by MHC &Committee
City Council Votes todesignate
Notice of Intention
To Designate Issued
Conservation ReviewBoard
Hearing
City CouncilReviews CRB
Reportand
votes again
1. Council passesBylaw
2. Council withdraws
Notice of Intention
![Page 14: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/14.jpg)
14
Applications under the Ontario Heritage Actl Demolition or alteration to a
designated building require a heritage permit under the authority of the Ontario Heritage Act (OHA).
l Proponent works with staff to come up with a sensitive solution
l Must be processed through OBHAC, Planning Committee or Agriculture and Rural Affairs Committee and Council for approval
![Page 15: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/15.jpg)
15
Appeals under Part IV
l Appeal of designation by any member of the public
l Appeal of alteration/demolition only by the owner of the property
l All appeals under Part IV referred to the Conservation Review Board
![Page 16: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/16.jpg)
16
Conservation Review Board (CRB)
l Quasi-judicial board appointed by the province to hold hearings on matters related to cultural heritage
l Makes recommendations to municipal Councils about heritage disputes
l Decision of CRB is not binding
![Page 17: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/17.jpg)
17
Part V Designation Heritage Conservation Districts
l Designation of a Heritage Conservation District (HCD) through Municipal Bylaw
l Can be a few houses (Stewart/Wilbrod) or a whole neighbourhood (New Edinburgh)
l 16 districts in Ottawa (3500 properties)
![Page 18: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/18.jpg)
18
Heritage Conservation Districts
![Page 19: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/19.jpg)
19
New Construction in Heritage Conservation Districts
General guidelines:l Contemporary architecture, not
historicl Respect character and scale of the
districtl Setbacks and height should be
respected
![Page 20: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/20.jpg)
20
279-283 Dalhousie Street
![Page 21: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/21.jpg)
21
Strong, Modern Cornice
Small storefront bays
Clerestory Windows
Sign Band
Use of materials
Tyndal stone pilasters
![Page 22: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/22.jpg)
22
Alterations/Additions in Heritage Conservation Districts
l General guidelines:l Contemporary and distinguishable
from originall Complement, not copy the originall Be located at the rear of the buildingl Respect height, scale and massing
![Page 23: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/23.jpg)
23
217-221 Laurier Avenue
![Page 24: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/24.jpg)
24
Planning Tools to Protect Heritage
l Provincial Policy Statement (2005)l Official Planl Heritage zoning/overlayl Performance Securitiesl Relationship to Ontario Building Codel Heritage Grantsl Integration with the municipal development
review process
![Page 25: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/25.jpg)
25
Standards and Guidelines for the Conservation of Historic Places in Canada
l Adopted by Council in 2008l National standard for conservation l Developed in 2003 by Parks Canada as
part of the Historic Places Initiative
![Page 26: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/26.jpg)
After Approvals – Development Inspections and
Building Inspections
![Page 27: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/27.jpg)
27
Preparing to construct / demolishl Planning approvals obtainedl MOE and other approvals obtainedl Tree permit(s) obtainedl Development agreement executed,
securities submitted, early servicing approval granted
l Building permit issuedl Construction commences
![Page 28: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/28.jpg)
28
Development Inspections
Installation of infrastructure, services and amenities:
l Ensure the site is developed consistent with development agreements, while allowing the developer to do what they do
l Timing for various phases and installations of infrastructure, services and amenities is complex, interdependent and is mostly market driven
![Page 29: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/29.jpg)
29
Development Inspections
l Need to consider when the agreements were executed (different clauses reflect the different approaches adopted over time)
l Securities motivate the developer to complete the construction of services and amenities in accordance with the development agreements
![Page 30: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/30.jpg)
30
Development Inspections
l Development Inspectors review: Infrastructure installations and
connections (sewers, ponds, water, roadways, curbs, parks, trees, streetlights, etc), grading and drainage
Various components rely on information provided by consulting engineers
![Page 31: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/31.jpg)
31
Development Inspections
l Enforcement through securities and/or court action for breach of contract
l Infrastructure work must be accepted by City per agreement before partial and full release of securities
![Page 32: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/32.jpg)
32
Development Inspections
l Issues: Poor construction/project management; Developer oversells and is overextended; No control over timing of development; Construction debris, noise, ponding, etc.
![Page 33: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/33.jpg)
33
Development Inspections
• Issues: High expectations by new resident that all
amenities will be installed at outset.
Impatience with developer not completing the development fast enough.
![Page 34: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/34.jpg)
34
Development Inspections
l Solutions – subject of a report to Planning Committee February 22nd
New mandatory and enforceable targets for the installation of asphalt, installation and illumination of streetlighting, curbs, sidewalks, paved driveways, lot sodding, and tree planting, noise mitigation measures
![Page 35: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/35.jpg)
35
Building Constructionl Building Code Act establishes
province-wide building construction regulatory scheme
l Purpose: promote public safety through the application of uniform building standards
l Legislation regulates construction, not the builders or the trades involved
![Page 36: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/36.jpg)
36
Building Constructionl Responsibility is first and
foremost that of the property owner/permit holder/builder to build in compliance with the Building Code
l The City is tasked to enforce the Act and Code
l The City does this via permitting and inspections program
![Page 37: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/37.jpg)
37
Building Constructionl Building construction /
renovation/ demolition cannot proceed without a Building Permit (must have picked it up and be on display)
l Site preparation can proceed before Code permit is issued
l Excavation for shoring and foundation = construction
![Page 38: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/38.jpg)
38
Building Constructionl Permit is only issued if all applicable
law will be complied with once constructed: Heritage Act Planning Act (zoning, Demolition
Control By-law) Decision only of OMB and
Committee of Adjustment 25+ other legislations BUT not Tree Conservation By-law,
Drainage By-law, by-laws in general
![Page 39: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/39.jpg)
39
Building Constructionl Issues
Poor workmanship – Ontario Building Code does not regulate
Each permit application and permit must be evaluated on own merit, ie., poor performance at one site is not basis for refusing permit for another
Inspections of building construction by Building Officials at specific completed stages -- we do not revisit what was previously passed
![Page 40: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/40.jpg)
40
Building Construction
l Issues Community / neighbour opposed to
construction: a building permit can only be issued once it has been determined that there is intent to comply, that the building as constructed will meet OBC and applicable law requirements
No notification requirements
![Page 41: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/41.jpg)
41
Building Constructionl Issues
It is not possible for all aspects of the building to be inspected, nor is the City present at all times
Violations do occur. When observed, these are captured in Inspection Reports (deficiencies) or in Orders to Comply
Act promotes compliance, ie., tools are provided to obtain compliance. Act is not punitive
![Page 42: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/42.jpg)
42
Building ConstructionOccupancy Permits: l An occupancy permit confirms to the permit
holder that any deficiencies noted in the City’s Inspection Reports have been resolved and that the minimum requirements for occupancy have been met
l City does not control when actual occupancy of a new dwelling occurs
l If occupancy occurs prior to occupancy permit being issued, the builder and homeowner must work together to resolve outstanding deficiencies
![Page 43: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/43.jpg)
43
Building ConstructionOccupancy Permits, cont’dl Issuance of final occupancy permit signals to the
permit holder that their responsibilities related to the permit have been met. The permit file is closed.
l There is no longer any legal basis for the Inspector to require the permit holder to undertake any additional work.
![Page 44: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/44.jpg)
44
Post occupancy permit
l Deficiencies, if any, may be covered under terms of the purchase and sale agreement (contract law)
l City is not involved in civil disputes between vendor and purchaser
![Page 45: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/45.jpg)
45
Post occupancy permit
l Deficiencies may be covered under New Home Warranty program (TARION)
l www.tarion.ca – outlines the program in detail
l Tarion only applies to new constructionl Detailed processes and strict timelines for
submitting claimsl Not all deficiencies covered
![Page 46: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/46.jpg)
46
Quick recap – Role of the City
l The Planning Act sets out general parameters and processes for development.
l Other limited interferences imposed by legislations: Heritage Act, Environmental Protection Act, Building Code Act, etc.
l The legislations do not “regulate” the building industry/owner, rather, these inject order and minimum safety standards into development.
![Page 47: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/47.jpg)
47
Ontario Building Code Act
l The Ontario Building Code prescribes minimum standards.
l Minimum building standards for health (e.g., plumbing), fire protection (e.g., exit facility and smoke detector), and structural sufficiency of buildings.
![Page 48: Land Development and Development Review Process 2](https://reader035.fdocuments.net/reader035/viewer/2022062520/5681601e550346895dcf1d00/html5/thumbnails/48.jpg)
48
Questions?