Utah Abandoned Mine Reclamation Program Division of Oil, Gas & Mining Department of Natural Resources Lakeside Project

description

Lakeside Project. Utah Abandoned Mine Reclamation Program. Division of Oil, Gas & Mining Department of Natural Resources. Purpose : To seal hazardous abandoned mines. Abandoned Mine Hazards. Roof collapse Unstable side walls Total darkness – you can easily get lost - PowerPoint PPT Presentation

Transcript of Lakeside Project

Page 1: Lakeside Project

Utah Abandoned Mine Reclamation

Program

Division of Oil, Gas & Mining

Department of Natural Resources

Lakeside Project

Page 2: Lakeside Project

Purpose : To seal hazardous abandoned mines

Page 3: Lakeside Project

Abandoned Mine Hazards

• Roof collapse• Unstable side walls• Total darkness – you can easily get

lost• Hidden vertical shafts inside • Toxic gases• Lack of oxygen

Page 4: Lakeside Project

Project would close:

• 14 portals• 19 shafts

• Affect <5 acres

Page 5: Lakeside Project

Right of Entry (ROE)

• Permission is obtained from all land owners prior to any construction work

– Private land– Public (Bureau of Land Management)– State Trust Lands (minerals)– Private (Surface)

Page 6: Lakeside Project

Legal Authority

• Utah has primacy under the Surface Mining Control and

Reclamation Act of 1977, SMCRA

Page 7: Lakeside Project

Project Costs

• Funded by a taxon current coal production

Page 8: Lakeside Project

Project Selection

• Ranking priority system considers:

– Population: Resident and Transient– Mining Districts: historic mining areas– Mine density– Roads and accessibility

Page 9: Lakeside Project

Project Schedule• Work would occur in late summer/fall of

2008• Work would require 4 weeks

Page 10: Lakeside Project

Some of the laws we comply with:• National Environmental Policy Act

NEPA• National Historic Preservation Act• Antiquities Act• Endangered Species Act

Page 11: Lakeside Project

Environmental Assessment

• Analyzes potential impacts on the environment

• Includes clearances from:– State Historic Preservation Officer– US Fish and Wildlife Service

• Sign-offs from:– Office of Surface Mining– Bureau of Land Management

Page 12: Lakeside Project

Surveys & Data Collection

• Abandoned Mine Inventory• Cultural & Historical Surveys• Bat Surveys• Paleontological Surveys

(not applicable for Lakeside Project)

Page 13: Lakeside Project

Abandoned Mine Inventory

Page 14: Lakeside Project

Historical and Cultural Inventory

House Foundation

Page 15: Lakeside Project

Bat Surveys

Page 16: Lakeside Project

Paleontological Survey

Page 17: Lakeside Project

AMRP’s Intent• Cause the least amount of

disturbance possible• Design mine closures so that

historical features are preserved• Revegetate all areas disturbed

Page 18: Lakeside Project

Mine Closure Designs

Page 19: Lakeside Project

Hand Backfill

Page 20: Lakeside Project

Equipment Backfill -before & after

Page 21: Lakeside Project

Equipment Backfill – before & after

Page 22: Lakeside Project

Equipment tracks raked & seeded

Page 23: Lakeside Project

Locked steel gates allow for access and bat usage

Bat Gates

Page 24: Lakeside Project

Pinned Grate – before & after

Page 25: Lakeside Project

Pinned Grate – before & after

Page 26: Lakeside Project

Shaft Grate - Concrete Grade

Beam

Page 27: Lakeside Project

Block Wall – before & after

Page 28: Lakeside Project

Block Wall – before & after

Page 29: Lakeside Project

Stone Wall – before & after

Page 30: Lakeside Project

Stone Wall – before & after

Page 31: Lakeside Project

Closure # Avg. Costs

• Machine Backfill 21 <$10/CY• Hand Backfill 5

~$100/CY• Block Wall 1 ~$40/SF• Stone Wall 0 ~$40/SF• Bat Gate 1 ~$75/SF• Grade Beam Grate 1 ~$50/SF• Pinned Grate 4 ~$45/SF• PUF 0 ~$450/CY• Compound Custom 0 varies

Page 32: Lakeside Project

Public Participation

• What are your concerns?• Please give us your comments.

• Contacts: Chris Rohrer or Connie Jo

Garcia EA Coordinator Project

Manager 801-538-5322 801-538-5347

[email protected] [email protected]