LAKE WASHINGTON ROAD PROJECT
Prepared for:
Mr. Fran Lemieux
Shaw Group
Client’s Project Goals
Shaw Group Development Corp. Design & cpnstruct xxx mi. municipal road Design & construct yy sf commercial office
building MS Project construction schedule Project cost & cash flow analysis Develop construction contract & terms
Project Management Plan
Project Consists of 3 parts Project Controls
Project Scope Project Schedule Cash Flow Report
Transportation Design Traffic analysis Pavement design
Legal Aspects Contract development & terms Preparation for negotiations
Project Size and Cost
Road Design & Construction Traffic analysis Xx Mile municipal road Estimated cost - $ ________
Structure 3 Storys 62,523 sqft total Estimated cost - $479,000
Total Estimated Project Cost - $479,000
Project Schedule
Transportation Design
Key Elements of the Design Traffic Analysis Pavement Design & Cost Estimating Parking Lot Design
Traffic Analysis
Observed Traffic Counts Space Coast TPO Transportation Data Management
System FDOT Trip Calculation Software Pre/Post LOS Analysis for Babcock St. and University
Blvd.
Pavement Design
AASHTO Guide For Design of Pavement Structures Use of RAP (Recycled Asphalt Pavement) 2007 RS Means Precision Rock and Dredge – Palm Bay (Lime Stone) VA Paving – Cocoa (HMA)
Pavement Design
Parking Lot Design
City of Palm Bay Codes ADA Guidelines Lights by Outside Source Using ECO Lighting
Solutions
Parking Lot Design
Legal Aspects
Contract Development Preparations for Negotiations
Contract Development-1
Contract Development for Lake Washington Road Description of lands/site Contractors Responsibilities
Labor Schedule Permits
Owners Responsibilities Communication Payments Insurance
Contract Development-2
Bonds and Insurance/Surety Change Orders Claims Tests and Inspections Dispute Resolution
Good Faith Negotiations Mediation Arbitration Litigation
Liquidated Damages
Negotiations
Preparation for Negotiations Gather outside information on possible alternatives and prices to
compare to. Establish points of leverage that can be used during negotiation. Set a goal or target maximum/minimum value that you are willing
to buy/sell at. Decide initial approach method (friendly negotiation/good cop-bad
cop/etc…) Through negotiations try to determine the oppositions stand point
(do they NEED an agreement? do they have other options? Etc…) Most importantly, always shoot for a Win/Win conclusion. If both
parties can improve their situation and keep a friendly position with each other it will make it easier to negotiate again in the future.
Project summary
Schedule Timing Cash Flow Traffic Summary Pavement Features Contract Development Negotiation Tactics
Thank you for choosing Shaw group
Project plan meets client’s goals We will produce a quality project We appreciate your business I will be your project manager
My contact information is: Michael Matern 570-493-2053 [email protected]