LAKE WASHINGTON ROAD PROJECT

Prepared for:

Mr. Fran Lemieux

Shaw Group

Page 2: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Client’s Project Goals

Shaw Group Development Corp. Design & cpnstruct xxx mi. municipal road Design & construct yy sf commercial office

building MS Project construction schedule Project cost & cash flow analysis Develop construction contract & terms

Page 3: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Project Management Plan

Project Consists of 3 parts Project Controls

Project Scope Project Schedule Cash Flow Report

Transportation Design Traffic analysis Pavement design

Legal Aspects Contract development & terms Preparation for negotiations

Page 4: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Project Size and Cost

Road Design & Construction Traffic analysis Xx Mile municipal road Estimated cost - $ ________

Structure 3 Storys 62,523 sqft total Estimated cost - $479,000

Total Estimated Project Cost - $479,000

Page 5: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Project Schedule

Page 6: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.
Page 7: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Transportation Design

Key Elements of the Design Traffic Analysis Pavement Design & Cost Estimating Parking Lot Design

Page 8: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Traffic Analysis

Observed Traffic Counts Space Coast TPO Transportation Data Management

System FDOT Trip Calculation Software Pre/Post LOS Analysis for Babcock St. and University

Blvd.

Page 9: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Pavement Design

AASHTO Guide For Design of Pavement Structures Use of RAP (Recycled Asphalt Pavement) 2007 RS Means Precision Rock and Dredge – Palm Bay (Lime Stone) VA Paving – Cocoa (HMA)

Page 10: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Pavement Design

Page 11: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Parking Lot Design

City of Palm Bay Codes ADA Guidelines Lights by Outside Source Using ECO Lighting

Solutions

Page 12: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Parking Lot Design

Page 13: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Legal Aspects

Contract Development Preparations for Negotiations

Page 14: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Contract Development-1

Contract Development for Lake Washington Road Description of lands/site Contractors Responsibilities

Labor Schedule Permits

Owners Responsibilities Communication Payments Insurance

Page 15: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Contract Development-2

Bonds and Insurance/Surety Change Orders Claims Tests and Inspections Dispute Resolution

Good Faith Negotiations Mediation Arbitration Litigation

Liquidated Damages

Page 16: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Negotiations

Preparation for Negotiations Gather outside information on possible alternatives and prices to

compare to. Establish points of leverage that can be used during negotiation. Set a goal or target maximum/minimum value that you are willing

to buy/sell at. Decide initial approach method (friendly negotiation/good cop-bad

cop/etc…) Through negotiations try to determine the oppositions stand point

(do they NEED an agreement? do they have other options? Etc…) Most importantly, always shoot for a Win/Win conclusion. If both

parties can improve their situation and keep a friendly position with each other it will make it easier to negotiate again in the future.

Page 17: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Project summary

Schedule Timing Cash Flow Traffic Summary Pavement Features Contract Development Negotiation Tactics

Page 18: LAKE WASHINGTON ROAD PROJECT Prepared for: Mr. Fran Lemieux Shaw Group.

Thank you for choosing Shaw group

Project plan meets client’s goals We will produce a quality project We appreciate your business I will be your project manager