Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have...

49
Lake Delhi Dam Reconstruction Design Alternatives Report Lake Delhi Combined Recreational Facility and Water Quality District Transportation, Infrastructure, and Capitals Appropriations Subcommittee Presentation February 2, 2012

Transcript of Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have...

Page 1: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Lake Delhi Dam ReconstructionDesign Alternatives Report

Lake Delhi Combined Recreational Facilityand Water Quality District

Transportation, Infrastructure, and Capitals Appropriations Subcommittee Presentation

February 2, 2012

Page 2: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

I. Introduction

II. Project Objectives

III. Facility Description

IV. Field Investigation and Data Collection

V. Engineering Analysis

VI. Hazard Classification

VII. Repair Alternatives Development and Evaluation

VIII. Recommended Project

IX. Construction Schedule/Phasing

X. Construction Cost Estimate

XI. Moving Forward

XII. Questions

Alternatives Report Presentation Agenda:

Page 3: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Project Team

• Stanley Consultants• Gibbs Engineering and Surveying• Braun INTERTEC• Louis Berger Group• Lake Delhi Combined Recreational

Facility and Water Quality District

I. Introduction

Page 4: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

• Document Condition of Lake Delhi Dam• Collect Data to Perform Technical Analysis and

Design of Dam Repairs• Review Regulatory Requirements• Complete Archaeological Reconnaissance • Develop and Evaluate Alternatives for Repairing

Lake Delhi Dam• Provide “Recommended Project”, Bringing Dam Into

Compliance with Current Dam Safety Standards.• Provide Estimate of Construction Costs and

Schedule.

II. Project Objectives

Page 5: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

III. Description of Existing Facility Features

• Pool Area• North Embankment• North Abutment Wall• Powerhouse• Gated Spillway• Stilling Basin• South Buttress Wall• South Embankment

Page 6: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize
Page 7: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

• Document Review• Topographic Survey• Property Research• Geotechnical Investigations• Structural Investigations• Electrical Investigations• Mechanical Investigations• Archeological Reconnaissance• Permitting Requirements Review

IV. Field Investigation and Data Collection

Page 8: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Document Review

• Original Design Drawings• Repair Drawings/Specifications• 1997 Ashton-Barnes Inspection, Stability, and

Spillway Adequacy Report• 2002 J.F. Brennan Co. Underwater Inspection

Report and Videos• 2004 DNR Inspection Report• 2008 J.F. Brennan Co. Underwater Inspection

Report and Videos• 2009 DNR Inspection Report• 2010 Stanley Consultants Inspection Report

Page 9: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Topographic Survey & Property Research• Topographic Survey

– Complete survey of Project Area – Gibbs– Supplement With Light Detection and Ranging (LiDar)

• Property Research – Gibbs – Review Gibb’s Previous Surveys– Review Gibb’s Previous Computer Drawings– Generate Property Line Exhibit Compiling Previous Work– Conduct Research at County Courthouse– Add In Geometry of Missing Plats– Obtained Coordinates of accessible property pins– Compare Surveyed Property Pins to Property line exhibit

and adjust

• Future Property Work

Page 10: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Geotechnical Investigations

• Field Investigations–Dam Site–Potential Borrow Evaluation–Laboratory Testing

• Geotechnical Parameter Development

Page 11: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Structural Investigations

• Initial Field Investigations–Concrete Condition Survey–Concrete Cores

• Review 1997 Ashton-Barnes Structural Stability Analyses

• Supplemental Investigations–Powerhouse/Spillway Foundation

Coring

Page 12: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Electrical Investigations

• Power Distribution

• Trash Rakes and Hydroelectric

• Equipment

• Lift Gates

• Emergency Generator System

Page 13: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Mechanical Investigations

• Lift Gates

• Wicket Gates

• Trash Rake

Page 14: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Archeological Reconnaissance

• Louis Berger Group, Inc. (LBG)• Reconnaissance Level Survey• Reconnaissance included Lake Delhi Dam and all Exposed

land areas within the former impoundment area• Records review to identify high potential areas• Field survey to investigate High potential areas• Seven New Sites Within Study Area• Total of 12 archaeological sites reported for the study area • No burial sites were identified within the study area• None of 12 sites has been evaluated for National Register• Additional site investigations recommended at all 12• Additional reconnaissance survey recommended for

selected portions of the study area

Page 15: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Permitting Requirements Review

• U.S. Army Corps of Engineers - Section 404 Nationwide Permit (NWP)

• Iowa DNR – Section 401 Water Quality Certification

• Iowa DNR – Sovereign Lands Construction Permit

• Iowa DNR – Floodplain Development Permit• Cultural Resources• U. S. Fish and Wildlife Service (FWS)

Page 16: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

V. Engineering Analysis

• Geotechnical• Structural• Hydrology/Hydraulics• Hazard Classification

Page 17: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Geotechnical Analyses• Slope Stability• Seepage• Bearing Capacity• Settlement• Rock Anchor Capacity• Erosion/Scour Protection

Page 18: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Structural Analyses

• Structural Stability Analyses• Preliminary Structure Stabilization

Design

• Preliminary Concrete Structure Design– Service and Auxiliary Spillways– Training/Retaining Walls– Concrete Repair

Page 19: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Hydrology/Hydraulics• Lake Delhi Dam did not have sufficient hydraulic capacity

to meet current Iowa dam safety criteria.• Characterize Maquoketa River Flows at Dam.• Developing a hydrologic model of Delhi Dam watershed.• Developing a hydraulic model of Maquoketa River

upstream and downstream of Lake Delhi Dam.• Performing hazard classification and design flood analysis• Developing Lake Delhi Dam spillway concepts.• Addressing other hydraulic issues.

– Minimum Flow– Cofferdam By-Pass– Lake Draw-Down

Page 20: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Pool Impacts of Dam

Page 21: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

VI. Hazard Classification

• Low/Moderate/High• Impacts Spillway Capacity/Cost of New Project• A detailed hazard classification analysis was

completed and results indicate that a reconstructed Lake Delhi Dam most closely matches the DNR’s Moderate Hazard Classification.

• Reviewed by Iowa DNR• Included in Dam Construction Permit Application

Page 22: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

VII. Repair Alternatives Development and Evaluation

• Alternative Development/Evaluation Process

• Project Features With Multiple Alternatives

• Project Features Without Alternatives

Page 23: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Alternative Development/Evaluation Process

• “Brain Storming” session. • Establish District Objectives. • Review parameters for design

development and alternative evaluation.• Initiate the creative “brain storming”

process for alternative development.

Page 24: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

• District Objectives • Meet requirements of current dam safety and design standards.• Minimize operation/maintenance requirements.• Maintain or improve upstream and downstream flow conditions.• Provide adequate (50+ year) service life.• Increase public safety at dam site.• Improve public recreational opportunities.• Reduce potential for damage from debris flow.• Provide cost-effective solution.• Constructability.• Minimize right-of-way impacts.• Minimize permitting requirements.• Provide opportunity for greater pool control.• Enhance fisheries opportunities.• Improve water quality.

Alternative Development/Evaluation Process (Cont’d)

Page 25: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Alternative Development/Evaluation Process (Cont’d)

• Brain-Storm Potential Reconstruction Alternatives

• Review brain-stormed alternatives in terms of Project Objectives and Feasibility of Construction

• Select Alternatives for Continued Development• Complete Conceptual Design of Selected

Alternatives

Page 26: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize
Page 27: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Project Features With One or More Feasible Alternatives

• North Embankment• Double Sheet Pile Wall• Cellular Sheet Pile Structure• Reinforced Concrete Walls *

• North Downstream Abutment Wall• Leave the existing wall as-is• Remove and replace the masonry block portion of the wall

with large block or mechanically stabilized earth (MSE) wall *

• Remove and replace the masonry block portion of the wall with a reinforced concrete wall

Page 28: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize
Page 29: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize
Page 30: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize
Page 31: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize
Page 32: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Project Features With One or More Feasible Alternatives (Cont’d)

• Powerhouse/Spillway Stabilization• FERC Stability Requirements• U.S. Army Corps of Engineers Stability Requirements *

• Powerhouse Bridge Deck• Epoxy Seal• Waterproof Membrane *

• Spillway Gate Repair/Replacement• Radial Gates• Crest Gates• Lift Gates *

Page 33: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize
Page 34: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Project Features With One or More Feasible Alternatives (Cont’d)

• New Spillway• Fuse Plug• Add Additional Lift or Radial Gates• Conduit Spillway Through Embankment• Labyrinth Weir

• Dual Level• Single Level *

• Pneumatic Crest Gates

• Minimum Flow Passage• Refurbish Wicket Gates• Install Valves in New Lift Gates *

Page 35: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize
Page 36: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize
Page 37: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize
Page 38: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Project Features With One or More Feasible Alternatives (Cont’d)

• New South Spillway Embankment Construction• Homogeneous Earth• Zoned *• Roller Compacted Concrete (RCC)

• Existing South Embankment• Remove and Replace• Improve Existing and Bench Into New *

Page 39: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Option Features

• Fish Passage• Recommendation – Not Practical

• Cost• Maintenance• Property Impacts• Length• Invasive Species• Dam Safety

Page 40: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize
Page 41: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Option Features (Cont’d)

• Recreational Amenities• Handicapped Accessible Fishing Pier.• Canoe Portage Trail.• Boat Ramp.• Observation Deck.

• Sediment Control and Removal• Dredging During Construction• Sediment Control Features

Page 42: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Non-Alternative/Option Project Features

• Site Access• Utilities• Powerhouse/Spillway Concrete Repair• South Buttress Wall Modification/Repair• Electrical and Controls• Safety Features• Archeological Mitigation• Property/Easement Acquisition

Page 43: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

VII. Recommended Project

• Based on the project objective evaluation and cost comparison, reconstruction alternatives were selected for incorporation into the “recommended project.”

• “Recommended Alternatives” were combined with Non-Alternative Features for “Recommended Project”

Page 44: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

IX. Construction Schedule/Phasing

• Goal – Pool in 2013• Recommend Two Phase Construction• Preliminary scheduling - construction could be accomplished

in one construction season• Assumptions

• Experienced contractor with sufficient resources• Normal weather• Normal river flows• Normal permitting timeline• 6 day work week

Page 45: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Phase I

Page 46: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

Phase II

Page 47: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

X. Construction Cost Estimate

• Combine Costs Estimates for Recommended Alternatives• Non-Alternative Item Cost Estimates• Design and Engineering During Construction Costs• Unit Costs Based on Published Values and Stanley Data

Base• Apply Mark-Ups

• Undeveloped Design Costs• Construction Contingencies• Escalation for Inflation

• Recommended Project:Approximately $11.9 million

Page 48: Lake Delhi Dam Reconstruction Design Alternatives Report · • Lake Delhi Dam did not have sufficient hydraulic capacity to meet current Iowa dam safety criteria. • Characterize

XI. Moving Forward

• Present Alternative Report to Agencies• Initiate Detailed Design and Preparation of

Contract Documents • Permitting and Agency Coordination • Property/Easement Acquisition• Identify Qualified Contractors• Bid Project• Construction