Page 1 of 2 www.sjra.net ADDENDUM NO. 1 CSP # 19-0041 Date: March 12, 2019 To: All Interested Parties From: Grady Garrow, CPPB Senior Buyer Re: CSP No. 19-0041 Lake Conroe Division Office Facilities Repair The following additions, deletions, changes or clarifications to CSP No. 19-0041 are hereby made a part of the originally issued documents for the above referenced project as fully and as completely as though the same were included therein. CSP #19-0041 Clarification: The following items are in reference to all necessary Contract Documents and Lake Conroe Division Office Facilities Repair drawings (02/2019): 1. Chisel out excess mortar where sheathing was previously removed for mold remediation. See revised Sheet A-2.0 and A-1.0 of Construction Drawings and updated Section A, Item 4 of the Proposal Form. 2. Demo existing kitchen counter tops and replace with new kitchen counter mid-grade granite countertops; See revised Sheets A-1.0 and A-2.0 of Construction Drawings, and updated Section C, Item 2 of the Proposal Form. 3. Necessary brick removal and replacement for the reinstallation of windows shall be incidental to the reinstallation and will not be paid for at an additional cost. See Sheet A- 3.0 of Construction Drawings, updated Section A, Item 1 of the Proposal Form. 4. Addition of Alternate 3: Provide Lump Sum cost for all materials and labor for the installation of spray foam insulation (R30) in lieu of batt insulation in the attic. See Sheet A-1.0 of Construction Drawings and the addition of Item 3 in Section D of the Proposal Form.

Transcript of Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL...

Page 1: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

Page 1 of 2

www.sjra.net

ADDENDUM NO. 1 CSP # 19-0041

Date: March 12, 2019 To: All Interested Parties From: Grady Garrow, CPPB Senior Buyer Re: CSP No. 19-0041 Lake Conroe Division Office Facilities Repair The following additions, deletions, changes or clarifications to CSP No. 19-0041 are hereby made a part of the originally issued documents for the above referenced project as fully and as completely as though the same were included therein. CSP #19-0041 Clarification: The following items are in reference to all necessary Contract Documents and Lake Conroe Division Office Facilities Repair drawings (02/2019):

1. Chisel out excess mortar where sheathing was previously removed for mold remediation. See revised Sheet A-2.0 and A-1.0 of Construction Drawings and updated Section A, Item 4 of the Proposal Form.

2. Demo existing kitchen counter tops and replace with new kitchen counter mid-grade granite countertops; See revised Sheets A-1.0 and A-2.0 of Construction Drawings, and updated Section C, Item 2 of the Proposal Form.

3. Necessary brick removal and replacement for the reinstallation of windows shall be incidental to the reinstallation and will not be paid for at an additional cost. See Sheet A-3.0 of Construction Drawings, updated Section A, Item 1 of the Proposal Form.

4. Addition of Alternate 3: Provide Lump Sum cost for all materials and labor for the installation of spray foam insulation (R30) in lieu of batt insulation in the attic. See Sheet A-1.0 of Construction Drawings and the addition of Item 3 in Section D of the Proposal Form.

l2user
Image
l2user
Image
l2user
Text Box
3-13-2019
Page 2: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

Page 2 of 2

5. Replace all exposed rotten framing as necessary. See Sheet A-2.0 of Construction Drawings, and updated Section A, Item 4 of the Proposal Form.

6. Updated Section A, Item 7 of the Proposal Form to reflect the installation of floor drain for proposed water heater as depicted on Sheet P-1 of construction drawings

7. Remove existing wallpaper and paint existing conference room bathroom. See Sheet A-2.0 of Construction Drawings and updated Section A, Item 4 of the Proposal Form.

8. Remove and replace all face plates before painting interior of facility. See Sheet A-1.0 of Construction Drawings and updated Section A, Item 4 of the Proposal Form.

9. Install light switch for attic near the attic stairs on the first floor of facility. See Sheet E-1 of Construction Drawings and updated Section A, Item 3 of the Proposal Form.

10. Replace all existing gutters and downspouts as well as replace facia as directed by owner. See Sheet A-3.0 of Construction Drawings and updated Section A, Item 5 of the Proposal Form.

11. Fire extinguisher locations noted on Sheet A-2.0 to address comments from the City of Conroe.

12. 2009 IBC and IFC noted on Sheet G-1 to address comment from the City of Conroe. Contractor Questions:

1. Question: “besides Berridge and MBCI, are there any other approved roof manufacturers?” Answer: Specifications state: Othermanufacturers capableofproviding structural standingseamsystem&profilessimilartothatspecifiedwillbeconsidered. Additional Comments: The deadline for contractor submitted questions will be extended from March 14 @ 11:00 am to March 18th @ 11:00 am.

All provisions which are not so amended or supplemented remain in full force and effect. Please acknowledge receipt of this addendum with signature and date and return with completed Proposal/Quotation. Failure to do so may cause your Proposal to be considered non-responsive.

Receipt of this Addendum No. 1 is hereby acknowledged

Authorized Signature Date Company Name

Page 3: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 Addendum 1 PROPOSAL FORM

01/04/2018 SJRA Standard Specification CSP No. 19-0041 PROPOSAL FORM Contract No. 19-0041 00 41 00.02 - 1

SECTION 00 41 00.02

PROPOSAL FORM

To: The San Jacinto River Authority

1577 Dam Site Road G & A Building, 3rd Floor Receptionist Conroe, Texas 77304

Project: Lake Conroe Office Facilities Repair CSP No.: 19-0041 Project No.: SJRA Project No. GAPR0004.1003.2C001 Offeror: (Print or type full name of proprietorship, partnership, corporation, or joint venture)

1.0 OFFER A. Total Proposal Price: The undersigned Offeror proposes and agrees, if this

Proposal is accepted, to enter into an Agreement with Owner in the form included in the Contract Documents to perform all Work as specified or indicated in Contract Documents for the Contract Amount indicated in this Proposal or as modified by a Change Order or Change Directive.

B. Proposal Security: Included with the Proposal is a Proposal Security in the amount of 5 percent of the Total Proposal Price subject to terms described in Specification Section 00 21 13.02 – Instructions to Offerors.

C. Period for Proposal Acceptance: Offeror accepts all of the terms and

conditions of the Request for Proposals and Instructions to Offerors, including without limitation those dealing with the disposition of required Bonds. This offer shall remain open to acceptance and is irrevocable for 90 days after Proposal Date (opening). That period may be extended by mutual written agreement of the SJRA and Offeror.

D. Liquidated Damages: Offeror accepts the provisions of the Agreement as to liquidated damages in the event of its failure to complete Work in accordance with the schedule set forth in the Agreement.

E. Addenda: Offeror hereby acknowledges it has received, examined and

carefully studied all Addenda and all Addenda have been considered and all related costs are included in the Total Proposal Price. Offeror hereby acknowledges receipt of the following Addenda:

Page 4: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 PROPOSAL FORM

08/24/2018 SJRA Project Specification CSP No. 19-0041 PROPOSAL FORM Contract No. 19-0041 00 41 00.02 - 2

Addendum No.

Addendum Date Signature Acknowledging Receipt

1 March 13, 2019

F. Proposal Supplements: The following documents shall be provided with the proposal:

• Offeror’s Statement of Qualifications (SOQ). • Completed Certification of Proposal • Completed Felony Conviction Notice Form • Form of Business 00 45 20 • Proposal Security (Offeror’s Bond 00 43 13) • Resolution of Contractor 00 45 43 • Completed Verification Company Does Not Boycott Israel (00 52 00) • Completed TGC 2252.152 Certification Form (00 52 00) • Completed Vendor Information Form ( 00 52 00) • W-9 Request for Tax Payer Information (00 52 00) • One (1) flash drive with a Completed Proposal with Original signatures,

Statement of Qualifications (SOQ) and a full set of Financials. • Conflict of Interest Forms ( Form CIQ)

2.0 CONTRACT TIME

A. If Proposal is accepted, Contractor shall achieve Substantial Completion of the Work within 120 calendar days after the date when the Contract Time Requirements commence to run as provided in Article 2.3 of the General Conditions, and Contractor shall achieve Final Completion within 150 calendar days after the date required for Substantial Completion of the Work, subject to adjustments of Contract Time Requirements as provided in the Contract.

3.0 OFFEROR REPRESENTATIONS

A. Offeror is familiar with and is satisfied as to all federal, state and local laws and regulations that may affect cost, progress, performance and furnishing of the Work.

B. Offeror has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, performance and furnishing of the Work.

C. Offeror has carefully studied all: (1) drawings of physical conditions in or

relating to existing structures at or contiguous to the Site and (2) Hazardous Conditions identified in reports and drawings provided to Offeror or available for Offeror review. Offeror understands that neither Owner nor Principal

Page 5: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 PROPOSAL FORM

08/24/2018 SJRA Project Specification CSP No. 19-0041 PROPOSAL FORM Contract No. 19-0041 00 41 00.02 - 3

Architect/Engineer is responsible for the accuracy of these documents and they are not part of the Contract Documents.

D. Offeror has obtained and carefully studied all additional or supplementary

examinations, investigations, explorations, tests, studies and data concerning conditions including surface, subsurface and Underground Improvements at or contiguous to the Site which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Offeror, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Contract Documents to be employed by Offeror, and safety precautions and programs incident thereto.

E. Offeror does not consider that any further examinations, investigations,

explorations, tests, studies, or data are necessary for the determination of this Proposal for performance of the Work at the Contract Amount proposed, within the Contract Time Requirements proposed and in accordance with the terms and conditions of the Contract Documents. Offeror shall make no claims against the Owner and shall bear all risk of losses, if any, resulting on account of the amount and character of the Work, or because the conditions under which the Work must be done vary or differ from conditions or information contained in the Contract Documents, or are different from what were estimated or anticipated by it.

F. Offeror is aware of the general nature of work to be performed by Owner and

others at the Site that relates to the Work as indicated in the Contract Documents.

G. Offeror has correlated the information known to Offeror, information and

observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents.

H. Offeror has given Owner or Principal Architect/Engineer written notice of all

conflicts, errors, ambiguities, or discrepancies that Offeror has discovered in the Contract Documents, and the written resolution thereof by Principal Architect/Engineer are acceptable to Offeror.

I. The Contract Documents are generally sufficient to indicate and convey

understanding of all terms and conditions for performing and furnishing the Work for which this Proposal is submitted.

J. Laws to be Observed: In the performance of the Contract, the Contractor must

comply with all applicable federal, state, and local laws, ordinances and regulations, including but not limited to laws concerned with labor, safety,

Page 6: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 PROPOSAL FORM

08/24/2018 SJRA Project Specification CSP No. 19-0041 PROPOSAL FORM Contract No. 19-0041 00 41 00.02 - 4

minimum wages, and the environment. The Contractor will make himself familiar with and shall at all times observe and comply with all federal, state, and local laws, ordinances and regulations which in any manner affect the conduct of the work, and shall Indemnify and save harmless the Owner, and its representatives against any claim arising from violation of any such law, ordinance or regulation by himself or by his subcontractor or by his employees.

K. Review by Owner:

(a) The Owner and authorized representatives, agents and employees of the

Owner shall at all times have access to and be permitted to observe and review all work, materials, equipment, payrolls, personnel records, employment conditions, material invoices, books and accounting records, subcontracts, purchase orders, and all other relevant data, documents and records pertaining to this Contract.

L. Offeror will submit written evidence of its authority to do business in the state

where the Project is located with its Proposal, form 00 45 20 – Form of Business.

M. Offeror further represents that this Proposal is genuine and not made in the

interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Offeror has not directly or indirectly induced or solicited any other Offeror to submit a false or sham Proposal; Offeror has not solicited or induced any individual or entity to refrain from submitting a Proposal; and Offeror has not sought by collusion to obtain for itself any advantage over any other Offeror or over Owner.

4.0 DEFINED TERMS:

A. Terms defined in this Proposal, if any, shall be for the purposes of this Proposal. Terms with initial capital letters not defined herein shall have the meaning assigned to them in the other Bid Documents or Contract Documents.

5.0 TOTAL PROPOSAL PRICE HAS BEEN CALCULATED BY OFFEROR, USING THE FOLLOWING COMPONENT PRICES AND PROCESS (PRINT OR TYPE NUMERICAL AMOUNTS):

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

Page 7: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 PROPOSAL FORM

08/24/2018 SJRA Project Specification CSP No. 19-0041 PROPOSAL FORM Contract No. 19-0041 00 41 00.02 - 5

SAN JACINTO RIVER AUTHORITY

Lake Conroe Office Facilities Remediation & Repair

PROPOSAL FORM

A. BASE ITEMS

Item No.

Spec. Reference

Description

Qty

.

Unit

Unit Price (this column controls)

Proposal Price

1 04 05 13,

07 90 00,

07 14 00,

08 51 50,

08 11 00,

08 70 00

04 21 13

Weatherproofing:

Provide all materials and labor to repair all necessary items to ensure appropriate weatherproofing of structure as shown, noted in the drawings, or included by specifications. Including but not limited to: tuck pointing mortar, replacing failed sealants, reinstalling all windows, replacing weatherproofing and sweeps on all north-facing doors, and repairing all concrete expansion joint sealants. Necessary brick removal and replacement for the reinstallation of windows shall be incidental to the reinstallation and will not be paid for at an additional cost.

1 LS $______________ $_________________

2 See Plans HVAC Systems:

Provide all materials and labor to perform all necessary work to remove the existing HVAC systems and replace with appropriate systems as shown, noted in the drawings, or included by specifications.

1 LS $______________ $_________________

3 See Plans Electrical:

Provide all materials and labor to perform all necessary work and repairs to rerun electrical to meet Code requirements for all

1 LS $______________ $_________________

Page 8: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 PROPOSAL FORM

01/04/2018 CSP No. 19-0041 SJRA Standard Specification PROPOSAL FORM Contract No. 19-0041 00 41 00.02 - 6

interior and exterior lighting as shown, noted in the drawings, or included by specifications. Install new light at attic stairs

4 07 21 00,

07 90 00,

Miscellaneous Updates:

Provide all materials and labor to perform all necessary work for all other repairs as shown, noted in the drawings, or included by specifications. Including but not limited to: replacing all ceiling tiles and insulation, sistering new joists to cut joists, chiseling out excess mortar where sheathing was removed for mold remediation, adding lag bolts and sealants to attic stairs, covering all penetrations to stop rodents, removal of all face plates prior to painting, painting interior of facility, removal of wallpaper within conference bathroom and drilling out full-head weeps to extend to surface of concrete brick ledge, as well as replacing exposed rotten framing as necessary.

1 LS $______________ $_________________

5 07 61 13,

07 62 00

Roof System:

Provide all materials and labor to perform all necessary work to complete demolition of existing metal roof and installation of new standing seam metal roof as shown, noted in the drawings, or included by specifications. To include decking repair, and addition of ring shank nails or screws. Also includes the removal and replacement of existing gutters & downspouts.

1 LS $______________ $_________________

6 07 21 00 Mold Remediation Repair: 1 LS $______________ $_________________

Page 9: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 PROPOSAL FORM

01/04/2018 CSP No. 19-0041 SJRA Standard Specification PROPOSAL FORM Contract No. 19-0041 00 41 00.02 - 7

Provide all materials and labor to perform all necessary work to replace areas affected by mold remediation (remediation done by others) as shown, noted in the drawings, or included by specifications. Including but not limited to: sheetrock, insulation, sheathing, and built-in desk.

7 See Plans Mechanical/Plumbing:

Provide all materials and labor to perform all necessary work to make plumbing repairs as shown, noted in the drawings, or included by specifications. Including but not limited to: installing an appropriately sized water heater, and floor drain, adding vents and necessary items to mop closet, replacing the mop sink and flooring in the janitor’s closet, and relocating bathroom vents out of north-facing wall.

1 LS $______________ $_________________

8 See Plans

Earthwork:

Provide all materials and labor to perform all necessary work to make repairs to areas surrounding the facility as shown, noted in the drawings, or included by specifications. Including but not limited to: back-filling at the southwest corner of the building with stabilized material, adding tie-in drains, and regrading gutters.

1 LS $______________ $_________________

9 01 71 13 Mobilization:

Contractor mobilization and demobilization of all equipment, materials, and personnel to and from job site. As well as provide proper tree & shrub

1 LS $______________ $_________________

Page 10: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 PROPOSAL FORM

01/04/2018 CSP No. 19-0041 SJRA Standard Specification PROPOSAL FORM Contract No. 19-0041 00 41 00.02 - 8

protection as directed by owner

10 01 74 13,

01 74 19

Cleaning:

Provide all materials and labor to perform all necessary work to provide adequate protection and cleaning as shown, noted in the drawings, or included by specifications. Including but not limited to: providing floor protection during the duration of the project, doing a construction clean to restore building for occupancy, and providing construction dumpster(s) to haul off all waste.

1 LS $______________ $_________________

11 00 61 13.13 00 61 13.16

Contractor Bonding Costs (Statutory Payment Bond and Performance Bond)

1 LS $___ $

A. Total Base Items: $__________________________________

B. CASH ALLOWANCES

Item No.

Spec. Reference

Description Cash Allowance 1

1 N/A Agency Permits, to be reimbursed on an Actual Cost Basis.

$___________7,500.00_________

B. Total Cash Allowances: $___________$7,5000_________

Table C Footnotes: (1) Fixed price determined prior to Proposal. Cannot be adjusted by Offeror.

C. ALTERNATE ITEMS

Item No.

Spec. Reference

Description

Qty

.

Unit

Unit Price (this column controls)

Proposal Price

1 See Plans Provide all materials and labor to perform a remodel of existing restroom and the addition of an ADA shower. To include but not limited to

1 LS $______________ $_________________

Page 11: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 PROPOSAL FORM

01/04/2018 CSP No. 19-0041 SJRA Standard Specification PROPOSAL FORM Contract No. 19-0041 00 41 00.02 - 9

the upsizing of water heater (water heater being replaced in base bid will be larger) for this restroom, level-up and slope floor, removing and replacing flooring to meet ADA requirements, and removal of the existing toilet. See plans for exact requirements of ADA shower.

2 See Plans Provide all materials and labor to replace existing kitchen cabinetry and counter tops with new cabinetry and countertops

1 LS $______________ $_____________

3 See Plans Provide all materials and labor to install spray foam insulation R-30 in attic.

1 LS $_______________

$__________________

C. Total Alternate Items: $__________________________________

Note: Alternate Items shall be included in Total Proposal Price.

D. TOTAL PROPOSAL PRICE: Add Totals for Items A + B

Total Alternate C

$______________________________

$______________________________

6.0 SIGNATURES: By signing this Document, I agree that I have received and reviewed all Bid Documents, Contract Documents and Addenda and considered all costs associated

with the Bid Documents, Contract Documents and Addenda in calculating the Total Proposal Price.

Offeror:

(Print or type full name of your proprietorship, partnership, corporation, or joint venture.*)

** By:

Signature Date Name:

(Print or type name) Title

Page 12: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 PROPOSAL FORM

01/04/2018 CSP No. 19-0041 SJRA Standard Specification PROPOSAL FORM Contract No. 19-0041 00 41 00.02 - 10

Doing Business as:

Business Address:

(Mailing)

(Street, if different)

Telephone and Fax Number:

(Print or type numbers) * If Proposal is a joint venture, add additional Proposal Form signature sheets for each member of the joint venture. ** Offeror certifies that the only person or parties interested in this offer as principals are those named above. Offeror has not directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive Proposing. Note: This document constitutes a Governmental record, as defined by § 37.01 of the Texas

Penal Code. Submission of a false Governmental record is a criminal offense as provided in § 37.10 of the Texas Penal Code.

Page 13: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 PROPOSAL FORM

01/04/2018 CSP No. 19-0041 SJRA Standard Specification PROPOSAL FORM Contract No. 19-0041 00 41 00.02 - 11

7.0 CERTIFICATION OF PROPOSAL

The undersigned affirms that they are duly authorized to execute this Proposal, that this Proposal has not been prepared in collusion with any other Offeror, and that the contents of this Proposal have not been communicated to any other Offeror prior to the official opening of this Proposal. Additionally, the undersigned affirms that the Offeror is willing to sign the attached SJRA Agreement (if applicable).

Signed By: Title: Typed Name: Company Name: Phone No.: Fax No.: Email: Proposal Address: P.O. Box or Street City State Zip Order Address: P.O. Box or Street City State Zip Remit to Address: P.O. Box or Street City State Zip Federal Tax ID No.: _____________________________ Date:

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

Page 14: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 PROPOSAL FORM

01/04/2018 CSP No. 19-0041 SJRA Standard Specification PROPOSAL FORM Contract No. 19-0041 00 41 00.02 - 12

FELONY CONVICTION NOTIFICATION

Any person and/or business entity that enters into a contract with the San Jacinto River Authority must give advance notice to the SJRA if any employee or an owner or operator of the business entity has been convicted of a felony. The notice must include a general description of the conduct resulting in the conviction of a felony. The notice must also describe the role that the employee, owner, or operator will perform in executing the contract. The SJRA may require substitution of employees in the performance of the contract. The SJRA may terminate a contract with a person or business entity if the SJRA determines that the person or business entity failed to give notice as required by this clause, misrepresented the conduct resulting in the conviction, or failed to substitute personnel at SJRA’s request. I, the undersigned agent for the firm named below, certify that the information concerning notification of felony convictions has been reviewed by me and the following information furnished is true to the best of my knowledge.

_____________________________ Signature of Authorized Company Official Date

Authorized Company Official’s Name and Title (Printed) _________________________________________________________ Firm Name

A. My firm is not owned or operated by anyone who has been convicted of a felony nor does it have any employees who have been convicted of a felony:

Signature of Authorized Company Official Date

B. My firm has employee(s) or is owned or operated by the following individual(s) who has/have been convicted of a felony: Signature of Authorized Company Official Date

C. Provide a general description of the conduct resulting in the conviction of a felony. Signature of Authorized Company Official Date

D. Describe the role that the person(s) convicted of a felony will play in the performance of the contract. Signature of Authorized Company Official Date

END OF SECTION

Page 15: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

DIRECTORS

ISSUE DATE: (02) (2019)

SAN JACINTO RIVER AUTHORITY

LAKE CONROE DIVISION

OFFICE FACILITIES REPAIR

CSP NO. 19-0041

CONTRACT NO. 19-0041

LLOYD B. TISDALE PRESIDENT

RONNIE ANDERSON VICE PRESIDENT

JIM ALEXANDER SECRETARY

ED BOULWARE ASSISTANT SECRETARY

MARK MICHELETTI TREASURER

KAAREN CAMBIO MEMBER

BRENDA COOPER MEMBER

GENERAL MANAGER: JACE A. HOUSTON

FIN

AL

SU

BM

ITTA

L (L

AK

E C

ON

RO

E D

IVIS

ION

OFF

ICE

FAC

ILIT

IES

REP

AIR

)

AutoCAD SHX Text
ONE-CALL NOTIFICATION SYSTEMCALL BEFORE YOU DIG!!!(713) 223-4567(New Statewide Number Outside Houston)1-800-545-6005
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
%%ULOCATION MAP
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
G-1
AutoCAD SHX Text
21
AutoCAD SHX Text
PROJECTLOCATION
AutoCAD SHX Text
%%UVICINITY MAP
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
N.T.S. KEY MAP #155-H
AutoCAD SHX Text
L SQUARED ENGINEERINGTexas Registered Engineering Firm F-11235
AutoCAD SHX Text
PROJECTLOCATION
AutoCAD SHX Text
3/12/2019
AutoCAD SHX Text
PLANS DESIGNED IN ACCORDANCE WITH 2009 INTERNATIONAL BUILDING CODE AND 2009 INTERNATIONAL FIRE CODE
Page 16: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …
Page 17: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …
Page 18: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …
Page 19: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …
Page 20: Lake Conroe Office Facilities Repair SJRA Project No. GAPR0004.1003.2C001 . Addendum 1 . PROPOSAL FORM. 01/04/2018 SJRA Standard Specification CSP No. 19 …

OFFICE(O)

OFFICE(N)

OFFICE(A)

LOBBY(S)

OFFICE(P)

OFFICE(Q)

OFFICE(R)

CONFERENCE ROOM(L & W)

OFFICE(C)

OFFICE(B)

OFFICE(D)

STORAGE(M, T, Y)

STORAGE(F)

MECH.

KITCHEN

STORE

MEETING AREA \ CALL CENTER(L & X)

OFFICE(K) OFFICE

(J)

OFFICE(I)

OFFICE(H)

OFFICE(G & V)

STORAGE

JANITORCLOSET

WOMEN'SRESTROOM

MEN'SRESTROOM

ococ

ococ

3T

ococ

ococ

33

ococ

ococ

T

T3

oc

oc

oc

oc oc

oc oc oc

oc

oc3 a

b

4 ab4

3

3 ab3

oc ococ

m

mm

m

m

T

Electrical Lighting PlanSchedule & Notes

E-1

SAN JACINTO RIVER AUTHORITYLAKE CONROE DIVISION

10

0 %

S

UB

MIT

TA

L (

LA

KE

CO

NR

OE

DIV

ISIO

N O

FF

ICE

RE

ME

DIA

TIO

N A

ND

RE

PA

IR)

TX FIRM REGISTRATION # F-17728

Email: [email protected]: 832 . 332 . 1521

ENGINEERING & DESIGN

Date: 03/13/2019

AutoCAD SHX Text
X2
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
NL
AutoCAD SHX Text
X2
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
S
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
B
AutoCAD SHX Text
5
AutoCAD SHX Text
X3
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
X1
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
X1
AutoCAD SHX Text
1
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
NL
AutoCAD SHX Text
X1
AutoCAD SHX Text
D
AutoCAD SHX Text
NL
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
2
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
NL
AutoCAD SHX Text
1
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
1
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
5
AutoCAD SHX Text
X2
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
X2
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
X1
AutoCAD SHX Text
X1
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
D
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
X3
AutoCAD SHX Text
1
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
X3
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
a
AutoCAD SHX Text
a
AutoCAD SHX Text
b
AutoCAD SHX Text
a
AutoCAD SHX Text
b
AutoCAD SHX Text
b
AutoCAD SHX Text
a
AutoCAD SHX Text
a
AutoCAD SHX Text
b
AutoCAD SHX Text
a
AutoCAD SHX Text
b
AutoCAD SHX Text
a
AutoCAD SHX Text
a
AutoCAD SHX Text
b
AutoCAD SHX Text
a
AutoCAD SHX Text
b
AutoCAD SHX Text
b
AutoCAD SHX Text
b
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
X1
AutoCAD SHX Text
X1
AutoCAD SHX Text
X1
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
5
AutoCAD SHX Text
X3
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
4
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
3
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
6
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
X3
AutoCAD SHX Text
S
AutoCAD SHX Text
X3
AutoCAD SHX Text
F
AutoCAD SHX Text
X3
AutoCAD SHX Text
C
AutoCAD SHX Text
S
AutoCAD SHX Text
B
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A2-9
AutoCAD SHX Text
A
AutoCAD SHX Text
A2-7
AutoCAD SHX Text
A2-11
AutoCAD SHX Text
X3
AutoCAD SHX Text
8
AutoCAD SHX Text
8
AutoCAD SHX Text
8
AutoCAD SHX Text
F
AutoCAD SHX Text
F
AutoCAD SHX Text
F
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
9
AutoCAD SHX Text
S
AutoCAD SHX Text
(ON)A2-2A2-2
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
X1
AutoCAD SHX Text
1
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
NL
AutoCAD SHX Text
7
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
NL
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
(ON)A2-2A2-2
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
A5-5
AutoCAD SHX Text
%%UEF-5
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
(ON)A5-5A5-5
AutoCAD SHX Text
%%UEF-6
AutoCAD SHX Text
J
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
S
AutoCAD SHX Text
11
AutoCAD SHX Text
ELECTRICAL LIGHTING PLAN, KEYED NOTES & LIGHT FIXTURE SCHEDULE
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
1
AutoCAD SHX Text
KEYED NOTES: : 1.CONNECT TO LIGHTING CIRCUIT IN THIS ROOM BUT DO NOT SWITCH. CONNECT TO LIGHTING CIRCUIT IN THIS ROOM BUT DO NOT SWITCH. 2.GREENGATE # ONW-D-1001-MV-N-I DUAL TECHNOLOGY WALL MOUNTED GREENGATE # ONW-D-1001-MV-N-I DUAL TECHNOLOGY WALL MOUNTED # ONW-D-1001-MV-N-I DUAL TECHNOLOGY WALL MOUNTED # ONW-D-1001-MV-N-I DUAL TECHNOLOGY WALL MOUNTED ONW-D-1001-MV-N-I DUAL TECHNOLOGY WALL MOUNTED ONW-D-1001-MV-N-I DUAL TECHNOLOGY WALL MOUNTED DUAL TECHNOLOGY WALL MOUNTED DUAL TECHNOLOGY WALL MOUNTED TECHNOLOGY WALL MOUNTED TECHNOLOGY WALL MOUNTED WALL MOUNTED WALL MOUNTED MOUNTED MOUNTED OCCUPANCY SENSOR WITH SWITCHED NEUTRAL. 3.REPLACE EXISTING BUILDING LIGHTING (IN SAME LOCATION) WITH NEW LIGHTING REPLACE EXISTING BUILDING LIGHTING (IN SAME LOCATION) WITH NEW LIGHTING EXISTING BUILDING LIGHTING (IN SAME LOCATION) WITH NEW LIGHTING EXISTING BUILDING LIGHTING (IN SAME LOCATION) WITH NEW LIGHTING BUILDING LIGHTING (IN SAME LOCATION) WITH NEW LIGHTING BUILDING LIGHTING (IN SAME LOCATION) WITH NEW LIGHTING LIGHTING (IN SAME LOCATION) WITH NEW LIGHTING LIGHTING (IN SAME LOCATION) WITH NEW LIGHTING (IN SAME LOCATION) WITH NEW LIGHTING (IN SAME LOCATION) WITH NEW LIGHTING SAME LOCATION) WITH NEW LIGHTING SAME LOCATION) WITH NEW LIGHTING LOCATION) WITH NEW LIGHTING LOCATION) WITH NEW LIGHTING WITH NEW LIGHTING WITH NEW LIGHTING NEW LIGHTING NEW LIGHTING LIGHTING LIGHTING INDICATED AND CONNECT TO EXISTING CIRCUIT (A6-2) VIA TIME CLOCK. 4.DISCONNECT EXISTING SWITCH (INSIDE) AND SWITCHLEG TO EXISTING LIGHT DISCONNECT EXISTING SWITCH (INSIDE) AND SWITCHLEG TO EXISTING LIGHT EXISTING SWITCH (INSIDE) AND SWITCHLEG TO EXISTING LIGHT EXISTING SWITCH (INSIDE) AND SWITCHLEG TO EXISTING LIGHT SWITCH (INSIDE) AND SWITCHLEG TO EXISTING LIGHT SWITCH (INSIDE) AND SWITCHLEG TO EXISTING LIGHT (INSIDE) AND SWITCHLEG TO EXISTING LIGHT (INSIDE) AND SWITCHLEG TO EXISTING LIGHT AND SWITCHLEG TO EXISTING LIGHT AND SWITCHLEG TO EXISTING LIGHT SWITCHLEG TO EXISTING LIGHT SWITCHLEG TO EXISTING LIGHT TO EXISTING LIGHT TO EXISTING LIGHT EXISTING LIGHT EXISTING LIGHT LIGHT LIGHT (OUTSIDE). ALSO, REPLACE EXISTING BUILDING LIGHT (IN SAME LOCATION) WITH ALSO, REPLACE EXISTING BUILDING LIGHT (IN SAME LOCATION) WITH ALSO, REPLACE EXISTING BUILDING LIGHT (IN SAME LOCATION) WITH REPLACE EXISTING BUILDING LIGHT (IN SAME LOCATION) WITH REPLACE EXISTING BUILDING LIGHT (IN SAME LOCATION) WITH EXISTING BUILDING LIGHT (IN SAME LOCATION) WITH EXISTING BUILDING LIGHT (IN SAME LOCATION) WITH BUILDING LIGHT (IN SAME LOCATION) WITH BUILDING LIGHT (IN SAME LOCATION) WITH LIGHT (IN SAME LOCATION) WITH LIGHT (IN SAME LOCATION) WITH (IN SAME LOCATION) WITH (IN SAME LOCATION) WITH SAME LOCATION) WITH SAME LOCATION) WITH LOCATION) WITH LOCATION) WITH WITH WITH NEW LIGHT INDICATED BUT RECONNECT TO ADJACENT NEW BUILDING LIGHT (AS LIGHT INDICATED BUT RECONNECT TO ADJACENT NEW BUILDING LIGHT (AS LIGHT INDICATED BUT RECONNECT TO ADJACENT NEW BUILDING LIGHT (AS INDICATED BUT RECONNECT TO ADJACENT NEW BUILDING LIGHT (AS INDICATED BUT RECONNECT TO ADJACENT NEW BUILDING LIGHT (AS BUT RECONNECT TO ADJACENT NEW BUILDING LIGHT (AS BUT RECONNECT TO ADJACENT NEW BUILDING LIGHT (AS RECONNECT TO ADJACENT NEW BUILDING LIGHT (AS RECONNECT TO ADJACENT NEW BUILDING LIGHT (AS TO ADJACENT NEW BUILDING LIGHT (AS TO ADJACENT NEW BUILDING LIGHT (AS ADJACENT NEW BUILDING LIGHT (AS ADJACENT NEW BUILDING LIGHT (AS NEW BUILDING LIGHT (AS NEW BUILDING LIGHT (AS BUILDING LIGHT (AS BUILDING LIGHT (AS LIGHT (AS LIGHT (AS (AS (AS SHOWN) FOR TIME CLOCK CONTROL. 5.CONNECT 2-HOUR TIME SWITCH TO NEW CONTACTOR 'A' AT EXISTING PANEL A2. CONNECT 2-HOUR TIME SWITCH TO NEW CONTACTOR 'A' AT EXISTING PANEL A2. 6.DISCONNECT EXISTING SWITCH (INSIDE) AND SWITCHLEG TO EXISTING LIGHT DISCONNECT EXISTING SWITCH (INSIDE) AND SWITCHLEG TO EXISTING LIGHT EXISTING SWITCH (INSIDE) AND SWITCHLEG TO EXISTING LIGHT EXISTING SWITCH (INSIDE) AND SWITCHLEG TO EXISTING LIGHT SWITCH (INSIDE) AND SWITCHLEG TO EXISTING LIGHT SWITCH (INSIDE) AND SWITCHLEG TO EXISTING LIGHT (INSIDE) AND SWITCHLEG TO EXISTING LIGHT (INSIDE) AND SWITCHLEG TO EXISTING LIGHT AND SWITCHLEG TO EXISTING LIGHT AND SWITCHLEG TO EXISTING LIGHT SWITCHLEG TO EXISTING LIGHT SWITCHLEG TO EXISTING LIGHT TO EXISTING LIGHT TO EXISTING LIGHT EXISTING LIGHT EXISTING LIGHT LIGHT LIGHT (OUTSIDE). ALSO, REPLACE EXISTING RECESSED LIGHT WITH NEW LIGHT ALSO, REPLACE EXISTING RECESSED LIGHT WITH NEW LIGHT ALSO, REPLACE EXISTING RECESSED LIGHT WITH NEW LIGHT REPLACE EXISTING RECESSED LIGHT WITH NEW LIGHT REPLACE EXISTING RECESSED LIGHT WITH NEW LIGHT EXISTING RECESSED LIGHT WITH NEW LIGHT EXISTING RECESSED LIGHT WITH NEW LIGHT RECESSED LIGHT WITH NEW LIGHT RECESSED LIGHT WITH NEW LIGHT LIGHT WITH NEW LIGHT LIGHT WITH NEW LIGHT WITH NEW LIGHT WITH NEW LIGHT NEW LIGHT NEW LIGHT LIGHT LIGHT INDICATED BUT RECONNECT TO ADJACENT NEW BUILDING LIGHT (AS SHOWN) BUT RECONNECT TO ADJACENT NEW BUILDING LIGHT (AS SHOWN) BUT RECONNECT TO ADJACENT NEW BUILDING LIGHT (AS SHOWN) RECONNECT TO ADJACENT NEW BUILDING LIGHT (AS SHOWN) RECONNECT TO ADJACENT NEW BUILDING LIGHT (AS SHOWN) TO ADJACENT NEW BUILDING LIGHT (AS SHOWN) TO ADJACENT NEW BUILDING LIGHT (AS SHOWN) ADJACENT NEW BUILDING LIGHT (AS SHOWN) ADJACENT NEW BUILDING LIGHT (AS SHOWN) NEW BUILDING LIGHT (AS SHOWN) NEW BUILDING LIGHT (AS SHOWN) BUILDING LIGHT (AS SHOWN) BUILDING LIGHT (AS SHOWN) LIGHT (AS SHOWN) LIGHT (AS SHOWN) (AS SHOWN) (AS SHOWN) SHOWN) SHOWN) FOR TIME CLOCK CONTROL.
AutoCAD SHX Text
LIGHT FIXTURE SCHEDULE
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
MANUFACTURER AND MODEL
AutoCAD SHX Text
MOUNTING
AutoCAD SHX Text
LAMP - NR., SIZE AND TYPE
AutoCAD SHX Text
NOTE
AutoCAD SHX Text
A
AutoCAD SHX Text
EXISTING 2 X 4 LED TROFFER
AutoCAD SHX Text
RECESSED
AutoCAD SHX Text
50 W / LED / 4K
AutoCAD SHX Text
B
AutoCAD SHX Text
HALO # PD61ODO10PDM6A8406IVC
AutoCAD SHX Text
RECESSED
AutoCAD SHX Text
12 W / LED / 4K
AutoCAD SHX Text
C
AutoCAD SHX Text
METALUX #22FP4240C-DF22WU
AutoCAD SHX Text
RECESSED
AutoCAD SHX Text
39 W / LED / 4K
AutoCAD SHX Text
D
AutoCAD SHX Text
VERBATIM # PN24-W50-C40
AutoCAD SHX Text
RECESSED
AutoCAD SHX Text
50 W / LED / 4K
AutoCAD SHX Text
3
AutoCAD SHX Text
E
AutoCAD SHX Text
LUMARK # XTOR3B-W
AutoCAD SHX Text
WALL
AutoCAD SHX Text
26 W / LED / 4K
AutoCAD SHX Text
F
AutoCAD SHX Text
EXISTING SURFACE LED TROFFER
AutoCAD SHX Text
SURFACE
AutoCAD SHX Text
43 W / LED / 4K
AutoCAD SHX Text
X1
AutoCAD SHX Text
EVENLITE # TCXCOM-R-U-W
AutoCAD SHX Text
UNIVERSAL
AutoCAD SHX Text
2-2W / LED
AutoCAD SHX Text
1
AutoCAD SHX Text
X2
AutoCAD SHX Text
EVENLITE # TCXCOM-R-U-W
AutoCAD SHX Text
UNIVERSAL
AutoCAD SHX Text
2-2W / LED
AutoCAD SHX Text
1,2
AutoCAD SHX Text
X3
AutoCAD SHX Text
EVENLITE # TCL-2-W
AutoCAD SHX Text
UNIVERSAL
AutoCAD SHX Text
2-2W / LED
AutoCAD SHX Text
1
AutoCAD SHX Text
NOTES: 1. INCLUDES BATTERY PACK FOR EMERGENCY POWER (1-1/2 HR. MINIMUM) 2. CONNECT REMOTE HEAD # TCWPI (OUTSIDE) TO EXIT SIGN (INSIDE) 3. SEE GENERAL NOTE # 3 ON THE LIGHTING PLAN SHEET E-1
AutoCAD SHX Text
SEQ.
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
FILE NAME:
AutoCAD SHX Text
ISSUE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SJRA PROJECT NO: 18-0097-3
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
LAKE CONROE DIVISION OFFICE FACILITIES REPAIR
AutoCAD SHX Text
FILE: C:\Users\amali\OneDrive - apmengineers.com\APM\APM 2018 Projects\1834_SJRA\ELECTRICAL.dwg LAYOUT: E-1 DATE: 3/13/2019 11:25:31 AM BY: AMALI
AutoCAD SHX Text
P.M.
AutoCAD SHX Text
A.M.
AutoCAD SHX Text
2-18-19
AutoCAD SHX Text
FOR PERMIT
AutoCAD SHX Text
3-13-19
AutoCAD SHX Text
CITY & OWNER COMMENTS
AutoCAD SHX Text
1
AutoCAD SHX Text
7.RELOCATE 6 TYPE 'A' FIXTURES AND ADD THREE TYPE 'D' FIXTURES AND RELOCATE 6 TYPE 'A' FIXTURES AND ADD THREE TYPE 'D' FIXTURES AND RECONNECT TO NEW DUAL SWITCHING AS SHOWN. 8.REPLACE EXISTING INCANDESCENT FIXTURE WITH NEW AND RECONNECT TO REPLACE EXISTING INCANDESCENT FIXTURE WITH NEW AND RECONNECT TO EXISTING CIRCUIT AND NEW OCCUPANCY SENSOR. 9.CONNECTED EXISTING LIGHT FIXTURE TO REMAIN TO NEW OCCUPANCY SENSOR. CONNECTED EXISTING LIGHT FIXTURE TO REMAIN TO NEW OCCUPANCY SENSOR. 10.FIELD COORDINATE EXACT LOCATION OF ROOF EXHAUST FAN EF-5 & EF-6. FIELD COORDINATE EXACT LOCATION OF ROOF EXHAUST FAN EF-5 & EF-6. 11.ELECTRICAL CONTRACTOR TO REMOVE EXISTING LIGHT SWITCH IN ATTIC AND ELECTRICAL CONTRACTOR TO REMOVE EXISTING LIGHT SWITCH IN ATTIC AND INSTALL NEW LIGHT SWITCH (AT LOCATION SHOWN) FOR EXISTING ATTIC LIGHT FIXTURE AND CONNECT TO EXISTING CIRCUIT. FIELD VERIFY REQUIREMENTS.
AutoCAD SHX Text
GENERAL NOTES: 1.ALL INTERIOR LIGHTING (OTHER THAN EXEMPT AREAS) ARE CONTROLLED BY DUAL ALL INTERIOR LIGHTING (OTHER THAN EXEMPT AREAS) ARE CONTROLLED BY DUAL SWITCHING AND OCCUPANCY SENSORS. 2.ALL EXTERIOR LIGHTING CONTROLLED BY A NEW TIME CLOCK AT PANEL A6. ALL EXTERIOR LIGHTING CONTROLLED BY A NEW TIME CLOCK AT PANEL A6. 3.ALL TYPE 'A' FIXTURES ARE EXISTING TO BE REUSED. ALL TYPE 'A' FIXTURES ARE EXISTING TO BE REUSED. 4.THIS CONTRACTOR TO VERIFY QUANTITY OF TYPE 'A' FIXTURES TO BE REUSED. IF THIS CONTRACTOR TO VERIFY QUANTITY OF TYPE 'A' FIXTURES TO BE REUSED. IF MORE FIXTURES ARE NEEDED, USE TYPE 'D' FIXTURES SPECIFIED IN THE LIGHTING SCHEDULE. 5.ALL LIGHTING BRANCH CIRCUITRY TO BE IN CONDUIT EXCEPT FOR LIGHT FIXTURE ALL LIGHTING BRANCH CIRCUITRY TO BE IN CONDUIT EXCEPT FOR LIGHT FIXTURE WHIPS (6'-0" MAXIMUM LENGTH WITHOUT EXCEPTION)
AutoCAD SHX Text
1
AutoCAD SHX Text
1