Lagos 1 pictorial presentation of first stage visit of independent
-
Upload
ossap-mdgs -
Category
Technology
-
view
209 -
download
2
Transcript of Lagos 1 pictorial presentation of first stage visit of independent
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
PICTORIAL PRESENTATION OF FIRST STAGE VISIT OF INDEPENDENT SUPERVISOR
LAGOS STATE
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12: The headquarters of the LCDA in Ikeja LG where the MDGs-CGS projects are located
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12, at the chairman’s office in Onigbongbo LCDA in Ikeja LG, L-R: Mr Padonu (Council Engineer), Dr. Oyeyemi (Independent Consultant), Mr. Toviho (TA), Hon
Wale Odunlami (LCDA Chairman)
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12: Work in progress, Rehabilitation of 1 block of classrooms at Community Primary School Wasinmi, Ikeja (LG/IK/044). Old roof removed, old wall being
demolished
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12: Work in progress, Rehabilitation of 1 block of classrooms at Community Primary School Wasinmi, Ikeja (LG/IK/044). Hard core for the
new wall
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12. Renovation of a 2-storey block at Central Primary school Ikeja (LG/IK/043): old window frames removed
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12. Renovation of a 2-storey block at Central Primary school Ikeja (LG/IK/043): The Council Engineer (Mr. Padonu) discussing with the foreman
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12. Rehabilitation of Beko-Ransome Kuti PHC (LG/IK/057). Old roof removed
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
18/12/12. Rehabilitation of Beko-Ransome Kuti PHC (LG/IK/057). Old roof removed
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
19/12/12. Work in progress: Construction of laboratory facility at Ogombo health post with water source & water treatment plant (LG/EO/004).
Construction at DPC substructure/ DPC level
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
19/12/12. Work in progress: Construction of laboratory facility at Ogombo health post with water source & water treatment plant (LG/EO/004). Construction at DPC
substructure/ DPC level
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
19/12/12. Work in progress: Construction of laboratory facility at Ogombo health post with water source & water treatment plant (LG/EO/004). Hard
core for the water treatment plant.
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
20/12/12. At Lekki LCDA of Ibeju-Lekki LGA L-R, Barr Mukandasi Ogidan (LCDA Chairman), Dr. Oyeyemi (Consultant), Mrs. Rosiji (Council Manager/LG contact), Mr.
Douglas (TA)
INDEPENDENT SUPERVISOR FIRST ROUND VISIT PICTURES
20/12/12. At Lekki LCDA of Ibeju-Lekki LGA L-R, Mr. Douglas (TA), Dr. Oyeyemi (Consultant), Mr. Adeleye (Council Engineer)