Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting November 7, 2011

description

Lab Results Interfaces S&I Framework Initiative. Bi-Weekly Initiative Meeting. November 7, 2011. Agenda. Moving Forward Workgroup Updates Q&A + Group Discussion. Standards Harmonization Timeline. We Are Here. Implementation Guide Analysis WG. - PowerPoint PPT Presentation

Transcript of Lab Results Interfaces S&I Framework Initiative

Lab Results InterfacesS&I Framework Initiative

Bi-Weekly Initiative Meeting

November 7, 2011

Agenda

• Moving Forward• Workgroup Updates• Q&A + Group Discussion

2

Standards Harmonization Timeline

3

We Are Here

Implementation Guide Analysis WG• Volunteer Leads: Ken McCaslin, Hans Buitendijk

Action Items/Next Steps

• 955 comments were received on the LRI IG– 30% of the 955 comments are likely duplications– 619 comments are negative (65%)– 336 comments are affirmative (35%)– 192 comments have been resolved (20%)– Ballot statistics can be reviewed here

• Ballot reconciliation will continue until all comments have been resolved

• New meeting times: – Tuesdays: 3:00-5:00PM EDT– Thursdays: 2:00-4:00PM EDT

4

Validation Suite WG

• Volunteer Lead: Robert Snelick

Action Items

• Delivered for review a draft of the LRI LIS Test Plan• Verification of the first three Test Data HL7 messages• Enhanced and updated the Data Management Spreadsheet of

segments, fields and components constrained by LRI IG with the first three test data HL7 messages

• Delivered Juror Document prototypeNext Steps

• Validate the completed Vocabulary spreadsheet (mostly IG-specified HL7 Tables/Value Sets by IG, etc)

• Software development of automated Juror Document generator

• Complete a draft version of the LRI Validation Suite web application

Pilots WG

• Volunteer Leads: Robert Lutolf and Rob Allen

Action Items

• Updated LRI Pilot Guide

• Seven Pilot Ecosystems now scoped

• 5 Pilot Ecosystems submitted applications to 2012 HIMSS Showcase

• Orientation and Guidance for New Pilots and Pilot Teams

• Follow-up on October Face To Face action items

Next Steps

• Continue Pilot Outreach• Committed Pilots continue work on Pilot Project Brief Wiki page and

on completing steps in Pilot Guide

6

Q&A + GROUP DISCUSSION

7