La Jolla High School - San Diego Unified School … Jolla HS...La Jolla High School 750 Nautilus St....
Transcript of La Jolla High School - San Diego Unified School … Jolla HS...La Jolla High School 750 Nautilus St....
La Jolla High School
750 Nautilus St.
San Diego, CA 92037
Updated June 2019
Sub-district: C
Cluster: La Jolla
Year School Opened: 1922
Grades: 9-12
1
Stadium & Facilities Upgrades 1
La Jolla High School has been an integral part of the La Jolla community’s learning and education since 1922. The high
school is surrounded by residential housing and is located south of downtown La Jolla near private and public entities
including the University of California San Diego, Salk Institute, Scripps Institute of Oceanography, and Scripps Clinic and
Research Foundation.
La Jolla High School sits on a 14.27-acre lot and consists of 22 permanent buildings, constructed between 1940 and
2003. Stadium facilities were added during the stadium remodel in 2017. The total building area is approximately
194,000 square feet. The campus features an aquatic center, athletics stadium, two gyms, a small practice field, tennis
courts, library/media center, cafeteria, and an auditorium. Currently, La Jolla HS serves close to 1,600 students.
Whole Site Modernization 2
2
La Jolla HS Stadium & Facilities Upgrades
Completed: October 2016
Funding: Proposition S
La Jolla High School’s stadium has been upgraded and features more than 15,000 square feet of new facilities construction. New buildings were constructed on the West side of the campus in support of school athletics.
Stadium and Facilities Upgrades
Artificial turf field replacement New Press Box
New Home/visitor concessions and restrooms
New Boys locker rooms New weight room
New restrooms and concessions at the tennis courts
New visitor entry gates and bleachers
Additional storage buildings Accessibility upgrades Landscaping, hardscaping and
decorative fencing
La Jolla HS Stadium & Facilities Upgrades
La Jolla HS Stadium & Facilities Upgrades
New stadium storage facilities New Press Box
Coach Dedication wall with tiered landscaping and
accessibility ramps
New visitor stadium entrance and concessions
La Jolla HS Stadium & Facilities Upgrades
New security fencing at entrance Aerial view of renovated softball field
New accessibility ramps to tennis courts and new viewing area Added features to Softball Field
La Jolla HS Stadium & Facilities Upgrades
New Boys locker room facilities New varsity boys locker area
New weight room Interior view of new concessions
La Jolla HS Whole Site Modernization
Estimated Construction End: February 2021
Funding: Propositions S and Z
The Whole Site Modernization project will improve upon the learning environment, health, safety and security of the stu-
dents as well as comply with accessibility throughout campus. Here are the proposed items that are being considered
and are not limited to:
Upgrades to the heating, ventilating and air conditioning systems
Improvements to security fencing to close-off uncontrolled points of access
New Entry to campus
Renovation and upgrades to the kitchen and food services area
Improve and upgrade accessibility throughout campus
Reconfiguring and remodeling of Science Building classrooms and labs
New interior and exterior finishes and hardware
Remodel of student restrooms in building 500
Project Renderings
La Jolla HS Whole Site Modernization
Exterior Project Renderings Interior Project Renderings
Interior Project Renderings Interior Project Renderings
La Jolla HS Whole Site Modernization
Renderings of Graphics Examples