PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Engineering Standard Engineering Standard - Maintenance Structures & Facilities MCST 030200-01 FIRE PROTECTION SYSTEMS AND EQUIPMENT MAINTENANCE IN THE MURL Version: 1 Issued: August 2012 Owner: Standards Development Manager Approved By: Authorise For Use By: Ahmed Dwidar Standards Development Manager YS Au Chief Engineer Disclaimer Metro Trains Melbourne makes no warranties, express or implied, that compliance with the contents of this document shall be sufficient to ensure safe systems or work or operation. It shall be the document user’s responsibility to ensure that the copy of the document it is viewing is the current version of the document as in use by Metro Trains Melbourne. Metro Trains Melbourne accepts no liability whatsoever in relation to the use of this document by any party, and Metro Trains Melbourne excludes any liability which arises in any manner by the use of this document. Copyright The information in this document is protected by Copyright and no part of this document may be reproduced, altered, stored or transmitted by any person without the prior consent of Metro Trains Melbourne.

Transcript of L1-SDD-STD-005 1 MCST 030200-01 1 Fire Protection … · FIRE PROTECTION SYSTEMS AND EQUIPMENT...

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION

E

ngin

eerin

g St

anda

rd

Engineering Standard - Maintenance

Structures & Facilities

MCST 030200-01 FIRE PROTECTION SYSTEMS AND

EQUIPMENT MAINTENANCE IN THE MURL

Version: 1

Issued: August 2012

Owner: Standards Development Manager

Approved By: Authorise For Use By: Ahmed Dwidar Standards Development Manager

YS Au Chief Engineer

Disclaimer Metro Trains Melbourne makes no warranties, express or implied, that compliance with the contents of this document shall be sufficient to ensure safe systems or work or operation. It shall be the document user’s responsibility to ensure that the copy of the document it is viewing is the current version of the document as in use by Metro Trains Melbourne. Metro Trains Melbourne accepts no liability whatsoever in relation to the use of this document by any party, and Metro Trains Melbourne excludes any liability which arises in any manner by the use of this document.

Copyright The information in this document is protected by Copyright and no part of this document may be reproduced, altered, stored or transmitted by any person without the prior consent of Metro Trains Melbourne.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 2 of 46

Approval

Amendment Record

Approval Date Version Description 01/08/2012 1 Initial issue under MTM

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 3 of 46

Table of Contents 1 Purpose....................................................................................................................7 2 Scope .......................................................................................................................7 3 Abbreviations ..........................................................................................................7 4 Definitions................................................................................................................8 5 References & Legislations .....................................................................................9

5.1 MTM Standards and Documents............................................................................................ 9 5.2 Rail Industry Standards.......................................................................................................... 9 5.3 Australian Standards.............................................................................................................. 9 5.4 International Standards .........................................................................................................10

6 Related Documents...............................................................................................10 7 Safety and Environmental ....................................................................................11 8 Fire Protection Systems and Equipment ............................................................11

8.1 Maintenance Program...........................................................................................................11 8.2 Maintenance Schedules........................................................................................................12

8.2.1 General.....................................................................................................................12 8.2.2 Maintenance Frequencies .........................................................................................12 8.2.3 Frequency Tolerances...............................................................................................13 8.2.4 Amending Frequencies for Aggressive Environments ................................................14

8.3 System Inoperative Precautions............................................................................................15 8.4 Maintenance Documentation.................................................................................................15

8.4.1 General.....................................................................................................................15 8.4.2 Maintenance Activity Records ...................................................................................15 8.4.3 Form of Records .......................................................................................................15

8.5 System Interfaces .................................................................................................................17 8.6 Typical Maintenance Process................................................................................................18

8.6.1 General.....................................................................................................................18 8.6.2 Preparation ...............................................................................................................18 8.6.3 Maintenance .............................................................................................................18 8.6.4 Reinstatement...........................................................................................................19 8.6.5 Documentation..........................................................................................................19

8.7 Defect Rectification and Condition Reporting.........................................................................19 8.7.1 Defect Rectification ...................................................................................................19 8.7.2 Condition Reporting ..................................................................................................19

8.8 Waivers ................................................................................................................................19 9 Automatic Fire Sprinkler Systems.......................................................................20

9.1 General.................................................................................................................................20 9.2 Option to Omit Weekly Inspections........................................................................................20 9.3 Design and Installation Survey ..............................................................................................20

10 Fire Hydrant Systems ...........................................................................................20

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 4 of 46

10.1 General.................................................................................................................................20 10.2 Design and Installation Survey ..............................................................................................20 10.3 Maintenance Record Tag or Label ........................................................................................20

11 Portable and Wheeled Fire Extinguishers...........................................................21 11.1 General.................................................................................................................................21 11.2 Australian Standards for Fire Extinguishers ...........................................................................21 11.3 Aggressive Environment .......................................................................................................22 11.4 Design and Installation survey...............................................................................................23 11.5 Cylinder Lining......................................................................................................................23 11.6 Water Quality........................................................................................................................23 11.7 Corrosion..............................................................................................................................23 11.8 Exceptions............................................................................................................................23 11.9 Pressure Test Marking..........................................................................................................23 11.10 Service Labels ......................................................................................................................24 11.11 Defects .................................................................................................................................24 11.12 Recharging Agent .................................................................................................................24 11.13 Powder Mixing Precautions...................................................................................................25 11.14 Vaporizing Liquid Extinguishers.............................................................................................25 11.15 Extinguisher Recharging .......................................................................................................25 11.16 Location Records..................................................................................................................25

11.16.1 Location ................................................................................................................25 11.16.2 Identification..........................................................................................................25

11.17 Maintenance Records ...........................................................................................................26 11.17.1 General .................................................................................................................26 11.17.2 Records system ....................................................................................................26 11.17.3 Maintenance Record Tag or Label.........................................................................26 11.17.4 Frequency.............................................................................................................26 11.17.5 Maintenance Record Tag or Label.........................................................................27

11.18 Reports.................................................................................................................................28 11.19 Inspection, Test, PM, Survey and Records............................................................................28

12 Passive Fire and Smoke Containment Systems.................................................28 12.1 General.................................................................................................................................28 12.2 Application............................................................................................................................29

12.2.1 General...................................................................................................................29 12.2.2 Compartment Integrity.............................................................................................29 12.2.3 Structural Fire Resistant elements...........................................................................29

12.3 High Use and Aggressive Environments................................................................................31 12.4 Design and Installation Survey ..............................................................................................32

12.4.1 General...................................................................................................................32 12.4.2 Compartmentation Integrity .....................................................................................32 12.4.3 Structural fire integrity .............................................................................................32

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 5 of 46

12.5 Marking, Labelling, Tagging and Signage..............................................................................32 12.5.1 Fire Doors ...............................................................................................................32 12.5.2 Compartment Barriers and Penetrations..................................................................32 12.5.3 Structural Steel Elements ........................................................................................33

12.6 Maintenance Records and Reports .......................................................................................33 13 Fire and Smoke Control Features of HVAC Systems.........................................33

13.1 General.................................................................................................................................33 13.2 Application............................................................................................................................34 13.3 Design and Installation Survey ..............................................................................................35 13.4 Dual Duty Systems ...............................................................................................................35 13.5 Documentation......................................................................................................................36

13.5.1 General...................................................................................................................36 13.5.2 Schedule of Essential Functionality and Performance Requirements .......................36 13.5.3 Operating and maintenance manuals ......................................................................37 13.5.4 Maintenance schedule ............................................................................................38 13.5.5 Plant Register .........................................................................................................38 13.5.6 Plant History Record ...............................................................................................39 13.5.7 Diagram(s) of the installation...................................................................................39

13.6 Maintenance records.............................................................................................................39 13.6.1 General...................................................................................................................39 13.6.2 Availability of Manuals and Records ........................................................................39 13.6.3 Evidence of Compliance..........................................................................................39

13.7 Forms for Recording Maintenance ........................................................................................40 13.7.1 General...................................................................................................................40 13.7.2 Smoke Control Matrices ..........................................................................................42

13.8 Skills Associated with Inspection, Test, Preventive Maintenance and Survey.........................42 13.8.1 General...................................................................................................................42 13.8.2 Non-technical (N) ....................................................................................................42 13.8.3 Technician (T) .........................................................................................................42 13.8.4 Specialist (S)...........................................................................................................43 13.8.5 Typical activities and skill sets .................................................................................43

13.9 Functionality and performance tests......................................................................................43 13.10 FREQUENCY .......................................................................................................................44

13.10.1 Inspection, preventive maintenance and records ...................................................44 14 Appendices............................................................................................................45

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 6 of 46

List of Tables

Table 1 – Fire Systems and Corresponding Maintenance Frequencies......................................... 13 Table 2 – Frequency Tolerances................................................................................................... 14 Table 3 – Typical Fire Protection System Interface ....................................................................... 18 Table 4 – Australian Standards for Portable Fire Extinguishers..................................................... 22 Table 5 – Application of AS 1851 to HVAC Systems..................................................................... 34

List of Figures

Figure 1 – Fire Hydrant Maintenance Record Tag / Label ............................................................. 16 Figure 2 – Typical Fire & Smoke Compartment Showing Passive Fire & Smoke Protection Systems..................................................................................................................................................... 30 Figure 3 – Typical Duct & Damper ................................................................................................ 31 Figure 4 – Service Penetration / Control Joint Service Label......................................................... 33

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 7 of 46

1 Purpose The purpose of this Standard is to describe the maintenance standards required for scheduled programmed preventive maintenance of all Fire Service Assets as detailed in the MTM Asset Management Plan.

2 Scope This Standard applies to all stations, facilities and other buildings in the MURL, for all of which Fire protections Systems in the MTM Network are to be maintained in accordance with the contemporary edition of AS 1851.

3 Abbreviations AHU Air Handling Unit

BCA Building Code of Australia

CMMS Computerised Maintenance Management system

EPA Environmental Protection Agency (Victoria)

FFCP Fire Fan Control Panel

FRL Fire Resistance Level

HVAC Heating Ventilation and Air Conditioning

JSEA Job Safety and Environment Analysis

MST Maintenance Scheduled Task

MTM Metro Trains Melbourne Pty Ltd

MURL Melbourne Underground Rail Loop

NAM Network Asset Manager

S&F Structures & Facilities

SCADA Supervisory Control And Data Acquisition

SWMS Safe Work Method Statement.

VAV Variable Air Volume

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 8 of 46

4 Definitions Asset Register Database of assets as detailed in the Asset Management Plan.

Civil Inspector Refers to the relevant Bridge & Structures Co-ordinator, Works Officer or Works Co-ordinator.

Corrective Maintenance Planned maintenance of an asset which is undertaken on an as required basis

Electrical Supervisor Refers to the relevant Contract Supervisor – Electrical.

Extinguisher A portable or wheeled fire extinguisher is generally referred to in this documents as an “extinguisher”

Filed Inspectors Refers to the relevant MTM staff or contract Field Inspectors.

Inspection Engineers Refers to a suitably qualified and experienced Inspection Engineer (Metro or Contracted) as approved by the Structure & Facilities Manager.

Ellipse The asset management software used by MTM.

Network Asset Manager Network Asset Manager or delegated representative.

Programmed Maintenance

Maintenance of an asset which is undertaken on a regular basis, and likely generated by the CMMS (Ellipse).

Reactive Maintenance Unplanned maintenance of an asset which is undertaken on an as required basis

S&F Civil Infrastructure Assets:

Civil assets detailed in the Asset Management Plan at station buildings, infrastructure maintenance depots, bridges, culverts, platforms, cutting, embankments, overhead traction power structures, stabling sidings, pedestrian and level crossings.

S&F Electrical Infrastructure Assets:

Electrical assets detailed in the Asset Management Plan at platforms, station buildings, fleet depots (excluding buildings), signalling and communications buildings, infrastructure maintenance depots, subways, car parks, pathways and stabling sidings.

S&F Substation Building Assets:

Building assets associated with train traction substations, tie stations and switching stations, industrial high voltage AC assets including switching stations and substations, signal power supplies to trackside feeders, 1500 volt DC and high voltage AC underground cables, electrolysis and the SCADA system or any “like” system.

Shall Is used as the descriptive word to express a requirement that is mandatory to achieve conformance to the standard.

Should Is used as the descriptive word to express a requirement that is recommended in order to achieve compliance to the standard. Should can also be used if a requirement is a design goal but not a mandatory requirement.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 9 of 46

5 References & Legislations

5.1 MTM Standards and Documents

Document Number Title

L0-SQE-MSM-003 Quality Management System Manual

L0-SQE-MAN-002 Safety Management System Manual

L0-SQE-PRO-014 Safety and Environmental Requirements for Contractors Working On MTM Premises

L1-INF-PLA-007 Infrastructure Division 2011 Divisional Safety Plan

L1-SQE-PRO-015 MURL Stations Emergency Management Procedures

L1-ASY-PRO-006 Change of Asset Data Procedure

L1-ASY-PRO-001 Engineering Change Procedure

L1-CHE-PRO-001 Standard Waiver Procedure

5.2 Rail Industry Standards

Document Number Title

N/A Book of Rules and Operating Procedures 1994

5.3 Australian Standards

Document Number Title

AS / NZS 1850 Portable fire extinguishers - Classification, rating and performance testing

AS 1851 Maintenance of Fire Protections Systems and Equipment

AS/NZS 1668.1 The use of ventilation and air-conditioning in buildings - Fire and smoke control in multi-compartment buildings

AS 1668.3 The use of ventilation and air-conditioning in buildings - Smoke control systems for large single compartments or smoke reservoirs

AS 1682.1 Fire dampers - Specification

AS 1682.2 Fire dampers - Installation

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 10 of 46

AS 1841.2 Portable fire extinguishers - Specific requirements for water type extinguishers

AS 1841.3 Portable fire extinguishers - Specific requirements for wet chemical type extinguishers

AS 1841.4 Portable fire extinguishers - Specific requirements for foam type extinguishers

AS 1841.5 Portable fire extinguishers - Specific requirements for powder type extinguishers

AS 1841.6 Portable fire extinguishers - Specific requirements for carbon dioxide type extinguishers

AS 1841.7 Portable fire extinguishers - Specific requirements for vaporizing liquid type extinguishers

AS 1905.1 Components for the protection of openings in fire-resistant walls - Fire-resistant doorsets

AS 2337 Gas cylinder test stations - General requirements, inspection and tests - Gas cylinders

AS 2700 Colour standards for General Purposes

AS 4072.1 Components for the protection of openings in fire-resistant separating elements - Service penetrations and control joints

5.4 International Standards Nil

6 Related Documents MCSS 030200-01 Automatic Fire Sprinkler Systems Maintenance Schedules

MCSS 030200-02 Fire Hydrant Systems Maintenance Schedules.

MCSS 030200-03 Passive Fire and Smoke Containment Systems Maintenance Schedules

MCSS 030200-04 Fire and Smoke Control of HVAC System Maintenance Schedules

MCSS 030200-05 Portable & Wheeled Fire Extinguisher Maintenance Schedules

MCSS 030200-06 Critical Emergency Schedules

MCMF 030200-01 Assessment Of Essential Fire Safety Measures – Fire Damper Maintenance Record

MCMF 030200-02 Essential Smoke Control Services – System Functionality Test Chart

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 11 of 46

MCMF 030200-03 Fire-Isolated Exit Pressurisation Systems Functionality Test Record

MCMF 030200-04 Fire-Isolated Exit Pressurisation Systems Performance Test Record

7 Safety and Environmental 7.1 The general requirements in relation to safety are included in Metro Trains

Melbourne’s Safety Management Plan (L0-SQE-MAN-002).

7.2 At all times inspections must be carried out in accordance with the current Book of Rules & Operating Procedures 1994, and all relevant circulars.

7.3 All work performed by Metro is required to be in accordance with the Metro Environmental Management Plan (L0-SQE-PRO-014).

7.4 These documents address the relevant processes governed by; OH&S (AS/NZS 4801), Rail Safety (AS 4292), Quality (ISO 9001) and Environment Management (ISO 14001)

7.5 The general requirements in relation to safety are included in Metro Trains Melbourne’s Security Management Plan (L0-SQE-PLA-002).

7.6 New task safety analyses have introduced a Safe Work Method Statement SWMS analysis and assessment for the task.

7.7 Specific SWMS have been developed for the MURL.

8 Fire Protection Systems and Equipment

8.1 Maintenance Program 8.1.1 As described in AS 1851 the scheduled maintenance is designed to demonstrate

the fire protection systems and equipment are performing to the minimum level for which they were designed.

8.1.2 To ensure compliance a number of maintenance tasks have been formulated into separate schedules for each fire service system. The schedules, along with typical activities prescribed for each, include;

8.1.2.1 Inspections and Records

o Inspect

o Check

8.1.2.2 Test and Records

o Start (& Restart)

o Observe

o Operate – including Open & Close

o Verify

o Test

o Record

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 12 of 46

8.1.2.3 Preventive Maintenance and Records

o Check

o Clean

o Examine

o Fit

o Renew

o Overhaul

o Lubricate

o Service (to maintenance instruction)

o Remove and Test

8.1.2.4 Installation and Design Survey and Records

o Check

8.2 Maintenance Schedules

8.2.1 General 8.2.1.1 A number of maintenance intervention frequencies have been

developed, together with tolerances, for each of the systems.

8.2.1.2 These schedules are included in a series of Service Schedules covering the separate fire prevention systems. These Service Schedules are listed in Section 6 of this document.

8.2.2 Maintenance Frequencies 8.2.2.1 Frequencies applying to each of the fire prevention systems are shown

in Table 1 below. For details of each inspection refer to the relevant MTM Service Schedules as stated in Section 6 and AS 1851.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 13 of 46

Table 1 – Fire Systems and Corresponding Maintenance Frequencies

AS 1851 Section

Wee

kly

Mon

thly

Thre

e-m

onth

ly

Six-

mon

thly

Year

ly

Thre

e-ye

arly

Five

-yea

rly

Twel

ve-y

early

Twen

ty F

our-

year

ly

2 Sprinklers ● ● ● ● ● ● ● 3 Pump sets ● ● ● ● ● 4 Fire Hydrant Systems ● ● ● 5 Delivery Lay Flat Fire Hose ● 6 Detection ● ● ● ● 7 Smoke & Heat Alarms ● ● ● 8 Fire Alarm Monitoring ● 9 Sound Systems ● ● ● ● 10 Intercom systems ● ● ● 11 Gaseous ● ● ● ● 12 Aerosols ● ● ● ● 13 Water Mist ● ● ● ● 14 Hose Reels ● ● 15 Fire Extinguishers ● ● ● 16 Fire Blankets ● 17 Passive Fire & Smoke Alarms ● ● ● 18 Smoke Control & HVAC ● ● ● ● ● ● 19 Evacuation ● ● ●

8.2.3 Frequency Tolerances 8.2.3.1 Frequency tolerances shall be applied to the interval from the previous

activity.

8.2.3.2 Tolerances relating to each of the frequency intervals are shown in the table below.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 14 of 46

Table 2 – Frequency Tolerances

Frequency Tolerance + / -

Weekly 2 working days Monthly 5 working days

Three-monthly 2 weeks Six-month 1 month

Yearly 1 month Three-yearly 2 months

Five-yearly & Six-yearly 3 months Twelve-yearly 6 months

Twenty Four-yearly 6 months

8.2.4 Amending Frequencies for Aggressive Environments 8.2.4.1 Fire protection systems and equipment located in aggressive

environments shall be subjected to a more rigorous maintenance program than that set out in the standard maintenance schedules.

8.2.4.2 The maintenance frequency may be shortened based on the recommendations of the Inspector, or Manager in Charge of Facilities. If the maintenance frequency is altered the appropriate documentation should be updated in accordance with L1-ASY-PRO-001 Engineering Change Procedure.

8.2.4.3 Where the frequency is shortened the results are to be incorporated into the CMMS so the next Maintenance Scheduled Task utilises the shortened frequency. The reduced frequency is to remain until the environment is rectified. in accordance with Change of Asset Data Procedure L1-ASY-PRO-006

8.2.4.4 Aggressive environments may include, but are not limited to, the following:

Exterior situations exposed to the weather or salt spray.

Corrosive atmospheres.

Abnormally dusty or moisture-laden (humid) atmospheres.

Environments that subject the systems or equipment to continuous or intense vibrations.

Environments having extremes of temperature.

Environments having increased risk of physical damage to equipment.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 15 of 46

8.3 System Inoperative Precautions 8.3.1 When a system is rendered inoperative during maintenance activities the

appropriate authorities shall be advised of all systems that may be connected to an alarm monitoring service.

8.3.2 In the case of multiple installations, each individual installation should be returned to service before work commences on subsequent installations

8.3.3 On completion of defect rectification and minor works, all relevant tests are to be conducted in accordance with the schedules to verify that the system has been reinstated to fully operational condition.

8.3.4 All authorities are to be advised the systems have been restored.

8.4 Maintenance Documentation

8.4.1 General 8.4.1.1 Records of maintenance shall be completed and made available to the

Network Asset Manager at the time of conducting the system and equipment maintenance.

8.4.1.2 Maintenance records shall be retained for a minimum period of seven years.

8.4.2 Maintenance Activity Records 8.4.2.1 Records of the maintenance activity shall contain the following

information:

Work Order No.

Name of station, building or structure

Date of maintenance.

System or equipment identification and location.

The Scheduled Frequency of the maintenance activity undertaken.

Defects identified.

Name and signature of the inspector, or maintainer undertaking the activity

Date the record was completed.

8.4.3 Form of Records 8.4.3.1 Maintenance records may be in different forms.

8.4.3.2 Tags

a) Maintenance record tags shall be used for;

hydrant landing valves

delivery lay flat hose

hose reels

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 16 of 46

portable and wheeled fire extinguishers

fire blankets

b) Maintenance record tags, as shown below shall comply with the following:

a) Provide for year and month of service.

b) Be made from a durable material suitable for the purpose.

c) Have lettering, figures, and lines on the tag printed in black.

d) Have a continuous background colour approximating Golden Yellow (Y14 of AS 2700).

Figure 1 – Fire Hydrant Maintenance Record Tag / Label

8.4.3.3 Logbooks

a) Logbooks shall be used for;

sprinklers

pumpsets

fire hydrant

detection

smoke and heat alarm

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 17 of 46

fire alarm monitoring

sound and intercom systems

gaseous

aerosol

water mist

passive fire and smoke

Smoke control and HVAC

evacuation

b) The use of maintenance record tags or labels shall not preclude the need for a separate maintenance record system.

c) Logbooks shall have sequentially numbered pages in triplicate.

d) Provision shall be made for the signatures of the NAM Discipline representative and the service person. The required distribution of copies shall be printed on each page as follows:

(a) Original Network Asset Management

(b) Duplicate Maintainer / Contractor

(c) Triplicate retain in book

8.5 System Interfaces 8.5.1 Where systems are interfaced, such interface shall be tested annually.

8.5.2 Annual tests shall take into account fire protection systems that interface with other systems to permit fire protection systems to function as intended at the time of commissioning. A systems interface diagram shall be displayed in the fire control room or centre.

8.5.3 A typical fire protection system interface matrix is shown in below.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 18 of 46

Table 3 – Typical Fire Protection System Interface

SYSTEM St

air p

ress

uriz

atio

n

Doo

r rel

ease

s

Roo

f ven

ts

Soun

d sy

stem

s fo

r em

erge

ncy

purp

oses

Pl

ant s

hutd

own

Fuel

isol

atio

n

Elev

ator

ove

rrid

e

Ala

rm m

onito

ring

Smok

e ex

haus

t fan

s

Smok

e cu

rtai

ns

Smok

e sp

ill m

ode

HVA

C s

hutd

own

Fire

pum

p

Dam

per c

losu

re

Sprinkler systems ● ● ● ● ● ● ● ● ● ●

Detection systems ● ● ● ● ● ● ● ● ● ● ● ● ● Smoke/heat alarm systems ● ● ● ● ● ● ● ● ● Gaseous systems ● ● ● ● ● ●

Aerosol systems ● ● ● ● ● ●

Water mist systems ● ● ● ● ● ●

Hydrants ● ● ●

Hose reels ● ● ●

Kitchen suppression systems ● ● ● ● ● ● ● ●

8.6 Typical Maintenance Process

8.6.1 General 8.6.1.1 For all systems the following routine activities will normally apply in the

maintenance sequencing.

8.6.2 Preparation 8.6.2.1 All maintenance routines shall be carried out by suitably experienced

and trained personnel

8.6.2.2 Officer in Charge of station or building shall be notified of attendance to conduct maintenance

8.6.3 Maintenance 8.6.3.1 Undertake the maintenance in accordance with the maintenance

schedule and / or Work Order

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 19 of 46

8.6.4 Reinstatement 8.6.4.1 Officer in Charge of station or building shall be notified on completion

of the maintenance

8.6.5 Documentation 8.6.5.1 The following documentation will be produced as part of the

maintenance activities:

a) Record maintenance carried out in the location logbook b) Provide copy of records to Maintenance Engineer c) Where appropriate close out the work order and update the CMMS

8.7 Defect Rectification and Condition Reporting

8.7.1 Defect Rectification 8.7.1.1 Routine defects are to be managed through the appropriate Metro

Fault Centre.

8.7.1.2 Critical defects are to be given priority and where there is a possible impact on the integrity of the fire prevention systems the appropriate authorities are to be informed and, where necessary, alternatives are to be introduced to mitigate the risk.

8.7.2 Condition Reporting 8.7.2.1 Infrastructure Delivery shall submit monthly reports to Network Asset

Management on the integrity of the fire prevention systems and the status of maintenance programs.

8.8 Waivers 8.8.1 Where testing cannot be undertaken in strict accordance with AS 1851 and this

standard the following process must be completed to obtain a waiver in accordance with L1-CHE-PRO-001 Standard Waiver Procedure.

8.8.1.1 Identify the fire prevention asset(s) for which maintenance under AS 1851 cannot be performed – for example there may be structural restrictions related to original construction or obsolescent equipment

8.8.1.2 List the reasons for the non-compliance

8.8.1.3 For each affected asset undertake and record a risk assessment for each maintenance activity that cannot be completed

8.8.1.4 Apply for a waiver for the specific asset and maintenance activity

8.8.1.5 Record the waiver on the asset record in the CMMS and adjust the maintenance Schedules Task accordingly in accordance with Engineering Change and Change of Asset Data Procedures.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 20 of 46

9 Automatic Fire Sprinkler Systems

9.1 General 9.1.1 All sprinkler systems shall be inspected, maintained, tested and surveyed at the

frequencies indicated in MCSS 030200-01 Automatic Fire Sprinkler Systems Maintenance Schedules.

9.2 Option to Omit Weekly Inspections 9.2.1 AS 1851 makes allowance for some of the weekly testing to be omitted.

9.2.2 Where testing cannot be undertaken in strict accordance with AS 1851 a list of the specific assets and the relevant provisions from AS 1851 that apply to that asset must be recorded in the CMMS so that MST’s can be amended.

9.3 Design and Installation Survey 9.3.1 A survey is typically conducted visually from floor level to identify changes to the

sprinkler system or the building and its environment which could impair the performance of the sprinkler system.

10 Fire Hydrant Systems

10.1 General 10.1.1 All fire hydrant systems shall be inspected, maintained, tested and surveyed at the

frequencies indicated in MCSS 030200-02 Fire Hydrant Systems Maintenance Schedules.

10.2 Design and Installation Survey 10.2.1 The survey may be conducted visually from floor level. The goal of the survey is to

identify that;

the system can perform as originally intended

the performance capability is not compromised by occupancy or building alterations

changes to the hydrant system or the building and its environment do not impair the performance of the hydrant system.

10.2.2 Where a system upgrade has resulted in a change of the performance capability, the system should be appraised against the upgraded level of performance.

10.3 Maintenance Record Tag or Label 10.3.1 A maintenance record tag or label shall be provided for each hydrant to record the

last level of inspection and test performed.

10.3.2 Where a maintenance record tag is used, it shall be attached to the hydrant so that the force necessary to detach the tag is not less than 200 N.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 21 of 46

10.3.3 In addition to the requirements detailed in Section 8.4.3 maintenance record tags shall also comply with the following:

(a) be manufactured from a durable adhesive material capable of being punched

(b) carry no information other than that shown in and the recorded information specified in this section.

10.3.4 The level of inspection, test and survey routine carried out shall be etched, embossed, or stamped on the tag or label in the box corresponding to the year and month in which the routine was performed, with a figure representing the routine as follows:

1 = Six monthly

2 = Yearly

4 = Five yearly

10.3.5 The figures shall be not less than 3 mm high, and the markings shall be such that the figures are legible.

10.3.6 Where tags are used, the six-monthly inspection routine may, as an option, be indicated by a hole punched in the tag.

10.3.7 When a new maintenance record label is provided, the label shall be marked indelibly and applied to the hydrant adjacent to the completed label so that the previous service history is not obscured.

11 Portable and Wheeled Fire Extinguishers

11.1 General 11.1.1 All portable and wheeled fire extinguishers - that at the time of manufacture

complied with the contemporary edition of the relevant standards listed in Table 4 - shall be inspected, maintained, tested and surveyed at the frequencies indicated in MCSS 030200-05 Portable & Wheeled Fire Extinguisher Maintenance Schedules.

11.2 Australian Standards for Fire Extinguishers 11.2.1 Fire extinguisher types and the relative Australian Standards are summarised in

Table 4

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 22 of 46

Table 4 – Australian Standards for Portable Fire Extinguishers (Extract from AS 1851)

Expellant Method Extinguisher Type

Gas Container Stored Pressure Chemical

Water

AS/NZS 1841.2 (AS 1841.2) (AS 1841) (AS A31.2)

AS/NZS 1841.2 (AS 1841.2) (AS 1842) (AS A31.3)

(AS 1840) (AS A31.1)

Wet Chemical - AS/NZS 1841.3

(AS 1841.3) (AS 1842)

-

Foam

AS/NZS 1841.4 (AS 1841.4) (AS 1844) (AS A32.2)

AS/NZS 1841.4 (AS 1841.4) (AS 1845) (AS A32.3)

(AS 1843) (AS A32.1)

Powder (Dry Chemical)

AS/NZS 1841.5 (AS 1841.5) (AS 1846) (AS A137)

AS/NZS 1841.5 (AS 1841.5) (AS 1846) (AS A137)

-

Carbon Dioxide -

AS/NZS 1841.6 (AS 1841.6) (AS 1847) (AS A138)

-

Vaporizing Liquid (Halon) -

AS/NZS 1841.7 (AS 1841.7) (AS 1848) (AS A163)*

-

NOTE: Australian Standards numbers shown in parenthesis refer to superseded Standards

* Halon 1211 and 1301.

11.3 Aggressive Environment 11.3.1 Unless protected from the effects of an aggressive environment (see Section

8.2.4), extinguishers located in such environments shall be subject to a more comprehensive maintenance program by conducting the five-yearly inspection, test and preventive maintenance schedules, every three years.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 23 of 46

11.4 Design and Installation survey 11.4.1 A survey is typically conducted visually from floor level and is intended to identify

changes to fire extinguishers, or the building and its environment that could impair the performance of fire extinguishers.

11.5 Cylinder Lining 11.5.1 Where a cylinder lining is found to be suspect as to its soundness, e.g., the lining

shows evidence of cracking, separation from the wall of the cylinder, lifting of the lining, or any signs of bubbles or irregularities in the lining, the cylinder shall be condemned.

11.6 Water Quality 11.6.1 In areas where the water supply, whilst of drinking quality (potable) may be

unsatisfactory for prolonged contact under pressure with water-type fire extinguisher cylinders, either specially treated cylinders shall be used, or a corrosion inhibitor shall be added to each charge in the extinguisher. Extinguishers used in these areas shall be supplied with the appropriate treatment in accordance with the extinguisher manufacturer’s recommendations.

11.6.2 If in any doubt as to the water quality, an inhibitor shall be added as failure to do so may result in rapid deterioration of the extinguisher, leading to leakage or failure to operate.

11.6.3 Maintenance shall be undertaken with greater regularity where:

(a) Water quality has proved to be a problem, or is likely to be a problem;

(b) Salts are deposited in extinguishers; or

(c) Hard water is used.

11.7 Corrosion 11.7.1 Where an extinguisher is pitted or otherwise damaged by corrosion and it cannot

be determined if the damage is within the limits detailed in AS 2337.1, then the cylinder shall be condemned.

11.8 Exceptions 11.8.1 Fire extinguishers designed for ‘one-off’ use, such as aerosol and non-

rechargeable types, shall undergo all inspection and test requirements contained in Section 11.19 except for those requiring the depressurizing of the cylinder, removal of the operating head, inspection of the contents, and inspection of the interior of the extinguisher.

11.9 Pressure Test Marking 11.9.1 Extinguishers (with the exception of carbon dioxide types) that have passed the

hydrostatic pressure test shall have the month and year of the test clearly and permanently marked on the skirt or neck ring of the cylinder.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 24 of 46

11.10 Service Labels 11.10.1 Any service label applied to the extinguisher after servicing shall not exceed 90

mm × 50 mm in size and shall not be applied on the coloured identification band, over any manufacturers’ labels or instructions, or on the maintenance record tag or label.

11.11 Defects 11.11.1 Defects, including faulty or defective components advised by public notices or

manufacturers’ service bulletins, shall be replaced, exchanged or repaired.

11.11.2 Defects that can be repaired on site shall be repaired immediately, or reported, or reported to the owner / occupier or agent. Any unit that is not repaired shall have a red “out of service” tag attached and evidence of compliance shall not be applied to the maintenance record tag or label.

11.11.3 Defective extinguishers that can not be repaired on site shall be removed from site for repair, or reported to the owner. Any defective unit that is not removed for repair shall have a red ‘out of service’ tag attached and evidence of maintenance shall not be applied to the maintenance service tag or label.

11.11.4 A replacement unit of the same type and size or similar rating shall be left in place of the unit removed from site.

11.11.5 To prevent the ‘out of service’ tag being removed from the extinguisher, it shall have a tear-off section identifying the extinguisher, its location and the fault shall be signed by the buildings owner, occupier or agent.

11.11.6 Extinguishers with defects that cannot be repaired shall be condemned, and tagged or labelled as appropriate. The label shall have black letters, not less than 10mm high, on a yellow background.

CONDEMNED – DO NOT USE.

11.11.7 Evidence of the maintenance level shall not be applied to the maintenance service tag or label. A record of the inspection and the outcome shall be made in the maintenance records.

11.11.8 Unsuitable equipment shall be returned to the owner with a ‘defective component’ report and an ‘action required’ report.

11.11.9 Actions taken shall be recorded in the maintenance record.

11.12 Recharging Agent 11.12.1 Recommendations and instructions for the recharging of fire extinguishers are

included on the extinguisher label supplied by the manufacturer. These instructions include the quantity and type of extinguishing agent to be used.

11.12.2 Where an internal inspection of the extinguisher and its components is required, but a discharge test is not specified, the extinguishing agent (with the exception of vaporizing liquid type extinguishers) may be either recovered for re-use in the extinguisher being serviced (provided that the extinguishing agent is not due for mandatory replacement), or discarded.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 25 of 46

11.13 Powder Mixing Precautions 11.13.1 Mixing or cross-contamination of different types of powder, e.g. BE and ABE

types, is dangerous and shall be avoided.

11.14 Vaporizing Liquid Extinguishers 11.14.1 ‘Halon’ type extinguishers shall not be discharged to the atmosphere and only

those extinguishers that have been granted ‘essential use’ status may be pressure tested and returned to service (see 11.14.3).

11.14.2 Prior to any pressure test or service work on any vaporizing liquid type extinguisher that requires the contents to be removed, the contents shall be transferred from the extinguisher to a holding container by a method of recovery approved by the regulatory authority.

11.14.3 Regulatory authorities have banned the possession and use of ‘halon’ type vaporizing liquid fire extinguishers, unless ‘essential use’ status has been sought and granted for nominated extinguishers of this type.

11.15 Extinguisher Recharging 11.15.1 To ensure that adequate fire protection is maintained, extinguishers that have

been;

(a) found by inspection to be under pressurized

(b) found by test to be undercharged

(c) fully or partially discharged,

shall be recharged as soon as practicable in accordance with the manufacturer’s instructions.

11.16 Location Records

11.16.1 Location 11.16.1.1 Where there are more than 10 portable fire extinguishers located in or

on a property, or where required by the regulatory authority, the type, size and / or rating (see Note), location and identification of the extinguishers in or on the property shall be recorded, either on a site plan or by other means, clearly describing the extinguishers and their location.

Note: Ratings for portable fire extinguishers in accordance with AS/NZS 1850 were not required before March 1980.

11.16.2 Identification 11.16.2.1 Extinguishers shall bear a permanently fixed, unique, site identification

mark, suitable for cross- referencing with the maintenance records. The mark shall consist of at least one of the following:

(a) Written numbers, letters or a combination of both

(b) A barcode

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 26 of 46

(c) A magnetic or electronic strip, or similar, e.g. a smart chip

11.17 Maintenance Records

11.17.1 General 11.17.1.1 A maintenance record shall be provided to sequentially record the

maintenance carried out on the fire extinguishers. In addition to the requirements of Section 8.4.3 , it shall contain the following:

(a) The type of extinguisher (e.g. powder, carbon dioxide).

(b) The date of manufacture or the date of the last pressure test.

(c) The last level of service as per the inspection, test, preventive maintenance and survey schedules.

(d) Any defects and remedial actions taken.

(e) A record of any missing, or misplaced, extinguishers.

(f) Any other applicable comments.

11.17.2 Records system 11.17.2.1 Details of records shall be kept in accordance with the requirements of

MCSS 030200-05 Portable & Wheeled Fire Extinguisher Maintenance Schedules.

11.17.2.2 Maintenance records may be electronically based; however, for extinguishers, hard copy records, in the form of a record tag or label, shall be kept on site and be available at all times.

11.17.3 Maintenance Record Tag or Label 11.17.3.1 The level of inspection, test, preventive maintenance and survey

routine carried out shall be etched, embossed, stamped or indelibly marked on the tag or label in the box corresponding to the year and month in which the routine was performed, with a figure representing the routine as follows:

1 = six monthly

2 = yearly

4 = five yearly

11.17.3.2 The figures shall be not less than 3 mm high, and the markings shall be such that the figures are legible. Where tags are used, the six-monthly routine may, as an option, be indicated by a hole punched in the tag.

11.17.4 Frequency 11.17.4.1 For the purpose of this Section, the frequencies of inspection, test,

preventive maintenance and survey shall apply as specified in MCSS 030200-05 Portable & Wheeled Fire Extinguisher Maintenance Schedules.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 27 of 46

11.17.4.2 Commencement of the sequence shall be based on the date of manufacture of the extinguisher, or the date of the last pressure test, whichever is the later. If the date of manufacture or last pressure test cannot be reliably established, a five-yearly inspection, test and preventive maintenance procedure shall be carried out on the extinguisher.

11.17.4.3 Upon installation, a six monthly inspection shall be carried out.

11.17.4.4 Note: Where an extinguisher has been discharged after the fourth year of the five-year period, a pressure test should be carried out to allow the extinguisher to begin a new five-year cycle.

11.17.5 Maintenance Record Tag or Label 11.17.5.1 A maintenance record tag or label shall be provided to record the last

level of inspection, test preventive maintenance and survey performed. Where a maintenance record tag/label is used, it shall be attached to the extinguisher so that the force necessary to detach the tag is not less than 200 N.

11.17.5.2 Where a maintenance record label is used, it shall be applied to the back of the extinguisher cylinder.

11.17.5.3 In addition to the requirements detailed in Section 8.4.3 maintenance record tags shall also comply with the following

a) be manufactured from a durable adhesive material

b) carry no information other than that shown in and the recorded information specified in this section.

11.17.5.4 The level of inspection, test, preventive maintenance and survey routine carried out shall be etched, embossed, stamped or indelibly marked on the tag or label in the box corresponding to the year and month in which the routine was performed, with a figure representing the routine as follows:

1 = six monthly

2 = yearly

4 = five yearly

11.17.5.5 The figures shall be not less than 3 mm high, and the markings shall be such that the figures are legible. Where tags are used, the six-monthly routine may, as an option, be indicated by a hole punched in the tag.

11.17.5.6 When a new maintenance record label is provided, the label shall be applied to the extinguisher adjacent to the completed label so that the previous service history is not obscured.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 28 of 46

11.18 Reports 11.18.1 At the completion of the inspection, test, preventive maintenance and survey

routines, in accordance with MCSS 030200-05, a report shall be provided to the Network Asset Manager. All discrepancies shall be identified and included in the report on an ‘exceptions basis’.

11.18.2 Defect and condition reports shall be prepared and distributed in accordance with Section 8.7 of this document

11.19 Inspection, Test, PM, Survey and Records 11.19.1 Cylinder Types covered by the standard;

a) Water (Soda Acid),

b) Water (Gas Container),

c) Water (Stored Pressure),

d) Wet Chemical (Stored Pressure),

e) Foam (Chemical) ,

f) Foam (Gas Container),

g) Foam (Stored Pressure),

h) Powder (Gas Container),

i) Powder (Stored Pressure),

j) Carbon Dioxide,

k) Vapourizing Liquid.

12 Passive Fire and Smoke Containment Systems

12.1 General 12.1.1 All Passive Fire and Smoke Containment Systems shall be inspected, maintained,

tested and surveyed at the frequencies indicated in MCSS 030200-03 Passive Fire and Smoke Containment Systems Maintenance Schedules.

12.1.2 This Section sets out the requirements for maintenance of passive fire and smoke containment systems comprising vertical and horizontal fire and smoke compartment barriers together with any openings, fire doors, fire shutters or any service penetrations and control joints preventing the passage of fire and smoke to other compartments.

12.1.3 These include, but are not limited to the following:

(a) Fire and smoke barriers—vertical and horizontal (including walls, floors, ceilings, bulkheads)

(b) Structural fire-resistant elements (beams, columns, girders, trusses, etc.)

(c) Fire-resistant doorsets (hinged and pivoted and horizontal sliding)

(d) Smoke doors (hinged and pivoted)

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 29 of 46

(e) Fire shutters

(f) Fire-rated glazing

(g) Access panels and ceiling hatches

(h) Ducts and dampers

(i) Fire stopping elements: Service penetrations and control joints (metal/plastic pipes, electrical cables/conduits/cable tray, construction/control joints and deflection heads)

12.2 Application

12.2.1 General 12.2.1.1 Passive elements of fire and smoke containment systems (passive

protection) are illustrated in Figure 2 and Figure 3, and form the basis of the maintenance program.

12.2.2 Compartment Integrity 12.2.2.1 The basis of maintenance for compartment integrity is to identify the

respective vertical and horizontal barriers and their respective fire-resistance level (FRL) or smoke containment requirements and to ensure all openings or service penetrations and control joints in these barriers do not compromise the performance requirements relating to fire and smoke compartmentation.

12.2.3 Structural Fire Resistant elements 12.2.3.1 The basis of maintenance for structural fire-resistance elements is to

identify all the structural elements (beams, columns, girders and trusses), and their respective fire-resistance level (FRL) requirements and to ensure adequate fire protection coverings are incorporated at the correct thickness and that they are in good condition.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 30 of 46

Figure 2 – Typical Fire & Smoke Compartment Showing Passive Fire &

Smoke Protection Systems (Extract From AS 1851)

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 31 of 46

Figure 3 – Typical Duct & Damper

(Extract From AS 1851)

12.3 High Use and Aggressive Environments 12.3.1 Passive fire and smoke containment systems located in high-use and aggressive

environments may require a higher frequency of maintenance than set out in the requirements of MCSS 030200-03 Passive Fire and Smoke Containment Systems Maintenance Schedules.

12.3.2 Note: The frequency of maintenance may need to be increased to satisfy the needs of the particular building as determined during the compilation of the essential services schedule.

12.3.3 For the purposes of this Section high use may be regarded as constant use, for a fire door, as an example, where building occupants travel from floor-to-floor using fire stairs on an hourly basis moving freely between compartments.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 32 of 46

12.4 Design and Installation Survey

12.4.1 General 12.4.1.1 A survey of all fire and smoke containment elements shall be

conducted using existing compartmentation integrity, structural integrity or appropriately marked general drawings and any associated schedules, which show the location of all the items and the requirements for fire and smoke containment.

12.4.1.2 Suitable documentation is to be produced and made available for the survey.

12.4.2 Compartmentation Integrity 12.4.2.1 A survey shall be conducted visually using the compartmentation

integrity drawings or appropriately marked general drawings and any associated schedules to identify or locate all relevant passive fire and smoke containment systems, and to determine whether there are any new barriers and/or penetrations added or removed, and if any of these may potentially impair the overall performance of the building in terms of fire and smoke containment.

12.4.3 Structural fire integrity 12.4.3.1 A survey shall be conducted visually, using the structural fire integrity

drawings or appropriately marked general drawings and any associated schedules, to identify or locate all structural elements and associated FRL requirements and to determine whether there are any areas where there may potentially be a requirement to add a fire protective covering or to repair an existing fire protective covering.

12.5 Marking, Labelling, Tagging and Signage

12.5.1 Fire Doors 12.5.1.1 Passive fire and smoke containment systems shall be labelled for

identification purposes.

a) Fire doorsets are required by AS 1905.1 to be tagged.

b) Smoke doors and solid core doors, as required by the BCA or by specific designs, should be tagged or labelled in a similar manner to that of fire doors.

c) The labels may be numbered to coincide with the key used on any compartmentation integrity or appropriately marked up general drawings and any associated schedules.

12.5.2 Compartment Barriers and Penetrations 12.5.2.1 A service label, similar to Figure 4 shall be affixed adjacent to each

service penetration or control joint and shall contain, as a minimum, the information specified in MCSS 030200-03.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 33 of 46

Figure 4 – Service Penetration / Control Joint Service Label

12.5.3 Structural Steel Elements 12.5.3.1 Structural steel elements are not required to be labelled.

12.6 Maintenance Records and Reports 12.6.1 Maintenance records shall record the outcomes of maintenance activities

undertaken in accordance with MCSS 030200-03 Passive Fire and Smoke Containment System Maintenance Schedules using Log Books for hard copies and CMMS for soft copy.

12.6.2 Reports shall be prepared in accordance with Section 8.4 of this document.

13 Fire and Smoke Control Features of HVAC Systems

13.1 General 13.1.1 All Passive Fire and Smoke Containment Systems shall be inspected, maintained,

tested and surveyed at the frequencies indicated in MCSS 030200-04 Fire and Smoke Control of HVAC System Maintenance Schedules

13.1.2 This Section sets out the requirements for inspection, test, preventive maintenance and survey of fire and smoke control features of;

heating ventilation

air-conditioning (HVAC) systems in buildings,

13.1.3 This Section does not apply to air-conditioning, mechanical ventilation or natural ventilation systems that are not required to operate in fire and smoke control mode except that systems required to shut down in fire mode shall be proven to shut down in accordance with the Australian Standard.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 34 of 46

13.2 Application 13.2.1 This Section only applies to the fire and smoke control features of HVAC systems,

including the shutdown function for systems that are required not to run in fire mode.

13.2.2 Where operation of HVAC systems in fire mode is not specified by Standards or building codes, this Standard does not apply (see Table 5).

Table 5 – Application of AS 1851 to HVAC Systems

HVAC System Required Fire Mode Operation

Application of AS 1851

Exit Pressurisation Run Yes

Smoke Control Run Yes

Smoke Exhaust (Note 1) Run Yes

Run Yes

Shutdown Refer Note 2 below

Air-handling

Optional N/A

13.2.3 Note 1: Smoke exhaust systems, smoke control systems and exit pressurization systems are required to be tested at least annually to demonstrate they are capable of performing to the Standard to which they were installed. In the case of the following systems, this requires measurement of parameters required by AS/NZS 1668.1 or the relevant building codes. For example:

(a) Pressurization systems—Doorway velocities, door opening forces, restoration times, etc.

(b) Smoke control systems—Differential pressures, etc.

(c) Smoke exhaust systems—Airflow rates.

13.2.4 Note 2: Some buildings may have stand-by power generation provisions that are required to operate fire and smoke control equipment and controls in the event of a normal power failure. ‘Partial Simulation’ tests and ‘Full Simulation’ tests should be carried out under stand-by power to verify fire mode performance. Where a system has more than one fire or smoke zone, verification of fire mode operation of the stand-by power need only be carried out for one zone, the most critical in terms of power consumption.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 35 of 46

13.3 Design and Installation Survey 13.3.1 A survey is typically conducted visually from floor level or from an accessible

platform, or from an accessible roof, by simple observation through vent and fan discharges and is intended to identify changes to the HVAC system, or the building and its environment, that could affect the performance of the smoke control features of the HVAC system.

13.3.2 The goal of this survey is to ensure that the system can perform as originally intended and that performance capability is not compromised by occupancy, building alterations or HVAC alterations. Where an alteration has resulted in a change of the performance requirements, the system should be appraised against the modified performance requirements.

13.3.3 Fans that continue operating or stop in fire mode shall be included in the survey.

13.4 Dual Duty Systems 13.4.1 Systems or components that operate in normal HVAC duty and also have

dedicated fire mode duty, shall be inspected, tested and maintained to the requirements of MCSS 030200-04 Fire and Smoke Control of HVAC System Maintenance Schedules for day-to-day duty as well as dedicated fire-mode duty.

13.4.2 Failure of fire safety equipment can usually be attributed to one of three potential causes:

a) Wear and tear Prevention of failure due to wear and tear is usually addressed by regular inspections and appropriate maintenance or repair

b) Random event (environmental, material or usage).

Prevention of failure due to random events is usually addressed by inspection or testing, to demonstrate an acceptable level of performance at suitable intervals

c) Human error. Prevention of failure due to human error is usually addressed by training and education of responsible staff, monitoring of equipment status or regular inspection and testing

13.4.3 When HVAC equipment has been designed to provide fire and smoke control, the relative likelihood of the first two of these failure modes will depend on the pattern of usage.

13.4.4 Equipment used only for fire service duty will not be subject to the same level of wear and tear as equipment used for day-to-day HVAC duty, for comfort, health or process control. Hence, for reliable operation, equipment subjected to day-to-day usage will require more frequent inspections and maintenance or repair than equipment used only for fire service duty.

13.4.5 However, equipment used for day-to-day HVAC duty, is effectively monitored (tested) by the occupants of the building every day, and any breakdown is likely to cause occupant discomfort and generate corrective action to regain the required performance providing there is a current maintenance contract in place.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 36 of 46

13.4.6 Equipment used only for fire service duty will not be subject to regular monitoring by occupants, and so will require frequent inspections or tests to establish confidence that it will be available to operate when needed, but will not require the same level of maintenance or repair as equipment used for day-to-day duty.

13.5 Documentation

13.5.1 General 13.5.1.1 Documentation covering maintenance records required to implement

the maintenance program shall be retained to sequentially record the maintenance carried out and shall include the following:

a) A schedule of essential functionality and performance requirements.

b) Operating and maintenance manuals.

c) Maintenance schedule.

d) Maintenance records.

e) Plant register.

f) Plant history sheet.

g) Diagram(s) of the installation.

13.5.1.2 In the absence of adequate documentation, the infrastructure facilities manager shall supply performance and testing data, such as building approvals, development applications, drawings, etc., to support the maintenance requirements of this Standard.

13.5.1.3 Where the installation is incomplete or not in accordance with the approval documentation, the Network Asset Manager shall be notified.

13.5.1.4 Note: Attention is drawn to the requirements of AS/NZS 1668.1 relating to the purpose, location and updating of operating instructions and diagrams of the installation.

13.5.2 Schedule of Essential Functionality and Performance Requirements 13.5.2.1 Documentation shall include a schedule indicating the correct fire

mode operation of all components, such as fans and dampers, and the required performance parameters of the system. Where relevant, this operation shall be linked to the applicable fire alarm zone. Refer to MCMF 030200-02 Essential Smoke Control Services – System Functionality Test Chart for a typical chart.

13.5.2.2 The schedule shall be amended on each occasion that the building or HVAC system is altered in a manner that affects the fire mode functionality or performance of the HVAC system.

13.5.2.3 The schedule of essential functionality and performance requirements shall incorporate the following:

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 37 of 46

(a) Unambiguous description of HVAC system operation in fire mode.

As it is critical that this document always be available to building management, the document should ideally be associated with the annual testing documentation, rather than being archived in design files.

(b) Provision to record the status and/or performance (correct or faulty) of the following:

(i) Operation of every fan or air-handling unit (AHU) in normal duty.

(ii) Operation of every fan or AHU during general fire alarm condition.

(iii) Operation of every fan or AHU during a zone-specific fire alarm condition.

Note: Fans that continue operating or stop in fire mode also need to be included.

(iv) Operation of every motorized damper required to operate during a general or zone specific

(v) fire alarm condition.

(vi) Every required make-up airflow path (natural or via door or damper).

(vii) Manual override control from the fire fan control panel (FFCP) (ON and OFF).

(viii) Fan or damper indicator lamps on the FFCP.

(c) Provision to describe specific HVAC function linked to specific fire alarm zone reference, and to record correct operation of fire/HVAC function.

(d) Provision to record that the appropriate fire systems and HVAC personnel have both been involved in the checking/test process, so that the fire/HVAC interface can be seen to have been demonstrated (Refer Section 8.5).

(e) Provision to demonstrate that the essential HVAC systems are capable of performing to the standard to which they were originally installed.

13.5.2.4 Floor plans, showing smoke alarm zones necessary for the development of the schedule of essential functionality and performance, shall be drawn and made available for the testing team, to assess if specific detectors, used to activate smoke control systems, actually operate in the correct zone.

13.5.3 Operating and maintenance manuals 13.5.3.1 Operating and maintenance manuals shall be provided for all plant,

equipment and systems covered by this Standard.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 38 of 46

13.5.3.2 Operating and maintenance manuals shall include at least the following:

(a) The performance criteria for all fire and smoke control features of the HVAC systems - applicable Standards, regulatory requirements, alternative fire engineered solutions and design criteria.

(b) Results of initial commissioning tests for all fire and smoke control features of the HVAC systems.

(c) Physical details of the plant, equipment and systems.

(d) Supplier’s recommendations on maintenance and management.

(e) Recommended cleaning methods and dismantling instructions.

(f) Start-up, operating and shutdown procedures.

(g) Particulars of the maintenance program.

13.5.4 Maintenance schedule 13.5.4.1 The maintenance schedule shall list all required items of plant and

equipment and operational features to be subjected to the maintenance routines set out in this Standard. It shall include the frequencies at which the relevant levels of routines are to be carried out - MCSS 030200-04 Fire and Smoke Control of HVAC System Maintenance Schedules.

13.5.5 Plant Register 13.5.5.1 The plant register shall list all items of plant and equipment that require

inspection as a prerequisite to maintenance, and shall describe their locations within the building. If not already incorporated in the operating and maintenance manuals, the plant register shall include design data and unit capacities in sufficient detail to order a replacement of equivalent performance.

13.5.5.2 Allocate each item of plant and equipment in the plant register a unique identity reference within the building. The identity reference shall be indicated on the diagram(s).

13.5.5.3 Notes:

(i) Generally, an auxiliary item incorporated within the parent equipment need not be allocated a separate identity reference.

(ii) For ease of identification, the marking of items of plant and equipment with allocated identity references is recommended.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 39 of 46

13.5.6 Plant History Record 13.5.6.1 The plant history record shall be used to record details of the

performance (test results) of each item at commissioning or any subsequent recommissioning. At subsequent inspections and tests, the results shall be recorded and compared with the results achieved at commissioning or any subsequent recommissioning. Any defects observed and any repairs and modifications effected shall be recorded in the plant history record.

13.5.7 Diagram(s) of the installation 13.5.7.1 Floor plans, showing smoke alarm zones necessary for the

development of the system functionality test chart (see Note) shall be drawn and made available for the testing team, to assess if specific detectors used to activate smoke control systems operate in the correct zone.

13.5.7.2 Note: MCMF 030200-02 Essential Smoke Control Services – System Functionality Test Chart provides an example of a system functionality test chart.

13.6 Maintenance records

13.6.1 General 13.6.1.1 Maintenance records shall record the outcomes of maintenance

activities undertaken in accordance with MCSS 030200-04 using Log Books for hard copies and CMMS for soft copy.

13.6.1.2 Reports shall be prepared in accordance with Section 8.4 of this document.

13.6.1.3 Logbook, shall be kept on site and be available at all times.

13.6.2 Availability of Manuals and Records 13.6.2.1 Operating and maintenance manuals and maintenance records shall

be readily available for inspection by authorized personnel upon request. For the purpose of maintenance management, the maintenance records shall be retained for at least 5 years.

13.6.2.2 Note: Maintenance records, design data and records of unit capacities should be retained for the life of the equipment.

13.6.3 Evidence of Compliance 13.6.3.1 Records shall provide evidence of compliance with this AS 1851 and

this standard.

13.6.3.2 Where building records are unable to confirm that maintenance has been carried out on each item within the past five year period then the 5 year maintenance routine shall be carried out on that item.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 40 of 46

13.6.3.3 In the case of equipment requiring specialized maintenance, evidence of compliance with this AS 1851 and this document shall be in the form of records demonstrating that manufacturer’s recommendations have been observed. Where a conflict arises between the requirements of this AS 1851 and this standard, and those of the manufacturer, the more stringent shall apply.

13.7 Forms for Recording Maintenance

13.7.1 General 13.7.1.1 Forms MCMF 030200-01 Figures Assessment of Essential Fire Safety

Measures – Fire Damper Maintenance Record, MCMF 030200-02 Essential Smoke Control Services – System Functionality Test Chart, MCMF 030200-03 Fire-Isolated Exit Pressurisation Systems Functionality Test Record and MCMF 030200-04 Fire-Isolated Exit Pressurisation Systems Performance Test Record provide examples of typical record documents required by this Section, the format of which may be used for recording purposes. Maintainer developed alternative layouts incorporating all the requirements of are acceptable.

13.7.1.2 The following applies to the use of smoke control functionality charts:

(a) Test indicator lamps to demonstrate On/Off fault. Fault may be tested by observing delay after manual override ‘Start’ or by isolating power before activating manual override.

(b) Where fans or dampers are individually activated by more than one fire alarm, allow a separate row in the chart for each activating alarm. For example, supply air detector, specifically zoned sprinkler alarm or return air detector that is not in the same zone as the occupied space detectors.

Note: See Column 4, ‘Design Comments’ and Column 21, ‘Comments on Tests’ of the chart shown in MCMF 030200-02 Essential Smoke Control Services – System Functionality Test Chart.

(c) In Columns 8 and 11, the inspector should indicate which smoke detector zone, sprinkler zone, supply air detector or specific smoke detector activated this operation.

(d) Smoke exhaust fans and exit pressurization systems to be tested at frequencies required by the regulatory authority to demonstrate that they are capable of performing to the Standard to which they were installed. This requires measurement of airflow rates, doorway velocities, door opening forces, restoration times, etc.

(e) The performance tests are to be carried out prior to the functionality tests, but within the maximum time period allowed under the relevant legislation. Document test results and methods used for testing separately, with a note in Column 21 indicating where performance test results are available, if not attached.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 41 of 46

To indicate when performance tests are required, the relevant cell in Column 20 should be highlighted.

(f) In Column 4, charts should include:

(i) All air-conditioning and ventilation fans in the premises even if they simply shut down or continue running without manual or automatic control on fire alarm.

(ii) All smoke control make-up airflow paths. For example, motorized dampers, barometric (non-return) dampers, fixed intake grilles and doors that open automatically on fire alarm.

(iii) All motorized dampers that operate automatically during fire alarm, or have manual control from the fire fan control panel

Note: VAV dampers or ventilation dampers that have no fire mode operation need not be included.

(g) Smoke exhaust fans, pressurization fans, dampers (and some supply air fans) only operate if fire or smoke is detected in a specific zone and not when fire is detected in other zones. These functionality test charts allow verification of zone-specific activation from the ‘fire-affected zone’ and one ‘outside zone’. There will be many more ‘outside zones’ than fire-affected zones, so visual verification of non-operation for every device and every outside-zone could generate multitudes of tests, unless an effective procedure is established. Carry out at least one visual confirmation of fire ‘non-fire’ operation for each device. Confirmation of operation under other fire detection permutations may be verified by observation of indicator lamps (after their operation has been proved).

(h) The ‘non-operation’ verification procedure is to be attached to these charts and indicate, in Column 21, that those devices that were verified ‘non-operational’ when an associated fan or damper was confirmed to be operating.

(i) In a large project, the functionality charts may require many pages to cover all air handlers, dampers, smoke exhaust fans and sundry ventilation systems. Unless handled carefully, the sheer volume of documentation may cause difficulties during testing.

(j) Column 1 is to be used to show the reference used by the HVAC service provider or as shown on the HVAC drawings.

(k) Column 2 is to be used to show the name used by the building owner/manager to describe the relevant zone or area within the building.

(l) Column 3 is to be used to show the reference used by the fire services maintenance contractor to describe the relevant zone or zones.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 42 of 46

13.7.2 Smoke Control Matrices 13.7.2.1 Smoke control matrices prepared by fire contractors show clearly and

unambiguously, the intended operation of HVAC systems under various different fire alarm conditions. However, limitations do occur and it is important for the documentation to make adequate provision for the following:

(a) Recording action when the alarm occurs in ‘another’ smoke zone.

(b) Recording action on ‘general fire alarm’ or sprinkler alarm.

(c) Recording if a fan / damper combination has manual override at FFCP.

(d) Recording if FFCP has indicator lamps for fan/damper combinations.

(e) Sufficient space to certify right / wrong operation on the sheet.

(f) Easy of reading, especially in low light test conditions.

(g) Written verification of fire alarm zone actuated.

13.8 Skills Associated with Inspection, Test, Preventive Maintenance and Survey

13.8.1 General 13.8.1.1 Personnel responsible for inspection, test, preventive maintenance and

survey of fire and smoke control features of HVAC systems shall have appropriate qualifications and experience.

13.8.1.2 A person with skill level T (technician) may carry out tasks of a person with skill level N (non-technical); however, persons with skill level T or S should only carry out tasks relevant to their acquired skills and qualifications.

13.8.2 Non-technical (N) 13.8.2.1 Non-technical (N) skill level includes the following:

(a) Demonstrated knowledge of fire and smoke control systems contained in this Standard.

(b) Minimum of one year’s experience in inspection and testing of fire and smoke control systems.

(c) Trained by Specialist or Technician.

13.8.3 Technician (T) 13.8.3.1 Technician (T) skill level includes the following:

(a) Demonstrated knowledge of fire and smoke control systems contained in this Standard, AS/NZS 1668.1, AS 1668.3, AS 1682.1, AS 1682.2, AS 2665 and the relevant parts of the Building Code of Australia (BCA).

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 43 of 46

(b) Minimum of three years’ experience in inspection and testing of fire and smoke control systems.

(c) Relevant trades qualifications from a recognized technical institution.

13.8.4 Specialist (S) 13.8.4.1 Specialist (S) skill level includes the following:

(a) Demonstrated knowledge of fire and smoke control systems contained in this Standard, AS/NZS 1668.1, AS 1668.3, AS 1682.1, AS 1682.2, AS 2665 and the relevant parts of the Building Code of Australia.

(b) Minimum of 5 years’ experience in design or installation, or inspection and testing of fire and smoke control systems; and a relevant engineering degree from a recognised university.

(c) Minimum of 7 years’ experience in design or installation, or inspection and testing of fire and smoke control systems; and a relevant certificate or associate diploma in engineering from a recognised technical institution.

OR

Minimum of 12 years experience in design or installation, or inspection and testing of fire and smoke control systems, with a relevant trade qualification and supervisory experience in this field for at least 5 years.

13.8.5 Typical activities and skill sets 13.8.5.1 MCSS 030200-04 identifies what qualifications are required for the

various maintenance activities.

13.9 Functionality and performance tests 13.9.1 Testing of the fire and smoke control features of HVAC systems requires

verification of both functionality as well as performance of the components and the systems. For the purpose of this Section, functionality shall be demonstrated by a fan starting or stoping, a damper opening or closing, or an indicator lamp turning on/off. Performance is demonstrated by measurement of airflow velocity or volume flow rate, pressure difference between compartments, door opening force, etc.

13.9.2 MCSS 030200-04 provides for elementary testing procedures that may be used in some cases for ‘Partial Simulation’ tests, but in the case of ‘Full Simulation’ tests, accurate measurements of the performance parameters shall be taken.

13.9.3 Examples of the different results obtained from Functionality tests and Performance tests are as follows:

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 44 of 46

13.9.3.1 Functionality

(a) Fan #1A starts and Damper #2A opens on fire alarm in Zone A.

(b) AHU 23 stops on General Fire Alarm.

13.9.3.2 Performance

(a) Fan #1A delivers 20,000 L/s in fire mode operation

(b) Pressure in Zone A is 20 Pa below Zone B on fire alarm in Zone A.

13.10 FREQUENCY

13.10.1 Inspection, preventive maintenance and records 13.10.1.1 The fire and smoke control features of all HVAC systems shall be

subjected to inspection and preventive maintenance in accordance with Clauses MCSS 030200-04 Fire and Smoke Control of HVAC System Maintenance Schedules.

13.10.1.2 Corrective maintenance, where required, includes removal, repair, replacement, lubrication or adjustment as appropriate.

13.10.1.3 Notes:

a) In the case of HVAC systems used for smoke control, the inspection, testing, preventive maintenance and survey work should be a carried out such that inspection, preventive maintenance and surveys are applied to components or equipment, and testing is applied to whole systems.

Apart from gross failures such as broken belt drives or collapsed bearings, most of the preventive maintenance work on HVAC systems depends on the skill and experience of qualified technicians recognizing, after inspection, that preventive maintenance or replacement of consumables is necessary. Hence, preventive maintenance work is not specified at prescribed intervals, rather, it is specified by noting ‘remove, repair, replace or adjust as necessary’. Where action is taken during inspection to successfully rectify or repair a component, then ‘pass’ is to be recorded in the ‘pass/fail’ column and details of the action taken is to be entered in the ‘Comments’ column.

b) Apart from gross failures such as broken belt drives or collapsed bearings, most of the preventive maintenance work on HVAC systems depends on the skill and experience of qualified technicians recognizing, after inspection, test or survey, that repair, adjustment, etc., of components or replacement of consumables is necessary. Hence, preventive maintenance work is not specified at prescribed intervals, rather, it depends on an inspection to ascertain the condition of the plant, followed by adjustment, correction or even repair where, in the judgment of the experienced technician, such actions are necessary, and this is the intention of the schedules in MCSS 030200-04 Fire and Smoke Control of HVAC System Schedules.

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 45 of 46

Where action is taken during inspection to successfully rectify or repair a component, then ‘pass’ is to be recorded in the ‘Pass/fail’ column and details of the action taken are to be entered in the ‘Comments’ column.

c) Maintenance should be completed at the specified intervals and to the standard required by the equipment manufacturer and scheduled in the project’s operation and maintenance manuals.

In HVAC systems, much of the maintenance is carried out when required; hence, inspections need to be carried out prior to considering the scheduled maintenance activity. For example, belt tensioning is carried out when inspection shows it is needed, rather than regular tightening without assessment, which could do more damage than leaving the belts loose.

14 Appendices Appendix 1 – Responsibilities

STRUCTURES & FACILITIES STANDARD FIRE PROTECTION SYSTEMS AND EQUIPMENT

MAINTENANCE IN THE MURL

MCST 030200-01 L1-SDD-STD-005 Version: 1 Effective from: 1 August 2012

Approving Manager: Standards Development Manager Approval Date: 01/08/2012 Next Review Date: 01/05/2015

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 46 of 46

Appendix 1 - Responsibilities A1.1 Network Asset Manager (NAM)

The Network Asset Manager is responsible for the following:

Determining the inspection type, frequency and competency of the individual undertaking the inspections to ensure a safe and “fit for purpose” asset

Creating Maintenance Scheduled Tasks within the CMMS to address all of the inspection types and frequencies, reviewing the inspection output and ensuring all third party inspection results are loaded into the CMMS. (NAM will arrange the Third Party inspections.)

Analysing all inspection results to determine effectiveness of the inspection programs and identify any fault and defect trends.

Initiating work orders for follow up inspections and corrective actions

A1.2 Infrastructure Delivery Manager The Infrastructure Delivery Manager is responsible for the following;

Assessing the MST schedules and the availability of track access and suitably qualified inspectors to ensure the MSTs and subsequent work orders generated by the CMMS are met.

Scheduling and arranging inspections undertaken by inspectors and inspection teams.

Monitoring and reporting on the completion of all scheduled inspections, rescheduling any missed or incomplete inspections and scheduling any identified ongoing inspection requirements.

The input of inspection results into the CMMS

Reviewing the inspection results and initiating any reactive maintenance requirements.

Reviewing all inspection results and the subsequent corrective actions undertaken for both appropriateness and effectiveness in conjunction with the Trend Analysis reports.

Reviewing third party inspection results along with MTM inspections to prioritise, scope and issue corrective maintenance works programs.

Ensuring all reactive and corrective works are undertaken in accordance with appropriate maintenance instructions.

The input of completed corrective and reactive track works results to the CMMS.