    2/22

    Approximately 10 to 25 percent of a systems development and

    maintenance effort is put toward developing and maintaining

    documentation.

    It is important to ensure that the right documentation has been

    prepared, is complete and current, reflects the criticality of the system,

    and contains all necessary elements. If any part of the documentation

    is not current, the tester must assume that none of it may be current

    and look for other sources to substantiate what has been developedand how it works.

    The testing of documentation should conform to other aspects of

    systems testing. Documentation is as prone to error as computer

    programs. The difference is that defective programs usually leads

    to defective results, whereas defective documentation may not.However, defective documentation is a time bomb; it can cause

    systems to be improperly changed or system output to be

    improperly used. Both of these errors can lead to incorrect system

    results.Source:Effective

    Methods for

    Software Testing byWilliam Perry

  • 8/3/2019 L Document Testing

    3/22

    The concerns regarding computer systems documentation are that the

    documentation will fail to:

    1. Bring discipline to the performance of an IT function2. Assist in planning and managing resources

    3. Help in planning and implementing security procedures

    4. Assist auditors in evaluating application systems

    5. Help transfer knowledge of software development throughout the

    life cycle

    6. Promote common understanding and expectation about the systemwithin the organization

    7. Define what is expected and verify that that is what is delivered

    8. Provide basis for training individual in how to maintain software

    9. Provide managers with technical documents to determine that

    requirements have been met

  • 8/3/2019 L Document Testing

    4/22

    Testing the adequacy of system documentation consists of the

    following tasks:

    1. Measure project documentation needs

    2. Determine what documents must be produced

    3. Determine the completeness of individual documents

    4. Determine how current project documents are

  • 8/3/2019 L Document Testing

    5/22

    Measure project documentation needs

    The formality, extend and level of detail of the documentation to beprepared depends on the organizations management practices and

    the projects size, complexity and and risk. What is adequate for one

    project may be inadequate for another. The first task in testing

    documentation is to test the sufficiency or adequacy of the

    documentation produced.

    Too much documentation can also be wasteful. An important part of

    testing documentation is to determine first that the right

    documentation is prepared; there is little value is conforming that

    unneeded documentation is adequately prepared.

  • 8/3/2019 L Document Testing

    6/22

    Determine what documents must be produced

    Method for determining the level of documentation needed:

    Level 1 (minimal): documentation guidelines are applicable to single-

    use programs of minimal complexity. Suggested cost criteria for

    programs that are categorized as level 1 are programs requiring less

    than one worker-month of effort.

    Level 2 (internal): documentation applies to special purpose programs

    that after careful considerations, appear to have no sharing potential

    and to be designed for use only by the requesting department. Large

    programs with a short life expectancy also fall into this category. The

    effort spent toward formal documentation for level 2 programs should

    be minimal.

  • 8/3/2019 L Document Testing

    7/22

    Level 3 (working document) documentation applies to programs that are

    expected to be used by many people in the same organization or thatmay be transmitted on request to other organization, contractors etc.

    These documents should undergo a more stringent documentation

    review.

    Level 4 (formal publication) documentation applies to programs that are

    of sufficient general interest and documentations are critical toprograms operations. These documents should be formally reviewed,

    tested and subject to configuration control procedures.

  • 8/3/2019 L Document Testing

    8/22

    Determine the completeness of individual documents

    Testers must determine whether each document is adequatelyprepared based on the following:

    1. Documentation content

    2. Document audience: the information must be presented with the

    level of detail appropriate to the audience

    3. Information should be included in each document types is

    completed

  • 8/3/2019 L Document Testing

    9/22

    Testing the completeness of documentation

    In testing the completeness of documentation, tests will reveal

    whether:

    1. The documentation is understandable to an independent

    person

    2. An independent person can use the documentation to correctlyoperate the system in a efficient, effective manner.

  • 8/3/2019 L Document Testing

    10/22

    Software Testing Environment

  • 8/3/2019 L Document Testing

    11/22

    Creating the software testing environment is not a trivial task. Each

    phase of software development has a parallel testing activity.

    Testers create test cases from the documents produced at each

    development phase.

    Requirements

    Design

    specification

    Unit

    specifications

    Implement

    the units

    System test

    Integration test

    Unit test

    Define system tests

    Define integration tests

    Define unit tests

  • 8/3/2019 L Document Testing

    12/22

    1. The requirements document provides input to define system

    test cases and drives the design phase

    2. The design phase consists of refining the design from high

    level down to detailed level. Each design level defines a part

    of the system, thus requires integration tests to ensure that

    each component works as an incremental element.

    3. The unit phase provides the specifications and eventually the

    code for each unit. Unit specifications are used to defines

    unit tests

  • 8/3/2019 L Document Testing

    13/22

    Unit testing

    Unit testing consists of verifying each individual unit in isolation by

    running tests in an artificial environment.

    Most people divide unit tests into two categories: white box and

    black box. Developers use the codes inner structure and control

    flow to construct white box tests. Black box tests derive from the

    requirements and other specifications, without any knowledge of the

    applications internal structure and control.

    White box tests find bugs, but tests based on the codes internal

    structure pose the danger of verifying the code works as written,

    without ensuring that the logic is correct. This is where black box

    tests come in to ensure that specific inputs yield the correct expected

    outcome.

    Unit testing is the first opportunity for exercising source code. By

    evaluating each unit in isolation, and ensuring that each works on its

    own, one can more easily pinpoint problems than if the unit were part

    of a larger system

  • 8/3/2019 L Document Testing

    14/22

    Integration testing

    A software integration strategy defines the order in which to merge

    individual units. Integration is a process that starts with a set of unitseach individually tested in isolation and ends when the entire

    application (or sub-system) has been built. Integration testing verifies

    that the combined units function together correctly. This can facilitate

    finding problems that occur at interfaces or communication between

    the individual parts.

    Integrating software and integration testing typically are parallel

    activities. As a component is added to the growing system, tests

    verify that the interim configuration works as expected prior to adding

    more components.

  • 8/3/2019 L Document Testing

    15/22

    System testing

    System testing verifies the entire product, validates it according to the

    original project requirements. Some of the major categories ofsystem tests include:

    Compatibility testing Configuration testing Functional testing

    Installation testing Load testing Performance testing Recovery testing Reliability testing Security testing Serviceability testing Stress testing Usability testing

  • 8/3/2019 L Document Testing

    16/22

    Regression testing

    Regression testing consists of reusing a subset of previouslyexecuted tests on new versions of the application. The goal is to

    ensure that features that worked on previous versions still work as

    expected. Adding new features sometimes may invalidate old

    regression tests. Testers may need to update existing tests to

    account for new product features.

    Running a regression test re-checks the integrity of the modified

    application. In an idea test environment, the tester re-executes

    regression tests every time the application changes.

  • 8/3/2019 L Document Testing

    17/22

    Acceptance testing

    Acceptance testing validates the system against the users

    requirements and ensures that the application is ready for operational

    use. The phase of testing occurs after the completing of system

    testing. Acceptance tests consist of typical user scenarios focusing on

    major functional requirements. Acceptance tests are often executed at

    the customer site for final handoff.

    Acceptance testing is the final checkpoint prior to delivery. The end

    user may often execute the acceptance tests, which are often a

    selected subset of system test cases that are run in the real

    environment.

  • 8/3/2019 L Document Testing

    18/22

    Software testing requires more than simply creating and executing

    tests. Before beginning to test, tester must devise the overall teststrategy, including how to record problems found during testing.

    Ideally tester creates a test plan at every level of testing, from

    system level through integration, down to unit level testing.

    A system test plan describes the requirements, resources,

    strategies, and schedule for testing an application. The information

    contained in the test plan aides the tester in acquiring necessary

    resources for creating the test environment and in defining the

    approach for creating the tests.

  • 8/3/2019 L Document Testing

    19/22

    Problem reporting system

    Problem reporting is a process for initiating fixes, enhancements,

    approvals and for tracking the progress of change. This presents a

    method for managing change and for minimizing the impact of

    rework, which are essential for controlling quality.

    Many commercial problem reporting tools exist today. These tools

    provide metrics and reports to identify deficiencies and to monitor

    test status.

    A problem reporting system is the primary means of

    communication between testers and developers. The tester

    records every problem found and provides detailed information for

    reproducing the problem, although some problems are not easilyreproducible. Once the developer has fixed the problem and a new

    release is available for testing, the tester re-executes the

    associated case to ensure that the problem has been fixed.

  • 8/3/2019 L Document Testing

    20/22

    Test reporting

    The primary goal of a test report is to described what occurred

    during the test activities. A typical test report identifies the

    configurations and test environment used, and then enumerates

    the tests executed and their results

    This document provides an audit trail of what the testeraccomplished while testing the application. Metrics derived from

    the test statistics help determine the applications readiness for

    use.

  • 8/3/2019 L Document Testing

    21/22

    A good system test plan defines the following:

    Overview of schedule for test activities

    Approach to testing, including usage of test tools Test tools; including how and when to obtain them Process by which to conduct tests and report results System test entry and exist criteria Personnel required to design, develop and execute tests Equipment resources what machines and test benches are needed

    Test coverage goal, where appropriate Special configuration of software and hardware needed for tests Strategies for testing the application Features that will and will not be tested Risks and contingency plans

  • 8/3/2019 L Document Testing

    22/22

    We have now finished software testing part of the lecture,

    starting with next lecture, we will be discussing software

    configuration systems, software maintenance and how to assure

    software reliability.

    Homework assignment (03/25/04)

    Please read chapters 13, 14