Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
WATER & SANITATION PERFORMANCE BENCHMARKING INDICATORS
A. Coverage
INDICATOR UNIT DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
1. Water Coverage 85.7% Population with easy access to water services (either with direct serviceconnection or within 200m of a standpost or served by other sources ofpotable water provided by the utility e.g. deep bore handpumps)/totalpopulation under utilitys notional responsibility, expressed inpercentage.
Population of the city is 9.8 M (1998 census), 14 M (JICA 2005 report)and 12.8 M (ADB 2005 report). Water department staff uses 13 M whilethe planning department uses 14 M figures for their calculations.Based on 14 M figure:Through legal connections = 9.0 M (64%)Theft & lossess in Katchi Abadies = 2.7 M ( 19%)Through Tankers = 0.3 M ( 2%)
2. Sewerage Coverage 70% - 75% Population with sewerage services (direct service connection)/totalpopulation under utilitys notional responsibility, expressed inpercentage.
About 70% area of Karachi is covered by KWSB. The detail of remaining30% area is as underArea Sewerage Responsibility5 Cantonment Boards Cantonment Boards
Karachi Development Authority (KDA)Karachi Municipal Corporation (KMC) EDO (W&S), CDGKDistrict Municipal Corporations (DMCs)Zonal Municipal Corporation (ZMC)
1
-
8/2/2019 KWSB-benchmarkingdata
2/16
Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
Katchi Abadies Sindh Katchi Abadi AuthorityEDO (W&S), CDGK
Private Housing Societies 95% Housing societies and5% KWSB
B. Water Consumption and Production
INDICATOR UNIT DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)
INFORMATION TO BE COLLECTED (IN RED)3. Water Production 173 lpcd Total annual water supplied to the distribution system (ex-treatment plant
and including purchased water, if any) expressed by population servedper day.540 MGD for 14 M population
4. Water Consumption 114 lpcd
140 lpcd
(Total annual water sold + Total annual volume of free supplies)expressed by population served per dayTotal Water sold = Total water supplied UFW= 540-189=351= 351+ free supply (4 MGD)
= 355 MGD for 14 M population
the 114 lpcd figure will improve if we include water illegal consumedwater through leakages and theft 355 + 81 MGD for 14 M population
Breakup of water consumption is as follows:4 MGD gratis supply through tankers (2%)55 MGD for industries (16%)12 MGD for commercial (3%)3.5 MGD for agriculture (1%)
2
-
8/2/2019 KWSB-benchmarkingdata
3/16
Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
276.5 for domestic (78%)
351 MGD
5. Metered WaterConsumption
lpcd
Total annual metered water consumed expressed by metered populationserved per day
C. Unaccounted for Water
INDICATOR UNIT DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
6. Unaccounted-for-Water
20 %
Difference between total water produced (ex-treatment plant) and totalwater consumed (which is water sold plus free supplies) expressed as apercentage of total water produced.
Transmission losses 5% = 27 MGDHead Loses 5% = 27 MGDFriction losses 5% = 27 MGDLeakages Losses 10% = 54 MGDTheft losses 10% = 54 MGD
Total 35% = 189 MGD
It is estimated that about 50% of water lost in leakages and 100% lost intheft losses is consumed by residents.Total water produced = 540 MGDTotal Water Consumed = water sold+ free supplies + consumptionagainst leakages = 347+4+81= 432540-432= 108
Total water produced = 540 MGDTotal Water Consumed = water sold+ free supplies= 347+4= 351
3
-
8/2/2019 KWSB-benchmarkingdata
4/16
Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
INDICATOR UNIT DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
35% 540-351= 189 MGD
7. Non-Revenue Water 35.7% Difference between total water produced (ex treatment plant) and totalwater sold expressed as a percentage of total water produced.
Total water produced = 540 MGDTotal water sold = 347 MGD for 14 M population540-347 = 193 MGD
D. Metering Practices
INDICATOR UNIT DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
8. Proportion of connectionsthat are metered
% Total number of metered water connections expressed as a percentage oftotal number of connections
9. Proportion of functionalmeters
% Total number of water connections with functional/operating metersexpressed as a percentage of total number of metered water connections
10. Proportion of water soldthat is metered
% Volume of water sold that is metered expressed as a percentage of totalvolume of water sold
E. Pipe Network Performance
INDICATOR UNIT DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
11. Pipe Breaks breaks/km/yr. Total number of pipe breaks per year expressed per km of the waterdistribution network.
12. Sewerage Blockages blockages/km/ Total number of blockages per year expressed per km of sewers
4
-
8/2/2019 KWSB-benchmarkingdata
5/16
Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
yr.
F. Cost and Staffing
INDICATOR UNIT DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
13. Unit Operational Cost
Rs. 22.94/000glnssold
Rs.14.74/000glnproduced
Total annual operating expenses1/Total annual volume of water sold.Total annual operating expenses1/Total annual water of water produced.
For FY 2004-05Total operating expanses = Rs. 2906.66 MTotal annual volume of water sold = 347*365 = 126655 MG/year
Total operating expanses = Rs. 2906.66 MTotal annual volume of water sold = 540*365 = 197100 MG/year
14. Staff/000 Water conn.Staff/000 W&S conn.
6/1000connections
Total number of staff expressed as per thousand water connections andper thousand water and sewerage connections.
15. Salary Costs as aproportion of OperatingCosts
32 % Total annual salary costs (including salaries, wages, pensions, otherbenefits, etc.) expressed as a percentage of total annual operating costs.
For FY 2004-05Total operating cost = Rs. 2906.66 MTotal salaries + benefits = Rs. 934 M
16. Power/Electricity Costsas a proportion of OperatingCosts
58 % Total annual power/electricity costs of the utility expressed as apercentage of total annual operating costs.
For FY 2004-05Total operating cost = Rs. 2906.66 MTotal power/electricity cost = Rs. 1672,05 M
17. Contracted-out service NIL Total cost of services contracted-out to the private sector expressed as a
5
-
8/2/2019 KWSB-benchmarkingdata
6/16
Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
costs as a proportion ofOperating Costs
percentage of total annual operating costs.
Note 1: Annual operating expenses exclude depreciation, interest and debt service
G. Quality of Service
INDICATOR UNIT DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
18. Continuity of Service Hrs/day Average hours of service per day for water supply.
On average10% - 15 % receives 2hrs/week20% - 25% receives 4-5 hrs/3 days
30% - 35% receives 4-6 hrs/alternate day25% - 30% receives 10-12 hrs/day andlucky 5% receives 24/hrs day
19. Complaints about W&Sservices
% of W&Sconn
Total number of W&S complaints per year expressed as a percentage ofthe total number of W&S connections
Sewerage: Jan-Aug 2005, 135400 complaints received, 129984 resolved
20. Wastewater treatment 17 % Proportion of total sewage generated that is treated by at least primary
treatment (including screening).
There is no mechanism to measure actual volume of wastewater. KWSBuses conventional formula of 65% of total water supplied is wastewater540MGD * 65%= 351 MGD is volume of wastewater. Three Treatmentplants are operational receiving and treating about 90 MGD. 351-90= 261MGD wastewater is discharged into Liyari (60%) and Malir (40%)untreated.90/540 * 100 = 17
6
-
8/2/2019 KWSB-benchmarkingdata
7/16
Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
H. Billings and Collections
INDICATOR UNIT DEFINITION (IN BLUE)
COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
21. Average Tariff Rs./m3/yr. Total annual operating revenues (W&S) expressed by annual amount ofwater sold.
22. Residential fixed charge Rs./conn./yr. Any fixed component of the residential tariff (total amount).
23. Ratio of industrial toresidential charges
% The average charge (per m3) to industrial customers compared againstthe average charge (per m3) to residential customers.
24. Connection charge Water Supply and Sewerage
Rs. One time charge for obtaining a residential piped water supplyconnection and a residential sewer connection.
25. Collection Period yearly Year-end accounts receivable/Total annual operating revenues expressedin months equivalent of sales.
I. Financial Performance
INDICATOR UNIT DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
26. Working Ratio 1.1 Ratio Total annual operating expenses/Total annual operating revenues
For FY 2004-05Operating expanses = Rs. 2906.66Operating Revenues = Rs. 2553.592906.66/2553.59 = 1.3
7
-
8/2/2019 KWSB-benchmarkingdata
8/16
Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
27. Debt Service Ratio % OperatingRevenues
Total annual debt service costs expressed as a percentage of total annualoperating revenues.
J. Capital Investment
INDICATOR UNIT DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
28. Investments % OperatingRevenues
Total annual investments expressed as a percentage of total annualoperating revenues.
BENCHMARKING WATER AND SANITATION UTILITIES
DATA DEFINITIONS
The benchmarking data lists, and their associated definitions, are provided in the Table below. Almost all data items arerequired as either a numerator or a denominator for one or more of the core cost and performance indicators. The few that arenot used for this purpose have been collected to provide additional data that will be helpful in making comparisons betweenutilities. These additional data items are identified by the letters FIO (For Information Only).
Please provide the information/figures for all the data items for the Financial Years (FY) 2000-01, 2001-02 and 2002-03 i.e. for the years ending 31st Mar 2001, 31st Mar 2002 and 31st Mar 2003 respectively.
8
-
8/2/2019 KWSB-benchmarkingdata
9/16
Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
S No. Data Item DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
Unit
I General Information: Utility
1 Utility name Full name of utility. Please provide:Long name up to 50 charactersShort name up to 20 characters
Karachi Water & Sewerage Board (KWSB)
Text
2 Contact Name, Address, Tel. #, Fax #, e-mail Full contact details to allow communication withWSP
Text
3 Country (FIO) State country in which utility is locatedPakistan
Text
4 Region/State (FIO) State region/state within countrySind
Text
5 City (FIO) State City on which utility services are centeredKarachi
Text
6 Minimum Annual Salary (FIO) Country/Region/Citys minimum annual per capitasalary
Rs./yr.
II General Information: Utility Service Area
1 Total Population. Total population under notional responsibility of theutility irrespective of whether they receive service
12.8 M14 M
000 inhabitants
2 Type of services provided Specify if : (A) Water only (B) Sewerage only (C)Water and sewerage (D) Water, sewerage and other(C)
A,B,C,D as thecase may be
3 Nature of service area Specify if : (1) Urban; (2) Rural; or (3) Urban andrural.(3)
1,2,3 as the casemay be
4 Number of Towns served with Water (FIO) Total number of towns under responsibility of the Number
9
-
8/2/2019 KWSB-benchmarkingdata
10/16
Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
S No. Data Item DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
Unit
utility irrespective of their service coverage.
18 + 2 = 205 Number of Towns served with Sewerage (FIO) Total number of towns under responsibility of the
utility irrespective of their service coverage.
18 some partially some fully
Number
6 Total Number of Staff Total number of staff working at the utility.
1992-3 1995-6 1997-8 2004-512281 13865 8748 8260
Number
7 Extent of private sector involvement in the routine
operation of the facility (i.e. excluding capitalcreation and procurement)
Look at the use of the private sector in routine
operation of the utility e.g. O&M, landscaping,security, billing, etc. - A) None B) multiple servicecontracts C) management contract(s) D) leasecontract(s) E) concession contract(s) F)BOOT/BOT(s) G) full divestiture to private sectorA
A, B, C, D, E, F,
G as the casemay be
III Water service
1 Population served Population under responsibility of the utility withaccess to water through house connections and
standpipes (including other sources of potable waterwhich are provided by the utility e.g. deep borehandpumps)
000 inhabitants
2 Water Connections year end Number of water connections at year-end. 000
3 Households connected year end Number of households served at year-end(households might not correspond to connections e.g.cities with hi-rises/apartment blocks, etc served by asingle connection; so this figure should include thetotal number of households in each high-
000
10
-
8/2/2019 KWSB-benchmarkingdata
11/16
Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
S No. Data Item DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
Unit
rise/apartment block).
4 Inhabitants/household Number of inhabitants per household. Number5 Metered Connections Total number of metered water connections 000
6 Connections with operating/functional meters Total number of metered water connections whosemeters are functional/operating at year end
000
7 Metered Household Connections Total number of household connections that aremetered
000
8 Households with operating/functional meter Total number of metered household connectionswhose meters are functional/operating at year end
000
9 Length of water distribution network Total length of the distribution network (excludingtransmission lines)
Km
10 Volume of water produced Total volume of water produced for the service area(ex-treatment plant and including purchased water, ifany).
Million m3/year
11 Volume of water sold - metered Total volume of water billed which is metered. Million m3/year
12 Volume of water sold - unmetered Total volume of water billed which is unmetered. Million m3/year
13 Volume of free supplies Total Volume of water that is supplied by the utilityfree of cost (through public standposts)
Million m3/year
14 Volume of water sold to residential customers -metered
Total volume of water billed to residential customerswhich is metered.
Million m3/year
15 Volume of water sold to residential customers
unmetered
Total volume of water billed to residential customers
which is unmetered.
Million m3/year
16 Volume of water sold to industrial customers Total volume of water billed to industrial customers Million m3/year
17 Number of Pipe Breaks Total number of water pipe breaks in the distributionnetwork during the year.
Number
18 Duration of supply Average hours of service /day. Hrs/day
19 Number of complaints Total number of customer complaints related to thewater service during the year.
Number
IV Sewerage service
11
-
8/2/2019 KWSB-benchmarkingdata
12/16
Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
S No. Data Item DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
Unit
1 Population served Population under responsibility of the utility with
sanitation services through house connections.
000 inhabitants
2 Sewerage connections year end Number of sewerage connections at year end inthousands.
000
3 Households connected year end Number of households served at year end inthousands (households might not correspond toconnections e.g. cities with hi-rises/apartmentblocks, etc served by a single connection; so thisfigure should include the total number of householdsin each high-rise/apartment block)).
000
4 Length of sewers Total length of the sewerage network. 3500 miles 6-
845 Number of complaints Total number of customer complaints related to the
sewerage service during the yearNumber
6 Number of sewerage blockages Total number of sewerage blockages in thecollection network during the year.
Number
7 Sewage Generated Total Volume of sewage generated from the servicearea under the Utility
Million m3/year
8 Sewage Collected Total Volume of sewage collected from the servicearea under the Utility
Million m3/year
9 Wastewater treatment Proportion of sewage generated that is treated to at
least primary level (i.e. screening and settlement ofinfluent sewage)
%
V Financial Information
The information to be provided in this section is self-explanatory. However, definitions are givenwhen ambiguity might exist. Much of the information is available in the annual financial statements.Otherwise, the source of information should be specified. If possible please comments on how fixed assetsare valued. All information is annual and should be provided in local currency.
1 Total Operating Revenues Total billing of water and sewerage services, Rs. 2553
12
-
8/2/2019 KWSB-benchmarkingdata
13/16
Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
S No. Data Item DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
Unit
connection fees, well abstraction fees, reconnection
fees and other operational revenues includingsubsidies, but excluding all taxes
2 Total billings to residential customers Total amount billed to residential customers duringthe year to include fixed and volumetric chargesonly.
Rs.
3 Total billings to industrial customers Total amount billed to industrial customers duringthe year to include fixed and volumetric chargesonly
Rs.
4 Total Operational Expenses Total operational expenses (W&S) excludingdepreciation and financing charges (interest and
principal repayments).
Rs. 2906.66
5 Salary Costs Total annual salary costs (including salaries, wages,pensions, other benefits, etc.).
Rs. 934.40
6 Power/Electricity Costs Total annual power/electricity costs of the utility Rs. 1672.05
7 Contracted out Services costs Costs of all services within Item II (7) above whichare provided by private firms.
Nil
8 Total Net Fixed Assets Net Book Value of fixed assets at year end Rs. 26117.920M
9 Total Debt Service Total annual debt service costs (Including interestand repayment of principal)
Rs. 1323.74 M
10 Annual Investments Amount of capital investment during the year -11 Year end accounts receivable Total of all accounts receivable at year end including
water billings, and all other outstanding invoices.Rs. 1159.07 M
VI Tariff Information
The information to be provided in this section is also self-explanatory. This information should beobtained from the tariff structure.
1 Tariff Structure Provide complete tariff structure for all categories of consumers (domestic, commercial and industrial)
13
-
8/2/2019 KWSB-benchmarkingdata
14/16
Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
S No. Data Item DEFINITION (IN BLUE)COMMENTS/REMARKS/DETAILS (IN BLACK)INFORMATION TO BE COLLECTED (IN RED)
Unit
2 Fixed charge per month for residential customers The fixed component of the bill (if any) for the
provision of water and wastewater services. Indicateno fixed charge with a Zero
Rs./month
3 Connection charges Water Lump sum cost for residential water connection Rs.
4 Connection charges Sewers Lump sum cost for residential sewer connection Rs.
BEST PRACTIC
Various studies of World Bank, proposes the following best practices targets for utilities in developing countries. The following figuresare based upon the actual performance of the top 25% of 123 utilities studied in 44 developing countries by World Bank in 2000:
Unaccounted for water < 23%
5 or fewer staff per 000 connections
A working ratio of 0.7
A billing collection period of 3 month or less
Connection fee no higher than 20% of the annual per capita GDP
24 hours service ideally
100% coverage - ideally
Maximum metered connection
14
-
8/2/2019 KWSB-benchmarkingdata
15/16
Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
Consumption based tariff
Phnom Penh example
Phnom Penh, the capital of the Kingdom of Cambodia, has a total land area of 375 km2 divided into 7 districts. The city center, 7.5%of the total land area, consist of 4 small districts, is populated by 55% of the total one million Phnom Penh inhabitants. Main source ofwater is the river and the quality of the rivers water changes under the influence of the monsoon.
In 1993 the utility received foreign funding and embarked upon brining reform in water and sanitation sector. Ten years down the lanetheir performance is remarkable.
Performance Improvement1993 2003
1. Staff/1000 Connections 22 52. Qualified Staff 42 1723. Capacity, m3/day 65,000 235,0004. Coverage 25% 80%5. Supply Network 280km 870km6. Supply Pressure 0.2 bar 2 bar7. Supply Duration 10 hr/day 24 hr/day8. Connections 26,881 95,0009. Illegal Connections >300/year
-
8/2/2019 KWSB-benchmarkingdata
16/16
Benchmarking Urban Water & Sanitation Utilities Water & Sanitation Program South Asia
11. Billing Ratio 28% 94%12. Collection Ratio 50% 99%13. Non-revenue Water 72% 16%14. Total Income 0.7 bill. R 34 bill. R
15. Operating Expenses 1.4 bill. R 9.4 bill. R16. Total Expenses N/A 27 bill. R
16