  • ID ALILA RESORT-KOH RUSSEY M&E SCHEDULE Duration Start Finish

    1 ALILA RESORT - KOH RUSSEY M&E CONSTRUCTION SCHEDULE PHASE 1 390 days Fri 8/1/14 Mon 8/31/152 MATERIAL AND SHOP DRAWING WORK 260 days Thu 8/14/14 Wed 5/6/153 Material & Shop drawing submission 90 days Thu 8/14/14Tue 11/11/144 Material submission 90 days Thu 8/14/14Tue 11/11/145 Shop drawing sumission 90 days Thu 8/14/14Tue 11/11/146 Location surveying and marking 90 days Thu 8/14/14Tue 11/11/147 Material Procurement schedule 210 days Fri 10/3/14 Wed 5/6/158 First phase material ordering 180 days Fri 10/3/14 Tue 3/31/159 Plumbing material 90 days Fri 10/3/14Wed 12/31/14

    10 Domestic Water Pipe 90 days Fri 10/3/14Wed 12/31/1411 Waste Water pipe 90 days Fri 10/3/14Wed 12/31/1412 Storm water pipe 90 days Fri 10/3/14Wed 12/31/1413 LV & ELV Electrical material 150 days Fri 10/3/14 Sun 3/1/1514 Electrical pipe 90 days Fri 10/3/14Wed 12/31/1415 LV Cable 60 days Thu 1/1/15 Sun 3/1/1516 ELV Cable 60 days Thu 1/1/15 Sun 3/1/1517 Material delivery to site 150 days Sun 11/2/14 Tue 3/31/1518 Domestic water pipe 90 days Sun 11/2/14 Fri 1/30/1519 Waste water pipe 90 days Sun 11/2/14 Fri 1/30/1520 Storm Water pipe 90 days Sun 11/2/14 Fri 1/30/1521 Electrical Pipe 90 days Sun 11/2/14 Fri 1/30/1522 LV cable 60 days Sat 1/31/15 Tue 3/31/1523 ELV Cable 60 days Sat 1/31/15 Tue 3/31/1524 Second phase material ordering 200 days Mon 10/13/14 Wed 5/6/1525 Mock-up second phase material 47 days Mon 10/13/14 Fri 11/28/1426 Plumbing material 45 days Mon 10/13/14Wed 11/26/1427 Swimming Pool equipment 45 days Mon 10/13/14Wed 11/26/1428 Electrical and A/C equipment 45 days Mon 10/13/14Wed 11/26/1429 Electrical Panel 30 days Tue 10/28/14Wed 11/26/1430 Lighting 30 days Tue 10/28/14Wed 11/26/1431 A/C unit 45 days Mon 10/13/14Wed 11/26/1432 Material delivery to site 2 days Thu 11/27/14 Fri 11/28/1433 Swimming Pool equipment 2 days Thu 11/27/14 Fri 11/28/1434 Electrical Panel 2 days Thu 11/27/14 Fri 11/28/1435 Lighting 2 days Thu 11/27/14 Fri 11/28/1436 A/C unit 2 days Thu 11/27/14 Fri 11/28/1437 Second phase Material 105 days Fri 1/16/15 Wed 5/6/1538 Plumbing material 45 days Fri 1/16/15 Sun 3/1/1539 Water Pump 45 days Fri 1/16/15 Sun 3/1/1540 Swimming Pool equipment 45 days Fri 1/16/15 Sun 3/1/1541 Hydrant equipment 45 days Fri 1/16/15 Sun 3/1/1542 Electrical and A/C equipment 57 days Mon 3/2/15 Sun 5/3/1543 Electrical Panel 57 days Mon 3/2/15 Sun 5/3/1544 Lighting 57 days Mon 3/2/15 Sun 5/3/1545 A/C unit 57 days Mon 3/2/15 Sun 5/3/1546 Fan 57 days Mon 3/2/15 Sun 5/3/1547 Material delivery to site 60 days Mon 3/2/15 Wed 5/6/1548 Water Pump 3 days Mon 3/2/15 Wed 3/4/1549 Swimming Pool equipment 3 days Mon 3/2/15 Wed 3/4/1550 Hydrant equipment 3 days Mon 3/2/15 Wed 3/4/1551 Electrical Panel 3 days Mon 5/4/15 Wed 5/6/1552 Lighting 3 days Mon 5/4/15 Wed 5/6/1553 A/C unit 3 days Mon 5/4/15 Wed 5/6/1554 Fan 3 days Mon 5/4/15 Wed 5/6/1555 ALILA RESORT - KOH RUSSEY M&E CONSTRUCTION SCHEDULE FOR INFRAS 260 days Wed 12/3/14 Tue 8/25/1556 M&E PHASE 1 Infrastructure Part 260 days Wed 12/3/14 Tue 8/25/1557 Milestone Starting Infrastructure work 0 days Wed 12/3/14 Wed 12/3/1458 Plumbing Work 248 days Wed 12/3/14 Thu 8/13/1559 Zone 1 Plumbing Work 76 days Wed 12/3/14 Mon 2/16/1560 Step 1 Plumbing work behind Unit (Unit 1001 to 1006 & unit 20 38 days Wed 12/3/14 Fri 1/9/1561 Storm water pipe installation work 38 days Wed 12/3/14 Fri 1/9/1562 Trench excavation 7 days Wed 12/3/14 Tue 12/9/1463 Sand bedding, leveling and pipe installation work 14 days Wed 12/10/14 Tue 12/23/1464 Manhole and Pit construction 21 days Sun 12/14/14 Sat 1/3/1565 Testing and Inspection work by consultant before back fil 3 days Sun 1/4/15 Tue 1/6/1566 Trench backfilling 3 days Wed 1/7/15 Fri 1/9/1567 Waste Water pipe installation work 38 days Wed 12/3/14 Fri 1/9/1568 Trench excavation 7 days Wed 12/3/14 Tue 12/9/1469 Sand bedding, leveling and pipe installation work 14 days Wed 12/10/14 Tue 12/23/1470 Manhole and Pit construction 21 days Sun 12/14/14 Sat 1/3/1571 Testing and Inspection work by consultant before back fil 3 days Sun 1/4/15 Tue 1/6/1572 Trench backfilling 3 days Wed 1/7/15 Fri 1/9/1573 Step 2 Plumbing work behind Unit (Unit 001 to 019) 38 days Sat 1/10/15 Mon 2/16/1574 Storm water pipe installation work 38 days Sat 1/10/15 Mon 2/16/1575 Trench excavation 7 days Sat 1/10/15 Fri 1/16/1576 Sand bedding, leveling and pipe installation work 14 days Sat 1/17/15 Fri 1/30/1577 Manhole and Pit construction 21 days Wed 1/21/15 Tue 2/10/1578 Testing and Inspection work by consultant before back fil 3 days Wed 2/11/15 Fri 2/13/1579 Trench backfilling 3 days Sat 2/14/15 Mon 2/16/1580 Waste Water pipe installation work 38 days Sat 1/10/15 Mon 2/16/1581 Trench excavation 7 days Sat 1/10/15 Fri 1/16/1582 Sand bedding, leveling and pipe installation work 14 days Sat 1/17/15 Fri 1/30/1583 Manhole and Pit construction 21 days Wed 1/21/15 Tue 2/10/1584 Testing and Inspection work by consultant before back fil 3 days Wed 2/11/15 Fri 2/13/1585 Trench backfilling 3 days Sat 2/14/15 Mon 2/16/1586 Zone 2 Plumbing Work 76 days Tue 2/17/15 Sat 5/9/1587 Step 1 Plumbing work behind Main arrival building 38 days Tue 2/17/15 Thu 3/26/1588 Storm water pipe installation work 38 days Tue 2/17/15 Thu 3/26/1589 Trench excavation 7 days Tue 2/17/15 Mon 2/23/1590 Sand bedding, leveling and pipe installation work 14 days Tue 2/24/15 Mon 3/9/1591 Manhole and Pit construction 21 days Sat 2/28/15 Fri 3/20/1592 Testing and Inspection work by consultant before back fil 3 days Sat 3/21/15 Mon 3/23/1593 Trench backfilling 3 days Tue 3/24/15 Thu 3/26/1594 waste Water pipe installation work 38 days Tue 2/17/15 Thu 3/26/1595 Trench excavation 7 days Tue 2/17/15 Mon 2/23/1596 Sand bedding, leveling and pipe installation work 14 days Tue 2/24/15 Mon 3/9/1597 Manhole and Pit construction 21 days Sat 2/28/15 Fri 3/20/1598 Testing and Inspection work by consultant before back fil 3 days Sat 3/21/15 Mon 3/23/1599 Trench backfilling 3 days Tue 3/24/15 Thu 3/26/15

    100 Step 2 Plumbing work behind Unit V-01 & V-02 38 days Fri 3/27/15 Sat 5/9/15101 Storm water pipe installation work 38 days Fri 3/27/15 Sat 5/9/15102 Trench excavation 7 days Fri 3/27/15 Thu 4/2/15103 Sand bedding, leveling and pipe installation work 14 days Fri 4/3/15 Wed 4/22/15104 Manhole and Pit construction 21 days Tue 4/7/15 Sun 5/3/15105 Testing and Inspection work by consultant before back fil 3 days Mon 5/4/15 Wed 5/6/15106 Trench backfilling 3 days Thu 5/7/15 Sat 5/9/15107 Waste Water pipe installation work 38 days Fri 3/27/15 Sat 5/9/15108 Trench excavation 7 days Fri 3/27/15 Thu 4/2/15109 Sand bedding, leveling and pipe installation work 14 days Fri 4/3/15 Wed 4/22/15110 Manhole and Pit construction 21 days Tue 4/7/15 Sun 5/3/15111 Testing and Inspection work by consultant before back fil 3 days Mon 5/4/15 Wed 5/6/15112 Trench backfilling 3 days Thu 5/7/15 Sat 5/9/15113 Zone 3 Plumbing Work 67 days Sun 5/10/15 Wed 7/15/15114 Step 1 Plumbing work from Unit 203 to waste treament plan (fi 37 days Sun 5/10/15 Mon 6/15/15115 Storm water pipe installation work 37 days Sun 5/10/15 Mon 6/15/15116 Trench excavation 7 days Sun 5/10/15 Sat 5/16/15117 Sand bedding, leveling and pipe installation work 20 days Sun 5/17/15 Fri 6/5/15118 Manhole and Pit construction 20 days Fri 5/22/15 Wed 6/10/15119 Testing and Inspection work by consultant before back fil 2 days Thu 6/11/15 Fri 6/12/15120 Trench backfilling 3 days Sat 6/13/15 Mon 6/15/15121 Waste Water pipe installation work 37 days Sun 5/10/15 Mon 6/15/15122 Trench excavation 7 days Sun 5/10/15 Sat 5/16/15123 Sand bedding, leveling and pipe installation work 20 days Sun 5/17/15 Fri 6/5/15124 Manhole and Pit construction 20 days Fri 5/22/15 Wed 6/10/15125 Testing and Inspection work by consultant before back fil 2 days Thu 6/11/15 Fri 6/12/15126 Trench backfilling 3 days Sat 6/13/15 Mon 6/15/15127 Domestic water pipe installation work 30 days Sun 5/10/15 Mon 6/8/15

    8/1 8/318/14 5/68/14 11/118/14 11/118/14 11/118/14 11/11

    10/3 5/610/3 3/3110/3 12/3110/3 12/3110/3 12/3110/3 12/31

    10/3 3/110/3 12/31

    1/1 3/11/1 3/1

    11/2 3/3111/2 1/3011/2 1/3011/2 1/3011/2 1/30

    1/31 3/311/31 3/31

    10/13 5/610/13 11/2810/13 11/2610/13 11/26

    10/13 11/2610/28 11/2610/28 11/26

    10/13 11/2611/27 11/2811/27 11/2811/27 11/2811/27 11/2811/27 11/28

    1/16 5/61/16 3/11/16 3/11/16 3/11/16 3/1

    3/2 5/33/2 5/33/2 5/33/2 5/33/2 5/3

    3/2 5/63/2 3/43/2 3/43/2 3/4

    5/4 5/65/4 5/65/4 5/65/4 5/6

    12/3 8/2512/3 8/2512/3 Milestone Starting Infrastructure work 12/3 8/1312/3 2/1612/3 1/912/3 1/912/3 12/912/10 12/23

    12/14 1/31/4 1/61/7 1/9

    12/3 1/912/3 12/912/10 12/23

    12/14 1/31/4 1/61/7 1/9

    1/10 2/161/10 2/161/10 1/16

    1/17 1/301/21 2/10

    2/11 2/132/14 2/16

    1/10 2/161/10 1/16

    1/17 1/301/21 2/10

    2/11 2/132/14 2/162/17 5/92/17 3/262/17 3/262/17 2/23

    2/24 3/92/28 3/20

    3/21 3/233/24 3/26

    2/17 3/262/17 2/23

    2/24 3/92/28 3/20

    3/21 3/233/24 3/263/27 5/93/27 5/93/27 4/2

    4/3 4/224/7 5/3

    5/4 5/65/7 5/9

    3/27 5/93/27 4/2

    4/3 4/224/7 5/3

    5/4 5/65/7 5/9

    5/10 7/155/10 6/155/10 6/155/10 5/16

    5/17 6/55/22 6/10

    6/11 6/126/13 6/15

    5/10 6/155/10 5/16

    5/17 6/55/22 6/10

    6/11 6/126/13 6/15

    5/10 6/8

    Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctJuly August Septemb October Novembe Decembe January February March April May June July August Septemb October

    Task

    Split

    Progress

    Milestone

    Summary

    Project Summary

    External Tasks

    External Milestone

    Deadline

    MASTER SCHEDULE ALILA RESORT - KOH RUSSEY

    Prepared by: Soly

    Project: KRU-MEP ScheduleDate: Fri 10/24/14

  • ID ALILA RESORT-KOH RUSSEY M&E SCHEDULE Duration Start Finish

    128 Trench