Kristen’s Cookie Company
-
Upload
melvin-mumpuni -
Category
Documents
-
view
63 -
download
2
Transcript of Kristen’s Cookie Company
Kristen’s Cookie Company
Anindita Daisy (29110020)
Adam Reza Ganjara (29111098)
Pengky Frusman (29111099)
Taya Kadhita (29111108)
Ida Arsiyanti (29111116)
Melvin Mumpuni (29111128)
Operations
OperasiWaktu
(menit)
washing & mixing bowls 6
dishing to tray 2
setup the oven 1
baking process 9
remove and cooling 5
packing 2
payment 1
Total Waktu Operasi 26
Start
Washing and Mixing Bowls
Dishing to Tray
Cycle Time = 10 menit Troughput Time = 26 menit
Flowchart
Q&A - 1
• Q : How long will it take you to fill a rush
: order?
• A : It will take 26 minutes to fill one dozen
: cookies.
Q&A - 2
• Q : How many orders can you fill in a night,
: assuming you are open four hour each
: night?
• A : We can fill 22 dozen in a night, if we are
: are open four hour each night.
Q&A – 2 (Penjelasan)
OperasiWaktu
(menit)
washing & mixing bowls 6
dishing to tray 2
setup the oven 1
baking process 9
remove and cooling 5
packing 2
payment 1
Total Waktu Operasi 26
Start
Washing and Mixing Bowls
Dishing to Tray
18 menit
Asumsi 1 malam = 4 jam (240 menit)
Maximum = (240 – 18) / 10 Maximum = 22 dozens
Q&A - 3
• Q : How much of your own and your
: roommate’s valuable time will it take to fill
: each order?
• A : It will take 8 minutes to fill each order.
Q&A – 3 (Penjelasan)
Valuable time
Q&A – 4
• Q : Should you give any discount for people
: who order to 2 dozens cookies, 3 dozen
: cookies or more? Will it take you any longer
: to fill two-dozen cookie order than
: one-dozen cookie order?
• A : We can give any discount for people who
: order to 2 or 3 dozens cookies.
: 2 dozens discounts up to 36 %
: 3 dozens discount up to 48%
Q&A – 4 (Penjelasan)
Labor Others
1 26 2.00 0.7 2.70 2.70 1 0
2 36 2.77 0.7 3.47 1.73 0.6 36
3 46 3.54 0.7 4.24 1.41 0.5 48
Total CostCost /
DozenProporsi
Discount
(Persen)
PriceTimeDozen
Asumsi : Biaya labor $1/dozens
Time t+1 = Time t + Waktu Siklus Total Cost = Labor Prize + Others Prize Cost/Dozen = Total Cost / Dozen Proporsi = Cost/Dozen : 2.7 Discount = 1 - Proporsi
Q&A – 5
• Q : How many food processors and baking
: trays will you need?
• A : We need only 1 food processors and 3
: baking trays (food processors and baking
: trays are not bottleneck. Baking process is
: the bottleneck).
Q&A – 6
• Q : Are there any changes you can make in your
: production plans that will allow you to
: make better cookies or more cookies in less
: time or at lower cost?
• A : We can add 1 more ovens (there are 2
: ovens). It needs additional $0.07 for
:additional oven.
Q&A – 6 (Penjelasan)
Q&A – 6 (Penjelasan)
Labor Others
1 26 2.00 0.7 2.70
2 36 2.77 0.7 3.47
3 46 3.54 0.7 4.24
Total CostPrice
TimeDozen
Labor Others Ovens
2 26 2.00 1.4 x 3.40
Dozen TimePrice
Total Cost
TC 2 dozens = 3,47 (both 1 ovens and 2 ovens) Cost for additional ovens ($x) : $3.47 = $2 + $1.4 + $x $0.07= $X
Q&A – 7
• Q : What happens if you are trying to do this
: by yourself without a roommate?
• A : It takes longer time. (only 1 dozens in 26
: minutes, we can not work in pararell).
Q&A – 8
• Q : Should you offer special rates for rush
: orders? Can you fill the priority order
: while still fullfilling the order for the
:cookies that are already in oven?
• A : Yes we can give special rate for more than
: 1 dozens order. We can’t fill the priority
: order while still fullfilling the order for
: the cookies that are already in oven
Q&A – 9
• Q : How can you look quickly at your order \
: board (list of pending orders) and tell a
: caller when his or her order will be
: ready? How much of a safety margin for
: timing should you allow?
• A : I can look quickly with checklist board.
: Safety margin we allows is up to 8
: minutes .
Q&A – 10
• Q : What other factors should you consider at
: this stage of planning your business?
• A : We can consider other location, facilities,
: human capital.
Q&A – 11
• Q : If you decide to sell standard cookies
: instead, how should you change the
: production system? The order-taking
: process?
• A : We can make standard cookies, but it
: needs additional cost and efforts to
: change the production system.