KRIGE STREET ELEVATION SECTION A-A

1
5m 0m 10m GROUND FLOOR PLAN BIC FR TV BIC SHOWER ROOM FR TV BIC BIC SHOWER ROOM LIFT AIRCON SHAFT HOUSE KEEPING (LINEN & CLEANING) FR FR INFORMAL LOUNGE & FIRE PLACE OPEN-PLAN LOBBY GUEST WC'S SELF-HELP COUNTER TIMBER FIRE DOOR FIRE ESCAPE, TIMBER FIRE DOOR STORAGE & SERVICES RECEPTION OUTLINE- OFFICE/ADMIN SPACE ENTRANCE ENTRY INTO BASEMENT OUTLINE OF BUILDING ABOVE OUTLINE OF BUILDING ABOVE up FHR COMS ELEC REFUSE SHOOT down FHR ELEC TV TV BIC FR TV PATIO PATIO 3M BUILDING LINE OUTLINE OF BUILDING ABOVE SHOWER ROOM ERF BOUNDARY A 270 RAMP 1:7 DOWN TO ENG. SPECIFICATIONS 3048 110 BIC 270 463 110 5833 5349 17768 PATIO PATIO 10779 4662 270 3210 1662 5116 A 230 1343 110 4300 3074 480 5210 2182 RAMP 1:25 UP FROM STORMWATER CHANNEL TO KERB 1390 5936 2244 300 1500 FR BIC BIC 6440 TV 4843 SHOWER ROOM ERF BOUNDARY 2000 270 6980 ERF BOUNDARY 1282 ERF BOUNDARY 270 3000 608 2947 270 989 3130 STORAGE HOTEL ROOM 1 HOTEL ROOM 2 HOTEL ROOM 3 HOTEL ROOM 4 Raised ground floor for basement ventilation Raised ground floor for basement ventilation Raised ground floor for basement ventilation Raised ground floor for basement ventilation Raised ground floor for basement ventilation 5m 0m 10m FIRST & SECOND FLOOR PLAN FR TV BIC BIC SHOWER ROOM FR TV BIC BIC SHOWER ROOM BIC BIC SHOWER ROOM SHOWER ROOM TIMBER FIRE DOOR BIC BIC SHOWER ROOM SHOWER ROOM SHOWER ROOM SHOWER ROOM BIC BIC BIC TV FR FR TV FIRE ESCAPE, AIRCON SHAFT HOUSE KEEPING (LINEN & CLEANING) SHOWER ROOM FR FHR ELEC BIC BIC up FHR COMS ELEC REFUSE SHOOT TV BIC BIC BIC BIC SHOWER ROOM 5790 230 10779 230 1500 270 4620 1000 480 2760 4135 3950 230 230 270 4135 110 1500 270 600 4830 1421 1500 110 12269 230 3824 2645 1394 2262 230 270 1894 1240 1500 456 270 4458 4830 110 6249 230 6980 270 2577 270 230 270 1240 1500 2278 110 4135 230 230 4135 2081 3884 535 110 1524 270 4531 1240 4300 4801 HOTEL ROOM 9 &19 4365 HOTEL ROOM 12 & 22 3210 9588 2905 1000 2905 1000 2780 270 110 2129 480 1280 1184 A LIFT 17768 270 270 3130 4135 270 4135 230 1500 230 2760 3210 1664 1500 1000 HOTEL ROOM 5 &15 HOTEL ROOM 6 &16 HOTEL ROOM 7 &17 HOTEL ROOM 8 &18 HOTEL ROOM 10 & 20 HOTEL ROOM 11 & 21 HOTEL ROOM 13 & 23 HOTEL ROOM 14 & 24 FR FR TV BIC BIC FR FR TV TV TV TV FR 5m 0m 10m BASEMENT PLAN LAUNDRY FACILITIES STAFF FACILITIES REFUSE 8 X PARKING SPACES - BASEMENT 1 RAMP UP RAMP UP RAMP UP RAMP UP FHR REFUSE SHOOT 4. LIFT up ELEC COMS down 3. 7. 2. 1. 8. 6. 5. A A GREY WATER INFRASTRUCTURE 4320 5184 4580 2850 2500 2851 7380 2850 2500 2500 2501 3700 5m 0m 10m KRIGE STREET ELEVATION ERF BOUNDARY 3210 1343 ERF BOUNDARY 13858 4292 Raised ground floor for basement ventilation Raised ground floor for basement ventilation 1848 HOTEL ROOM HOTEL ROOM 3410 1:25 up for first 2m from stormwater channel 1:8 ramp down 1:17 ramp down 1:8 ramp down 1:8 ramp down 1:17 ramp down 1:7 ramp down LOWER BASEMENT PARKING BASEMENT PARKING 2458 2325 2733 HOTEL ROOM EN-SUITE HOTEL ROOM EN-SUITE Ground floor set-back 0m 5m SECTION A-A 2700 ERF BOUNDARY ERF BOUNDARY 10m NOTE: ALL BASEMENT FLOOR LEVELS TO BE FINALIZED PENDING ALLOWANCES REQUIRED FOR STRUCTURE & MECHANICAL EXTRACTION AND SERVICES. 2635 340 2465 680 680 680 3116 3230 2976 10000 Raised ground floor for basement ventilation Raised ground floor for basement ventilation Ventilation grid for natural ventilation of basement area services services services services services services 2000 2636 WALL PLATE HEIGHT RESTRICTION Ventilation grid for natural ventilation of basement area 5m 10m LOWER BASEMENT PLAN 0m ELEC 10 X PARKING SPACES - BASEMENT 2 13. 11. 10. 12. 15. 9. 14. 18. 17. 16. LIFT up FHR COMS A A STORAGE & SERVICES MECHANICAL & MAINTENANCE RAMP UP RAMP UP 4580 2850 2500 2850 2850 2500 2500 3700 2500 2500 2850 7380 CLIENT: PROJECT TITLE: DRAWING TITLE: PROJECT No.: SCALE: DRAWING No.: DATE: REV. DRAWN: CHECKED: This drawing and all the information contained thereon is the property of Dennis Moss Partnership and may not be copied or disclosed to a third party without their written consent. HANDRE BASSON KRIGE STREET HOTEL FLOORPLANS, SECTION & ELEVATION AS SHOWN 29-03-2018 ABB FOR DISCUSSION Proposing raising the building by 680mm to be able to let in natural ventilation for the first basement.

Transcript of KRIGE STREET ELEVATION SECTION A-A

Page 1: KRIGE STREET ELEVATION SECTION A-A

5m0m 10m

GROUND FLOOR PLAN

BIC

FR

TV

BIC

SHOWERROOM

FR

TV

BIC

BIC

SHOWERROOM

LIFT

AIRC

ON

SHAFT

HOUSE KEEPING(LINEN & CLEANING)

FR

FR

INFORMAL LOUNGE& FIRE PLACE

OPEN-PLANLOBBY

GUEST WC'S

SELF-HELPC

OUN

TER

TIMBER FIREDOOR

FIRE ESCAPE,

TIMBER FIREDOOR

STORAGE &SERVICES

RECEPTION

OUTLINE-OFFICE/ADMIN

SPACE

ENTRANCE

ENTRY INTO BASEMENT

OUTLINE OF BUILDING ABOVE

OUTLINE OF BUILDING ABOVE

up

FHR

COMS ELEC

REFUSESHOOT

down

FHR

ELEC

TV

TV

BIC

FR

TV

PATIO PATIO 3M BUILDING LINE

OUTLINE OF BUILDING ABOVE

SHOWERROOM

ERF

BOUN

DA

RY

A270

RAM

P 1:

7 D

OW

N T

O E

NG

. SPE

CIF

ICA

TION

S

3048

110

BIC

270

463

110

5833

5349

17768

PATIO PATIO

10779

4662

270

3210

1662

5116

A

230

1343

110

4300

3074

480

5210

2182

RAMP 1:25 UP FROM STORMWATER

CHANNEL TO KERB

1390

5936

2244

300

1500

FR

BIC

BIC

6440

TV

4843

SHOWERROOM

ERF BOUNDARY

2000

270

6980

ERF BOUNDARY1282

ERF

BOUN

DA

RY

270

3000

608

2947

270

989

3130

STORAGE

HOTEL ROOM 1 HOTEL ROOM 2 HOTEL ROOM 3 HOTEL ROOM 4

Raised groundfloor for basementventilation

Raised groundfloor for basementventilation

Raised groundfloor for basementventilation

Raised groundfloor for basementventilation

Raise

d g

roun

dflo

or fo

r bas

emen

tve

ntila

tion

5m0m 10m

FIRST & SECOND FLOOR PLAN

FR

TV

BIC

BIC

SHOWERROOM

FR

TV

BIC

BIC

SHOWERROOM

BIC

BIC

SHOWERROOM

SHOWERROOM

TIMBER FIREDOOR

BIC

BIC

SHOWERROOM

SHOWERROOM

SHOWERROOM

SHOWERROOM

BICBIC

BIC

TVFR

FR

TVFIRE ESCAPE,

AIRC

ON

SHAFT

HOUSE KEEPING(LINEN & CLEANING)

SHOWERROOM

FR

FHR

ELEC

BIC

BIC

up

FHR

COMS ELEC

REFUSESHOOT

TV

BIC

BIC

BIC

BIC

SHOWERROOM

5790

230

10779

230

1500

270

4620

1000

480

2760

4135

3950

230230 270

4135

110

1500

270

600

4830

1421

1500

110

12269

230

3824

2645

1394

2262

230

270

1894

1240

1500456

270

4458

4830

110

6249

230

6980

270

2577

270

230

270

1240

1500

2278

110

4135

230 230

4135

2081

3884 535

110

1524

270

4531

1240

4300

4801

HOTEL ROOM 9 &19

4365

HOTEL ROOM 12 & 22

3210

9588

29051000

29051000

2780

270

110

2129

480

1280

1184

A

LIFT

17768

270

270

3130

4135

270

4135

230

1500

230

2760

3210

1664

1500

1000

HOTEL ROOM 5 &15 HOTEL ROOM 6 &16 HOTEL ROOM 7 &17 HOTEL ROOM 8 &18

HOTEL ROOM 10 & 20

HOTEL ROOM 11 & 21

HOTEL ROOM 13 & 23

HOTEL ROOM 14 & 24

FR

FR

TV

BIC BIC

FRFR

TV

TVTVTV

FR

5m0m 10m

BASEMENT PLAN

LAUNDRY FACILITIES

STAFF FACILITIES

REFUSE

8 X PARKING SPACES - BASEMENT 1

RAMP UP

RAMP UP

RAMP UP

RAMP UP

FHR

REFUSESHOOT

4.

LIFT

up

ELECCOMS

down

3.

7.

2. 1.

8.6.5.

A

A

GREY WATER INFRASTRUCTURE

4320

5184

4580 2850 2500 2851

7380

2850 2500 2500 2501 3700

5m0m 10m

KRIGE STREET ELEVATION

ERF

BOUN

DA

RY

3210

1343

ERF

BOUN

DA

RY

13858

4292

Raised groundfloor for basementventilation

Raised groundfloor for basementventilation

1848

HOTEL ROOM

HOTEL ROOM

3410

1:25 up for first 2mfrom stormwater

channel

1:8 ramp down

1:17 ramp down1:8 ramp down

1:8 ramp down

1:17 ramp down

1:7 ramp down

LOWER BASEMENT PARKING

BASEMENT PARKING

2458

2325

2733

HOTEL ROOM

EN-S

UITE

HOTEL ROOM

EN-S

UITE

Ground floorset-back

0m 5m

SECTION A-A

2700

ERF

BOUN

DA

RY

ERF

BOUN

DA

RY

10m

NOTE: ALL BASEMENT FLOORLEVELS TO BEFINALIZED PENDINGALLOWANCES REQUIREDFOR STRUCTURE &MECHANICAL EXTRACTIONAND SERVICES.

2635

340

2465

680

680

680

3116

3230

2976

10000

Raised groundfloor for basementventilation

Raised groundfloor for basementventilation

Ventilation grid for naturalventilation of basementarea

services services services

servicesservices services

2000

2636

WA

LL P

LATE

HEI

GHT

RES

TRIC

TION

Ventilation grid for naturalventilation of basementarea

5m 10m

LOWER BASEMENT PLAN

0m

ELEC

10 X PARKING SPACES - BASEMENT 2

13.

11. 10.12.

15.

9.

14. 18.17.16.

LIFT

up

FHR

COMS

A

A

STORAGE & SERVICES

MECHANICAL & MAINTENANCE

RAMP UP

RAMP UP

4580 2850 2500 2850

2850 2500 2500 37002500 2500

2850

7380

CLIENT:

PROJECT TITLE:

DRAWING TITLE:

PROJECT No.: SCALE:

DRAWING No.: DATE:

REV. DRAWN: CHECKED:

This drawing and all the information contained thereon is the

property of Dennis Moss Partnership and may not be copied

or disclosed to a third party without their written consent.

HANDRE BASSON

KRIGE STREET

HOTEL

FLOORPLANS, SECTION

& ELEVATION

AS SHOWN

29-03-2018

ABB

FOR DISCUSSION

Proposing raising the building by 680mm to be able to let in naturalventilation for the first basement.

AutoCAD SHX Text
P. de Arq. Enrique Guerrero Hernández.
AutoCAD SHX Text
P. de Arq. Adrian A. Romero Arguelles.
AutoCAD SHX Text
P. de Arq. Francisco Espitia Ramos.
AutoCAD SHX Text
P. de Arq. Hugo Suárez Ramírez.
AutoCAD SHX Text
P. de Arq. Enrique Guerrero Hernández.
AutoCAD SHX Text
P. de Arq. Adrian A. Romero Arguelles.
AutoCAD SHX Text
P. de Arq. Francisco Espitia Ramos.
AutoCAD SHX Text
P. de Arq. Hugo Suárez Ramírez.