KQP 16 Inspection & Testing Rev 04

download KQP 16 Inspection & Testing Rev 04

of 11

Transcript of KQP 16 Inspection & Testing Rev 04

  • 8/10/2019 KQP 16 Inspection & Testing Rev 04

    1/11

    --'l

    KAGA

    COMPONENTS

    (M)

    SdnBhd

    CONTENTS

    1. Purpose

    2. Scope

    3. Responsibility

    4.

    Reference Document

    5. Definition

    6.

    Procedure

    7. Appendix

    8.

    Quality

    Record

    9.

    Revision

    Log

    QUALITY

    MANAGEMENT PROCEDURE

    lnspectlon

    & T$ting

    Efiective date:

    27

    Aug

    13

    REV DATE: 07 SEPTEMBER 2005

    -t-

    FM.QAD,OOO,I.REV-OO

  • 8/10/2019 KQP 16 Inspection & Testing Rev 04

    2/11

    KAGA

    COMPONENTS

    (M)

    Sdn

    Bhd

    QUALITY

    MANAGEMENT PROCEDURES

    1.0

    Purpose

    '1.'l

    To

    ensure

    lncoming

    materials are corect and rieet the requirements betore the maiedals

    a.e

    releasd tot use in menufacfuring.

    1.2

    To

    ensure that the cusiomer Equircments are met befoG

    producE

    are shipped

    to the austomer.

    2.0Scop6

    2.1 Applicable

    lo

    allthe

    direct matErials in Kaga Components

    (M)

    Sdn. Bhd.

    2.2 Appliaable to

    all

    manufactured

    and

    Fini6hed

    Goods, whicfi had been

    gone

    through

    all equired

    processes,

    inspection

    ancllesting.

    3.0Responsibility

    3.1

    IQC

    Deparbrnt

    3.2 OQC Departmer(

    IQC Engineer shall

    be

    r6ponsible.

    OQC Engineer shall be responsible.

    ,1.0

    Reference

    Document

    4.1 Bill of mate.ials

    (BOM)

    or

    pad

    list

    4.2 Related Work lmtuclion

    4.3 KQP

    03

    -

    Contol

    of

    Non-Contorming

    Product

    4.4 Customer

    Specificetion

    / Wo*manship

    Standard-

    5.0

    Definition

    5.1 tQC

    5.1.1

    Critical

    5.1.2 Majo.

    5-1.3 Minor

    5.2 oQC

    5.2.'l Critical

    5.2.2

    Majo.

    5.2.3 Minor

    5,3 PRLR

    5.4 BOM

    5.5 DO

    5.6 CAR

    57MRB

    - The Non-Conformance which having

    fundional

    failur,

    sabty

    tailure,

    wrong

    part,

    parl

    not

    bllow

    producl

    design and

    /

    o. dimension oul of 3pecification.

    - The Non-Conformance

    which causing end

    p.oduct

    flting l6sue.

    -

    The Non-Conforming Meterial which having Appearance / Cosmetic Defect.

    -

    TIe Non-Conio.mance whidl

    oauBe

    lhe

    product

    having functional failllre, saty failure

    and

    /

    or

    missing

    component

    (PCBA

    ).

    -

    The Non-Conto.rning

    productwhich

    having dimen6lon

    out

    otspecification, mi$ing

    procers

    idedmcaton

    anal

    /

    or missing component

    (mechanical

    pad).

    - The

    Non

    -Conforming

    produd

    whicfi

    having Appearance

    /

    Cosmetic defect.

    - P6rt Rejected

    Lot

    Report

    -

    Bill

    of Material

    -

    Delivery

    Order

    j

    Coreclive Action. Request

    - Meteriel Review Boerd

    Title

    lFpection

    & Testing

    Procedure

    No.

    KQP 16

    Rev

    tll

    Revi3ion

    Date

    27

    Aug 13

    REV DATE: 07 SEPTEMaER 2005

    -2-

    FM-OAD.0001-REV-00

  • 8/10/2019 KQP 16 Inspection & Testing Rev 04

    3/11

    6.0

    Procedurc

    6.1lQC

    prccedure

    KAGA

    COMPONENTS

    (M)

    Sdn

    Bhd

    QUALITY

    MANAGEMENT PROCEDURES

    Title

    lnspecffon & Testing

    Procedurc

    No.

    KQP.I6

    Rev

    04

    Revision

    Dato

    27

    Aug

    13

    Doteilg Raapon6lblllUga Doc.rRet

    6. 1

    .

    1

    Develop the incoming material

    lnspeclion

    List

    IQC

    Engineer

    .

    lncoming Matedal

    lnspection List,

    BOM

    lisi

    6.1.2 To work wih Enginering

    lo

    develop

    lncoming Work lnslruction based on

    produci

    specifcation.

    IQC Engineer /

    Engineering

    .

    Woft ln6huction,

    Specification

    6.1.3 Sarnple

    plan

    is based on ANS|21.,{-1993,

    normal sample size

    (level

    llD, AQL 0.,1for

    l\rinor de{ect ciassifcation and AOL 0. 1 for

    Critical or / and Major

    de{ect

    cla$ifcation

    unless otheMise

    specifid

    in .elaled work

    inskuction.

    IQC

    Engineer

    ANS|Zl.+1993

    6.1.4 Sample size fur dimension measurement is

    10pc5"/

    supplier delivery.

    IQC Engineer

    6.

    1

    .5

    Veriry

    supplier cartons label for conect

    part

    no

    / model end supplier Accept stamp

    bebre

    inspeclion. The

    lot

    will

    be

    rethed

    to

    receiving store if any di66epancy

    found.

    IOC lnspector

    .

    DO / lnvoice

    6.1.6 Carry out visual inspection and dimensional

    measuaement

    ba6ed on espctiv

    work

    instruclion. All inspec{ion and

    meesurement result are recorded

    in

    an

    IOC hspedor

    .

    Wo.k lnsfuclion,

    lncoming

    lrcpeclion

    Report

    6.1.7 During the

    inspection,

    if

    any

    lot is

    found

    RejecGd

    ba6ed on

    lhe

    lot

    rejedion-

    sampiing

    plan,

    the folloving actions

    need

    io

    be canied

    out:

    i.

    All

    lhe

    effedod lot

    should

    be

    pasted

    wilh

    "REJECTED'

    sticker on every Carton.

    ii.

    The

    rejcted lot

    shall then be fansbned

    to d*ignated rejec{ed erea

    iii. Raise Part Rejecbd Lot Report

    iv.

    Rsinspection

    is

    canied

    out by

    inspedor

    after the MRB dispo6ition.

    IQC lnspeclor

    IQC

    lnspedor

    IQC lnspec{or

    IQC lnspeclor

    .

    PRLR

    (FM-CI]AD0029)

    REV DATE: 07 SEPTEMBER

    2005 -3-

    FM.QADOOOl.REV.OO

  • 8/10/2019 KQP 16 Inspection & Testing Rev 04

    4/11

    I

    KAGA

    COMPONENTS

    (M)

    Sdn Bhd

    QUALITY

    MANAGEMENT PROCEDURES

    Titlo

    lnspoction &

    T$ting

    Procedurc

    alo.

    KQP 16

    Rev

    u

    Reviaion

    Date

    27

    Ntg 13

    Defa

    s

    R6poisitilldss

    DOCJRSf,

    6.1-8 Feedback to 3lpplier regarding

    tle

    rcjeded

    lot

    details and

    request

    Coreclive Aadion

    trom supplier

    (it

    necessary).

    IQC Engineer

    .

    CAR

    (FM-O4D0024)

    6. 1 .9

    The Rejected lot

    shall then subjed for MRB

    disposfion

    by IQC Engineer. The

    disposition lesult shall be recorded in

    PRLR.

    6.'1.9.'l

    ll ihe

    disposilion ls SORT/REWORK

    the reieded loi shall

    be

    iubied

    to

    re-

    inspeclion,

    whenthe Re-lnspeclion

    result

    shou,s

    fail, the

    lot

    will

    be

    sublect

    to soRT/ REV\IORK

    again.

    6.1.9.2

    lf the

    disposilion

    is

    Use

    As lt, the

    Carton boxes /package

    must

    be

    slided tlrih

    'USE AS

    lT' kbel

    by IQC

    lnspec{or.

    IQC Engineer

    .

    PRLR

    (FM-OAF0029)

    6.'1.'10 Once

    lhe

    so.ted/re*g*ed

    loi

    is accepted

    afier

    gampling

    inpection,

    all the

    accepbd

    .

    maljerial

    6hall be stanpwih'Aqppf on

    evry carlons. For

    safety

    pgrt3,A\sign

    shall

    be slamped on every certons and lncoming

    lnapction reporL

    IQC lnspeclor

    .

    lncomlng

    lnspedion

    Report

    6.1.t'l

    AccepGd

    lol

    shallbe

    Stamped

    QC

    Accept

    and send to

    siore

    by IQC lnspec.tor, store

    fitedal handlers is r$ponsible

    to

    verify

    quanUty

    olthe

    lots.

    IQC

    lnspedor

    .

    QC

    Accept

    siamp

    REV DATE: 07 SEPTEMBER 2005 -1- FM.QAD,OOOl -REV-OO

  • 8/10/2019 KQP 16 Inspection & Testing Rev 04

    5/11

    -

    6.2

    OOC

    procedure

    KAGA

    COMPONENTS

    (M)

    Sdn

    Bhd

    QUALITY

    MANAGEMENT PROCEDURES

    Title

    lrcpocllon & Testing

    Procedure

    No.

    KQP 16

    Rev

    t4

    Revision

    Date

    27

    Aug

    t3

    Oetailg Respoi|3ibilito6

    DocJRet,

    6.2.1 Responsible to wort with Proosg Engineer

    lo determine

    the

    inspeaiion

    cdteria based

    on Producl

    Specifcatjon

    and

    generate

    the

    related Work lnshuclion.

    OQC Enqineer .

    Produot

    specmcation,

    work inslruction

    6-2.2 Sample

    plan

    is based

    on

    ANSI 21.+1993

    nomal

    semple size

    (levoi

    lll),

    AQL

    0.4lor

    Minor classification and AQL

    0. 1

    tor

    Cdtical

    or

    /

    and

    Maror

    dassmcation unless

    otherwise is gpecified

    in

    rolated

    work

    instruc{on.

    OQC Engineer

    ANS|21.4-1993

    6.2.3 This sample size can

    be

    indeased ifdeem

    necessary

    by

    respedive

    QC dept. head.

    QC

    dept. hesd

    6.2.4

    This

    sample size

    is

    not applicabb to

    dbtraciive

    test

    whicb

    include any

    Fundional

    Tt or special iast, which will

    cause

    phFical

    damage to the test unib. The

    '

    sample size for this test b spell out in Work

    lnsfuction.

    QA Engineer

    6.2.5 To

    receive

    Finished Goods fom

    produclion.

    OQC lnspector

    6.2.6

    He /

    she

    shall

    verify the

    quaftily,

    trDdel

    and

    pa.t

    Number of the Finishcd Goods

    received

    versus

    &e carton labelfilled

    -{rp

    pbperly

    and conectly. He / Bhe

    abo

    need

    lo ensure

    poduct

    are

    packed

    acaording to

    Packing lnstruction.

    OQC

    lnspeclor

    .

    Work lrclludion

    6.2.7 OOC Technician shall en$rre all OQC

    lnspectoIs follow

    lhe

    proper

    ways

    of

    inspeaiion based on OQC woft lnstdction

    by

    producl.

    6.2.7.1

    OQC

    ln3pec{or

    shall thn

    recod all

    relevent velue wherc applicable

    quanlity

    inspecied,

    quanlily

    accepted

    or rejecied, dofect mode in OQC

    lnspeclion Report.

    OQC Tedrnicien

    OQC lnspector

    Work lnslruction

    OQC

    lnspedion

    Repod

    REV DATE: 07 SEPTEMBER 2005 FM.OADOOOl.REV.OO

  • 8/10/2019 KQP 16 Inspection & Testing Rev 04

    6/11

    KAGA

    COMPONENTS

    (M)

    SdnBhd

    QUALITY

    MANAGEMENT

    PROCEDURES

    Tltle

    lnspection

    &

    Tssting

    Procedute

    No.

    KQP 16

    Rev

    04

    Revbion

    Dais

    27 Aug 13

    o6t

    ili

    Rosgonsibilitia

    DocJR6f.

    6.2.8 It the inspecred

    lot

    or batch

    b

    NG, b carry

    oul the

    following

    aclions:

    i.

    To ideniify

    all

    norFcofforming

    produci

    wifn

    reject Sicker at defucls location

    and/or

    gn

    the

    dobclive Finished

    Goods.

    ii. lgsue

    OQC

    Feedback

    Nolice to Paoducdon

    iii. Vedft

    in

    pocess

    wlP

    iv. Product

    Dkposition

    v. Re-inspeclion

    i6

    required for

    atf Product

    Disposition

    goods.

    OQC

    lmpe.ror

    OQC lnspeclor

    Production

    Supervisor

    Engi ering/

    QC

    OQC lrcpeclor

    Reiecl

    Bli*er

    .

    OOC Feedbed(

    Notic6

    (FM-44D0007)

    8.2.9

    OQC lnEpedor shall stamp OQC Accept

    ldet ifcalion

    to accepted lot or Hch.

    OOC

    lnBpctor

    .

    OOC Accept

    stamQ

    6.2.10 Approval on the Finirhed

    Goods

    TEnsfer

    .

    fot'n

    prior

    to

    bansbr

    the Finished Goode

    to

    Finished Goods

    ere..

    OQC Engineer

    and above

    .

    Finished Goods

    Tramier

    furm

    6.2.'l

    l

    Where applicable, OQC lmpcctor ie

    respoNible

    fur bansfeMng all the accepbd

    lot3

    to Finish Goods

    area.

    He

    /she

    shall

    verify and identify

    the

    quantity

    and

    models

    ol the Finished Goods tramfened.

    OQC

    lnsledor

    .

    Fini6hcd Goodg

    Transfer form

    REV DATE: 07 SEPTEMBER 2005 FM-O4D.0001-REV-00

  • 8/10/2019 KQP 16 Inspection & Testing Rev 04

    7/11

    KAGA

    COMPONENTS

    (M)

    Sdn

    Bhd

    QUALITY

    MANAGEMENT PROCEDURES

    7.0

    Appendix

    7.1

    IQC Flow Chart

    R.3oon3lblllte6

    IQC

    Engineer

    IOC Engineer /

    Enginee.ing

    Doc. / Ref.

    lnconing Malerial

    lnspecton List, BOM

    List

    Work lnsbuction,

    Produd Sprification

    IQC

    lnspeclor

    *

    lQc tnspecior

    **

    lec

    Engtn"e.

    IQC

    lnspeclor

    IQC

    lnspector

    IQC

    Engineer

    DO, lnvoice

    Woft

    lnsvuction.

    lnmming lnspeclion

    Report,

    CAR

    (FirF

    oAD0024)

    OC

    Accept stamp

    PRLR

    fMAAD-0029)

    PRLR

    (FM-OADOO2g)

    IQC lnspedor

    Supplier / ln-

    IQC lnspedor

    .

    UAldicker

    .

    PRLR

    (FM-OAD-0029)

    .

    PRLR

    (FM-OAD-0029)

    Title

    lnspsction

    & Testing

    Procedure

    No.

    KQP

    ,16

    Rev

    u

    Revision

    Date

    27 Aug

    13

    lllcmnE

    leolt inslnElion

    REV DATE: 07 SEPTEMBER 2005

    -7

    -

    FM-QAILoo01-REV-00

  • 8/10/2019 KQP 16 Inspection & Testing Rev 04

    8/11

    KAGA

    COMPONENTS

    (M)

    Sdn

    Bhd

    QUALITY

    MANAGEMENT

    PROCEDURES

    7.2 OQC

    Flow Chart

    REV DATE:

    07

    SEPTEMBER 2005

    Ra6ooirsibllltos

    ooc

    Engineer

    OQC lnspedor

    Production/

    Engineeringl

    oc

    OQC lnspctor

    Produc-tion

    SupeMsor

    Doc. , Ret

    .

    Work hdruction

    .

    Wotk lnstruclion

    .

    @C

    Accept sl,amp

    OQC

    ln8pedor

    Work lnsttlclion,

    OQC

    hspeclion

    Report,

    OQC

    Feedbaok Nolice

    (Fli&OAt>0007)

    Rejecl

    dicker

    Finished Goods

    Transfr form

    Finished

    Goods

    Transfer bm

    OOC

    lnspedor

    OOC lnspector

    OQC Engineer

    and above

    OQC

    lnspedor

    Tide

    lrcpection & Testing

    Procedure

    No.

    KQP

    t6

    Rev

    04

    Revision

    Data

    27

    Aug

    13

    tHefiire in$edid

    critlri.

    &

    genl"all

    Woli

    lBtruction

    .

    Vqity

    qlaniity,

    nodd &

    p6rl

    m.

    . EBU

    pmduct

    Packed

    @ding

    to

    pacring

    lctrudion

    . C.ry oul OOC lll8p.cdoir

    ba$d

    on lofi insfuclion

    . Ftscotd

    all

    dvad

    1,stu6

    in

    OaC hpdion RePon

    _/

    -\

    NO

    {*j2-l

    OK

    Apprwal

    b.

    Fi.i.hd Goods

    Transisr o

    Finbhd

    Goods

    -8-

    FM-OAI 0001-REV-00

  • 8/10/2019 KQP 16 Inspection & Testing Rev 04

    9/11

    KAGA

    COMPONENTS

    (M)

    Sdn

    Bhd

    QUALITY

    MANAGEMENT PROCEDURES

    7.3

    Suppligr

    CAR

    l{umberino Swbm

    12 3 4

    5 6 7I

    g

    10 11

    tsTcTATRl

    "

    f-f-fT_-l

    -

    f-l-T*-l

    Space No.

    1-1

    -

    lndicates

    Supplier Conea{ive Aciion Requesl

    5.6 - indicetG

    year.

    Erample :

    05

    for Year 2005

    7-B

    -

    indicalEs month.

    Exaftple

    :

    I 0

    tor Oc{ober

    S11 - indicates tho

    srial number

    (reset

    by rnonth)

    7.4 OQC

    Feedback

    Notice

    l{umbe.ino

    Swtom

    1234

    t

    oTFTN-n -

    Title

    lBpection

    & Tosting

    Procedurc

    No,

    KOP 16

    Rev It4

    Revbion

    Date

    27 Aug

    It

    5878

    910

    r*n

    Space

    No.

    1-3 - lndicates OQC Feedback

    Nolice

    4

    -

    indicates devision code:

    i.

    1

    ii. 2

    iii. 3

    for OEM

    tor SPS

    for TEnsfomer

    for

    Auto

    S

    - indicates

    year.

    E)mple

    j

    05

    for

    Year2005

    7-8

    -

    indicates monlh. Example : 10

    fur Oaiober

    +10

    -

    indicates the serial number

    (rest

    by month)

    REV DATE: 07 SEPTEMBER

    2005

    -9-

    FM.OADOOOl-REV.OO

  • 8/10/2019 KQP 16 Inspection & Testing Rev 04

    10/11

    KAGA

    COMPONENTS

    (M)

    Sdn Bhd

    -

    10-

    QUALITY

    MANAGEMENT

    PROCEDURES

    Titl lnspecdon

    & Tating

    Prccedure

    No.

    KOP t6

    ReY

    04

    Reviaion

    Daie

    ZZ Aug

    13

    8.0

    Quality

    Rccord3

    Quality

    Record

    Tide

    Record Reiention Regponsible

    Personnel

    lncornlng lns@ion

    Report

    3

    Yoars

    rQc

    OQC lnspdion

    Report

    3 Yeala

    oQc

    Pad Reieded

    Lo[ Repo

    3

    Y6ar9

    roc

    OQC

    Fedback

    tlotce

    3

    Years

    oQc

    Coredive

    A.iion

    Requosi

    (CAR) 3

    Years

    roc

    REV DATE: 07 SEPTEMBER

    2005

    FM-QASOOOl

    -REV.OO

  • 8/10/2019 KQP 16 Inspection & Testing Rev 04

    11/11

    9.0

    Revision

    log

    KAGA

    COMPONENTS

    (M)

    Sdn

    Bhd

    QUALITY

    MANAGEMENT PROCEDURES

    Tifle

    lnspoction & Testing

    Procoduro

    l{o.

    KQP 16

    Rev

    04

    Revi3ion

    Date

    27

    Aug 13

    DCN#

    Rev.

    dsts

    Rev

    Originatol

    Revisd

    from

    Revisd

    to

    DCr+

    0002

    DCt+

    0023

    DCN-

    0068

    DCt$

    0069

    29 Nov. 05

    14

    Jan. 06

    05

    Jul.07

    20 Jun. 13

    27

    NJS.

    13

    00

    01

    02

    03

    04

    KK Foo

    KY Lok

    KK Foo

    CC Lim

    CC Lim

    lnitial

    Release

    6.2.10

    QC

    Manager

    Add in:

    5.3

    PRLR,

    5.,{ BOM,5.5

    DO, 5.6 CAR, 7.3 Suppliet

    CAR Numbering System &

    7.4 OQC Feedback Nolic

    Numbering System

    6.2.10 OOC Engineer

    and

    above

    Add

    Fon

    .Ftr-QA$0024

    and

    FM-QAD 0029

    at 6.'1

    ,

    Add

    Form:

    FM-OA}Ooo7

    elA.2

    REV DATE: 07 SEPTEMBER 2005 -11-

    F[eoAD0001-REV-00