1. Purpose
2. Scope
3. Responsibility
4.
Reference Document
5. Definition
6.
Procedure
7. Appendix
8.
Quality
Record
9.
Revision
Log
QUALITY
MANAGEMENT PROCEDURE
lnspectlon
& T$ting
Efiective date:
27
Aug
13
REV DATE: 07 SEPTEMBER 2005
-t-
FM.QAD,OOO,I.REV-OO
-
8/10/2019 KQP 16 Inspection & Testing Rev 04
2/11
KAGA
COMPONENTS
(M)
Sdn
Bhd
QUALITY
MANAGEMENT PROCEDURES
1.0
Purpose
'1.'l
To
ensure
lncoming
materials are corect and rieet the requirements betore the maiedals
a.e
releasd tot use in menufacfuring.
1.2
To
ensure that the cusiomer Equircments are met befoG
producE
are shipped
to the austomer.
2.0Scop6
2.1 Applicable
lo
allthe
direct matErials in Kaga Components
(M)
Sdn. Bhd.
2.2 Appliaable to
all
manufactured
and
Fini6hed
Goods, whicfi had been
gone
through
all equired
processes,
inspection
ancllesting.
3.0Responsibility
3.1
IQC
Deparbrnt
3.2 OQC Departmer(
IQC Engineer shall
be
r6ponsible.
OQC Engineer shall be responsible.
,1.0
Reference
Document
4.1 Bill of mate.ials
(BOM)
or
pad
list
4.2 Related Work lmtuclion
4.3 KQP
03
-
Contol
of
Non-Contorming
Product
4.4 Customer
Specificetion
/ Wo*manship
Standard-
5.0
Definition
5.1 tQC
5.1.1
Critical
5.1.2 Majo.
5-1.3 Minor
5.2 oQC
5.2.'l Critical
5.2.2
Majo.
5.2.3 Minor
5,3 PRLR
5.4 BOM
5.5 DO
5.6 CAR
57MRB
- The Non-Conformance which having
fundional
failur,
sabty
tailure,
wrong
part,
parl
not
bllow
producl
design and
/
o. dimension oul of 3pecification.
- The Non-Conformance
which causing end
p.oduct
flting l6sue.
-
The Non-Conforming Meterial which having Appearance / Cosmetic Defect.
-
TIe Non-Conio.mance whidl
oauBe
lhe
product
having functional failllre, saty failure
and
/
or
missing
component
(PCBA
).
-
The Non-Conto.rning
productwhich
having dimen6lon
out
otspecification, mi$ing
procers
idedmcaton
anal
/
or missing component
(mechanical
pad).
- The
Non
-Conforming
produd
whicfi
having Appearance
/
Cosmetic defect.
- P6rt Rejected
Lot
Report
-
Bill
of Material
-
Delivery
Order
j
Coreclive Action. Request
- Meteriel Review Boerd
Title
lFpection
& Testing
Procedure
No.
KQP 16
Rev
tll
Revi3ion
Date
27
Aug 13
REV DATE: 07 SEPTEMaER 2005
-2-
FM-OAD.0001-REV-00
-
8/10/2019 KQP 16 Inspection & Testing Rev 04
3/11
6.0
Procedurc
6.1lQC
prccedure
KAGA
COMPONENTS
(M)
Sdn
Bhd
QUALITY
MANAGEMENT PROCEDURES
Title
lnspecffon & Testing
Procedurc
No.
KQP.I6
Rev
04
Revision
Dato
27
Aug
13
Doteilg Raapon6lblllUga Doc.rRet
6. 1
.
1
Develop the incoming material
lnspeclion
List
IQC
Engineer
.
lncoming Matedal
lnspection List,
BOM
lisi
6.1.2 To work wih Enginering
lo
develop
lncoming Work lnslruction based on
produci
specifcation.
IQC Engineer /
Engineering
.
Woft ln6huction,
Specification
6.1.3 Sarnple
plan
is based on ANS|21.,{-1993,
normal sample size
(level
llD, AQL 0.,1for
l\rinor de{ect ciassifcation and AOL 0. 1 for
Critical or / and Major
de{ect
cla$ifcation
unless otheMise
specifid
in .elaled work
inskuction.
IQC
Engineer
ANS|Zl.+1993
6.1.4 Sample size fur dimension measurement is
10pc5"/
supplier delivery.
IQC Engineer
6.
1
.5
Veriry
supplier cartons label for conect
part
no
/ model end supplier Accept stamp
bebre
inspeclion. The
lot
will
be
rethed
to
receiving store if any di66epancy
found.
IOC lnspector
.
DO / lnvoice
6.1.6 Carry out visual inspection and dimensional
measuaement
ba6ed on espctiv
work
instruclion. All inspec{ion and
meesurement result are recorded
in
an
IOC hspedor
.
Wo.k lnsfuclion,
lncoming
lrcpeclion
Report
6.1.7 During the
inspection,
if
any
lot is
found
RejecGd
ba6ed on
lhe
lot
rejedion-
sampiing
plan,
the folloving actions
need
io
be canied
out:
i.
All
lhe
effedod lot
should
be
pasted
wilh
"REJECTED'
sticker on every Carton.
ii.
The
rejcted lot
shall then be fansbned
to d*ignated rejec{ed erea
iii. Raise Part Rejecbd Lot Report
iv.
Rsinspection
is
canied
out by
inspedor
after the MRB dispo6ition.
IQC lnspeclor
IQC
lnspedor
IQC lnspec{or
IQC lnspeclor
.
PRLR
(FM-CI]AD0029)
REV DATE: 07 SEPTEMBER
2005 -3-
FM.QADOOOl.REV.OO
-
8/10/2019 KQP 16 Inspection & Testing Rev 04
4/11
I
KAGA
COMPONENTS
(M)
Sdn Bhd
QUALITY
MANAGEMENT PROCEDURES
Titlo
lnspoction &
T$ting
Procedurc
alo.
KQP 16
Rev
u
Reviaion
Date
27
Ntg 13
Defa
s
R6poisitilldss
DOCJRSf,
6.1-8 Feedback to 3lpplier regarding
tle
rcjeded
lot
details and
request
Coreclive Aadion
trom supplier
(it
necessary).
IQC Engineer
.
CAR
(FM-O4D0024)
6. 1 .9
The Rejected lot
shall then subjed for MRB
disposfion
by IQC Engineer. The
disposition lesult shall be recorded in
PRLR.
6.'1.9.'l
ll ihe
disposilion ls SORT/REWORK
the reieded loi shall
be
iubied
to
re-
inspeclion,
whenthe Re-lnspeclion
result
shou,s
fail, the
lot
will
be
sublect
to soRT/ REV\IORK
again.
6.1.9.2
lf the
disposilion
is
Use
As lt, the
Carton boxes /package
must
be
slided tlrih
'USE AS
lT' kbel
by IQC
lnspec{or.
IQC Engineer
.
PRLR
(FM-OAF0029)
6.'1.'10 Once
lhe
so.ted/re*g*ed
loi
is accepted
afier
gampling
inpection,
all the
accepbd
.
maljerial
6hall be stanpwih'Aqppf on
evry carlons. For
safety
pgrt3,A\sign
shall
be slamped on every certons and lncoming
lnapction reporL
IQC lnspeclor
.
lncomlng
lnspedion
Report
6.1.t'l
AccepGd
lol
shallbe
Stamped
QC
Accept
and send to
siore
by IQC lnspec.tor, store
fitedal handlers is r$ponsible
to
verify
quanUty
olthe
lots.
IQC
lnspedor
.
QC
Accept
siamp
REV DATE: 07 SEPTEMBER 2005 -1- FM.QAD,OOOl -REV-OO
-
8/10/2019 KQP 16 Inspection & Testing Rev 04
5/11
-
6.2
OOC
procedure
KAGA
COMPONENTS
(M)
Sdn
Bhd
QUALITY
MANAGEMENT PROCEDURES
Title
lrcpocllon & Testing
Procedure
No.
KQP 16
Rev
t4
Revision
Date
27
Aug
t3
Oetailg Respoi|3ibilito6
DocJRet,
6.2.1 Responsible to wort with Proosg Engineer
lo determine
the
inspeaiion
cdteria based
on Producl
Specifcatjon
and
generate
the
related Work lnshuclion.
OQC Enqineer .
Produot
specmcation,
work inslruction
6-2.2 Sample
plan
is based
on
ANSI 21.+1993
nomal
semple size
(levoi
lll),
AQL
0.4lor
Minor classification and AQL
0. 1
tor
Cdtical
or
/
and
Maror
dassmcation unless
otherwise is gpecified
in
rolated
work
instruc{on.
OQC Engineer
ANS|21.4-1993
6.2.3 This sample size can
be
indeased ifdeem
necessary
by
respedive
QC dept. head.
QC
dept. hesd
6.2.4
This
sample size
is
not applicabb to
dbtraciive
test
whicb
include any
Fundional
Tt or special iast, which will
cause
phFical
damage to the test unib. The
'
sample size for this test b spell out in Work
lnsfuction.
QA Engineer
6.2.5 To
receive
Finished Goods fom
produclion.
OQC lnspector
6.2.6
He /
she
shall
verify the
quaftily,
trDdel
and
pa.t
Number of the Finishcd Goods
received
versus
&e carton labelfilled
-{rp
pbperly
and conectly. He / Bhe
abo
need
lo ensure
poduct
are
packed
acaording to
Packing lnstruction.
OQC
lnspeclor
.
Work lrclludion
6.2.7 OOC Technician shall en$rre all OQC
lnspectoIs follow
lhe
proper
ways
of
inspeaiion based on OQC woft lnstdction
by
producl.
6.2.7.1
OQC
ln3pec{or
shall thn
recod all
relevent velue wherc applicable
quanlity
inspecied,
quanlily
accepted
or rejecied, dofect mode in OQC
lnspeclion Report.
OQC Tedrnicien
OQC lnspector
Work lnslruction
OQC
lnspedion
Repod
REV DATE: 07 SEPTEMBER 2005 FM.OADOOOl.REV.OO
-
8/10/2019 KQP 16 Inspection & Testing Rev 04
6/11
KAGA
COMPONENTS
(M)
SdnBhd
QUALITY
MANAGEMENT
PROCEDURES
Tltle
lnspection
&
Tssting
Procedute
No.
KQP 16
Rev
04
Revbion
Dais
27 Aug 13
o6t
ili
Rosgonsibilitia
DocJR6f.
6.2.8 It the inspecred
lot
or batch
b
NG, b carry
oul the
following
aclions:
i.
To ideniify
all
norFcofforming
produci
wifn
reject Sicker at defucls location
and/or
gn
the
dobclive Finished
Goods.
ii. lgsue
OQC
Feedback
Nolice to Paoducdon
iii. Vedft
in
pocess
wlP
iv. Product
Dkposition
v. Re-inspeclion
i6
required for
atf Product
Disposition
goods.
OQC
lmpe.ror
OQC lnspeclor
Production
Supervisor
Engi ering/
QC
OQC lrcpeclor
Reiecl
Bli*er
.
OOC Feedbed(
Notic6
(FM-44D0007)
8.2.9
OQC lnEpedor shall stamp OQC Accept
ldet ifcalion
to accepted lot or Hch.
OOC
lnBpctor
.
OOC Accept
stamQ
6.2.10 Approval on the Finirhed
Goods
TEnsfer
.
fot'n
prior
to
bansbr
the Finished Goode
to
Finished Goods
ere..
OQC Engineer
and above
.
Finished Goods
Tramier
furm
6.2.'l
l
Where applicable, OQC lmpcctor ie
respoNible
fur bansfeMng all the accepbd
lot3
to Finish Goods
area.
He
/she
shall
verify and identify
the
quantity
and
models
ol the Finished Goods tramfened.
OQC
lnsledor
.
Fini6hcd Goodg
Transfer form
REV DATE: 07 SEPTEMBER 2005 FM-O4D.0001-REV-00
-
8/10/2019 KQP 16 Inspection & Testing Rev 04
7/11
KAGA
COMPONENTS
(M)
Sdn
Bhd
QUALITY
MANAGEMENT PROCEDURES
7.0
Appendix
7.1
IQC Flow Chart
R.3oon3lblllte6
IQC
Engineer
IOC Engineer /
Enginee.ing
Doc. / Ref.
lnconing Malerial
lnspecton List, BOM
List
Work lnsbuction,
Produd Sprification
IQC
lnspeclor
*
lQc tnspecior
**
lec
Engtn"e.
IQC
lnspeclor
IQC
lnspector
IQC
Engineer
DO, lnvoice
Woft
lnsvuction.
lnmming lnspeclion
Report,
CAR
(FirF
oAD0024)
OC
Accept stamp
PRLR
fMAAD-0029)
PRLR
(FM-OADOO2g)
IQC lnspedor
Supplier / ln-
IQC lnspedor
.
UAldicker
.
PRLR
(FM-OAD-0029)
.
PRLR
(FM-OAD-0029)
Title
lnspsction
& Testing
Procedure
No.
KQP
,16
Rev
u
Revision
Date
27 Aug
13
lllcmnE
leolt inslnElion
REV DATE: 07 SEPTEMBER 2005
-7
-
FM-QAILoo01-REV-00
-
8/10/2019 KQP 16 Inspection & Testing Rev 04
8/11
KAGA
COMPONENTS
(M)
Sdn
Bhd
QUALITY
MANAGEMENT
PROCEDURES
7.2 OQC
Flow Chart
REV DATE:
07
SEPTEMBER 2005
Ra6ooirsibllltos
ooc
Engineer
OQC lnspedor
Production/
Engineeringl
oc
OQC lnspctor
Produc-tion
SupeMsor
Doc. , Ret
.
Work hdruction
.
Wotk lnstruclion
.
@C
Accept sl,amp
OQC
ln8pedor
Work lnsttlclion,
OQC
hspeclion
Report,
OQC
Feedbaok Nolice
(Fli&OAt>0007)
Rejecl
dicker
Finished Goods
Transfr form
Finished
Goods
Transfer bm
OOC
lnspedor
OOC lnspector
OQC Engineer
and above
OQC
lnspedor
Tide
lrcpection & Testing
Procedure
No.
KQP
t6
Rev
04
Revision
Data
27
Aug
13
tHefiire in$edid
critlri.
&
genl"all
Woli
lBtruction
.
Vqity
qlaniity,
nodd &
p6rl
m.
. EBU
pmduct
Packed
@ding
to
pacring
lctrudion
. C.ry oul OOC lll8p.cdoir
ba$d
on lofi insfuclion
. Ftscotd
all
dvad
1,stu6
in
OaC hpdion RePon
_/
-\
NO
{*j2-l
OK
Apprwal
b.
Fi.i.hd Goods
Transisr o
Finbhd
Goods
-8-
FM-OAI 0001-REV-00
-
8/10/2019 KQP 16 Inspection & Testing Rev 04
9/11
KAGA
COMPONENTS
(M)
Sdn
Bhd
QUALITY
MANAGEMENT PROCEDURES
7.3
Suppligr
CAR
l{umberino Swbm
12 3 4
5 6 7I
g
10 11
tsTcTATRl
"
f-f-fT_-l
-
f-l-T*-l
Space No.
1-1
-
lndicates
Supplier Conea{ive Aciion Requesl
5.6 - indicetG
year.
Erample :
05
for Year 2005
7-B
-
indicalEs month.
Exaftple
:
I 0
tor Oc{ober
S11 - indicates tho
srial number
(reset
by rnonth)
7.4 OQC
Feedback
Notice
l{umbe.ino
Swtom
1234
t
oTFTN-n -
Title
lBpection
& Tosting
Procedurc
No,
KOP 16
Rev It4
Revbion
Date
27 Aug
It
5878
910
r*n
Space
No.
1-3 - lndicates OQC Feedback
Nolice
4
-
indicates devision code:
i.
1
ii. 2
iii. 3
for OEM
tor SPS
for TEnsfomer
for
Auto
S
- indicates
year.
E)mple
j
05
for
Year2005
7-8
-
indicates monlh. Example : 10
fur Oaiober
+10
-
indicates the serial number
(rest
by month)
REV DATE: 07 SEPTEMBER
2005
-9-
FM.OADOOOl-REV.OO
-
8/10/2019 KQP 16 Inspection & Testing Rev 04
10/11
KAGA
COMPONENTS
(M)
Sdn Bhd
-
10-
QUALITY
MANAGEMENT
PROCEDURES
Titl lnspecdon
& Tating
Prccedure
No.
KOP t6
ReY
04
Reviaion
Daie
ZZ Aug
13
8.0
Quality
Rccord3
Quality
Record
Tide
Record Reiention Regponsible
Personnel
lncornlng lns@ion
Report
3
Yoars
rQc
OQC lnspdion
Report
3 Yeala
oQc
Pad Reieded
Lo[ Repo
3
Y6ar9
roc
OQC
Fedback
tlotce
3
Years
oQc
Coredive
A.iion
Requosi
(CAR) 3
Years
roc
REV DATE: 07 SEPTEMBER
2005
FM-QASOOOl
-REV.OO
-
8/10/2019 KQP 16 Inspection & Testing Rev 04
11/11
9.0
Revision
log
KAGA
COMPONENTS
(M)
Sdn
Bhd
QUALITY
MANAGEMENT PROCEDURES
Tifle
lnspoction & Testing
Procoduro
l{o.
KQP 16
Rev
04
Revi3ion
Date
27
Aug 13
DCN#
Rev.
dsts
Rev
Originatol
Revisd
from
Revisd
to
DCr+
0002
DCt+
0023
DCN-
0068
DCt$
0069
29 Nov. 05
14
Jan. 06
05
Jul.07
20 Jun. 13
27
NJS.
13
00
01
02
03
04
KK Foo
KY Lok
KK Foo
CC Lim
CC Lim
lnitial
Release
6.2.10
QC
Manager
Add in:
5.3
PRLR,
5.,{ BOM,5.5
DO, 5.6 CAR, 7.3 Suppliet
CAR Numbering System &
7.4 OQC Feedback Nolic
Numbering System
6.2.10 OOC Engineer
and
above
Add
Fon
.Ftr-QA$0024
and
FM-QAD 0029
at 6.'1
,
Add
Form:
FM-OA}Ooo7
elA.2
REV DATE: 07 SEPTEMBER 2005 -11-
F[eoAD0001-REV-00