Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander...

20
Kolob Canyon Air Services: IR Support

Transcript of Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander...

Page 1: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

Kolob Canyon Air

Services:

IR Support

Page 2: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

OutlinePlatform and Imaging System

IR Interpretation

First Incident Support

Northern California Support

Some Observations

Page 3: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

Platform and Imaging System

Platform

Turbo Commander

Imaging System

FireMapper™ 2.0

� Uncooledmicrobolometer

� Framing system

� 16-bit imagery

• 0-65536

� 2 mile swath

Page 4: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

IR Interpretation Process

ImageryImagery

AcquiredAcquired

(.(.datdat, ., .csvcsv))

KolobIRKolobIR FTP SiteFTP Site

(Secure)(Secure)

Processing in Cedar City:Processing in Cedar City:

Partial OrthoPartial Ortho--CorrectionCorrection

Create Strip Mosaics (.Create Strip Mosaics (.imgimg))

Upload to Upload to KolobIRKolobIR FTP SiteFTP Site

IRIN w/ IRIN w/ ArcMapArcMap::

Overlay Overlay Mosaic(sMosaic(s))

Look for HeatLook for Heat

GeoGeo--Reference AOIReference AOI

Interpret (.Interpret (.shpshp, ., .pdfpdf))

ftp.nifc.govftp.nifc.gov

La

nd

an

d U

plo

ad

La

nd

an

d U

plo

ad

Dow

nload

Dow

nload

Dow

nloa

d

Dow

nloa

d

Up

loa

d

Up

loa

d

Full OrthoFull Ortho--CorrectionCorrection

Post to Post to KolobIR.comKolobIR.com

GeoTiffGeoTiff JPEGJPEG KMLKML

Page 5: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

IR Interpretation

Whiskey East Mosaics 1 and 2, June 24, 2008, 2135 PDTWhiskey East Mosaics 1 and 2, June 24, 2008, 2135 PDT

Page 6: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

IR Interpretation

Whiskey East, June 24, 2008, 2135 PDTWhiskey East, June 24, 2008, 2135 PDT

Page 7: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

IR Interpretation

Page 8: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

IR Interpretation

Page 9: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

IR Interpretation

Page 10: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

First Incident Support

••Dixie NF, UTDixie NF, UT

••Type II TeamType II Team

••2,269 acres2,269 acres

••“See How The “See How The

System FunctionsSystem Functions””

Page 11: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

June 22 June 22 –– July 12July 12

Northern California Support

Aqua 250mAqua 250m

25 June 200825 June 2008

“…“…On June 20, 2008, a severe thunderstorm systemOn June 20, 2008, a severe thunderstorm system

moved through northern and central California resultingmoved through northern and central California resulting

in over 6,000 total lightning strikes in more than 26 counties.in over 6,000 total lightning strikes in more than 26 counties.

The overwhelming number of lightning strikes, along withThe overwhelming number of lightning strikes, along with

record dry conditions sparked over two thousand lightningrecord dry conditions sparked over two thousand lightning

fires…”fires…”

CalFireCalFire, 11 August 2008, 11 August 2008

Page 12: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

Early (Initial) Missions

“Go out and

find the fires”

Remote

interpretation

WalkerWalker

WhiskeyWhiskey

ButteButte

ShastaShasta

Page 13: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

Later Missions

Daytime coverage of fires

Mid-day, late afternoon flights

� Mendocino Complex after marine layer moved off-shore

� UTFs from previous night’s flights

Fires coordinated/assigned by regional

coordinator in Redding

Remote interpretation

Page 14: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

Later Missions

CorralCorral

ParadiseParadise

MendocinoMendocino

LightningLightning

ComplexComplex

AmericanAmerican

RiverRiver

Blue/Blue 2Blue/Blue 2

SiskiyouSiskiyou

ComplexComplex

UkonomUkonom

ComplexComplex

PetersonPeterson

PopcornPopcorn

GouldGould

North North MtnMtn..

Page 15: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

Issues

Gaps in coverage

Steep canyon terrain

Ortho-rectification pulled frames

Happened only one

time

Government & Westville Fires (American River), July 5Government & Westville Fires (American River), July 5

Page 16: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

Some Observations

Plus Side

Kolob Air flew the wings off the Turbo

Commander

Communication between Kolob techs (Redding), Cedar City techs and IRIN not an

issue

� Notified prior to takeoff

� Uploading on return

� Call from Cedar City when mosaics posted

No problem with feedback from the IRIN

Page 17: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

Some Observations

Plus Side

Image quality not an issue

� Requires more interpretation than Phoenix

• NAIP was essential for daytime imagery

– Final registration of imagery

– Distinguishing warm background objects from

heat

Page 18: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

Some Observations

Corral Fire: 5,878 acresCorral Fire: 5,878 acres Corral Fire: 4+ strips to coverCorral Fire: 4+ strips to cover

Page 19: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

Some Observations

Down SideSmall image footprint + multiple images + large boxes = Lots of images to upload, ortho-rectify and mosaic

Also = mutiple long strips to register and interpret

� Time from acquisition to incident delivery longer

System as currently configured works more efficiently with smaller areas to be acquired

Kolob has purchased an Applanix system to integrate into their FireMapper system

� Will make ortho-rectification process faster

Page 20: Kolob Canyon Air Services: IR Support · Platform and Imaging System Platform Turbo Commander Imaging System FireMapper™ 2.0 Uncooled microbolometer Framing system 16-bit imagery

Questions?Questions?