MBA CPM SECTION A GROUP 2 SUBGROUP 1ABIN BABU PUNEET SURI POORVA RATHORE DEVESH VERMA MOHIT MISRA
STAKEHOLDER ANAL-YSIS OF KOCHI METRO
RAIL Ltd(PHASE 1)
![Page 2: Kochi metro stakeholder analysis](https://reader035.fdocuments.net/reader035/viewer/2022081416/5871b7621a28ab55058b4b67/html5/thumbnails/2.jpg)
ABOUT KOCHI METRO..PROJECT PROFILE
This PowerPoint Template has clean andTransit type Rapid transit
Number of lines 1
Number of stations(PHASE 1) 25 (including 3 in future)
Operation will start 7 June 2016(as per schedule)
Train length 3 coaches
Headway 5 minutes
System length 25.612 km (15.915 mi)
Average speed 34 km/h (21 mph
Top speed 80 km/h (50 mph)
![Page 3: Kochi metro stakeholder analysis](https://reader035.fdocuments.net/reader035/viewer/2022081416/5871b7621a28ab55058b4b67/html5/thumbnails/3.jpg)
•Ministry of Urban Development predicts an aver-age city speed of 6 to 8 kmph by 2030•The present transport facilities are inadequate•Further road development is very limited •first move in such a direction in Kerala.•The average citizen would get a reliable, safe, eco-nomic, comfortable, user friendly and punctual mode of transport at affordable rates
Why Kochi Metro?
WHY NOT?????
![Page 4: Kochi metro stakeholder analysis](https://reader035.fdocuments.net/reader035/viewer/2022081416/5871b7621a28ab55058b4b67/html5/thumbnails/4.jpg)
ALUVA PULIN-CHODU
COMPANYPADY AMBATTUKAVU MUTTOM
PATHADIP-ALAM
EDAPALLY CHANGAM-PUZHA
PALARIVAT-TOM
JLN
M.G.ROAD MAHARAJAS SOUTH KADAVANTHRA VYTTILAKALAMASSERY CUSAT TRIPUNITHARA ELAMKULAM THAIKOODAM
KALOOR LISSIE PETTA
![Page 5: Kochi metro stakeholder analysis](https://reader035.fdocuments.net/reader035/viewer/2022081416/5871b7621a28ab55058b4b67/html5/thumbnails/5.jpg)
Moving to business....Tools we used .....
![Page 6: Kochi metro stakeholder analysis](https://reader035.fdocuments.net/reader035/viewer/2022081416/5871b7621a28ab55058b4b67/html5/thumbnails/6.jpg)
MAJOR STAKEHOLDERS
KMRL DMRC GCDA CORPORA-TION
M1
M2 M3 M4 M5 M6
L&T SOMA E & R VINDHYA REDSTAR
ARDANUY ALSTROM CENTRAL STATE GOVT CM(KERALA)
JICA AFD MEDIA RESIDENTS
![Page 7: Kochi metro stakeholder analysis](https://reader035.fdocuments.net/reader035/viewer/2022081416/5871b7621a28ab55058b4b67/html5/thumbnails/7.jpg)
Power interest matrix
![Page 8: Kochi metro stakeholder analysis](https://reader035.fdocuments.net/reader035/viewer/2022081416/5871b7621a28ab55058b4b67/html5/thumbnails/8.jpg)
![Page 9: Kochi metro stakeholder analysis](https://reader035.fdocuments.net/reader035/viewer/2022081416/5871b7621a28ab55058b4b67/html5/thumbnails/9.jpg)
Engagement assessment matrix
Stakeholder Unaware Resistant Neutral Supportive leading
Residents c d
Media c d
corporation c d
![Page 10: Kochi metro stakeholder analysis](https://reader035.fdocuments.net/reader035/viewer/2022081416/5871b7621a28ab55058b4b67/html5/thumbnails/10.jpg)
![Page 11: Kochi metro stakeholder analysis](https://reader035.fdocuments.net/reader035/viewer/2022081416/5871b7621a28ab55058b4b67/html5/thumbnails/11.jpg)
![Page 12: Kochi metro stakeholder analysis](https://reader035.fdocuments.net/reader035/viewer/2022081416/5871b7621a28ab55058b4b67/html5/thumbnails/12.jpg)
![Page 13: Kochi metro stakeholder analysis](https://reader035.fdocuments.net/reader035/viewer/2022081416/5871b7621a28ab55058b4b67/html5/thumbnails/13.jpg)
![Page 14: Kochi metro stakeholder analysis](https://reader035.fdocuments.net/reader035/viewer/2022081416/5871b7621a28ab55058b4b67/html5/thumbnails/14.jpg)
So in short
People are unaware of benefits they are going to get.
Wrong attitude of media (which is further fired by DMRC )
Worsened traffic scenario due to constructions.
![Page 15: Kochi metro stakeholder analysis](https://reader035.fdocuments.net/reader035/viewer/2022081416/5871b7621a28ab55058b4b67/html5/thumbnails/15.jpg)
![Page 16: Kochi metro stakeholder analysis](https://reader035.fdocuments.net/reader035/viewer/2022081416/5871b7621a28ab55058b4b67/html5/thumbnails/16.jpg)
THANK you for this opportunity sir