Kneat Gx Compliance by Design
2
Kneat Gx creates and maintains sets of product, process or equipment lifecycle documents with less effort and higher quality
Kneat can be applied to any process wherecompliance and data integrity is business criticaland information is shared across a set of documents
For example
– Large project execution
– Manufacturing facility validation documentation
What is Kneat Gx
3
Right First Time translation of requirements
Collaboration across multiple stakeholders
Engineering data management– Data flow between different stakeholders
– Data integrity
– Management of change
C&Q process– Test plans need to be appropriate and optimised
– Test documents need to be aligned with latest design
– Management of deviations and re-work process
Timely handover of accurate and complete data / information to operations
Some Large Project Execution Concerns…..
4
Corrupt, inaccurate, missing data
Test documents not aligned with design
C&Q process delayed and over budget
As-building exercise is a headache
Handover to operations is problematic
Non-optimal start up impacts company goals
Typical Project Execution Outcomes
5
Document content is dynamically linked to a database which provides structure and context
Automated assessment of the impact of change across all documents
Streamlined execution of changes to documents
Downstream life cycle documents/ test reports are auto-generated
Online test execution and deviation processing
Cloning of suites of documents for new projects maintaining embedded relationships
Efficiency, Quality and Compliance built in
Kneat Gx Paperless Approach
6
Kneat Modeling Concept
7
Kneat’s Powerful Leveraging of Work
These are new units created by simply cloning RE201 including all of its associated documentation, embedded relationships and model objects.
RE204 bioreactor cloned documents are at development closed status and are waiting for a document number to be assigned.
8
Document Change Execution Process
Change Initiation
Auto Impact Assessment
Affected Documents
Auto Generate re-test Documents
Re-test Documents
Approved Document
A1.0
D1.0
C1.0
B1.0
Approved Documents
A1.1
B1.1
C1.1
D1.1
Change Pre-Approval
Change Execution and
re-test
Change Post-
Approval
Change Completed
All docs automatically
updated
9
Kneat Fit in Large Project Execution
All lifecycle documents are generated, approved and executed within
Kneat
Global collaboration
Automated and streamlined change execution
Just in Time release of test documents
Online testing and deviation management
Auto-generation of test and acceptance reports
10
Kneat Fit in Large Project Execution
A/E Data
Automation
Integrator
Data
Equipment
Vendor
Data
Kneat
Database
Master Project
Database (MPD)
Owned by
Construction Mgr
Receipt
Verification
Process
C&Q
Process
Kneat Gx application (Owned by Operator)Construction Mgt
Import* Document
Change
Execution
Requirements
Management
Process
• User/functional requirements
• Risk assessment
• Requirements traceability
• Design verification
• FAT/SAT
• IV/FV
• Online testing / Deviation Mgt
• Acceptance Reports
• Auto-impact assessment
• Auto-retest scripts
• Auto doc updating
Operations
* Import on demand,
periodically or at milestone
Note: A/E can own the
MPD for smaller projects
11
Engineering specifications and verification process can be standardised
Global project execution through collaboration and live management oversight
Design and test documents always aligned– On-line document change execution
– Auto impact assessment
– Auto updating of affected life cycle documents
– Just in Time release of test protocols
Right first time project deliverables translates to reduced Business Risk - Quality, Safety, Financial, and Operational
Kneat Benefits for Project Execution
12
Kneat Opportunity for Operations
Kneat can continue to provide value to operations in a new facility
Instant access to original requirements, design basis and associated risk assessments
Retention of project knowledge, practices and templates for future projects
Ongoing document change execution related to facility modifications and additions
Documentation relating to new equipment can be cloned from similar existing equipment
13
Kneat Supporting Ongoing Operations
RetirementFacility Lifecycle (20 – 30 years)
Facility
Modifications /
Upgrades
Change execution based on robust impact assessment
Lifecycle documentation is always audit ready and
easily accessed
Kneat Database
Enterprise Document Management System
Approved documents
published from Kneat
Initiation
Design
Construct
Verify
Closeout
14
Kneat Fit in Site Infrastructure
EDMS
CAPAKneatGeneration/
Management of the
content of lifecycle*documents
Management of all site documents
Site Change Control System
Publishing of approved Kneat
documents
Doc status and change details
* Lifecycle documents describe a regulated process, where info is shared across documents and compliance and data integrity are business critical. eg Facility Qualification
15
Kneat Benefits for Operations
Ability to copy/clone work done on previous projects provides significant efficiencies
Reduced time to market for new product launches
Optimal plant performance is achieved sooner
Lifecycle documents are audit-ready and maintained in a state of compliance at all times
Lower risk of citations and warning letters
Lower cost of compliance
16
Web application based on Microsoft’s .NET platform
Browser based access to secure optimized database
Controlled login over Secure Sockets Layer (SSL)
Full enterprise level scalability
Fully validated to GAMP 5 ISPE guidelines and 21CFR Part 11 regulations
System architecture facilitates integration with other IT applications
Kneat Gx Infrastructure
17