K&K TECHNOLOGY · In the period from 01/2009 to 09/2009, K&H Kinetic a.s. together with UNITHERM...

2

Transcript of K&K TECHNOLOGY · In the period from 01/2009 to 09/2009, K&H Kinetic a.s. together with UNITHERM...

Page 1: K&K TECHNOLOGY · In the period from 01/2009 to 09/2009, K&H Kinetic a.s. together with UNITHERM BIO s.r.o. implemented a biogas power station project in Ladzany, Slovakia. The biogas
Page 2: K&K TECHNOLOGY · In the period from 01/2009 to 09/2009, K&H Kinetic a.s. together with UNITHERM BIO s.r.o. implemented a biogas power station project in Ladzany, Slovakia. The biogas