KITCHEN ARRANGEMENT

9
KITCHEN ARRANGEMENT

description

KITCHEN ARRANGEMENT. 3 WORK CENTERS. EQUIPMENT AND UTENSILS SHOULD BE STORED IN AREA OF FIRST USE 3 MAIN ACTIVITIES PERFORMED IN A KITCHEN PREP BAKE OR COOK CLEAN UP. 1. FOOD PREP & STORAGE (MIX AND MEASURE) CABINETS FOR FOOD STORAGE REFRIGERATOR STORAGE FOR REFRIGERATED FOOD - PowerPoint PPT Presentation

Transcript of KITCHEN ARRANGEMENT

Page 1: KITCHEN ARRANGEMENT

KITCHEN ARRANGEMENT

Page 2: KITCHEN ARRANGEMENT
Page 3: KITCHEN ARRANGEMENT

3 WORK CENTERSEQUIPMENT AND UTENSILS SHOULD BE

STORED IN AREA OF FIRST USE

3 MAIN ACTIVITIES PERFORMED IN A KITCHEN

1. PREP2. BAKE OR COOK3. CLEAN UP

Page 4: KITCHEN ARRANGEMENT

1. FOOD PREP & STORAGE (MIX AND MEASURE)

CABINETS FOR FOOD STORAGEREFRIGERATORSTORAGE FOR REFRIGERATED FOODMIXING AND PREPARING UTENSILS

Page 5: KITCHEN ARRANGEMENT
Page 6: KITCHEN ARRANGEMENT

2. COOKING AND SERVING: RANGE/OVENWORK SPACECOOKWARE AND UTENSILSPOTS AND PANSPOTHOLDERS

Page 7: KITCHEN ARRANGEMENT

3.CLEANUP: SINKWASHING AND PREPCLEANING AND STORING OF DISHESGLASSWARE AND FLATWARE

Page 8: KITCHEN ARRANGEMENT