King Street Station 7.16.11 slide show

19
Phase 2A In this slide show: Geothermal wells and first floor mezzanine July 16, 2011

description

 

Transcript of King Street Station 7.16.11 slide show

Page 1: King Street Station 7.16.11 slide show

Phase 2AIn this slide show:

Geothermal wells and first floor mezzanine

July 16, 2011

Page 2: King Street Station 7.16.11 slide show

The additional geothermal wells on the west side installed and connected with the rest of the geothermal network under the plaza.

Page 3: King Street Station 7.16.11 slide show

The west side street repaved and painted with new Amtrak bus queuing boundaries.

Page 4: King Street Station 7.16.11 slide show

The new turn around system will improve Amtrak bus access.

Page 5: King Street Station 7.16.11 slide show

Original under-plaza geothermal wells on the left. New west side wells on the right. Both are now connected for operation.

Page 6: King Street Station 7.16.11 slide show

Grand stair terrazzo treads and rails mobilized onsite for installation.

Page 7: King Street Station 7.16.11 slide show

The new terrazzo treads are beautiful and match the original .

Page 8: King Street Station 7.16.11 slide show

Half the terrazzo treads installed at top of the stair.

Page 9: King Street Station 7.16.11 slide show

Original brass rails installed on the sides of the stairway.

Page 10: King Street Station 7.16.11 slide show

Ticketing desks are being installed.

Page 11: King Street Station 7.16.11 slide show

New ticketing counters match the original appearance.

Page 12: King Street Station 7.16.11 slide show

A view of the drawers behind the ticketing counters.

Page 13: King Street Station 7.16.11 slide show

Additional counters are also being installed behind the ticketing desks.

Page 14: King Street Station 7.16.11 slide show

The mezzanine stairs and lift are fully installed connecting the first floor Amtrak offices to additional space above.

Page 15: King Street Station 7.16.11 slide show

Carpet and lighting are in place for the mezzanine level.

Page 16: King Street Station 7.16.11 slide show

A skilled technician working with the ceiling in the mezzanine.

Page 17: King Street Station 7.16.11 slide show

Carpet installation for Amtrak break room.

Page 18: King Street Station 7.16.11 slide show

Dedicated restrooms for all Amtrak employees.

Page 19: King Street Station 7.16.11 slide show

A ceiling will be installed to cover these mechanicals under the plaza.