Kimbell Restroom and Storage Building · Kimbell Restroom and Storage Building Civic Design Review...

21
Kimbell Restroom and Storage Building Civic Design Review Phase 2 - Design Development May 21, 2012 Dan Mauer, Project Manager RecreaƟon and Park Department Tara Lamont, Interim Manager Will Kwan, Architect Rommel Taylor, Project Designer Department of Public Works Building Design and ConstrucƟon

Transcript of Kimbell Restroom and Storage Building · Kimbell Restroom and Storage Building Civic Design Review...

  • Kimbell Restroom and Storage Building Civic Design Review Phase 2 - Design Development May 21, 2012

    Dan Mauer, Project Manager RecreaƟon and Park Department

    Tara Lamont, Interim Manager Will Kwan, Architect Rommel Taylor, Project Designer Department of Public Works Building Design and ConstrucƟon

  • 3

    Ellis Street

    Geary Boulevard

    Stei

    ner S

    tree

    t

    Pier

    ce S

    tree

    t

    Landscape Area of Work

    EXISTING RESTROOM AND STORAGE BUILDING TO BE DEMOLISHED

    NEW RESTROOM AND STORAGE BUILDING

    1

    2

    3

    4

    No Work This Area

    1 2

    Existing restroom and storage building to be demolished

    4

    BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E Context and Vicinity Map

    Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 1

  • BUILDING DESIGN & CONSTRUC TION

    S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E

    Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Context-Playground 2

    http:05.21.12

  • New Restrooms and Storage Building

    No Work This Area

    BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E

    Landscape PlanKimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 3

  • 0RUNUS�SERRULATA�@+WANZAN� &LOWERING�#HERRY

    #ARPENTERIA�CALIFORNICA "USH�!NEMONE

    2HAPHIOLEPIS�UMBELLATA )NDIAN�(AWTHORN

    2IBES�SANGUINEUM 0INK�&LOWERING�#URRANT

    SHRUB ACCENTS

    GROUNDCOVER

    !RTEMESIA�@0OWIS�#ASTLE� (ELIANTHEMUM�NUMMULARIUM )RIS�DOUGLASIANA 0HLOMIS�FRUTICOSA 4RACHELOSPERMUM�JASMINOIDES 7ORMWOOD 3UNROSE 0ACIFIC�#OAST�)RIS *ERUSALEM�3AGE 3TAR�*ASMINE

    BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12

    Plant Materials-@Geary

    A R C H I T E C T U R E 4

    http:05.21.12

  • INDEPENDENT PLAY STRUCTURES

    BASKETBALL COURT

    OUTDOOR EXCERCISE EQUIPMENT

    (N) TREES TYP.

    (E) STREET TREES, TYP.

    (N) TREES TYP. New Restrooms and Storage Building

    No Work This Area

    BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E Landscape Plan-@ Pierce St.

    Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 5

  • !RBUTUS�MARINA0RUNUS�SERRULATA�@+WANZAN� 3TRAWBERRY�4REE &LOWERING�#HERRY

    BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E

    Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Plant Materials@Pierce 6

    http:05.21.12

  • 36’

    12’

    48’

    24’

    1 2 3 4

    BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 ConceptsA R C H I T E C T U R E 7

    http:05.21.12

  • RPD Storage

    PAL Storage

    Elec. Room

    Women’s

    Men’s

    Maint.

    48' 0

    "

    36' 0"

    12' 0" 12' 0" 12' 0"

    24' 0

    "24

    ' 0"

    Floor Plan and Site Plan

    Pier

    ce S

    tree

    t

    Ellis Street

    Entr

    y

    Entr

    y

    RPPD Storage

    Elec. Room

    Maint.

    PAL Storage

    Men’s

    Women’s

    AA

    A R C H I T E C T U R E

    BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 8

  • BUILDING DESIGN & CONSTRUC TION

    S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E

    Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 View Looking NE 9

    http:05.21.12

  • STANDING METAL SEAM ROOF

    WOOD SIDING AND FASCIA

    ALUMINUM FRAME LOUVERS AND WINDOWS

    STUCCO OVER CMU

    PORCELAIN TILE OVER CMU

    STEEL SLIDING GATE

    South

    East

    BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E

    ElevationsKimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 10

  • North

    West

    BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Elevations A R C H I T E C T U R E

    11

    http:05.21.12

  • RPD STORAGE

    ELECTRICAL ROOM

    PLUMBING CHASE

    MEN’S RESTROOM

    BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E

    Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Building Section A-A 12

    http:05.21.12

  • 2X TONGUE AND GROOVE WESTERN RED CEDAR CEILING

    2X8 WD JOISTS 16” O.C.

    STANDING METAL SEAM ROOF

    2X TONGUE AND GROOVE WESTERN RED CEDAR SOFFIT

    AND FASCIA

    ALUMINUM FRAME LOUVER

    PAINTED ALUMINUM WINDOW FRAME WITH 1/2” LAMINATED GLASS WITH

    TRANSLUCENT INTERLAYER

    4X4 PAINTED STEEL FRAME

    2X TONGUE AND GROOVE WESTERN RED CEDAR FASCIA

    EXPOSED CMU

    STUCCO OVER CMU

    BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E

    Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Section Detail-Roof Assembly 13

    http:05.21.12

  • BUILDING DESIGN & CONSTRUC TION

    S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E

    Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Roof-Exploded Isometric 14

    http:05.21.12

  • CLOSED POSITION

    OPEN POSITION

    BUILDING DESIGN & CONSTRUC TION S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E

    Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Entry Gate 15

    http:05.21.12

  • BUILDING DESIGN & CONSTRUC TION

    S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E

    Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Views Looking SE 16

    http:05.21.12

  • BUILDING DESIGN & CONSTRUC TION

    S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E

    Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Views Looking SW 17

    http:05.21.12

  • BUILDING DESIGN & CONSTRUC TION

    S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E

    Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 View Looking NW 18

    http:05.21.12

  • BUILDING DESIGN & CONSTRUC TION

    S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E

    Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Day 19

    http:05.21.12

  • BUILDING DESIGN & CONSTRUC TION

    S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E

    Kimbell Restrooms and Storage Building | Phase 2 - Design Development | 05.21.12 Night 20

    http:05.21.12

    010203040506070809101112131415161718192021