    Description No. L B D Qty. Rate Per

    1 2 3 4 5 6 7 8 9 10

    Sl.No.

    Units

    Walls (6-21) 1 5.62 0.45 0.90 2.28

    Walls (34-96) 1 17.43 0.45 0.90 7.06

    Walls (1-3) 1 6.11 0.45 0.90 2.47

    Walls (4-6) 1 6.1 0.45 0.90 2.47

    Walls (10-16) 1 17.55 0.45 0.90 7.11Walls (20-21) 1 4.5 0.45 0.90 1.82

    Walls (33-34) 1 4.5 0.45 0.90 1.82

    Walls (84-96) 1 30.56 0.45 0.90 12.38

    Walls (36-42) & (63-69) 2 17.55 0.45 0.90 14.22

    Walls (35-62) & (43-70) 2 9.59 0.45 0.90 7.77

    Inbetween column portions. 12 1.2 0.45 0.90 5.83

    19 1.02 0.45 0.90 7.85

    22 0.82 0.45 0.90 7.31

    27 0.62 0.45 0.90 6.78

    0.08

    98.70 Cum 1,785.66 Cum

  • 8/8/2019 KGBV Nakarikallu

    3/81

    Description No. L B D Qty. Rate Per

    1 2 3 4 5 6 7 8 9 10

    Sl.No.

    Units

    4

    Footings (F1) 12 1.85 1.85 0.40 16.43

    Footings (F2) 19 1.55 1.55 0.40 18.26

    Footings (F3) 22 1.35 1.35 0.40 16.04

    Footings (F4) 21 1.00 1.00 0.25 5.25

    Footings (CF1) 5 1.85 1.85 0.40 6.85

    Footings (CF2) 2 1.60 1.60 0.30 1.54

    Footings (CF3) 5 1.20 1.20 0.23 1.66

    0.0766.08 Cum 3,962.30 Cum

    Pedestal - P1 67 0.53 0.38 0.60 8.10

    Pedestal - P2 31 0.38 0.38 0.60 2.69

    0.02

    10.80 Cum 3,962.30 Cum

    5

    Column up to plinth - F1 12 0.23 0.38 0.85 0.89

    Column up to plinth - F2 19 0.23 0.38 0.85 1.41

    Column up to plinth - F3 22 0.23 0.38 0.85 1.63

    Column up to plinth - F4 21 0.23 0.38 1.00 1.84

    Column up to plinth - CF1 10 0.23 0.38 0.85 0.74

    Column up to plinth - CF2 4 0.23 0.38 0.95 0.33

    Column up to plinth - CF3 10 0.23 0.38 1.10 0.96

    0.09

    7.90 Cum 5,018.30

    6

    Plinth Beam

    Wall 1-3 1 6.11 0.23 0.30 0.42

    7 6.11 0.23 0.30 2.95

    Wall -84-1,86-3 2 24.4 0.23 0.30 3.37

    Wall -85-72 1 4.8 0.23 0.30 0.33

    Wall 72-60 1 21.04 0.23 0.30 1.45

    Vibrated Reinforced cement concrete as per IS 456 equivalent to(1:2:4) prop nominal mix (cement fine aggreate, coarseaggregate) using 20mm size HBG (SS 5) machine crushed metalfrom approved quarry inclduing cost and conveyance of allmaterials water to wrok site and all operational, incidental,blasting , seig charges, sales and other taxed and all labourcharges such as centering, cutting, scafolding. lift chargesmachine mixing, curing, vibrating etc complete but excluding costof steel and fabrication for finished item of work

    Vibrated Reinforced cement concrete as per IS 456 equivalent to(1:1.5:3) prop nominal mix (cement fine aggreate, coarseaggregate) using 20mm size HBG (SS 5) machine crushed metalfrom approved quarry inclduing cost and conveyance of allmaterials water to wrok site and all operational, incidental,blasting , seig charges, sales and other taxed and all labourcharges such as centering, cutting, scafolding. lift charges

    machine mixing, curing, vibrating etc complete but excluding costof steel and fabrication for finished item of work

    Vibrated Reinforced cement concrete as per IS 456 equivalent to(1:2:4) prop nominal mix (cement fine aggreate, coarseaggregate) using 20mm size HBG (SS 5) machine crushed metalfrom approved quarry inclduing cost and conveyance of allmaterials water to wrok site and all operational, incidental,blasting , seig charges, sales and other taxed and all labourcharges such as centering, cutting, scafolding. lift chargesmachine mixing, curing, vibrating etc complete but excluding costof steel and fabrication for finished item of work

    Wall 7-9,22-4, 44-46, 53-55, 59-61,77-73, 84-86.

    Wall 10-16 25-31 36-42 63-69 74-

  • 8/8/2019 KGBV Nakarikallu

    4/81

    Description No. L B D Qty. Rate Per

    1 2 3 4 5 6 7 8 9 10

    Sl.No.

    Units

    7

    Column above plinth - C1 3 0.23 0.38 3.60 0.94

    Column above plinth - C2 9 0.23 0.38 3.60 2.83

    Column above plinth - C3 19 0.23 0.38 3.60 5.98

    Column above plinth - C4 38 0.23 0.38 3.60 11.96

    Column above plinth - C5 2 0.23 0.3 3.60 0.50

    Column above plinth - C6 24 0.23 0.23 3.60 4.57

    Column above plinth - C7 3 0.3 0.3 3.60 0.970.05

    27.80 Cum 5,018.30 Cum

    8

    Beam (1-3) & (22-24) 2 6.1 0.23 0.30 0.84

    Beam (4-6) 1 6.1 0.23 0.30 0.42

    Beam (7-9) 1 6.25 0.23 0.38 0.55

    Beam (10-16) & (25-31) 2 17.55 0.23 0.30 2.42

    Beam (x-y) 1 4.8 0.23 0.38 0.42

    Beam (a-19) & (b-21) 2 6.33 0.23 0.30 0.87

    Beam (44-45) (53-54) (69-60) 3 4.65 0.23 0.38 1.22

    Beam (33-34) (48-49) (z-z) 5 4.65 0.23 0.38 2.03

    Beam (71-72) (82-83) 2 3.15 0.23 0.30 0.43

    Beam (72-73) (81-83) 2 2.87 0.23 0.38 0.50

    Beam (74-80) (87-93) 2 17.55 0.23 0.30 2.42

    Beam (84-86) (94-96) 2 6.48 0.23 0.30 0.89

    Beam (97-98) 1 5.54 0.23 0.30 0.38

    Beam (84-71) (95-82) 6 4.42 0.23 0.38 2.32

    4 5.91 0.23 0.38 2.07

    Beam (97-76) (98-78) 2 7.97 0.23 0.38 1.39

    Beam (59-22) 1 12.92 0.23 0.30 0.89

    Beam (22-1) (23-2) (24-3) 3 7.06 0.23 0.38 1.85

    Beam (60-2) 1 14.15 0.23 0.30 0.98

    Beam (36-10) (42-16) 2 6.14 0.23 0.38 1.07

    Beam (26-11) (30-15) 5 4.45 0.23 0.38 1.94

    Beam (43-32) (17-4) 2 1.8 0.23 0.23 0.19

    Beam (32-17) 1 4.45 0.23 0.38 0.39

    Beam (20-5) (21-6) 2 5.53 0.23 0.30 0.76

    Beam (z-57) 1 4.45 0.23 0.38 0.39

    Beam (57-33) (58-34) 2 7.95 0.23 0.30 1.10

    Beam (96-58) 1 9.23 0.23 0.38 0.81

    Vibrated Reinforced cement concrete as per IS 456 equivalent to(1:1.5:3) prop nominal mix (cement fine aggreate, coarseaggregate) using 20mm size HBG (SS 5) machine crushed metalfrom approved quarry inclduing cost and conveyance of allmaterials water to wrok site and all operational, incidental,blasting , seig charges, sales and other taxed and all labourcharges such as centering, cutting, scafolding. lift chargesmachine mixing, curing, vibrating etc complete but excluding costof steel and fabrication for finished item of work

    Vibrated Reinforced cement concrete as per IS 456 equivalent to(1:2:4) prop nominal mix (cement fine aggreate, coarseaggregate) using 20mm size HBG (SS 5) machine crushed metalfrom approved quarry inclduing cost and conveyance of allmaterials water to wrok site and all operational, incidental,blasting , seig charges, sales and other taxed and all labourcharges such as centering, cutting, scafolding. lift chargesmachine mixing, curing, vibrating etc complete but excluding costof steel and fabrication for finished item of work.Roof beams

  • 8/8/2019 KGBV Nakarikallu

    5/81

    Description No. L B D Qty. Rate Per

    1 2 3 4 5 6 7 8 9 10

    Sl.No.

    Units

    0.09

    68.80 Sqm 462.34 Sqm

    Slab (175mm thick)

    Waist slab 2 1.4 5.1 14.28 Sqm 651.96 Sqm

    Lintels

    Over D1 15 1.5 0.23 0.15 0.78

    Over D3 &D3 2 1.2 0.23 0.15 0.08

    Over D4 20 1.05 0.23 0.15 0.72

    Over HW 3 1.2 0.23 0.15 0.12

    Over KW 3 1.5 0.23 0.15 0.16

    Over W 39 1.5 0.23 0.15 2.02

    0.02

    3.90 Cum 4,149.80 Cum

    Bressumer beam

    36-42 & 62-69 2 17.55 0.23 0.30 2.42

    62-35, 70-43 2 9.35 0.23 0.30 1.29

    0.09

    3.80 Cum 4,592.30 Cum

    Sun Shades 0.6mt width 25 1.5 37.50 Rmt 224.13 Cum

    Sun Shades - 0.45mt width 2 17.55 35.10

    (along bressumer) 2 9.35 18.70

    53.80 Rmt 190.72 Cum

    9

    Earth - CC, RCC,RR &CRS 236.86 Cum 17.25 Cum

    10.

    Class rooms 2 6.6 4.8 0.900 57.02

    2 6.6 4.8 0.900 57.02

    1 4.8 4.8 0.900 20.74

    dormitory 2 9.6 4.8 0.900 82.94

    1 8.28 4.8 0.900 35.77

    Kitchen 1 4.92 4.8 0.900 21.25

    Dining 1 10.8 4.8 0.900 46.66

    Staffroom 2 4.8 3 0.900 25.92

    Staircase 1 3 4.8 0.900 12.96

    Toilets 1 6.6 6.6 0.900 39.20

    Corridor 2 23.1 13.1 0.900 544.70

    Courtyard 1 19.5 10.5 0.900 184.28

    Portico 1 6.35 4 0.900 22.86

    0.07

    1151.40 Cum 143.30 Cum

    11.

    Filling with usefull available exacavated earth (excluding rock) intrenches, sides of foundatin with intial lead in layers not

    exceeding 15cm thick consolidating each deposited layer bywatering and ramming including all labour charges, hire charges,T&P Etc., complete for finished item of work (APSS No. 309 & 310)

    Filling with gravel for basement with initial lead in layers notexceeding 15cm thick consolidating each deposited layer bywatering and ramming including all labour charges, hire charges, T&P Etc., Complete for finished item of work . (APSS No. 309 &310)

    Brick masonry for panel walls in super structure 23cm thick withCM(1:6) prop (cement : sand) using second class bricks havingminimum crushing strength of 40kgs/sq cm including cost andconveyance of all materials like cement, sand, bricks, water etc.,to site. including seigniorage charges, sales and other taxes on allmaterials and all operational, incidential charges such as labourcharges, mixing cement mortor, scaffolding charges, constructionmasonry, lift charges, curing etc., complete for finished item ofwork (APSS No 501 & 504)

  • 8/8/2019 KGBV Nakarikallu

    6/81

    Description No. L B D Qty. Rate Per

    1 2 3 4 5 6 7 8 9 10

    Sl.No.

    Units

    Wall (82-57) (51-48) 1 7.21 0.23 3.60 5.97

    Wall (96-34) 1 24.63 0.23 3.60 20.39

    Corridor ( 36-42) & (63-69) 2 17.78 0.23 2.50 20.45

    (62-35) (70-43) 2 9.60 0.23 2.50 11.04

    Deductions

    D1 Doors 15 1.2 0.23 2.10 -8.69

    D3 & D3 2 0.9 0.23 2.10 -0.87

    W1 windows 34 1.25 0.23 1.35 -13.20

    SW windows 3 0.9 0.23 0.90 -0.56

    KW 1 1.2 0.23 0.90 -0.25

    Ventilators (Toilets) 10 0.9 0.23 0.60 -1.24

    Ventilators (below slab) 51 0.9 0.23 0.20 -2.11

    Openings 2 3 0.23 3.25 -4.49

    0.04

    162.10 Cum 2,302.93 Cum

    12

    59-60 1 4.8 3.17 15.22

    9 4.8 3.17 136.94

    57-51,48-38, 2 3.47 3.25 32.56

    Toilets 1 6.37 3.25 20.70

    1 4.5 3.25 14.63

    4 4.5 2.10 37.80

    4 1.23 2.10 10.33

    8 0.9 2.10 15.12

    4 1.07 2.10 8.99

    PH toilet 1 1.64 2.10 3.44

    Deductions

    D3 1 0.9 2.10 -1.89

    D4 20 0.75 2.10 -31.50

    0.06

    262.40 Sqm 300.39 Sqm

    Reinforced Brick masonary for partition walls (11.5cm thick ) inCM(1:4) prop (cement:sand) using second class bricks withcrushing strength not less than 40kg/sqcm and planking 2nos of6mm MS plain rods at every 600mm c/c with free ends of thereinforcement pegged into mortor joints of main brick wall whereapplicable, inclding cost and conveyance of all materials likecement, sand, bricks, water etc., to site inclduing seignioragecharges, sales and other taxes on all the materials, scaffoldingcharges and all labour charges, mixing cement mortar, liftcharges, curing etc., complete but excluding cost of steel and itsfabrication charges for finished item of work (APSS No.501 &509)

    23-8-,24-9,28-13,31-16,86-73,89-76,90-77,91-78,93-80.

  • 8/8/2019 KGBV Nakarikallu

    7/81

    Description No. L B D Qty. Rate Per

    1 2 3 4 5 6 7 8 9 10

    Sl.No.

    Units

    13.

    D1 size 1.2m x 2.1 m DS 15 15.00 Nos. 5,386.62 Each

    D3 & D3, size 0.9m x 2.1m 2 2.00 Nos. 4,610.12 Each

    D4 size 0.75m x 2.1m SS 20 20.00 Nos. 4,105.92 Each

    14.

    W - 1.2m X 1.35m size (no shutters) 4 4.00 Nos. 2,553.43 Each

    32 32.00 Nos. 5,695.94 Each

    Supply and fixing of Door with sale/Assam teak wood door frameof size 65mm X 100mm along with flush door shutters solid bondwood block board type with commercial ply on booth faces of35mm 204, 300mm long 2 No.s MS Powder coated Butt hinges IS205 125mm long 6 Nos. MS Powder coated handles IS 208125mm long 2 Nos. MS Powder coated aldrop IS 2681 300mmlong 1 No. MS Powder coated door stoppers 2 Nos. sales and othertaxes cost and conveyance of all materials to site, all labourchanges such as making of door frame fixing in position fixing ofshutters & hardware fixtures etc., complete for finished item ofwork. APSS - 1002.

    Supply and fixing of Door with Assam/Assam teak wood doorframe of size 65mm X 100mm and also welded with fixtures such

    as M.S. fasts 4 Nos. s M.S. Powder coated Butt hinges IS 205100mm long 16 Nos. MS Powder coated handles is 208 125mmlong 8 Nos. MS Powder coated appli 8 Nos. safety rods of 10mmsquare rods at 100mm center to center welded horizontally to fullwidth of window including Red Oxide primer of full width ofwindow including Red Oxide primer of grade - 1 quality sales andother taxes cost and conveyance of all materials to site, alllabour charges etc., complete for finished item of work. APSS -1002.

    W - 1.2m X 1.35m size (Shutters toglazed & bottom wood)

  • 8/8/2019 KGBV Nakarikallu

    8/81

    Description No. L B D Qty. Rate Per

    1 2 3 4 5 6 7 8 9 10

    Sl.No.

    Units

    15

    KW 2 1.2 0.90 2.16 Sqm 162.00 Sqm

    HW 3 0.9 0.90 2.43 Sqm 162.00 Sqm

    Toilets

    Ventilators 10 0.9 0.60 5.40 Sqm 162.00 Sqm

    below slab 51 0.9 0.20 9.18 Sqm 162.00 Sqm

    stair case 1 1.5 1.50 2.25 Sqm 162.00 Sqm

    16.

    Classroom 2 6.6 4.8 63.36

    Staff & entrance 2 3 4.8 28.80

    Classroom 2 6.6 4.8 63.36

    1 4.8 4.8 23.04

    dormitory 1 4.8 8.28 39.74

    2 9.6 4.8 92.16

    dining 1 4.8 10.8 51.84

    kitchen 1 4.8 4.92 23.62

    ver & store 1 4.57 1.9 8.68

    pot wash 1 1.8 3.3 5.94

    hand wash 1 1.8 3.3 5.94

    corridor 1 65.74 1.8 118.33

    toilets 1 1.64 4.8 7.87

    2 5.83 0.75 8.75

    staircase 1 4.8 3.65 17.52

    558.95 Sqm 5,122.77 10Sqm

    Supply and fixing of 50mm thick RCC jally including all labourcharges etc., complete for finished item of work.

    Flooring with 25.40 thick polished black cuddapah slabs of sizenot less than 45x45cm set over a bse coat of CM(1:8)prop 12mmthick joint of stone must be finished over cc bed of 100mm thickof CM(1:5:10) incl neat cement slurry of honey like consistencyspread @ 3.3kgs of cement jointed with neat cement full depthincl. all materials like cement sand, water flooring stone etc., tosite incl. cost of cement concrete bed and cost of seig chargessales & other taxes and all labour charges such as dressing offlooring stone mixing of cement mortor laying curing, lift chargesetc complete for finished item of work

  • 8/8/2019 KGBV Nakarikallu

    9/81

    Description No. L B D Qty. Rate Per

    1 2 3 4 5 6 7 8 9 10

    Sl.No.

    Units

    17.

    footing 56.15

    pedastals 10.61

    column below plinth 4.32

    plinth beam 30.55

    column above plinth 26.56

    roof beams 29.57

    roof slab - 115mm thick 554.83

    roof slab - 125mm thick 61.71

    waist slab - 175mm thick 14.28

    lintels 3.88

    bressumer beam 3.71

    sunshades - 0.6 mt width 37.5

    sunshades - 0.45 mt width 53.8

    25.00 MT 36,850.00 MT

    18.

    Wall (1-3) 1 4.93 3.17 15.63

    Wall (78) 1 4.8 3.17 15.22

    Wall (59-60) 1 4.8 3.17 15.22

    Wall (71-73) (84-86) 2 6.6 3.17 41.84

    Wall (84-71) 1 4.7 3.25 15.28

    Wall (71-59) 1 2.8 2.50 7.00

    59-1 1 17.6 3.25 57.20

    (60-2) 1 17.6 3.25 57.20

    (86-73) 1 4.8 3.17 15.22

    (24-3) 1 6.7 3.17 21.24

    (10-16) (45-31) (74-80) (87-93) 4 19.2 3.25 249.60

    5 4.8 3.17 76.08

    (32-4) 1 6.7 3.17 21.24

    (36-42) (63-69) 2 17.89 2.50 89.45

    (62-24) (70-43) 2 9.35 2.50 46.75

    (4-6) (20-21) 2 6.1 3.25 39.65

    (18-19) 1 4.5 3.25 14.63

    (33-34) (57-58) 2 4.5 3.17 28.53

    (81-83) (94-96) 2 6.6 3.17 41.84

    (82-33) 1 13 3.25 42.25

    Providing High Yield strength deformed (HYSD) steel bars (Fe 415grade) (as per IS 1786 - 1985) of different diameters cutting,bending to required size and shape in position with cover blocksof approved size and binding wire of 20 SWG forming grills forreinforcement work as per approved designs drawings incl. cost &conveyance of bars from approved sources to site of work,incl,c/c. of all materials like binding wire, cover blocks etc., incl. alloperational, incidental, seigiorage charges, sales & other taxesand all labour charges, such as cutting, bending, planking inposition, typing etc. complete for finished item of work (APSSNo.126.)

    Plastering with 20mm thick in two coats with base coat of 16mmthick in CM(1:6) and top coat of 4mm thick in CM(1:4) prop withdubara sponge finishing including Cost & conveyance of allmaterials like cement, sand, water etc., to site, cost of

    seigniorage charges on all materials and all operational,incidental charges and all labour charges for mixing mortar,finshing, scaffolding, lift charges, curing, including cuttinggrooves, etc., complete for finished item of work. (APSS No.901&904)

    (28-13) (89-76) (90-77) (91-78) (93-80)

  • 8/8/2019 KGBV Nakarikallu

    10/81

    Description No. L B D Qty. Rate Per

    1 2 3 4 5 6 7 8 9 10

    Sl.No.

    Units

    19.

    1174.00

    columns 67 0.23 3.25 50.08

    2 0.23 3.25 1.50

    24 0.72 3.25 56.39

    3 0.94 3.25 9.18

    beams as per RCC 1 317.95 0.34 108.10

    parapet 1 114.14 0.90 102.732 19.5 0.90 35.10

    2 10.5 0.90 18.90

    top 1 114.14 0.23 26.25

    1 60 0.23 13.80

    sunshade 6mt width 25 1.5 0.60 22.50

    Sunshade 0.45 mt width 2 17.55 0.45 15.80

    2 9.35 0.45 8.42

    0.05

    1642.80 Sqm 1,002.52 10 Sqm

    20.

    as per RCC item. 637.82 Sqm 775.67 10 Sqm

    21.

    All plastering qty - snowsem. 2828.52 Sqm 267.56 10 Sqm

    22.

    Wall (1-3) 1 4.93 4.50 22.19

    Wall (84-86) 1 6.6 4.50 29.70

    Wall (84-1) 1 26.23 4.50 118.04

    (10-16) 2 19.2 4.50 172.80

    (4-6) 1 6.9 4.50 31.05

    (20-21) (33-34) 2 4.5 4.50 40.50

    (94-96) 1 6.6 4.50 29.70

    (96-34) 1 17.88 4.50 80.46

    (21-6) 1 6.37 4.50 28.67

    (36-42) (63-69) 2 19.5 2.50 97.50

    (63-36) (70-43) 2 10.5 2.50 52.50

    Deductions - Doors 25 1.5 1.35 -50.63

    Kw 2 1 2 0 90 2 16

    Plastering with 12mm thick in two coats with base coat of 8mmthick in CM(1:6) & top coat of 4mm thick in CM(1:4)with dubarasponge finishing including Cost and conveyance of all materialslike cement, sand, water etc., to site, including seignioragecharges, sales and other taxes on all materials and alloperational, incidental charges on materials and including cost ofall labour charges for mixing mortar, finishing, scaffolding, liftcharges, curing, including cutting grooves etc for finished item ofwork. (APSS No.901,903&904)

    Quantity as per 20mm thickplastering

    Plastering to ceiling with 12mm thick in CM(1:3) with dubrasponge finishing incl. Cost & conveyance of all materials at worksite and all operational, incidental, seig charges, sales & othertaxes and all labour charges such as scaffolding charges, mixingmortor, lift charges etc for finished item of work

    Whiting to internal walls and ceilling two coats over a primarycoar total 3 coats incl. Cost & conveyance of all materials at worksite and all operational, incidental, seigniorage charges, sales &other Taxes, and all labour charges, etc., complete for finisheditem of work APSS 908.

    Painting to NEW WALL with 2 coats approved SNOWCEM PAINTover a primary coat total (3) coat incl. C/c. of all materials at worksite on all operational, incidental, seigniorage charges, sales &other taxes sand all labour charges, etc., complete for finisheditem of work. AP SS 912.

  • 8/8/2019 KGBV Nakarikallu

    11/81

    Description No. L B D Qty. Rate Per

    1 2 3 4 5 6 7 8 9 10

    Sl.No.

    Units

    23.

    D1 - Door frames 9.9 1.2 2.10 24.95

    D1- Door shutters 20.1 1.2 2.10 50.65

    D3&D3 - Door frames 2.68 0.9 2.10 5.07

    D3&D3 - Door shutters 1.32 0.9 2.10 2.49

    D4- Door frames 13.2 0.75 2.10 20.79

    D4- Door shutters 26.8 0.75 2.10 42.21

    Window - W frames 11.9 1.2 1.35 19.28

    Window - W - four wooden shutters. 6.03 1.2 1.35 9.77

    5.7 0.9 0.90 4.62

    four glazed shutters. 1.01 0.9 0.90 0.82

    0.06

    180.70 Sqm 352.00 10 Sqm

    24.

    Over roof slab (115 & 125mm thick) 623.54 Sqm 973.77 10 Sqm

    25

    Bath rooms 2 3.36 1.50 10.08

    3 2.7 1.50 12.15

    3 2.7 1.50 12.15

    5 3.04 1.50 22.80

    Toilets 3 3.36 0.90 9.07

    2 2.7 0.90 4.86

    2 2.7 0.90 4.86

    0.03

    76.00 Sqm 3,506.79 10 Sqm

    26

    5 0.9 1.23 5 54

    Painting with SYNTHETIC ENAMEL PAINT two coats over a primarycoat to new wood work including cost & conveyance of allmaterials at work site on all operational, incidental, seignioragecharges, sales & other taxes and all labour charges etc., completefor finished item of work APSS 1201, 1207, 1212.

    Top two glazed & bottom twowooden

    Providing Imprevious coat to exposed RCC roof slab surfaces torequired slopes with CM(1:3)prop 20mm thick (average) mixingwith water proofing compound from reputed manufcturerer asapproved by Engineer-in-charge at 1kg/bag of cement laid overroof slab when it green, finshed smooth with a floating coat ofneat cement and thread lining at regular interval of 45cmx45cmincluding cost and conveyance of materials like cement, sand,water proofing compound etc., to site. cost of seigniorage chargeson all materials and all operational, incidental and labour chagesfor mixing mortar, laying, lift charges, rendering smooth andthread lining, curing including rounding off juntions of wall andslab etc., complete for finished item of work(APSS No.901 &903)

    Dadooing with 1st quality colour ceramic tiles of approved brandand set over 12mm thick in CM (1:3) prop. Base coat and neatcement paste at the rate of 3.30 kg/sqmt and jointed with whitecement paste mixed with pigment of macht with shade of tilesincluding of cost & conveyance of all materials at work site on alloperational charges, incidental, seigniorages. sales & othercharges including cost of all materials and labour charges etccomplete for finished item of work (APSS 701 & 707)

    Flooring with ceramic tiles 1st quality of any shade 7.3 mm thickas approved by Engineer and set over a base coat of CM (1:8),12mm thicklaid over flooring bed/VRCC slab and neat cementpaste at the rate of 3.3Kg/sqmt and joined with white cementpaste mixed with pigment of matching shade including coast andconveyance of all materials and labour charges complete bottomflooring (APSS 701 & 707)

  • 8/8/2019 KGBV Nakarikallu

    12/81

    Description No. L B D Qty. Rate Per

    1 2 3 4 5 6 7 8 9 10

    Sl.No.

    Units

    3030 30 Nos. 21.80 Each

    316 6 Nos. 58.10 Each

    3220 20 Nos. 79.90 Each

    33

    8 8 Nos. 232.30 Each

    343 3 Nos. 30.30 Each

    352 2 Nos. 30.30 Each

    36

    4 4 Nos. 774.40 Each

    37

    4 4 Nos. 254.10 Each

    38

    25 25 Nos. 111.30 Each

    39

    10 10 Nos 581.90 Each

    40

    1 30.00 30.00 Rm 202.40 Rm

    41

    2 10000 Ltrs. 7.00 Ltrs.

    25

    10 4.00 2.00 80.00 Sqm 1,622.87 10sqm

    26

    1 9.13 Sqm 1,280.00

    27 Provision for Septic tank and accessories

    28 Provision for borewell & pump set L.S.

    29 Electrification as per Sub - estimate L S

    S&F 12.7 mm MP coupling SSRitem No 132 a

    S&F 25.4 mm MP coupling SSRitem No 136a

    S&F 50.8 dia GI Union 1st qualitySSR item No 148

    S&F 12.7 mm NP elbow action pillarcock 600 gms SSR item No. 167 a

    S&F 12.7 mm GI ' T ' A class 1stquality SSR item No 150

    S&F CI Gully trap grating SSR itemNO. 304

    Supply and fixing of 50.3 mm G. M. peet valve ISI mark/makeheavy type as approved by chief Engineer, screw type 1st qualityof approved type including cost & conveyance of all materials atwork site, on all operational, incidental, seigniorage charges, sales& other Taxes,a nd all labour charges at all levels for finished itemof work in all floors. SSR item No. 236

    Supply and fixing of 25.40 mm G.M peet valve ISI mark/makeheavy type as approved by chief Engineer, screw type 1st qualityof approved type including cost & conveyance of all materials atwork site, on all operational, incidental, seigniorage charges, sales& other Taxes,a nd all labour charges at all levels for finished itemof work in all floors. SSR item No. 227

    supply and fixing of 12.70mm N.P. bib tap Indian make 300gms.SSR item 116

    S/Fixing of 584.2mm long Indian pattern white glazed W.C. andtrap. SSR item 91

    Supply, laying, jointing & testing of 152.40 mm SWG pipe of ISImake conforming to ISI 651 & 4127 with air tight cement joints incm (1:5:1) prop. Incl. Excavation of trenches & socket pits in anysoils (except rock requiring blasting) up to 151.2 mm depth andrefilling with watering and tamping. SSR item No. 23

    Supply and placing on Terrace (at all floors levels) polyethylene

    water storage Tank with Double layer confirming to IS 12701/96with cover & suitable locking arrangement and making necessaryholes for inlet & outlets & over flow pipes but without fittings andbase support for Tanks including cost & conveyance to site, slaes,& other Taxes on all materials and all labour charges etc.,complete for 5000 lts. capacity,SSR item No. 718

    Providing green chalk board with CM (1:3) prop with all materialsand labour etc., complete.

    Supply & fixing collapsable steel shutters with verticle, doublechannel of 20X10X2 mm of 100 mm center bracers with flat iron40X40X6 mm with 38 mm dia steel pully with all fixtures andfurniture as per special spn. 1105, SSR item No. 144

  • 8/8/2019 KGBV Nakarikallu

    13/81

    DATA SHEET

    Est.Cost :Rs 45 Lak

    Unit Description Rate Per

    1 2 3 5 6

    1 1.00 cum

    33.50 cum

    Add 50% extra

    sundries

    2 1.00 cum

    0.92 cum Cost of 40mm HBG metal 596.50 cum

    0.46 cum Cost of sand 480.60 cum

    0.132 MT Cost of cement 4300.00 MT

    1.00 cum Labour charges 449.20 cum

    sundries

    3 1.00 cum

    1.10 cum Cost of RR stone 546.30 cum

    0.34 cum Cost of CM(1:6) 1535.10 cum

    1.00 cum Labour charges 662.80 cum

    sundries

    Name of the work : Construction of KGB Vidyalaya at Nakarikallu in Guntur district

    Sl.No.

    Earth work excavation in foundations for buildings anddepositing the earth on bank with an initial lead of 10mand initial lift of 2m in loamy & clayey soils, red earth andordinary gravel soils as per SS 20B

    Plain cement concrete in CM(1:5:10) proportion using40mm size (SS5) HBG metal from approved quarryincluding Cost and conveyance of all materials likecement, sand , coarse aggregate, water etc., to site,including cost of seigniorage charges on all materials alllabour charges for machine mixing, laying concrete.ramming, finishing top surface to the required level,curing etc., complete for finished item of work. (APSSNo.402)

    R R masonary in CM(1:8) using Hard Granite stoneincluding Cost and conveyance of all materials like

    cement, sand, water, stones etc., to site and includingseigniorage charges, sales & other taxes on all materialsincluding labour for cutting stones to required size andshape, mixing of cement mortar, construction, curing etc.,complete for finished item of work in foundation andbasement (APSS No.107 &615)

  • 8/8/2019 KGBV Nakarikallu

    14/81

    Unit Description Rate Per

    1 2 3 5 6

    Sl.No.

    4 1.00 cum

    0.92 cum Cost of 20mm HBG Mc metal 1164.70 cum

    0.46 cum Cost of sand 480.60 cum

    0.331 MT Cost of cement 4300.00 MT

    1.00 cum Machine Mixing 37.50 cum1.00 cum Labour charges 794.40 cum

    sundries

    5 For Bed Blocks

    1.00 cum Cost of CC(1:2:4) 3547.80 cum

    1.00 cum Centering charges 376.00 cum

    6 1.00 cum

    For Footings

    1.00 cum Cost of CC(1:2:4) 3547.80 cum

    1.00 cum Centering charges 376.00 cum

    1.00 cum Vibrating charges 38.50 cum

    7 For Plinth Beams

    1.00 cum Cost of CC(1:2:4) 3547.80 cum

    1.00 cum Centering charges 602.00 cum1.00 cum Vibrating charges 38.50 cum

    Plain cement concrete as per IS 456 equivalent to (1:2:4)prop nominal mix (cement fine aggreate, coarseaggregate) using 20mm size HBG (SS 5) machine crushedmetal from approved quarry inclduing cost andconveyance of all materials water to wrok site and alloperational, incidental, blasting , seig charges, sales and

    other taxed and all labour charges such as centering,cutting, scafolding. lift charges machine mixing, curing,vibrating etc complete but excluding cost of steel andfabrication for finished item of work

    Vibrated Reinforced cement concrete as per IS 456equivalent to (1:2:4) prop nominal mix (cement fineaggreate, coarse aggregate) using 20mm size HBG (SS 5)machine crushed metal from approved quarry inclduingcost and conveyance of all materials water to wrok siteand all operational, incidental, blasting , seig charges,sales and other taxed and all labour charges such ascentering, cutting, scafolding. lift charges machine mixing,curing, vibrating etc complete but excluding cost of steeland fabrication for finished item of work

  • 8/8/2019 KGBV Nakarikallu

    15/81

    Unit Description Rate Per

    1 2 3 5 6

    Sl.No.

    8 For Lintels

    1.00 cum Cost of CC(1:2:4) 3547.80 cum

    1.00 cum Centering charges 602.00 cum

    9 for RCC sun shades & chajjas 0.60mts width

    0.0375 cum Cost of CC(1:2:4) 3547.80 cum

    1.00 cum Centering charges 91.00 cum

    for RCC sun shades & chajjas 0.45mts width

    0.0281 cum Cost of CC(1:2:4) 3547.80 cum

    1.00 cum Centering charges 91.00 cum

    10 For T Beams

    1.00 cum Cost of CC(1:2:4) 3547.80 cum

    1.00 cum Centering charges 1006.00 cum

    1.00 cum Vibrating charges 38.50 cum

    11 For VRCC slab of 150mm depth

    0.15 cum Cost of CC(1:2:4) 3547.80 cum

    0.15 cum Centering charges 112.00 cum0.15 cum Vibrating charges 38.50 cum

    12 For VRCC slab of 115mm depth

    0.115 cum Cost of CC(1:2:4) 3547.80 cum

    0.115 cum Centering charges 112.00 cum

    0.115 cum Vibrating charges 38.50 cum

    13 For VRCC slab of 125mm depth

    0.125 cum Cost of CC(1:2:4) 3547.80 cum

    0.125 cum Centering charges 112.00 cum

    0.125 cum Vibrating charges 38.50 cum

    14 For VRCC slab of 175mm depth

    0.175 cum Cost of CC(1:2:4) 3547.80 cum

    0.175 cum Centering charges 139.00 cum

    0.175 cum Vibrating charges 38.50 cum

  • 8/8/2019 KGBV Nakarikallu

    16/81

    Unit Description Rate Per

    1 2 3 5 6

    Sl.No.

    15

    for columns ( 1:1.5:3 )

    1.00 cum Cost of CC(1:2:4) 3547.80 cum

    0.110 MT Add difference cost of cement 4300.00 MT

    1.000 cum Vibrating charges 38.50 cum1.000 cum Centering charges 959.00 cum

    16

    0.21 cum Cost of CM(1:3) 2567.10 cum

    2.00 kg Cost of Acco proof powder 22.00 kg

    10.00 sqm Labour cgarges 390.60 10 sqm

    sundries

    Vibrated Reinforced cement concrete as per IS 456equivalent to (1:1.5:3) prop nominal mix (cement fineaggreate, coarse aggregate) using 20mm size HBG (SS 5)machine crushed metal from approved quarry inclduingcost and conveyance of all materials water to wrok siteand all operational, incidental, blasting , seig charges,

    sales and other taxed and all labour charges such ascentering, cutting, scafolding. lift charges machine mixing,curing, vibrating etc complete but excluding cost o fsteeland fabrication for finished item of work

    Providing Imprevious coat to exposed RCC roof slabsurfaces to required slopes with CM(1:3)prop 20mm thick(average) mixing with water proofing compound fromreputed manufcturerer as approved by Engineer-in-chargeat 1kg/bag of cement laid over roof slab when it green,finshed smooth with a floating coat of neat cement andthread lining at regular interval of 45cmx45cm including

    cost and conveyance of materials like cement, sand,water proofing compound etc., to site. cost of seignioragecharges on all materials and all operational, incidental andlabour chages for mixing mortar, laying, lift charges,rendering smooth and thread lining, curing includingrounding off juntions of wall and slab etc., complete forfinished item of work(APSS No.901 &903)

  • 8/8/2019 KGBV Nakarikallu

    17/81

    Unit Description Rate Per

    1 2 3 5 6

    Sl.No.

    17

    Add 50% excavated soils initial rate 33.50 cum

    Add difference between 20A-20B (37.00-33.50) 3.50 cum

    18

    512.00 Nos. Cost of 2nd class brick 2733.40 1000Nos

    0.20 cum Cost of CM(1:6) 1535.10 cum

    1.00 cum Labour charges 596.40 cum

    sundries

    19

    59.00 No Cost of 2nd class brick 2733.40 1000Nos

    0.02 cum Cost of sand 480.60 cum

    0.02 cum mixing charges 22.50 cum

    0.04 Nos 1st class Mason 180.00 Nos

    Filling with useful available excavated earth (excludingrock) in trenches, sides of foundations and basement withintial lead in layers not exceeding 15cm thick,consolidating each deposited layer by watering andramming including seignorage charges, all operational,incidental labour charges, hire charges of T&P etc.,

    complete for finshed item of work. (APSS No.309 &310)

    Brick masonry for panel walls in super structure 23cmthick with CM(1:6) prop (cement : sand) using second

    class bricks having minimum crushing strength of40kgs/sq cm including cost and conveyance of allmaterials like cement, sand, bricks, water etc., to site.including seigniorage charges, sales and other taxes on allmaterials and all operational, incidential charges such aslabour charges, mixing cement mortor, scaffoldingcharges, construction masonry, lift charges, curing etc.,complete for finished item of work (APSS No.501 & 504)

    Reinforced Brick masonary for partition walls (11.5cmthick ) in CM(1:4) prop (cement:sand) using second classbricks with crushing strength not less than 40kg/sqcm andplanking 2nos of 6mm MS plain rods at every 600mm c/cwith free ends of the reinforcement pegged into mortor

    joints of main brick wall where applicable, inclding costand conveyance of all materials like cement, sand, bricks,water etc., to site inclduing seigniorage charges, salesand other taxes on all the materials, scaffolding chargesand all labour charges, mixing cement mortar, liftcharges, curing etc., complete but excluding cost of steeland its fabrication charges for finished item of work (APSSNo.501 &509)

  • 8/8/2019 KGBV Nakarikallu

    18/81

    Unit Description Rate Per

    1 2 3 5 6

    Sl.No.

    0.11 Nos 2nd class Mason 160.00 Nos

    0.30 Nos Mazdoor 130.00 Nos

    0.88 kg M.S. plain 6mm rod 32175.00 MT

    0.88 kg fabrication charges 6.00 Kg

    0.007 MT Cost of cement 4300.00 MT

    sundries

    20 Cost of cement mortor in (1:3) proportion

    1.00 cum Cost of sand 480.60 cum

    0.48 cum Cost of cement 4300.00 cum

    1.00 cum mixing charges 22.50 cum

    Cost of cement mortor in (1:4) proportion

    1.00 cum Cost of sand 480.60 cum0.36 cum Cost of cement 4300.00 cum

    1.00 cum mixing charges 22.50 cum

    Cost of cement mortor in (1:5) proportion

    1.00 cum Cost of sand 480.60 cum

    0.29 cum Cost of cement 4300.00 cum

    1.00 cum mixing charges 22.50 cum

    Cost of cement mortor in (1:6) proportion

    1.00 cum Cost of sand 480.60 cum

    0.24 cum Cost of cement 4300.00 cum

    1.00 cum mixing charges 22.50 cum

    Cost of cement mortor in (1:8) proportion

    1.00 cum Cost of sand 480.60 cum

    0.18 cum Cost of cement 4300.00 cum1.00 cum mixing charges 22.50 cum

  • 8/8/2019 KGBV Nakarikallu

    19/81

    Unit Description Rate Per

    1 2 3 5 6

    Sl.No.

    21

    0.11 cum Cost of CM(1:6) 8mm thick 1535.10 cum

    1.00 Nos Mason 1st & 2nd class(30%+70%) 166.00 Nos

    1.50 Nos Man and Women Mazdoor 130.00 Nos

    0.04 cum Cost of CM(1:4) 4mm thick 2051.10 cum1.10 Nos Mason 1st & 2nd class 166.00 Nos

    1.60 Nos Man and Women Mazdoor 130.00 Nos

    22

    0.18 cum Cost of CM(1:6)prop 16mm thick 1535.10 cum

    1.00 Nos Mason 1st & 2nd class 166.00 Nos

    2.30 Nos Man and Women Mazdoor 130.00 Nos

    0.04 cum Cost of CM(1:4) 4mm thick 2051.10 cum

    1.10 Nos Mason 1st & 2nd class 166.00 Nos

    1.60 Nos Man and Women Mazdoor 130.00 Nos

    23

    0.06 cum Cost of Sand 480.60 cum

    0.06 cum Cost of Mixing Charges 22.50 cum

    0.05 MT Cost of Cement 4300.00 MT

    1.60 Nos I Class 30%+II Class 70% 166.00 Nos

    1.60 Nos Man&Woman mazdoors 130.00 Nos

    Plastering with 12mm thick in two coats with base coat of8mm thick in CM(1:6) & top coat of 4mm thick inCM(1:4)with dubara sponge finishing including Cost andconveyance of all materials like cement, sand, water etc.,to site, including seigniorage charges, sales and othertaxes on all materials and all operational, incidental

    charges on materials and including cost of all labourcharges for mixing mortar, finishing, scaffolding, liftcharges, curing, including cutting grooves etc for finisheditem of work. (APSS No.901,903&904)

    Plastering with 20mm thick in two coats with base coat of16mm thick in CM(1:6) and top coat of 4mm thick inCM(1:4) prop with dubara sponge finishing including Cost& conveyance of all materials like cement, sand, wateretc., to site, cost of seigniorage charges on all materialsand all operational, incidental charges and all labourcharges for mixing mortar, finshing, scaffolding, lift

    charges, curing, including cutting grooves, etc., completefor finished item of work. (APSS No.901 &904)

    Flush Pointing in CM(1:3)prop including cost andconveyance of all materials and of all labour charges etccomplete

  • 8/8/2019 KGBV Nakarikallu

    20/81

    Unit Description Rate Per

    1 2 3 5 6

    Sl.No.

    24 10.00 sqm

    10.10 sqm Cost of polished blueshahabad stone slab of Tandur 2026.00 10sqm

    0.051 cum Cement putty for sabera 4300.00 MT

    1.00 cum Cost of CC(1:5:10) 1786.66 cum

    0.12 cum cement mortor CM(1:8) 1277.10 cum

    0.96 nos Mason 1st class 180.00 Nos

    2.24 nos Mason 2nd class 160.00 Nos

    2.20 nos Man mazdoor 130.00 Nos

    1.10 nos Women Mazdoor 130.00 Nos

    Flooring with blue polished shahabad stone slab of Tandur25.4mm thich (0.457 X 0.304 ) or any other size asspecified set over a bse coat of CM(1:8)prop 12mm thick

    joint of stone must be finished over cc bed of 100mmthick of CM(1:5:10) incl neat cement slurry of honey like

    consistency spread @ 3.3kgs of cement jointed with neatcement full depth incl. all materials like cement sand,water flooring stone etc., to site incl. cost of cementconcrete bed and cost of seig charges sales & other taxesand all labour charges such as dressing of flooring stonemixing of cement mortor laying curing, lift charges etccomplete for finished item of work

  • 8/8/2019 KGBV Nakarikallu

    21/81

    Unit Description Rate Per

    1 2 3 5 6

    Sl.No.

    25 10.00 sqm

    0.15 cum Cost of CM(1:3) 2567.10 cum

    1.00 cum Labour charges 390.60

    26 10.00 sqm

    0.70 Lts Wood Primer 142.00 lt

    1.20 kg Synthetic enamel paint 155.00 kg

    0.21 nos Painter 1st class for primer coat 180.00 Nos

    0.49 nos Painter 2nd class for primer coat 160.00 Nos

    0.36 nos Ist class for enamel paint 180.00 Nos0.84 2nd class for enamel paint 160.00 Nos

    27 10.00 sqm

    3.50 kg Surya cem paint 6.48 kg

    1.00 sqm Labour charges 244.80 sqm

    28 10.00 sqm

    3.50 kg Snow cem paint 1st quality 34.56 kg

    1.00 sqm Labour charges 278.00 sqm

    Plastering to ceiling with 12mm thick in CM(1:3) withdubra sponge finishing incl. Cost & conveyance of allmaterials at work site and all operational, incidental, seigcharges, sales & other taxes and all labour charges suchas scaffolding charges, mixing mortor, lift charges etc forfinished item of work

    Painting to new wood work over a primary coat to newand painting two coats of synthetic enamel paint firstgrade of approved brand and shade including cost andconveyance of all materials to site cost of primer coat and

    all labour charges etc., complete including applying sandpaper on l for neat finish including sales & other taxes oncost of all materials etc., complete for finished item ofwork (APSS No.1200.1207 &1211)

    Whiting to internal walls and ceiling two coats over aprimary coat, total 3 coats inclduing cost & conveyance ofall materials at work site and all operational, incidentalseig charges, sales & other taxes and all labour charges,etc complete for finished item of work

    Painting to new wall with 2 coats approved snow cempaint over a primary coat, total 3 coats including cost andconveyance of all materials at work site on all operatinal,incidental seig charges, sales & other taxes sand alllabour charges etc complete for finished item of work

  • 8/8/2019 KGBV Nakarikallu

    22/81

    Unit Description Rate Per

    1 2 3 5 6

    Sl.No.

  • 8/8/2019 KGBV Nakarikallu

    23/81

    Unit Description Rate Per

    1 2 3 5 6

    Sl.No.

    29 10.00 sqm

    0.50 cum cost of CM(1:3) 2567.10 cum

    10.00 sqm cost of rabit wire mesh 10.00 sqm

    10.00 sqm labour chargs 50-75mm RCM 133.00 sqm

    10.00 sqm centering charges for hand railing 55.00 sqm

    26.40 kg cost of steel 32.18 kg

    30 10.00 sqm

    0.21 cum cost of CM(1:3) 2567.10 cum

    10.00 sqm Labour charges 846.20 10 sqm

    1.20 lts Green oxide 58.60 lts

    0.36 nos Painter 1st class 180.00 nos

    0.64 nos Painter 2nd class 160.00 nos

    31 1.00 Nos

    Frames

    0.0273 cum vertical posts (2x2.1x0.065x0.10) 31900.00 cum

    0.0185 cum Horizantal posts (2x1.42x0.065x0.10) 31900.00 cum

    6 nos hold fasts of 0.23mts long 50.00 Nos

    0.84 sqm labour charges (1/3x2.52) 406.00 sqm

    shutters

    2.52 sqm flush type shutters of 35mm thick 624.00 sqm

    6 nos Brass hinges of 0.125mts long 93.00 Nos

    1 nos Alluminium Aldrop of 0.25mts long 176.00 Nos2 nos Alluminium Tower bolts of 0.20mts long 64.00 Nos

    2 nos Aluminium handles of 0.125mts long 56.00 Nos

    2 nos Door stopers 28.00 Nos

    1.68 sqm labour charges (2/3x2.52) 406.00 sqm

    RCM in facia CM(1:3)prop using Rabit wire mesh spongefinishing all exposed faces using nominal recinforcementincluding cost and conveyance of all materials and labourcharges

    Forming green chalk board, 20 mm thick in CM(1:3) andpainted with green oxide of two coats including cost andconveyance of all mateials and labour charges

    Supplying and fixing of doors of size 1.20x2.10mts

    includng cost and conveyance of all materials and labourcharges etc complete

  • 8/8/2019 KGBV Nakarikallu

    24/81

    Unit Description Rate Per

    1 2 3 5 6

    Sl.No.

    32 1.00 Nos

    Frames

    0.0273 cum vertical posts (2x2.1x0.065x0.10) 31900.00 cum

    0.0145 cum Horizantal posts (2x1.115x0.065x0.10) 31900.00 cum

    6 nos hold fasts of 0.23mts long 50.00 Nos

    0.63 sqm labour charges (1/3x1.89) 406.00 sqm

    shutters

    1.89 sqm flush type shutters of 35mm thick 624.00 sqm

    6 nos Brass hinges of 0.125mts long 93.00 Nos

    1 nos Alluminium Aldrop of 0.25mts long 176.00 Nos

    2 nos Alluminium Tower bolts of 0.20mts long 64.00 Nos

    2 nos Aluminium handles of 0.125mts long 56.00 Nos

    2 nos Door stopers 28.00 Nos

    1.26 sqm labour charges (2/3x1.89) 406.00 sqm

    33 1.00 Nos

    Frames

    0.0273 cum vertical posts (2x2.1x0.065x0.10) 31900.00 cum

    0.0120 cum Horizantal posts (2x0.914x0.065x0.10) 31900.00 cum

    4.00 nos hold fasts of 0.23mts long 50.00 Nos0.53 sqm labour charges (1/3x1.575) 406.00 sqm

    shutters

    1.575 sqm flush type shutters of 35mm thick 624.00 sqm

    6 nos Brass hinges of 0.125mts long 93.00 Nos

    1 nos Alluminium Aldrop of 0.25mts long 176.00 Nos

    2 nos Alluminium Tower bolts of 0.20mts long 64.00 Nos

    2 nos Aluminium handles of 0.125mts long 56.00 Nos

    2 nos Door stopers 28.00 Nos

    1.05 sqm labour charges (2/3x1.575) 406.00 sqm

    34 1.00 nos

    Frames

    0.0260 cum vertical posts (3x1.35x0.065x0.10) 31900.00 cum

    0.0180 cum Horizantal posts (2x1.42x0.065x0.10) 31900.00 cum

    4 nos hold fasts of 0.23mts long 50.00 Nos

    20.856 kg 16mm dia MS plain rods 32.18 kg

    0.54 sqm labour charges (1/3x1.62) 331.00 sqm

    shutters

    0.010 cum styles horizontal (4x1.005x0.065x0.10) 36258.00 cum

    Supplying and fixing of doors of size 0.90x2.10mtsincludng cost and conveyance of all materials and labourcharges etc complete

    Supplying and fixing of doors of size 0.75x2.10mtsincludng cost and conveyance of all materials and labourcharges etc complete

    Supply and fixing of windows size 1.20x1.35mts includingcost and conveyance of all materials and labour charges(out of total 4 shtters, top 2 shutters are glazed)

  • 8/8/2019 KGBV Nakarikallu

    25/81

    Unit Description Rate Per

    1 2 3 5 6

    Sl.No.

    0.012 cum styles vertical (4x1.22x0.065x0.038) 36258.00 cum

    0.009 sqm Wood (2x1x0.52x0.4125x0.02) 36258.00 sqm

    0.429 sqm Glazed panels (2x1x0.52x0.4125x0.004) 189.00 sqm

    8 nos Brass hinges of 0.125mts long 93.00 nos

    8 nos Alluminium Tower bolts of 0.15mts long 51.00 nos

    8 nos Aluminium handles of 0.10mts long 38.00 Nos

    8 nos Stopers 28.00 Nos

    1.08 sqm labour charges (2/3x1.62) 331.00 sqm

    35

    Frames

    0.0260 cum vertical posts (3x1.35x0.065x0.10) 31900.00 cum0.0180 cum Horizantal posts (2x1.42x0.065x0.10) 31900.00 cum

    6 nos hold fasts of 0.23mts long 50.00 Nos

    20.856 kg 16mm dia MS plain rods 32.18 kg

    0.54 sqm labour charges (1/3x1.62) 331.00 sqm

    Supply and fixing of windows of size 1.20x1.35mtsincluding cost and conveyance of all materials and labourcharges complete

  • 8/8/2019 KGBV Nakarikallu

    26/81

    Unit Description Rate Per

    1 2 3 5 6

    Sl.No.

    36 10.00 sqm

    10.05 sqm Glazed coloured tiles 316.00 sqm

    3.30 kg Grey cement 4300.00 MT

    2.00 kg white cement 17.00 kg

    0.012 cum cement mortor CM(1:5) 1750.10 cum

    0.77 Nos 1st class mason 180.00 Nos

    0.77 Nos man & women mazdoor 160.00 Nos

    37 10.00 sqm

    10.05 sqm ceramic tiles 356.00 sqm

    3.30 kg Grey cement for slurry 4300.00 MT

    2.00 kg white cement for pointing 17.00 kg

    0.012 cum Cement mortor (1:8) 1277.10 cum

    0.77 nos 1st class mason 180.00 nos

    0.77 nos mazdoor 160.00 nos

    Dadooing to walls with glazed coloured tiles 1st quality ofany size as approved by Engineer and set over a basecoat of CM(1:5), 12mm thick and neat cement paste atthe rate of 3.3kg/sqm and joined with white cemetn pasemixed with pigment of matching shade including cost andconveyance of all materials and labour charges

    Flooring with non skid ceramic tiles 1st quality of anyshade 7.3mm thick as approved by Engineer and set overa base coat of CM(1:8), 12mm thick laid over flooringbed / VRCC slab and neat cement paste at the rate of3.3kg/sqm and joined with cement paste mixed withpigment of matching shade including cost andconveyance of all materials and labour charges complete

  • 8/8/2019 KGBV Nakarikallu

    27/81

    Unit Description Rate Per

    1 2 3 5 6

    Sl.No.

    38 1.00 MT

    1.00 MT Cost of steel 30850.00 MT

    1.00 MT Fabrictaion charges 6000.00 MT

    Providing high yield strength deformed steel (Fe 415grade as per IS 1786-1979) of different diameters,including labour charges for cutting, bending to reqwuiredsizes and shapes placing in position with cover blocks ofapproved materials and size and tying with binding wire of20 SWG, forming grills for reinforcement work as per

    approved designs and drawings including cost andconveyance of steel bars, including all wastage such asoverlaps, couplings, welding joints, chairs, spacers barsincluding cost and coveyance of binding wire, cover blocksand all operational, incidental, labour charges such ascuting, bending, placing in position, tying including salesand other taxes on all materials etc., complete for finisheditem of work. (APSS No.126)

  • 8/8/2019 KGBV Nakarikallu

    28/81

    hs

    Amount

    7

    33.50

    16.75

    0.00

    50.25cum

    548.78

    221.08

    567.60

    449.20

    1786.66

    cum

    600.93

    521.93

    662.80

    1785.66

    cum

  • 8/8/2019 KGBV Nakarikallu

    29/81

    Amount

    7

    1071.52

    221.08

    1423.30

    37.50794.40

    3547.80

    cum

    3547.80

    376.00

    3923.80

    cum

    3547.80

    376.00

    38.50

    3962.30

    cum

    3547.80

    602.0038.50

    4188.30

    cum

  • 8/8/2019 KGBV Nakarikallu

    30/81

    Amount

    7

    3547.80

    602.00

    4149.80

    cum

    133.04

    91.00

    0.09

    224.13

    Rmt

    99.69

    91.00

    0.03

    190.72Rmt

    3547.80

    1006.00

    38.50

    4592.30

    cum

    532.17

    16.805.78

    0.04

    554.79

    sqm

    408.00

    12.88

    4.43

    0.09

    425.39

    sqm

    443.48

    14.00

    4.81

    0.05

    462.34

    sqm

    620.87

    24.33

    6.740.03

    651.96

    sqm

  • 8/8/2019 KGBV Nakarikallu

    31/81

    Amount

    7

    3547.80

    473.00

    38.50959.00

    5018.30

    cum

    539.09

    44.00

    390.60

    0.08

    973.77

    10sqm

  • 8/8/2019 KGBV Nakarikallu

    32/81

    Amount

    7

    33.50

    3.50

    37.00

    cum

    1399.50

    307.02

    596.40

    0.01

    2302.93

    cum

    161.27

    11.05

    0.52

    7.20

  • 8/8/2019 KGBV Nakarikallu

    33/81

    Amount

    7

    17.60

    39.00

    28.31

    5.28

    30.10

    0.05300.39

    sqm

    480.60

    2064.00

    22.50

    2567.10

    cum

    480.601548.00

    22.50

    2051.10

    cum

    480.60

    1247.00

    22.50

    1750.10cum

    480.60

    1032.00

    22.50

    1535.10

    cum

    480.60

    774.0022.50

    1277.10

    cum

  • 8/8/2019 KGBV Nakarikallu

    34/81

    Amount

    7

    168.86

    166.00

    195.00

    82.04182.60

    208.00

    0.01

    1002.52

    276.32

    166.00

    299.00

    82.04

    182.60

    208.00

    1213.96

    10sqm

    28.84

    1.35

    206.40

    265.60208.00

    0.07

    710.26

    10sqm

  • 8/8/2019 KGBV Nakarikallu

    35/81

    Amount

    7

    2046.26

    176.40

    1786.66

    153.25

    172.80

    358.40

    286.00

    143.00

    5122.77

    10sqm

  • 8/8/2019 KGBV Nakarikallu

    36/81

  • 8/8/2019 KGBV Nakarikallu

    37/81

    Amount

    7

    399.00

    sqm

  • 8/8/2019 KGBV Nakarikallu

    38/81

    Amount

    7

    1283.55

    100.00

    1330.00

    550.00

    849.42

    4112.97

    10sqm

    539.09

    846.20

    70.32

    64.80

    102.40

    0.06

    1622.87

    10sqm

    870.87

    590.15

    300.00

    341.04

    1572.48

    558.00

    176.00128.00

    112.00

    56.00

    682.08

    5386.62

    each

  • 8/8/2019 KGBV Nakarikallu

    39/81

    Amount

    7

    870.87

    462.55

    300.00

    255.78

    1179.36

    558.00

    176.00

    128.00

    112.00

    56.00

    511.56

    4610.12

    each

    870.87

    382.80

    200.00213.15

    982.80

    558.00

    176.00

    128.00

    112.00

    56.00

    426.30

    4105.92

    each

    829.40

    574.20

    200.00

    671.04

    178.74

    362.58

  • 8/8/2019 KGBV Nakarikallu

    40/81

    Amount

    7

    435.10

    326.32

    81.08

    744.00

    408.00

    304.00

    224.00

    357.48

    5695.94

    each

    829.40574.20

    300.00

    671.04

    178.74

    0.05

    2553.43

  • 8/8/2019 KGBV Nakarikallu

    41/81

    Amount

    7

    3175.80

    14.19

    34.00

    21.00

    138.60

    123.20

    3506.79

    10sqm

    3577.80

    14.19

    34.00

    15.33

    138.60

    123.20

    3903.12

    10sqm

  • 8/8/2019 KGBV Nakarikallu

    42/81

    Amount

    7

    30850.00

    6000.00

    36850.00

    MT

  • 8/8/2019 KGBV Nakarikallu

    43/81

    LEADS STATEMENT (AS PER SSR 2006-07)

    Name of the work : Construction of KGB Vidyalaya at Nakarikallu in Guntur district

    Description of materials

    Lead Charges

    1 2 3 4 5 6 7 8 9

    1 40mm HBG metal Local 5 121.70 7.60 114.10 385.00 60.00

    2 20mm MC metal kotappakonda 32 262.40 7.60 254.80 650.00 60.00

    3 Velchuru 45 323.50 7.60 315.90 135.00 58.00

    4 Velchuru 45 323.50 7.60 315.90 190.00 60.00

    5 Local 5 121.70 7.60 114.10 116.00 58.00

    6 Sand for mortar Amaravathi 75 400.80 4.60 396.20 89.00

    7 Sand for filling Local 5 104.50 4.60 99.90 37.00

    8 Gravel Local 5 104.50 4.60 99.90 48.00

    9 Bricks Addanki 80 743.00 4.80 738.20 2000.00

    10 2026.00

    11 110.00

    Name of theQuarry

    Lead inKM

    Initialcost of

    material

    Add:Blasting

    Charges

    Se

    C

    GrossLead

    charges

    DeductStacking

    Charges atQuarry

    Net Lead

    Charges

    Granite stone for R RMasonary

    Granite sone for C RMasonary

    Other than Granite stonefor RR Masonary

    Polished Shahabad Stoneslab ofTandur 25.4 mmthick Blue

    Cuddapah slab, 40mmthick

  • 8/8/2019 KGBV Nakarikallu

    44/81

    Est. Cost : Rs.45 Lakhs

    Unit

    12 13 14

    7.60 596.50 cum

    7.60 1164.70 cum

    7.60 546.30 cum

    7.60 603.30 cum

    7.60 325.50 cum

    4.60 480.60 cum

    4.60 132.30 cum

    4.60 143.30 cum

    4.80 2733.40 1000 No.

    2026.00 10 sqm

    110.00 1 sqm

    DeductStacking

    Charges at

    Site

    TotalRate

  • 8/8/2019 KGBV Nakarikallu

    45/81

    DETAILED ESTIMATE

    Name of sub work : Drilling of bore well &errection of pump set at KGB Vidyalay, Rajupalem

    Description No Length Breadth Depth Qty. units Rate Per

    1 2 3 4 5 6 7 8 9 10

    1

    1 75.00 75.00 Rmt 180.00 rmt

    2

    160mm dia PVC 6kg/cm2 1 20.00 20.00 Rmt 215.82

    3

    2 6 HP 7500.00 HP

    4

    1 1 No 4500.00 each

    5

    1 1 No 145.00 each

    6

    1 No 95.00 each

    7

    50.00 50.00 rmt 35.00 rmt

    8

    50.00 50.00 rmt 247.50 rmt

    9

    1 1 No 638.00 each

    10 Provision for unforseen items L.S

    Total

    SlNo.

    Drilling of 6" dia bore well with power driller including cost andconveyance of all materials and labour charges etc complete

    Supplying and fixing of 160 mm PVC casing including cost andconveyance of all materials and labour charges etc complete

    Supplying and fixing of 3.0 HP summercible pump set of 3 phaseincluding cost and conveyance of all materials and labour chargesetc complete

    Supplying and fixing of 3 phase panel board with necessaryaccessories including cost and conveyance of all materials andlabour charges etc complete

    Supplying and fixing of MS clamp sets including cost andconveyance of all materials and labour charges etc complete

    Supplying and fixing of bore cover (cap) including cost and

    conveyance of all materials and labour charges etc complete

    Supplying and fixing of cable wire including cost and conveyanceof all materials and labour charges etc complete

    Supplying and fixing of 50.8 mm GI pipe "B" class ISI masrk withGI fittings including the cost of pipe & its fittings and labourcharges etc; complete.

    Supplying and fixing of 50mm dia C I Non return valve includingcost and conveyance of all materials and labour charges etccomplete

  • 8/8/2019 KGBV Nakarikallu

    46/81

    Amount

    11

    13500.00

    4316.00

    45000.00

    4500.00

    145.00

    95.00

    1750.00

    12375.00

    638.00

    3319.00

    85000.00

  • 8/8/2019 KGBV Nakarikallu

    47/81

    SUB ESTIMATE

    Name of sub work: Construction of Septic Tank of Size 5.7 mt X2.1 mtX2.0mt and soak pit o

    Description No Length Breadth Depth Qty. unit Rate

    1

    for septic tank 1 8.00 3.15 2.25 56.70

    for soak pit 4X22/7 6.00 6.00 2.50 282.6

    339.30 cum 50.25

    2

    for bottom of septic tank 1 8.00 3.15 0.15 3.78 cum 1786.66

    3

    1 st step long walls 2 5.85 0.75 0.75 6.58

    1 st step short walls 2 2.15 0.75 0.75 2.42

    2nd step long walls 2 5.55 0.6 0.6 4.00

    2nd step short walls 2 1.85 0.6 0.6 1.33

    3rd step long walls 2 5.25 0.45 0.65 3.07

    3rd step short walls 2 1.55 0.45 0.65 0.91

    18.31 cum 1785.66

    4

    for baffle walls 1 2.10 1.70 3.57 sqmt 4112.97

    S.No.

    Earthwork excavation for foundation and depositing at site with initial lead of10mts & 2 mts in clayey, loamy soils like BC soils, red earth and ordinary

    gravelly soils (SS 20B) including all incidental, operational segnioragecharges sales and other taxes and labour charges such as shoring strutting,sheeting planking and dewatering including hire charges of T&P, labourcharges etc complete for finished item of work as per SS 308

    C.C (1:5:10) using 40mm size machine crushed hard granite metal fromapproved quarry for foundation including cost and conveyance of allmaterials like cement, sand, coarse aggregate, water etc. to work site

    including all operational, incidental seigniorage charges, sales & other taxeson all materials and all labour charges such as machine mixing, layingconcrete in foundation ,curing etc. complete for finished item of work.(APSS No.492)

    Randam rubble stone masonary in CM(1:8) propotion using hard granitestone from approved quarry including cost and conveyance of all materialslike cement,sand, water to work site and all operational incidentalseigniorage charges, sales and other taxes and all labour charges such as

    cutting stones to required shape and size, mixing cement morter ,consturction of scaffolding , curing etc. complete for finished item of work infoundation and basement.(APSS No. 601 & 615)

    construction of 50.5mm thick RCM Baffle wall with 2.267 kg steel and rabbitwire mesh in CM(1:3) prop. With fine rendering in neat cement in septic tankincluding cost and conveyance of all materials to site, seignoragecharges,sales and other taxes on all materials and all labour charges etccomplete for finished item of work

  • 8/8/2019 KGBV Nakarikallu

    48/81

    Description No Length Breadth Depth Qty. unit RateS.

    No.

    5

    3.14 1.5 0.12 1.5 0.81 cum 1262

    6

    long walls 2 5.7 2 22.8

    short walls 2 2.1 2 8.4

    bottom of septic tank 1 5.7 2.1 11.97

    Total 43.17 sqmt #REF!

    7

    top slab 1 6.25 2.55 15.94 sqmt 425.39

    8

    LS

    Perforated dry brick masonry without using mortar and keeping vertiacl dry joints of 15 to 20mm as directed by the engineer in charge includng costand conveyance of all materials to site and all labour charges for alloperations etc complete for finished item of work for SOAK PIT

    Impervious coat 20mm thick average with cm (1:3) with approved brandwater proofing compound at the rate of 1.10Kgs/bag of cement laid whenthe slab is green with thread lining and finished as directed incl. Cost &conveyance of all materials at work site & all operational, incidental,seigniorage charges, sales & other Taxes and all labour charges, such asmotor mixing, curing, etc., complete for finished item of work.for internal walland bottob of septic tank

    Vibrated Reinforced cement concrete corresponding to M15 grade as per IS456 equivalent to (1:2:4) for top slab of 115 mm thick using 20mm size HBG(SS5) machine crushed metalfrom approved quarry including cost andconveyance of all materials and water to work site, on all operational,incidental,seigniorage charges,sales& other taxes, and all labourcharges,such as centering ,strutting,scaffolding lift charges, machinemixing, laying curing,vibrating etc complete but excluding cost of steel and

    its fabrication charges for finished item of work ( APSS No.402 & 403)

    Providing High Yield strength deformed (HYSD) steel bars (Fe 445 grade)(as per IS 1786-1985) of different diameters cutting, bending to requiredsize and shape in position with cover blocks of approved size and bindingwire of 20 SWG forming grills for reinforcemetn work as per approveddesigns drewing incl. cost & conveyance of bars from approved sources to

    site of work, incl.c/c.of all materials like binding wire, cover blocks etc., incl.all operational, incidental, seigiorage charges, sales & other taxes and alllabour charges, such as cutting, bending, planking in position, typing etc.complete for finished item of work (APSS No. 126.)

  • 8/8/2019 KGBV Nakarikallu

    49/81

    Description No Length Breadth Depth Qty. unit RateS.

    No.

    9

    10 mt 258.5

    Supplying, laying and fixing of 101.60mm C.I.Soil pipe with cement caulkedjoints & painted black and fixing all special such as necessary requirements,including all operational, incidental, seigniorage charges, sales & otherTaxes, and all labour charges, etc., complete for finished item of work.

  • 8/8/2019 KGBV Nakarikallu

    50/81

    f 1.5 mt Dia

    Per Amount

    cum 17050.00

    cum 6754.00

    cum 32688.00

    10 sqmt 1468.00

  • 8/8/2019 KGBV Nakarikallu

    51/81

    Per Amount

    cum 1025.00

    10 sqmt #REF!

    1 sqmt 6780.00

    5000.00

  • 8/8/2019 KGBV Nakarikallu

    52/81

    Per Amount

    mt 2585.00

    #REF!

  • 8/8/2019 KGBV Nakarikallu

    53/81

    Labour charges for various items as p

    180.00

    S.No

    Description Ist class Mason 2nd clas

    Nos. Amount Nos.

    1 Cement concrete other than RCC works 0.06 10.80 0.142 Cement concretefor RCC works 0.12 21.60 0.28

    3 R.R.Masonry in CM & LM 0.54 97.20 1.26

    4 R.R.Masonry in clay 0.42 75.60 0.98

    5 Brick masonry in CM & LM 0.42 75.60 0.98

    6 Brick masonry in clay 0.33 59.40 0.77

    7 R.R.Masonry in CM & LM for well steening 0.54 97.20 2.66

    8 Dry stone masonry for well steaning 0.33 59.40 1.77

    9 Dry stone masonry 0.33 59.40 0.77

    10 Rough stone dry packing for revetment - - 0.40

    11 Rough stone dry packing for approns

    12

    - - 0.40

    13 Pointing with CM & Cuddapah slabs(1:3) 0.48 86.40 1.12

    14 Flush pointing to R.R.masonry in CM(1:3) 0.48 86.40 1.12

    15 12mm thick plastering 0.33 59.40 0.77

    16 20mm thick plastering 0.66 118.80 1.54

    17Flooring with cuddapah slabs 0.96 172.80 2.24

    18 Ornamental boarder 12MM thick 75 to 0.09 16.20 0.21

    200MM thick

    19 Country wood wrought and putup 5.31 955.80 12.39

    20 Raised pointing to R.R. masonry 0.81 145.80 1.89

    21 C.R.Masonry in C.M. II sort 0.75 135.00 1.75

    22 C.R.Masonry in C.M. Ist sort 1.05 189.00 2.4523 Gravel packing for revetment - - -

    24 Snow cem paint two coats over primary coat 0.15 27.00 0.35

    25Snow cem paint single coat over primary coat 0.09 16.20 0.21

    White washing with best shell lime two coats

    0.36 64.80 0.84

    0.21 37.80 0.49

    Rough stone dry masonary with jeddy stonesfor revetment

    Painting with synthetic enamil paint two coatsto new wood work

    Painting with synthetic enamil paint one coat

    to old wood work

  • 8/8/2019 KGBV Nakarikallu

    54/81

    r S.S.R : 2007 - 2008

    160.00 130.00 130.00

    s Mason Man Mazdoor Woman Mazdoor Total

    Amount Nos. Amount Nos. Amount Amount

    22.40 1.8 234.00 1.4 182.00 449.2044.80 2.1 273.00 3.5 455.00 794.40

    201.60 1.4 182.00 1.4 182.00 662.80

    156.80 0.7 91.00 1.1 143.00 466.40

    156.80 0.7 91.00 2.1 273.00 596.40

    123.20 0.7 91.00 1.4 182.00 455.60

    425.60 3.5 455.00 2.8 364.00 1341.80

    283.20 0.7 91.00 0.4 52.00 485.60

    123.20 0.7 91.00 0.4 52.00 325.60

    64.00 1.1 143.00 0.7 91.00 298.00

    64.00 1.4 182.00 0.7 91.00 337.00

    179.20 0.5 65.00 1.1 143.00 473.60

    179.20 0.5 65.00 1.1 143.00 473.60

    123.20 0.5 65.00 1.1 143.00 390.60

    246.40 0.5 65.00 3.2 416.00 846.20

    358.40 2.2 286.00 1.1 143.00 960.20

    33.60 0.15 19.50 - - 69.30

    1982.40 8.8 1144.00 - - 4082.20

    302.40 0.5 65.00 1.1 143.00 656.20

    280.00 1.4 182.00 1.4 182.00 779.00

    392.00 1.4 182.00 1.4 182.00 945.00- 0.7 91.00 0.4 52.00 143.00

    56.00 0.5 65.00 1 130.00 278.00

    33.60 0.5 65.00 1 130.00 244.80

    61.44

    134.40 199.20

    78.40 116.20

  • 8/8/2019 KGBV Nakarikallu

    55/81

    Initial rate of materials & centering charges as per S.S.R ; 2007 -

    S.no. Description of material

    240 9.b33.50

    244 12.b Hard gravelly soils SS 20 - B 38.50

    245 13.b

    37.00

    247 1443.50

    249 16 59.00

    250 17 78.00

    193 HYSD Bars 30850.00190 Mild steel rods 6mm dia 32175.00

    140 Labour charges for fabrication of reinforcement 6.00

    183 42 Cement excluding cost of empty cement bags 4300.00

    188 42.e White cement 17.00

    36.a Sand for mortar 89.00 4.60

    36.b sand for filling 37.00 4.60

    33.f 40 mm HBG metal 385.00 7.60

    33.d 20 mm HBG metal 650.00 7.60

    33.c 12 mm HBG metal 530.00 7.60

    22.g Granite stone for R.R Masonary 135.00 7.60

    22.a Rough stone for R.R Masonary 116.00 7.60

    23.a Granite stone for C.R Masonary 190.00 7.60

    34 Gravel 48.00 4.60

    35.a Quarry rubbish 20.50 4.60

    1 Bricks second class 2000.00 4.80

    30Cuddapah slab, 40 mm thick (0.457m X 0.457m)

    110.00

    38 1509.00

    40 2026.00

    60 Ceramic tiles 7.3mm thick 1st quality of all shades 356.0070 Glazed coloured tiles of any size 1st quality 316.00

    291 Vibrating charges 38.50

    292 Machine mixing of concrete 37.50

    42.a Labour mixing of cement mortar 22.50

    25 Filling charges 12.50

    118 Galvanized steel barbed wire I.O.A 12 Guage 35.00

    119 Galvanized steel barbed wire I.O.A 14 Guage 34.00

    S.S itemNo.

    Initialrate

    Stackingcharges

    Loamy and clayey soils like black cotton soils, redearth and ordinary gravel SS 20 - B

    Mixture of gravel and soft disintegrated rock likeshales, ordinary gravel, stoney earthand earthmixed with fair sized boulders SS 20 - B

    Soft disintegrated rock( removable by pick axe andcrow bars )

    Hard disintegrated rock or soft rock or conglomeraterock etc., removable by pick axe and crow bars

    Hard disintegrated rock or soft rock or conglomeraterock and hard lime kankar requiring partial blasting.

    Polished cuddapah slab, 25.4 mm thick ( 0.457m X0.457m)

    Polished Shahabad stone slab 25.4 mm thick( 0.457m X 0.304m) or any other size as specified -Blue

  • 8/8/2019 KGBV Nakarikallu

    56/81

    213 Rabbit wire mesh (Chicken mesh) 10.00

    327 Snow cem or equivalent quality 34.56

    328 Surya cem or equivalent quality 6.48

    322 wood primer 142.00

    312 Synthetic enamil paints in all shades Grade-1 155.00

    313 Synthetic enamil paints in all shades Grade-2 115.00

    4 d Mason/Painter (1st class ) 180.00

    46 d Mason/Painter (2nd class ) 160.00

    73 Man/Woman Mazdoor 130.00

    320 Impervious water proofing compound 22.00

    295 Cement Jali - 25 mm thick 126.00

    197 Mastic pad of 2'X4' of 1" thick 671.00

    198 Mastic pad of 2'X4' of 1/2" thick 384.00

    1004 133.00

    7 b)

    i) 20 mm dia meter 85.50

    ii) 25 mm dia meter 94.50

    iii) 36 mm dia meter 104.00

    8

    i) 20 mm dia meter 54.50

    ii) 25 mm dia meter 70.00

    iii) 36 mm dia meter 84.50

    105 Sal wood frames 31900.00

    106 Sal wood planks 36258.00

    940Labour charges for framed and planked doors

    406.00

    945Labour charges for windows framed and planked

    331.00

    715 35mm thick 624.00

    TOWER BOLTS

    ALLUMINIUM

    128 100 mm long 42.00

    129 150 mm long 51.00

    130 200 mm long 64.00

    131 250 mm long 76.00132 300 mm long 89.00

    MILD STEEL(POWER COATED)

    133 100 mm long 13.00

    134 150 mm long 20.00

    135 200 mm long 28.00

    136 250 mm long 38.00

    137 300 mm long 47.00

    Labour charges for making 50 to 75 mm thick RCMparadah walls

    Drilling holes in hard granite or sheet rock -

    Grouting the holes with neat cement slurry

    Flush door shutters, solid bond wood block boardtype with commercial ply on both faces.

  • 8/8/2019 KGBV Nakarikallu

    57/81

  • 8/8/2019 KGBV Nakarikallu

    58/81

    985 139.00

    982 CHAJJAS of any thick 91.00

    Lift charges

    882 46.00

    89138.00

    895 19.00

    899 9.00

    Scaffolding charges

    969 36.00

    970 44.00

    973 1st and 2nd floor 40.00

    974 2nd and 3rd floor 80.00

    R.C.C Roof slabs above 150 mm depth & up to 3.66m of floor height

    For R.C.C items between 1 st & 2 nd floor

    For Brick maonary & stone masonary between 1 st& 2 nd floor

    Impervious coat up to 26 mm thick plastering orshahabad stone flooring between 1 st & 2 nd floor

    Plastering between 1 st & 2 nd floor

    For superstructure in first floor over the rate offoundation and basement

    For second floor over the rate of first floorsuperstructure

    Scaffolding for plastering of walls and ceiling orpainting of roof timber or walls, where height ismore than 3 M

  • 8/8/2019 KGBV Nakarikallu

    59/81

    8

    Unit (per)

    1 cum

    1 cum

    1 cum

    1 cum

    1 cum

    1 cum

    1 MT1 MT

    1 Kg

    1 MT

    1 kg

    1 cum 36.00

    1 cum 36.00

    60.00 1 cum 45.00

    60.00 1 cum 45.00

    60.00 1 cum 45.00

    58.00 1 cum 45.00

    58.00 1 cum 45.00

    60.00 1 cum 45.00

    1 cum 20.00

    1 cum 20.00

    1000 Nos

    1 sqm

    10 sqm

    10 sqm

    1 sqm1 sqm

    1 cum

    1 cum

    1 cum

    1 cum

    1 kg

    1 kg

    Blastingcharges

    Seignioragecharges

  • 8/8/2019 KGBV Nakarikallu

    60/81

    1 sqm

    1 kg

    1 kg

    1 Ltr

    1 Ltr

    1 Ltr

    Day

    Day

    Day

    1 kg

    1 sqm

    1 sqm

    1 sqm

    1 sqm

    1 RM

    1 RM

    1 RM

    1 RM

    1 RM

    1 RM

    1 cum

    1 cum

    1 sqm

    1 sqm

    1 sqm

    Each

    Each

    Each

    EachEach

    Each

    Each

    Each

    Each

    Each

  • 8/8/2019 KGBV Nakarikallu

    61/81

  • 8/8/2019 KGBV Nakarikallu

    62/81

    1 sqm

    1 RM

    1 cum

    1 cum

    10 sqm

    10 sqm

    1 cum

    1 cum

    10 sqm

    10 sqm

  • 8/8/2019 KGBV Nakarikallu

    63/81

    1 1 Cum 86.70

    2 2 Cum 90.80

    3 3 Cum 96.00

    4 4 Cum 100.30

    5 5 Cum 104.50

    6 6 Cum 113.50

    7 7 Cum 119.10

    8 8 Cum 123.60

    9 9 Cum 129.10

    10 10 Cum 133.8011 11 Cum 140.50

    12 12 Cum 143.60

    13 13 Cum 148.10

    14 14 Cum 153.30

    15 15 Cum 158.00

    16 16 Cum 161.00

    17 17 Cum 167.80

    18 18 Cum 172.60

    19 19 Cum 176.80

    20 20 Cum 182.3021 21 Cum 186.40

    22 22 Cum 190.50

    23 23 Cum 194.60

    24 24 Cum 198.70

    25 25 Cum 202.80

    26 26 Cum 206.90

    27 27 Cum 211.00

    28 28 Cum 215.10

    29 29 Cum 219.20

    30 30 Cum 223.3031 31 Cum 227.30

    32 32 Cum 231.30

    33 33 Cum 235.30

    34 34 Cum 239.30

    35 35 Cum 243.30

    36 36 Cum 247.30

    Rates for Conveyance of Earth, Sand and Gravel

    including Loading, Unloading and Stacking onMetalled Roads

    Sl.

    No.

    Lead

    in Kms

    Rate

    Per

    SS Rate for

    2007-2008

  • 8/8/2019 KGBV Nakarikallu

    64/81

    37 37 Cum 251.30

    38 38 Cum 255.30

    39 39 Cum 259.30

    40 40 Cum 263.30

    41 41 Cum 267.30

    42 42 Cum 271.3043 43 Cum 275.30

    44 44 Cum 279.30

    45 45 Cum 283.30

    46 46 Cum 287.30

    47 47 Cum 291.30

    48 48 Cum 295.30

    49 49 Cum 299.30

    50 50 Cum 303.30

    51 51 Cum 307.20

    52 52 Cum 311.1053 53 Cum 315.00

    54 54 Cum 318.90

    55 55 Cum 322.80

    56 56 Cum 326.70

    57 57 Cum 330.60

    58 58 Cum 334.50

    59 59 Cum 338.40

    60 60 Cum 342.30

    61 61 Cum 346.20

    62 62 Cum 350.1063 63 Cum 354.00

    64 64 Cum 357.90

    65 65 Cum 361.80

    66 66 Cum 365.70

    67 67 Cum 369.60

    68 68 Cum 373.50

    69 69 Cum 377.40

    70 70 Cum 381.30

    71 71 Cum 385.20

    72 72 Cum 389.10

    73 73 Cum 393.00

    74 74 Cum 396.90

    75 75 Cum 400.80

    76 76 Cum 404.70

    77 77 Cum 408.60

    78 78 Cum 412.50

    79 79 Cum 416.40

  • 8/8/2019 KGBV Nakarikallu

    65/81

    80 80 Cum 420.30

    81 81 Cum 423.90

    82 82 Cum 427.50

    83 83 Cum 431.10

    84 84 Cum 434.70

    85 85 Cum 438.3086 86 Cum 441.90

    87 87 Cum 445.50

    88 88 Cum 449.10

    89 89 Cum 452.70

    90 90 Cum 456.30

    91 91 Cum 459.90

    92 92 Cum 463.50

    93 93 Cum 467.10

    94 94 Cum 470.70

    95 95 Cum 474.3096 96 Cum 477.90

    97 97 Cum 481.50

    98 98 Cum 485.10

    99 99 Cum 488.70

    100 100 Cum 492.30

  • 8/8/2019 KGBV Nakarikallu

    66/81

  • 8/8/2019 KGBV Nakarikallu

    67/81

    38 38 Cum 290.60

    39 39 Cum 295.30

    40 40 Cum 300.00

    41 41 Cum 304.70

    42 42 Cum 309.40

    43 43 Cum 314.1044 44 Cum 318.80

    45 45 Cum 323.50

    46 46 Cum 328.20

    47 47 Cum 332.90

    48 48 Cum 337.60

    49 49 Cum 342.30

    50 50 Cum 347.00

    51 51 Cum 351.40

    52 52 Cum 355.80

    53 53 Cum 360.2054 54 Cum 364.60

    55 55 Cum 369.00

    56 56 Cum 373.40

    57 57 Cum 377.80

    58 58 Cum 382.20

    59 59 Cum 386.60

    60 60 Cum 391.00

    61 61 Cum 395.40

    62 62 Cum 399.80

    63 63 Cum 404.2064 64 Cum 408.60

    65 65 Cum 413.00

    66 66 Cum 417.40

    67 67 Cum 421.80

    68 68 Cum 426.20

    69 69 Cum 430.60

    70 70 Cum 435.00

    71 71 Cum 439.40

    72 72 Cum 443.80

    73 73 Cum 448.20

    74 74 Cum 452.60

    75 75 Cum 457.00

    76 76 Cum 461.40

    77 77 Cum 465.80

    78 78 Cum 470.20

    79 79 Cum 474.60

    80 80 Cum 479.00

  • 8/8/2019 KGBV Nakarikallu

    68/81

    81 81 Cum 483.20

    82 82 Cum 487.40

    83 83 Cum 491.60

    84 84 Cum 495.80

    85 85 Cum 500.00

    86 86 Cum 504.2087 87 Cum 508.40

    88 88 Cum 512.60

    89 89 Cum 516.80

    90 90 Cum 521.00

    91 91 Cum 525.20

    92 92 Cum 529.40

    93 93 Cum 533.60

    94 94 Cum 537.80

    95 95 Cum 542.00

    96 96 Cum 546.2097 97 Cum 550.40

    98 98 Cum 554.60

    99 99 Cum 558.80

    100 100 Cum 563.00

  • 8/8/2019 KGBV Nakarikallu

    69/81

    1 1 1000 Nos 171.70

    2 2 1000 Nos 177.303 3 1000 Nos 183.00

    4 4 1000 Nos 188.70

    5 5 1000 Nos 194.40

    6 6 1000 Nos 209.10

    7 7 1000 Nos 216.40

    8 8 1000 Nos 220.80

    9 9 1000 Nos 226.20

    10 10 1000 Nos 232.60

    11 11 1000 Nos 240.00

    12 12 1000 Nos 245.9013 13 1000 Nos 249.80

    14 14 1000 Nos 256.20

    15 15 1000 Nos 263.00

    16 16 1000 Nos 269.60

    17 17 1000 Nos 274.90

    18 18 1000 Nos 279.80

    19 19 1000 Nos 286.70

    20 20 1000 Nos 293.00

    21 21 1000 Nos 301.20

    22 22 1000 Nos 309.4023 23 1000 Nos 317.60

    24 24 1000 Nos 325.80

    25 25 1000 Nos 334.00

    26 26 1000 Nos 342.20

    27 27 1000 Nos 350.40

    28 28 1000 Nos 358.60

    29 29 1000 Nos 366.80

    30 30 1000 Nos 375.00

    31 31 1000 Nos 383.20

    32 32 1000 Nos 391.4033 33 1000 Nos 399.60

    34 34 1000 Nos 407.80

    35 35 1000 Nos 416.00

    36 36 1000 Nos 424.20

    37 37 1000 Nos 432.40

    38 38 1000 Nos 440.60

    39 39 1000 Nos 448.80

    Rates for Conveyance of Bricks including Loading,Unloading and Stacking on Metalled Roads

    Sl.

    No.

    Lead

    in Kms

    Rate

    Per

    SS Rate for

    2007-2008

  • 8/8/2019 KGBV Nakarikallu

    70/81

    40 40 1000 Nos 457.00

    41 41 1000 Nos 465.20

    42 42 1000 Nos 473.40

    43 43 1000 Nos 481.60

    44 44 1000 Nos 489.80

    45 45 1000 Nos 498.0046 46 1000 Nos 506.20

    47 47 1000 Nos 514.40

    48 48 1000 Nos 522.60

    49 49 1000 Nos 530.80

    50 50 1000 Nos 539.00

    51 51 1000 Nos 545.80

    52 52 1000 Nos 552.60

    53 53 1000 Nos 559.40

    54 54 1000 Nos 566.20

    55 55 1000 Nos 573.0056 56 1000 Nos 579.80

    57 57 1000 Nos 586.60

    58 58 1000 Nos 593.40

    59 59 1000 Nos 600.20

    60 60 1000 Nos 607.00

    61 61 1000 Nos 613.80

    62 62 1000 Nos 620.60

    63 63 1000 Nos 627.40

    64 64 1000 Nos 634.20

    65 65 1000 Nos 641.0066 66 1000 Nos 647.80

    67 67 1000 Nos 654.60

    68 68 1000 Nos 661.40

    69 69 1000 Nos 668.20

    70 70 1000 Nos 675.00

    71 71 1000 Nos 681.80

    72 72 1000 Nos 688.60

    73 73 1000 Nos 695.40

    74 74 1000 Nos 702.20

    75 75 1000 Nos 709.00

    76 76 1000 Nos 715.80

    77 77 1000 Nos 722.60

    78 78 1000 Nos 729.40

    79 79 1000 Nos 736.20

    80 80 1000 Nos 743.00

    81 81 1000 Nos 749.80

    82 82 1000 Nos 756.60

  • 8/8/2019 KGBV Nakarikallu

    71/81

  • 8/8/2019 KGBV Nakarikallu

    72/81

    SUB ESTIMATE

    Est. : Rs. 2.40 La

    .no Description of Item Qty. Unit Rate Per

    1

    700 mts 31.30 1 Mt.

    2

    140 Points 174.15 1 Point

    3

    60 Points 174.15 1 Point

    4

    600 mts 34.20 1 Mt.

    5

    150 mts 54.10 1Mt.

    Name of Sub-Work : Providing Electrification to KGBV at Bellamkonda odistrict.

    Supply & Fixing of 19mm dia 2mm thick PVCconduct pipe concealed in wall with all requiredaccessories and No.14 SWG G.1 wire for earthcontinuity inclu-ding masonary work for light, fanpoint and separate plug point with T.W. Deepbox including all Labour Charges etc., complete

    Wiring with 2 x 1.0 Sq.mm (14/0.3mm) PVCinsulated flexible copper cable in the existingmetallic/Non-metalic conduit pipe with 6A flushtype marked switch ceiling rose and 3mm thickhylam sheet covering to switch control boxincluding all labour charges etc., complete forlight bell & exhaust fan points in Non-resdl.Bldgs,except circuit mains.(SSR 2:3:3)

    Wiring with 2 x 1.0 Sq.mm (14/0.3mm) PVCinsulated flexible copper cable in the existingmetallic/Non-metalic conduit pipe with 6A flushtype marked switch ceiling rose and 3mm thickhylam sheet covering to Regultor box includingall labour charges etc., complete for fan points inNon-resdl. Bldgs, except circuit main.(SSR 2:3:4)

    Supply and run of 2 of 28/0.3mm and of 1 of14/0.3mm PVC insulated flexible copper cable inexisting metallic/Non/metallic conduit pipe forrun of main including all Labour Charges etc.,complete (SSR 3:3:3)

    Supply and run of l2 of 65/0.3mm (4.5Sq.mm)and of 1 of 28/0.3mm PVC insulated flexiblecopper cable in exist-ing metallic / Non-metalic

    conduit pipe for run of mains including all LabourCharges etc., complete(3:3:5)

  • 8/8/2019 KGBV Nakarikallu

    73/81

  • 8/8/2019 KGBV Nakarikallu

    74/81

    .no Description of Item Qty. Unit Rate Per

    10

    4 Nos. 1540.00 1 No.

    11

    5 Nos. 980.00 1 No.

    12

    3 Nos. 400.00 1 No.

    13

    150 36.20 1 Mt.

    14

    50 Nos. 370.00 1 No.

    15

    1 No 113.00 1 No.

    Supply & Fixing SPN 8 way SPN (SS-8W)Distribution board suitable for fixing single poleMCBS in sheet steel enclosure conc -ealed in wallchisling, masonry work and with 1 No 40 A.D.P.isolation and 6 Nos 6-32 Amps single pole MCBS

    including vitenal connections and LabourCharges etc., complete (SSR 4:4:4)

    Providing independent earthing for mainswitches 1.C cut outs and motors using 40mmdia B class G.1. pipe 2.0 mt.length dulyproviding 12mm dia 16 Nos. holes and requiredbolts, nuts, and washers, check nuts, hume pipe

    ring, etc., as per I.S. speci-fications withnecessary double G.I. earth wire No.8 SWGincluding filling with equal proportion of self andcharcoal in layers and all Labour charges etc.,complete (SSR 4:5:1)

    Supply and erecting proceeding base fuse unitapproved make 415 V 200A existing angle ironframe in approved manner (SSR 4:3:5)

    Supply and fixing of 25mm dia 2mm thickconduct pipe concealed in wall with all requiredaccessories with No.14 SWG, GI wire for earthcontinuity including chisling, the wall wherevernecessary lincluding masonry work and includingand all Labour Charges etc., complete for run ofmains.(SSR 1:4:1)

    Supply and erecting approved make similar to

    crompton make as directed by the depa- ment1x40W. patty type flourscent fitting made ofCRCA sheet, complete with polyster filled copperwound choke 40W; starter, and side holders etc.,complete with 40W. tube.(SSR 8:5:3 + differenrcost of copper choke)

    Supply and fixing lof ding dong bell on 4x7decolam block including giving connections, costof all accessories and all labour charges etc.,complete (SSR 4:5:25)

  • 8/8/2019 KGBV Nakarikallu

    75/81

    .no Description of Item Qty. Unit Rate Per

    16

    1 4870.00 1 No.

    17

    40 mts 356.00 1 Mt.

    18

    6 Nos. 108.00 1 No.

    19

    16 Nos. 55.00 1 No.

    Supply and erecting four pole sheet metal/ Ironclad HRC fuse switch ISI approved make415/500V. 200A with HRC fuses, conduit entryerected on angle iron frame covered with 3mmthick white hyam sheet cover etc., complete

    including cost and conveyance of all materialsand labour charges etc., complete (SSR 4:1:20)

    Supply and erecting PVC armoured casle 1100V.3.5 core 120 sq.mm, with ISI mark followingstandard/solid/alluminium cond- uctor completewith making French in soil upto 0.9mtr. deepembedding the cable complete with sand bed of

    20cms. Thick layers and bricks placed on top ofthe cable with wire all over the run and backfilling the excavated earth without stones arehard materials and making the surface properwith 15cms. Crown on the top duly providingroute indicators including connections etc.,complete (as per I.S.1255) as directed by thedepartment. (SSR 15:2:19)

    Supply and erecting heavy duty flange typebrass cable glands for 3.5 core 120 sq.mm PVCarmoured cable with brass washers rubber ringscomplete erected with cable ends and leadsconnected. (SSR 15:3:8)

    Supply and erected crimpling type copper legsconforming to IS Suitable for cable upto120sq.mm. evenly crimped with high pressuretool and connected to switchgear terminals withbrass/cadium plated Nut bolts in approvedmanner. (SSR 15:4:7)

  • 8/8/2019 KGBV Nakarikallu

    76/81

    .no Description of Item Qty. Unit Rate Per

    20

    50 Nos. 1343.00 1 No.

    21

    50 mts 4.00 1 Mt.

    22

    12 Nos. 165.00 No.

    23

    1 Nos. 1566.00 1 No.

    24 unforseen items

    Total

    Supply and erecting ceiling fan with 3 blades anddouble ball bearing with condensorA.C.250V.50c/s. of 48 1200mm sweepcompletely erected in position with resistancetype regulator, canopy down rod upto 304.80mm

    in length is provided with hook/clamps, nuts andbolts and 24/02 flexible copper wire etc.,complete, include- ing cost and conveyance ofall materials and labour charges. (SSR 9:7:3)

    Run of earth lead No.8 SWG G.I. wire inclu-dingcost of all accessories and labour charges etc.,

    complete. (SSR 3:4:1)

    Fixing of sheet light to the wall with 1.0 mt.25.00 mm dia class A G.I. pipe bracket bentinto 130o Degrees angle including fixing anti-filling flat made with 25mm x 6mm G.I. flatincluding wire leads and connections includingcost of all accesso- ries etc., complete. (SSR4:5:17)

    Supply and erecting of bulb chamber made withNo.16 SWG CRCA sheet fitted with 4 Nos. copperbars and erected with angle iron support atcorners, and necessary insulators, red-oxidepaint and drilling suitable number of holes, dulyproviding bolts and nuts with washers etc.,complete, including cost and conveyance of allmateri-als and labour charges: 220A (SSR 12:1:1)

  • 8/8/2019 KGBV Nakarikallu

    77/81

    hs

    Amount

    21910.00

    24381.00

    10449.00

    20520.00

    8115.00

    Guntur

  • 8/8/2019 KGBV Nakarikallu

    78/81

    Amount

    1450.00

    340.00

    1728.00

    18780.00

  • 8/8/2019 KGBV Nakarikallu

    79/81

  • 8/8/2019 KGBV Nakarikallu

    80/81

    Amount

    4870.00

    14240.00

    648.00

    880.00