KEY PRESENTERS WHEN VENUE - ALS€¦ · DAY 1 TUESDAY 28TH JUNE › Introduction to NDT Methods....
Transcript of KEY PRESENTERS WHEN VENUE - ALS€¦ · DAY 1 TUESDAY 28TH JUNE › Introduction to NDT Methods....
POWER PLANT INSPECTION & LIFE ASSESSMENT
Right Solutions ⋅ Right Partner alsglobal.com
Right Solutions ⋅ Right Partner alsglobal.comKEY PRESENTERS
Dr Chris Charlesworth, ALS Advanced Technology Manager
Mr Victor Ferris, HRST, Inc P.E. | Chief Executive Officer
Mr Damien Charman, ALS Principal Consultant
Mr Dale Franke, ALS Senior Metallurgist
Dr Warwick Payton, ANSTO Senior FEM/Life Assessment Engineer
Mr Darren Sullivan, ALS Welding Engineer & Pressure Vessel Inspector
To secure your booking, please RSVP to ALS along with your method of payment by 3rd June 2016. ALS reserves the right to cancel the seminar if there are insufficient participants.
Rates exclude accommodation, meals and leisure facilities at hotels. Delegates will be responsible for their own costs relating to room service, spa treatments, bar and mini bar.
WHEN28, 29 & 30 June 2016
VENUECrown Plaza, Hunter Valley 430 Wine Country Drive, Lovedale NSW 2325
RSVPFriday 10 June 2016
COST$1500 full course, or $600 per day All prices include GST.
ADDITIONAL INFORMATIONDinner will be provided on the 28th. Lunch, refreshments, and extensive course documentation are included.
ENQUIRIES+61 (0)2 4953 7999 [email protected]
Unit 1/2 Alhambra Avenue Cardiff NSW 2290 Australia
Crown Plaza, Hunter Valley28-30 JUNE 2016SEMINAR
DAY 1 TUESDAY 28TH JUNE
› Introduction to NDT Methods.
› Introduction to Failure Mechanisms in Power Plants.
› Introduction to High Temperature Life Assessment.
DAY 2 WEDNESDAY 29TH JUNE
› Inspections of Rotors and Valves.
› Difference between fitness for service, life assessment and defect assessment.
› Requirements to conduct a successful assessment.
› Management and NDT of steam piping systems.
› Importance of Boiler Water Chemistry.
› Pressure vessel inspection/legislation requirements.
DAY 3 THURSDAY 30TH JUNE
› P91 Material overview and case studies.
› HRSG Economiser and Evaporator Pressure Part Problem Areas.
› HRSG Superheater and Reheater Pressure Part Problem Areas.
› HRSG Assessment Focus Priorities.
› HRSG Pressure Part Upgrade and Repair Strategies.
The power industry has many stations that have exceeded or are approaching their design life.As these plants age new damage mechanisms come into play. These presentations look at selected damage mechanisms and how to address them. Conventional coal and gas fired plant and HRSGs will be covered.
The course is presented over three days with Day 1 as an introduction to damage mechanisms and NDT methods. Day 2 has a more in depth focus on varies boiler and turbine components. Day 3 focuses on P91 material issues and HRSGs.