Kerr-Tar RPO TCC and TAC Meeting Kerr-Tar COG Offices Henderson
Thursday October 13, 2016– 3:00PM – 5:00PM 1724 Graham Avenue, Henderson, NC 27536
Pursuant to NCGS §138A-15 (e): ETHICS AWARENESS & CONFLICT OF INTEREST REMINDER
Does any member have any known conflict of interest with respect to any matters coming before the board today? If so, please identify the conflict and refrain from any participation in the particular matter involved.
Please feel free to attend meeting in person or via Conference Call. Conference Call Option:
Phone #: 1-888-636-3807 Access Code: 7668349
Welcome Guests – 3:00pm TAC Vice Chair, Commissioner Sidney Dunston; TCC Chair, Mike Ciriello
TCC / TAC Action Item – Receive and approve minutes of last meeting on June 23, 2016. - June meeting minutes enclosed as attachment.
TAC/TCC Updates- - Freight Plan Update-Ann Stroobant - CMAQ Update-Ann Stroobant - SPOT 4.0 Update-Ann Stroobant - NCLD Bike Plan Update-Ann Stroobant, Mike Ciriello, Tony Sumter
TAC/TCC Action Item-Approval of the KTRPO Prioritization P4.0 Division Projects Local Points Assignment guided by the KTRPO methodology as applied to Division Scores - KTRPO Division Local Points ranked high to low were out for comment from July 19, 2016. The KTRPO P4.0
Subcommittee met on September 9, 2016 to assign our 1300 Division Local Points. The projects selected by the KTRPO P4.0 Subcommittee were then released for comment.
- Discussion of the KTRPO Division Local Points Assignment
TAC/TCC Action Item-Approve Resolution to Adopt the NC Lakes District Regional Bike Plan - Discussion of NC Lakes District Regional Bike Plan
NCDOT Reports –NCDOT Division 5 & NCDOT Transportation Planning Branch
Other Business
Public Comment
Adjourn – Thank you for your participation!
2016 KTRPO Meeting Schedule (3- 5PM) – Major Meeting Items The Thursday November 17, 2016 TAC/TCC meeting has been rescheduled to Wednesday December 14, 2016.
2017 KTRPO Meeting Schedule To Be Announced
Kerr-Tar Regional Transportation Planning TCC.TAC Meeting Minutes
June 23, 2016
1
Kerr-Tar Regional Transportation Planning TCC-TAC Meeting Minutes
Thursday June 23, 2016 (3:00PM - 5:00PM) Kerr-Tar Regional Council of Governments
1724 Graham Avenue / Henderson, NC
TAC Members TCC Members Jimmy Clayton-Person Co. Commissioner; TAC Chair Sidney Dunston-Franklin Co. Commissioner, TAC Vice Chair
Eddie Ellington-Mayor, City of Henderson Tony King-Town of Louisburg Henry Daniel-City of Roxboro Dan Brummitt-Vance Co. Commissioner Tare Davis-Warren Co. Commissioner
Guests Jacob Thomasson-Intern, Granville Co. Madison Davis-Student, Louisburg, NC Richard Handcock-Engineer, NCDOT Div. 5
Welcome and the Review of Agenda – 3:00pm TAC Chair, Commissioner Jimmy Clayton; TCC Vice Chair, Barry Baker
Barry Baker, TCC Vice Chair and Commissioner Jimmy Clayton, TAC Chair opened the meeting, welcomed everyone and reviewed the agenda. In addition to approving the minutes, the TCC/TAC will take a vote to approve the KTRPO Prioritization P4.0 local points assignments guided by the KTRPO methodology as applied to Regional Impact Scores now that the Division 5 scores have been released.
TAC/TCC ACTION ITEM: Approve Minutes from the meeting on April 22, 2016: Barry Baker introduced the approval of the May 26, 2016 minutes for the TCC. Justin Jorgensen made a motion to approve the minutes and Paylor Spruill seconded the motion for the TCC. The TCC unanimously approved the minutes. Jimmy Clayton, TAC Chair introduced the item for the TAC and Sidney Dunston made the motion to approve the May 26, 2016 minutes as presented to the TAC members. Dan Brummitt seconded the motion. The TAC members unanimously approved the May 26, 2016 minutes as presented.
Barry Baker- Granville Co. Planning Dir.; TCC Vice Chair Jason Rogers- Franklin Co. Planning; Alt for Angela Harris Cheryl Hart-Oxford Planning Director Jessica Gladwin-Butner, Alt. for Tommy Marrow Carroll Harris-Macon Administrator Justin Jorgensen-Granville County G. Paylor Spruill-Henderson Administrator David Keilson- NCDOT Div. 5 Harry Mills-Granville Co. EDC Stuart Litvin-Vance-Henderson EDC Diane Cox-Kerr-Tar COG Executive Director Ann Stroobant, KTRPO Regional Planner and KTRPO Secretary
1
Kerr-Tar Regional Transportation Planning TCC.TAC Meeting Minutes
June 23, 2016
2
TAC/TCC Update- - Legislative Update-Ann Stroobant
Ann Stroobant directed members to the page in the packet showing the recent legislative transportation updates from the NCARPO Newsletter dating from 6/17/16.
- SPOT 4.0 Update-Ann Stroobant Ann Stroobant directed members to the next page indicating revised P4.0 Schedule of Key Dates where our deadline for submission of Regional Impact Local Input Points is July 29, 2016. Ann also directed members’ attention to the page showing data corrections resulting in score changes or project deletions dated 6/10/16 from Sarah Lee at the SPOT Office. Three Kerr-Tar projects were affected. These three projects were A130319-Person County airport runway extension to 7000’ (score change-Division Score lowered from 43.49 to 39.23), T150709-Roxboro bus shelters (score change-Division score lowered from 23.47 to 19.44) and T150843-Roxboro park and ride (Delete project).
TAC/TCC Action Item-Approval of the KTRPO Prioritization P4.0 local points assignments guided by the KTRPO methodology as applied to Regional Impact Scores
- As discussed at the May 26, 2016 TAC/TCC meeting, we waited to approve our Prioritization P4.0 points assignments guided by the KTRPO methodology as applied to Regional Impact Scores until after the Division 5 Scores were available.
Ann Stroobant explained that the Kerr-Tar P4.0 Subcommittee met on June 17, once the Division 5 scores were available. As a result of the Division scores, we decided to modify our draft local points assignments for three projects. These projects were on our Regional and Statewide Local Points Assignment Table under “Top 3 Next highest scoring Projects regardless of County.” We substituted the projects that we thought had a reasonable chance in the P4 process, since project H1111010-D, US 501, Improve intersection from US158 (Oxford Rd) is now a Safety project that NCDOT Division 5 says will be constructed in 2017. The other two projects, H090765 ,US 15 from US 158(Oxford Outer Loop) to Chewning Rd, widen to multi-lanes and H090097, US 1 BUS, SR 1267 (Dabney Drive), Widen to multi-lanes scoring 37.59 and 36.02 respectively, were too low to be competitive. We included projects which scored higher: H111010-A, US 501 (Madison Blvd.) from Weeks Dr. to NC 157, and two high scoring KARTS expansion vehicles, T130114 and T130115. H111010-A scored 41.55 at the Regional level and the two KARTS vehicles scored 52.05 each.
Ann Stroobant referred members to the Division 5 Draft Regional Impact Scores which were included in the packet, the KTRPO Prioritization table showing the KTRPO methodology score, as well as regional and division ranking scores by county. Also included in the packet was the KTRPO methodology scoring breakdown for all KTRPO projects, including the regional and division scores.
- Discussion of the Division 5 Draft Regional Impact Scores and where Division 5 put their Draft Points (Division comment period 6/20/16 to 7/22/16: see http://www.ncdot.gov/strategictransportationinvestments/2018-2027.html under heading “Get Involved.” We are in Division 5.)
David Keilson, NCDOT Division 5, said in his overview of the P4 process that what we have now is the best estimate of where to put our regional points. At the end of July the SPOT Office will add up the scores to come up with the total score of all projects. The SPOT Office will do rankings and analysis of the regional and
2
Kerr-Tar Regional Transportation Planning TCC.TAC Meeting Minutes
June 23, 2016
3
statewide projects. At the end of August/September, we will see which projects show up in the Regional category. Some of the regional projects can cascade down to the division tier and compete at the division level. At the end of October, the Division points are tallied up. Looking at the scores, we have an estimate of which projects are likely. It is a complex process, designed to be data driven. David Keilson said that the projects with the greatest need come to the top.
- Discussion of the KTRPO Regional Local Points Assignment Dan Brummitt said that the money for projects goes to other areas like Raleigh and Durham and wanted to know if there was anything that could be done to change the process to enhance the ability of our area to obtain project funding. David Keilson said that what we needed to do was to identify the right projects to submit with the right scope. He said that there were several Kerr-Tar projects that have high scores in the mid 40’s or above.
Sidney Dunston wanted to know in more detail how the KTRPO regional projects were chosen to make up Kerr-Tar’s Regional Local Points assignment. Ann Stroobant explained the P4 subcommittee which represents the Kerr-Tar area. Each county has 200 points for their important projects, plus 300 points for the next top 3 projects regardless of county, totaling 1300 points.
Stuart Litvin wanted to know if there had been an analysis by NCDOT of how much tax money from rural areas goes to urban areas like Raleigh and Durham. He thinks that a disproportionate amount of rural tax dollars goes to urban areas.
David Keilson indicated that Division 5 would shave points off some of their projects to assign to the two KARTS Expansion vehicles. Tony King said that no harm should come to the projects that are likely to be funded. David Keilson wants to make all of the projects as competitive as possible.
Dan Brummitt feels that it is almost a waste of time to go through the process because we have to compete with CAMPO. David Keilson said that if both areas were rural, there would not be so much competition. Richard Handcock said that we are bound by the STI process.
Paylor Spruill asked about the Vance County project H0090819-A in the 5/26/16 minutes. Ann Stroobant replied that it was a Division level project and was not included at the Regional level. This project will be considered by the P4 subcommittee when KTRPO does its Local Points Assignment at the Division level. Ann also said that she made a note of Jordan McMillan’s comment on the tables listing all of our projects.
Carroll Harris said that we need the work done on I-85.The road had been really rough in the past and a piece of concrete had fallen off one of the bridges.
The TCC Vice Chair and TAC Chair asked if there were any further items for discussion. There were no further items for discussion. Barry Baker, TCC Vice Chair, asked for a motion to approve the KTRPO Prioritization P4.0 local points assignment guided by the KTRPO methodology as applied to the Regional Impact Scores as modified by the Kerr-Tar P4 Subcommittee on 6/17/16 after the Division 5 Points were available. Cheryl Hart made a motion to approve the KTRPO Local Points assignment at the Regional level. The motion was seconded by Justin Jorgensen. The motion passed. The action item was referred up to the TAC. Jimmy Clayton, TAC
3
Kerr-Tar Regional Transportation Planning TCC.TAC Meeting Minutes
June 23, 2016
4
Chair, introduced the item and asked for a motion to approve the KTRPO Prioritization P4.0 local points assignment guided by the KTRPO methodology as applied to the Regional Impact Scores as modified by the Kerr-Tar P4 Subcommittee on 6/17/16 after the Division 5 Points were available. Sidney Dunston made the motion to approve the KTRPO Local Points assignment at the Regional level. The motion was seconded by Dan Brummitt. The TAC members unanimously approved the KTRPO Prioritization P4.0 local points assignment guided by the KTRPO methodology as applied to the Regional Impact Scores as modified by the Kerr-Tar P4 Subcommittee on 6/17/16.
NCDOT Reports –NCDOT Division 5 & NCDOT Transportation Planning Branch
-David Keilson, NCDOT Division 5- David Keilson said that the Division comment period for Regional Impact Scores is from 6/20/16 to 7/22/16. There will also be a public meeting on June 30 from 5-7pm at the Durham Division 5 office, 2612 N. Duke St., Durham, NC 27704 He mentioned the information on line which can be found at https://www.ncdot.gov/strategictransportationinvestments/2018-2027.html Individuals can comment on projects using the link. Diane Cox, Kerr-Tar Executive Director, suggested that this link would be a good opportunity for our members to comment on projects or express their feelings about the P4 process.
-NCDOT Transportation Planning Branch-no update
Other Business-Diane Cox said that Kerr-Tar could send an E-mail out to our contacts about the Division Regional Impact Scores comment period. In addition, Joey Hopkins and Boyd Tharrington of the NCDOT will be presenting at the COG meeting later in the evening. Joey Hopkins is the Division 5 Engineer and Boyd Tharrington is working on the I-85 project.
Tony King said that he appreciates the NCDOT working with Louisburg on their CMAQ projects. Mike Kniess and John Sandor included safety projects such as crosswalks and signalized crosswalks in connection with the CMAQ projects. This happened at the time Wally Bowman was Division Engineer. They will also be doing in kind signalization of crosswalks for Louisburg’s second CMAQ project.
Public Comment-none
Adjournment Barry Baker asked for a motion to adjourn for the TCC. Justin Jorgensen made the motion to adjourn for the TCC which was seconded by Carroll Harris. The motion passed. Jimmy Clayton asked for a motion to adjourn for the TAC. Dan Brummitt made the motion to adjourn for the TAC, which was seconded by Tony King. The motion passed. The meeting was adjourned.
The next Kerr-Tar RPO meeting is scheduled for Thursday, October 13, 2016 from 3-5pm.
4
Transportation
Date Activity
April 13, 2016 Quantitative Scores and Draft list of Programmed Statewide Mobility Projects released
April 18, 2016 –July 29, 2016
Regional Impact Local Input Points assignment window open (Division Needs Local Input Points optional)
August 2016 NCDOT calculates Regional Impact total scores and programs Regional Impact projects
September –October 2016 Division Needs Local Input Point window opens for 2 months
November 2016 NCDOT calculates Division Needs total scores and programs DivisionNeeds projects
December 2016 NCDOT prepares 2018-2027 Draft STIP
January 2017 2018-2027 Draft STIP released
Revised P4.0 Schedule of Key Dates
Updated September 14, 2015
Updated April 19, 2016
5
SPOT ID Mode TIP Project CategoryRoute / Facility
NameFrom / Cross Street
To / Cross Street
DescriptionSpecific
Improvement Type Cost To NCDOT
Statewide Mobility Total / Quantitative
Score (Out of 100)
Regional Impact Total Score
(Out of 100)
Division Needs Total Score (Out of 100)
County(s) Programmed Amount
(2018-2027)
Draft Right-of-Way
Date
Draft Constructio
n DateFunded Status
H090247 Highway R-3608 Regional Impact US 401 , NC 39 NC 56/581 (Nash Street) in in Louisburg
SR 1229 (Main Street)
US 401-NC 39 (Bickett Boulevard), NC 56/581 (Nash Street) to SR 1229 (Main Street). Widen to Multi-Lanes.
1 - Widen Existing Roadway
$ 6,897,000 N/A 74.32 N/A Franklin $ 6,897,000 FY 2023 FY 2025 Regional
Impact
H111010-B Highway U-5969B Regional ImpactUS 501 (Madison Blvd)
NC 157Morehead Street
Replace 5 Lane Facility with 4 Lane Facility with Planted Median. Reduce Number intersections; Add Sidewalks to Both Sides of the Road Where they Are Missing. Includes intersection improvements at NC 157 / Johnson Street / Hurdle Mills Road / South Main Street AND NC 49 (Leasburg Road/Chub Lake Street).
11 - Access Management
$ 10,966,000 N/A 74.38 N/A Person $ 10,966,000 FY 2022 FY 2024 Regional
Impact
H111010-C Highway U-5969C Regional ImpactUS 501 (Madison Blvd)
Morehead StreetNC 49 / North Main Street
Replace 5 Lane Facility with 4 Lane Facility with Planted Median. Reduce Number intersections; Add Sidewalks to Both Sides of the Road Where they Are Missing. Includes intersection improvements at Carver Drive.
11 - Access Management
$ 11,736,000 N/A 74.50 N/A Person $ 11,736,000 FY 2022 FY 2024 Regional
Impact
T130114 Transit T-C003A Regional Impact Henderson
Expansion Vehicle-KARTS is requesting 1 expansion LTV. In order to meet demand KARTS will have to continue increasing operational capacity by 2 units annually.
1 - Expansion Vehicle
$ 5,600 N/A 68.70 N/A Vance $ 6,000 FY 2018 Regional
Impact
T130115 Transit T-C003B Regional Impact Henderson
Expansion Vehicle-KARTS is requesting 1 expansion LTV. In order to meet demand KARTS will have to continue increasing operational capacity by 2 units annually.
1 - Expansion Vehicle
$ 5,600 N/A 68.55 N/A Vance $ 6,000 FY 2019 Regional
Impact
Kerr-Tar RPOSPOT 4.0-Regional Impact Projects
6
Franklin County-KTRPO Prioritization 4.0-4-19-16-KTRPO Regional, KTRPO Division Scores Added 5-23-16, KTRPO Division Scores Ranked 7-20-16
SPOT ID Mode TIP
Project Category
Route / Facility Name
From / Cross Street To / Cross Street Description
Specific Improvement Type
Cost To NCDOT
Statewide Mobility
Quantitative Score
(Out of 100)
Regional Impact Quantitative
Score(Out of 70)
Division Needs Quantitative
Score(Out of 50)
KTRPOMethodology
Score
Regional KTRPO Project Ranking
Score
Division KTRPO Project Ranking
Score MPO(s)/RPO(s) County(s)
H111053 Highway Regional Impact US 401 East Nash Street Burke Boulevard
Replace 5-Lane Facility with 4-Lane Facility including Planted Median, Sidewalks and Bike Lane. the Objective Is to Improvethe Facility to Delay the Need For Another Bypass of Louisburg.
11 - Access Management
$ 13,900,000 N/A 41.05 31.23 100.00 141.05 131.23 Kerr-Tar RPO Franklin
H090247 Regional
Impact ProjectHighway R-3608 Regional Impact US 401 , NC 39
NC 56/581 (Nash Street) in in Louisburg
SR 1229 (MainStreet)
US 401-NC 39 (Bickett Boulevard), NC 56/581 (Nash Street) to SR 1229 (Main Street). Widen to Multi- Lanes.
1 - Widen Existing Roadway
$ 6,897,000
N/A 44.32 34.45 85.00 129.32 119.45 Kerr-Tar RPO Franklin
H090195-D Highway R-2814D Regional Impact US 401
SR 1103 (Flat Rock Church Road / Clifton Pond Road)
SR 1700 (Fox Park Road) at Louisburg
Widen to Multi-Lanes 1 - Widen Existing Roadway
$ 34,810,000
N/A 35.43 27.54 80.00 115.43 107.54 Capital Area MPO, Kerr-Tar RPO
Franklin
H140496 Highway Regional Impact US 401
SR 1103 (Flat Rock Church Road / Clifton Pond Road)
SR 1700 (Fox Park Road) at Louisburg
Modernize Roadway (Similiar Moving Ahead Project) 16 - Modernize Roadway
$ 6,139,000
N/A 36.78 28.98 70.00 106.78 98.98 Capital Area MPO, Kerr-Tar RPO
Franklin
H090813 Highway Regional Impact NC 56 Franklinton Bypass US 401/NC 56 inLouisburg
Section B Widen NC 56 to Four Lanes from Franklinton Bypass to US 401/NC 56 in Louisburg.
1 - Widen Existing Roadway
$ 48,730,000 N/A 32.71 25.41 70.00 102.71 95.41 Capital Area MPO, Kerr-Tar RPO
Franklin
Note: Franklin County Projects were all in the Highway Category at the Regional Impact Level
Franklin County-Page 1 of 1
7
Granville County-KTRPO P4.0 Prioritization-4-19-16-KTRPO Regional, KTRPO Division Scores Added 5-23-16, KTRPO Division Scores Ranked 7-20-16
SPOT ID Mode TIPProject
CategoryRoute / Facility Name From / Cross Street To / Cross Street Description
Specific Improvement Type
Cost To NCDOT
Statewide Mobility
Quantitative Score
(Out of 100)
Regional Impact Quantitative
Score(Out of 70)
Division Needs Quantitative
Score(Out of 50)
KTRPOMethodology
ScoreRegional KTRPO Project Ranking
Score
Division KTRPO Project Ranking
Score MPO(s)/RPO(s) County(s)
H150970 Highway Regional ImpactNC 96 BUS(Broad Street/Linden Ave)
Industry Drive North of 3rd Street
Road Diet on NC 96 from Industry Drive to North of 3rd Street 1 - Widen Existing Roadway
$ 2,364,000 N/A 36.31 27.06 90.00 126.31 117.06 Kerr-Tar RPO Granville
H140487-C Highway Regional Impact NC 56West Lyon Station Road
Realign West Lyon Station Road at NC-56 Intersection 21 - Realign Multiple Intersections
$ 2,369,000N/A 40.12 30.21 85.00 125.12 115.21 Kerr-Tar RPO, Capital
Area MPOGranville
H140487-A Highway Regional Impact NC 56 33rd Street
East of Butner Town Limit (as shown in NC 56 corridor study) Widen to 4 lanes with a median
1 - Widen Existing Roadway
$ 21,699,000 N/A 36.06 27.50 85.00 121.06 112.5 Capital Area MPO, Kerr-Tar RPO
Granville
H150761 Highway Regional Impact US 15Belltown Rd., SR 1133 Industry Drive Widen 1.5 miles of US-15 from Belltown Rd (near I-85 near
Walmart in Oxford) to Industry Drive1 - Widen Existing Roadway
$ 16,654,000N/A 28.88 22.41 85.00 113.88 107.41
Kerr-Tar RPOGranville
H090077 Highway R-2257Statewide Mobility
US 158 (Oxford Outer Loop)
US 158 Business West of Oxford
US 158 Business East of Oxford
Widen to Multi-Lanes. 1 - Widen Existing Roadway
$ 50,526,00030.45 24.89 18.61 85.00 109.89 103.61 Kerr-Tar RPO Granville
H141323 Highway U-5829 Division Needs New Route East Lyon Station 26th Street
Improve existing roadway and construct new overpass over I-85 and new roadway from overpass to 26th Street
6 - Widen Existing Roadway and Construct Part on New Location
$ 20,300,000 N/A N/A 18.05 85.00 N/A 103.05 Kerr-Tar RPO, Capital Area MPO
Granville
A130311 Aviation Division NeedsHNZ - Oxford- Henderson
Construct a new 50' x 60' corporate hangar, as well as apron, taxilane, and access road. (includes Project Request Numbers: 3067 )
1900 - Hangars $ 567,000
N/A N/A 24.51 75.00 N/A 99.51
Kerr-Tar RPO
Granville
H090387 Highway U-3322 Division NeedsSR 1195 (IndustryDrive), SR 1646
SR 1166 (Hillsboro Street)
NC 96 (Linden Avenue)
SR 1166 (Hillsboro Street) to NC 96 (Linden Avenue). Widen to Multi-Lanes, Some New Location.
6 - Widen Existing Roadway and Construct Part on
$ 31,592,000N/A N/A 14.41 85.00 N/A 99.41
Kerr-Tar RPOGranville
A130310 Aviation Division NeedsHNZ - Oxford- Henderson
Construct a new 100' X 120' corporate hangar and associated apron. (includes Project Request
1900 - Hangars $ 576,000 N/A N/A 24.34 75.00 N/A 99.34 Kerr-Tar RPO Granville
H150969 Highway Division Needs New Route NC 56/West Lyon Station Road
New Road/Proposed This project is a segment of former project H111042. Construct a new road adjacent to I-85 in accordance
5 - Construct Roadway on New
$ 10,021,000 N/A N/A 23.69 75.00 N/A 98.69 Kerr-Tar RPO Granville
H090765 Highway Regional Impact US 15US 158 (Oxford Outer Loop)
Chewning Road Widen to Multi-Lanes1 - Widen Existing Roadway
$ 28,441,000 N/A 37.59 28.09 70.00 107.59 98.09 Kerr-Tar RPO Granville
A150872 Aviation Division NeedsHNZ - Oxford- Henderson
Construct a New Parallel Taxiway (Project Request Number 3462); Construct a new terminal area apron(Project Request Number 3463); Construct a new terminal building (Project Request Number
1305 - General Aviation Terminal Building: New Construction
$ 5,674,500
N/A N/A 22.67 75.00 N/A 97.67 Kerr-Tar RPO Granville
H150963 Highway Division Needs New Route Gate 2 Road
New Road/Proposed project H141323
This project is a segment of former project H111042. Construct a new road adjacent to I-85 in accordance with the Butner Gateway Small Area Plan.
5 - Construct Roadway on New Location
$ 12,997,000 N/A N/A 19.33 75.00 N/A 94.33 Kerr-Tar RPO Granville
H090152 HighwayStatewide Mobility
US 158
SR 1159 (TheeHester Road) West of Roxboro
Oxford Outer Loop Widen to Multi-Lanes with Bypass of Roxboro on New Location, 6 - Widen Existing Roadway and Construct Part on
$ 493,732,000
22.15 16.34 12.26 70.00 86.34 82.26 Kerr-Tar RPO Person, Granville
Note: Granville County has both Regional Impact and Division Needs ProjectsTable includes Highway and Aviation Projects
Granville County-Page 1 of 1
8
Person County-KTRPO P4.0 Prioritization-4-19-16-KTRPO Regional, KTRPO Division Scores added 5-23-16, KTRPO Division Scores Ranked 7-20-16
*Projects modified or changed as a result of Sarah Lee's 6/10/16 E-mail from the SPOT Office
SPOT ID Mode TIPProject
CategoryRoute / Facility Name From / Cross Street To / Cross Street Description
Specific Improvement Type
Cost To NCDOT
Statewide Mobility
Quantitative Score
(Out of 100)
Regional Impact Quantitative
Score(Out of 70)
Division Needs Quantitative
Score(Out of 50)
KTRPOMethodology
ScoreRegional KTRPO Project Ranking
Score
Division KTRPO Project Ranking
ScoreMPO(s)/RPO(s) County(s)
H111010-C Regional
Impact ProjectHighway Regional Impact
US 501 (Madison Blvd)
Morehead Street
NC 49 / North Main Street
Replace 5 Lane Facility with 4 Lane Facility with Planted Median. Reduce Number intersections; Add Sidewalks to Both Sides of the Road Where they Are Missing. Includes intersection improvements at Carver Drive.
11 - Access Management
$ 11,736,000 N/A 45.10 34.00 100.00 145.10 134.00 Kerr-Tar RPO Person
H111010-B Regional
Impact ProjectHighway Regional Impact
US 501 (Madison Blvd)
NC 157 Morehead Street
Replace 5 Lane Facility with 4 Lane Facility with Planted Median. Reduce Number intersections; Add Sidewalks to Both Sides of the Road Where they Are Missing. Includes intersection improvements at NC 157 / Johnson Street / Hurdle Mills Road / South Main Street AND NC 49 (Leasburg Road/Chub Lake Street).
11 - Access Management
$ 10,966,000 N/A 44.68 33.53 100.00 144.68 133.53 Kerr-Tar RPO Person
A130319
*Score Modified
Aviation Division NeedsTDF - Person County
Executive
Extend runway to 7,000 ft. (Takeoff Length) (includes Project Request Numbers: 3140 ) 0500 - Runway
Length/Width
$ 2,484,000
N/A N/A 43.49 39.23 90.00 N/A 133.49 129.23 Kerr-Tar RPO Person
H111010-G Highway Regional ImpactUS 501 (Madison
Blvd)Carver Drive
Improve Intersection10 - Improve Intersection
$ 668,000
N/A 48.52 36.10 85.00 133.52 121.10 Kerr-Tar RPO Person
T150843
*ProjectDeleted
Transit Division NeedsPark and Ride Lot in
Uptown Roxboro
Create a Park and Ride Lot in Uptown Roxboro
2 - Facility
$ 2,000
N/A N/A 30.19 90.00 N/A 120.19 Kerr-Tar RPO Person
H111010-D 2017 Safety
ProjectHighway Regional Impact
US 501 (Madison Blvd)
US 158 (Oxford Road)
Improve Intersection10 - Improve Intersection
$ 668,000
N/A 47.40 34.49 85.00 132.4 119.49 Kerr-Tar RPO Person
H111010-F Highway Regional ImpactUS 501 (Madison
Blvd)
NC 49 (Leasburg Road/Chub Lake
Street)Improve Intersection
10 - Improve Intersection
$ 1,216,000 N/A 44.99 33.27 85.00 129.99 118.27 Kerr-Tar RPO Person
H111010-A Highway Regional ImpactUS 501 (Madison
Blvd)Weeks Drive NC 157
Replace 5 Lane Facility with 4 Lane Facility with Planted Median. Reduce Number intersections; Add Sidewalks to Both Sides of the Road Where they Are Missing. Includes intersection improvements at US 158 (Oxford Road).
11 - Access Management
$ 9,921,000 N/A 41.55 30.56 85 *100 126.55115.56
*130.56 (revisedscore)
Kerr-Tar RPO Person
A150869 Aviation Division NeedsTDF - Person County
Executive
Extend runway 500' to 6,500 ft total length(takeoff length); includes former projects 2432 Environmental Assessment/Preliminary Engineering; 2429 Land acquisition Rwy 24; and 2433/2434 Runway 24 Safety Area Extension, Relocate SR 1131 & Relocate Localizer, 200' extension on Rwy 6 and 300' extension
0500 - Runway Length/Width
$ 7,623,000 N/A N/A 39.97 75.00 N/A 114.97 Kerr-Tar RPO Person
A150871 Aviation Division NeedsTDF - Person County
Executive
Strengthen Runway, Taxiway, and Apron Pavements to 90,000# for Critical Air Freight Aircraft. The runway, apron & majority of the taxiways were last overlaid in 2003; Taxiway A West and Taxiway H were constructed in 2007. The design strength for these pavements was 30,000# SWG, 68.000# DWG. The pavement PCI's range from 67 (Fair) on the runway, 74 (Satisfactory) on the taxiways, & 67 (Fair) on the apron. The airport currently has operations by aircraft in excess of the pavement design strength.
0605 - Pavement Strength - Runway
$ 7,110,000 N/A N/A 34.74 75.00 N/A 109.74 Kerr-Tar RPO Person
T150709
*Score Modified
Transit Division Needs Roxboro
Construct 15 bus shelters along PATS route corridor. The Bus shelter stops are: Cleveland Lane, Brookstone/Shale Circle, Walmart, Weeks Drive, Madison Square Center, Person Memorial hospital, Piedmont Community College, Oaks Apartments, Pine Ridge Apartments, Roses/Food Lion, Person Plaza, Person Industries, Long Memorial Church Lot, Courthouse, and the Library.
2 - Facility $ 11,250 N/A N/A 23.47 19.44 90.00 N/A 113.47 109.44 Kerr-Tar RPO Person
Note: Person County has both Regional Impact and Division Needs Projects-Table includes Highway, Transit and Aviation Projects Person County Page 1 of 2
( M.Ciriello Emails 8/19/16 & 8/25/16-same as B&C segments-discussed at 9/9/16 Subcommittee)
9
SPOT ID Mode TIPProject
CategoryRoute / Facility Name From / Cross Street To / Cross Street Description
Specific Improvement Type
Cost To NCDOT
Statewide Mobility
Quantitative Score
(Out of 100)
Regional Impact Quantitative
Score(Out of 70)
Division Needs Quantitative
Score(Out of 50)
KTRPOMethodology
Score
Regional KTRPO Project Ranking Score
Division KTRPO Project Ranking Score MPO(s)/RPO(s) County(s)
A130316 Aviation Division NeedsTDF - Person County
Executive
Expand existing 2,000 terminal building to +/-5,000 sq ft. Building was constructed in mid-1980s. Passenger levels are projected to increase ~40% over next 20 years and terminal needs to be expanded to accommodate increased activity at TDF. Expand terminal auto parking in conjunction with Project 2439 to expand terminal building. Expand 6in waterline from SR 1131 to terminal area. Associated with project 2439. Current terminal is served by well. (includes PRN: 2440/2439/2444 )
1315 - General Aviation Terminal
Building: Construct Addition to Existing
$ 1,700,820 N/A N/A 24.03 85.00 N/A 109.03 Kerr-Tar RPO Person
A130318 Aviation Division NeedsTDF - Person County
Executive
Construct T-Hangar and Executive Hangar. All existing hangars at TDF are occupied. The Airport needs new hangars to support economic development.(includes Project Request Number: 3139) 1900 - Hangars $ 1,530,000 N/A N/A 20.48 85.00 N/A 105.48 Kerr-Tar RPO Person
H111010-E Highway Regional ImpactUS 501 (Madison
Blvd)
NC 157, Johnson Street, Hurdle Mills Road, South Main Street
Improve Intersection10 - Improve Intersection
$ 1,774,000 N/A 49.19 36.89 65.00 114.19 101.89 Kerr-Tar RPO Person
T150699
Transit Regional Impact Roxboro
Expansion Vehicle-PATS requests 1 expansion LTV. In order to meet demand, PATS will have to continue increasing operational capacity
1 - Expansion Vehicle
$ 6,200
N/A 26.03 18.90 80.00 106.03 98.90 Kerr-Tar RPO Person
H090073-C Highway R-2241C Regional Impact US 501 SR 1329 (Old NC 501) North of Virginia State Line
Widen to Multi-Lanes 1 - Widen Existing Roadway
$ 29,083,000 N/A 16.94 12.78 80.00 96.94 92.78 Kerr-Tar RPO Person
H090152 HighwayStatewide Mobility
US 158
SR 1159 (TheeHester Road) West of Roxboro Oxford Outer Loop
Widen to Multi-Lanes with Bypass of Roxboro on New Location, 6 - Widen Existing Roadway and
Construct Part on New Location
$ 493,732,000 22.15 16.34 12.26 70.00 86.34 82.26 Kerr-Tar RPO Person, Granville
H090825
Highway Division NeedsSR 1346 (New
Route - Younger Road)
SR 1333 (Chub Lake Road)
SR 1364 (Carver Drive) Extend Younger Road (SR 1346) 0.6 Mile from Chub Lake Road Road (SR 1333) to Carver Drive 5 - Construct Roadway
on New Location
$ 7,525,000
N/A N/A 12.83 60.00 N/A 72.83 Kerr-Tar RPO Person
H090073-B Highway R-2241B Regional Impact US 501
SR 1521 (Halifax Road) SR 1329 (Old NC 501)
Widen to Multi-Lanes, Part on New Location
6 - Widen Existing Roadway and
Construct Part on New Location
$ 42,591,000 N/A 14.27 10.73 55.00 69.27 65.73 Kerr-Tar RPO Person
Person County Page 2 of 2
10
Vance County KTRPO P4.0 Priortization-4-19-16-KTRPO Regional, KTRPO Division Scores added 5-23-16, KTRPO Division Scores Ranked 7-20-16
SPOT ID Mode TIPProject
CategoryRoute / Facility Name From / Cross Street To / Cross Street Description
Specific Improvement Type
Cost To NCDOT
Statewide Mobility
Quantitative Score
(Out of 100)
Regional Impact Quantitative
Score(Out of 70)
Division Needs Quantitative
Score(Out of 50)
KTRPOMethodology
Score
Regional KTRPO Project Ranking
Score
Division KTRPO Project Ranking
Score MPO(s)/RPO(s) County(s)
H090819-A Highway Division NeedsNew Route -
Henderson Western Outer
SR 1101 (OldCounty Home Road)
US 1 Business (Raleigh Road)
Construct 2 Lane Roadway, Part on New Location. Continuation of the Western Outer Loop.
6 - Widen Existing Roadway and Construct Part on
$ 27,886,000
N/A N/A 18.92 85.00 *100 N/A103.92
*118.92Kerr-Tar RPO Vance
T130114 Regional
Impact ProjectTransit Regional Impact Henderson
Expansion Vehicle-KARTS is requesting 1 expansion LTV. In order to meet demand KARTS will have to continue increasing operational capacity by 2 units annually.
1 - Expansion Vehicle
$ 5,600 N/A 52.05 38.13 80.00 132.05 118.13 Kerr-Tar RPO Vance
T130115 Regional
Impact ProjectTransit Regional Impact Henderson
Expansion Vehicle-KARTS is requesting 1 expansion LTV. In order to meet demand KARTS will have to continue increasing operational capacity by 2 units annually.
1 - Expansion Vehicle $ 5,600
N/A 52.05 38.13
80.00
132.05 118.13 Kerr-Tar RPO Vance
H090819-B Highway Division NeedsNew Route - Henderson
US 1 Business (Raleigh Road)
NC 39 Construct 2 Lane Roadway, Part on New Location. Continuation of the Western Outer Loop.
6 - Widen Existing Roadway and
$ 27,364,000N/A N/A 12.66
85.00N/A 97.66 Kerr-Tar RPO Vance
H090097 Highway Regional Impact US 1 BUSUS 1 Bypass SR 1267 (Dabney
Drive)Widen to Multi-Lanes 1 - Widen Existing
Roadway$ 36,087,000
N/A 35.02 26.4870.00
105.02 96.48 Kerr-Tar RPO Vance
H090449 Highway U-3836 Division Needs New RouteSR 1126 (Poplar Creek Road)
SR 1128 (RuinCreek Road)
SR 1126 (Poplar Creek Road) to SR 1128 (Ruin Creek Road). Two Lane Service Road on New Location.
5 - Construct Roadway on New
$ 16,264,000N/A N/A 15.77
65.00N/A 80.77 Kerr-Tar RPO Vance
H149004 Highway Regional Impact US 158US 158 Loop at Williamsboro Street in Oxford
Crest Road in Henderson Widen to Multi-Lanes
1 - Widen Existing Roadway $ 108,884,000 N/A 29.26 21.62 55.00 84.26 76.62 Kerr-Tar RPO Vance, Granville
H149005 Highway Regional Impact US 1 , US 158Satterwhite Point Road
Ridgeway Drewry Road
Widen to Multi-Lanes 1 - Widen Existing Roadway
$ 107,029,000N/A 25.03 18.47
45.0070.03 63.47 Kerr-Tar RPO Vance, Warren
H090017 HighwayStatewide Mobility
I-85US 1 Provide Additional Traffic Movements 8 - Improve
Interchange$ 45,100,000
27.55 20.21 11.5545.00
65.21 56.55Kerr-Tar RPO
Vance
*Comment from Jordan Mcmillan 5/3/16-Project aligns with CEDS Strategy and qualifies as a 2nd Plan, justifying 15 more points
Note: Vance County has both Regional Impact and Division Need ProjectsThe Table includes Highway and Transit Projects
11
Warren County KTRPO Prioritization P4.0-4-19-16-KTRPO Regional, KTRPO Division Scores added 5-23-16, KTRPO Division Scores Ranked 7-20-16
SPOT ID Mode TIPProject
CategoryRoute / Facility Name From / Cross Street To / Cross Street Description
Specific Improvement Type
Cost To NCDOT
Statewide Mobility
Quantitative Score
(Out of 100)
Regional Impact Quantitative
Score(Out of 70)
Division Needs Quantitative
Score(Out of 50)
KTRPOMethodology
Score
Regional KTRPO Project Ranking
Score
Division KTRPO Project Ranking
Score MPO(s)/RPO(s) County(s)
H090782 Highway Division Needs SR 1001 Henderson Warrenton Widen to 12-Foot Lanes from Henderson to Warrenton.
16 - Modernize Roadway
$ 13,546,000
N/A N/A 23.81 65.00 N/A 88.81 Kerr-Tar RPO Warren, Vance
H090154 Highway R-2587 Statewide Mobility
US 158 I-85 in Warren CountySR 1405 East of
Littleton in HalifaxWiden to Multi-Lanes with Bypasses of Norlina, Macon and Littleton on New Location.
6 - Widen Existing Roadway and
$ 160,800,000 24.05 14.45 10.28 70.00 84.45 80.28 Kerr-Tar RPO, Peanut Belt RPO
Warren, Halifax
H090823 Highway Regional Impact US 401 Franklin County Line Warrenton Widening US 401 from the Franklin County Line to Warrenton
1 - Widen Existing Roadway
$ 106,392,000 N/A 18.80 14.45 55.00 73.80 69.45 Kerr-Tar RPO Warren
H149005 Highway Regional Impact US 1 , US 158Satterwhite Point
RoadRidgeway Drewry
RoadWiden to Multi-Lanes 1 - Widen Existing
Roadway$ 107,029,000 N/A 25.03 18.47 45.00 70.03 63.47 Kerr-Tar RPO Vance, Warren
H090828 Highway Division Needs SR 1151 US 1Warren County Hub
Site
Upgrade SR 1151 from US 1 to Warren County Hub Site on Manson-Axtell Road (SR 1100). Construction of a Connector Road from US 401 South of Warrenton Connecting to 158 Business on New Location.
6 - Widen Existing Roadway and Construct Part on New Location
$ 10,465,000 N/A N/A 3.46 50.00 N/A 53.46 Kerr-Tar RPO Warren
Last edits of County Tables by Ann Stroobant on 9/8/16 for 9/9/16 P4 Subcommittee meeting. Edits added to agree with main methodology table and comments on KTRPO Project ranking scores for Division.
Note: Warren County has both Regional Impact and Division needs Projects
Warren County Page 1 of 1
12
SPOT ID ModeProject
CategoryRoute / Facility Name
From / Cross
Street
To / Cross
StreetDescription
Specific
Improvement
Type
Cost To NCDOT
Statewide
Mobility
Quantitative
Score
(Out of 100)
Regional Impact
Quantitative
Score
(Out of 70)
Division Needs
Quantitative
Score
(Out of 50)
MPO(s)/RPO(s) County(s)
Eligible for
Local Input
Points
REGIONAL IMPACT
Division Engineer
Methodology Points
(Criteria Points)
REGIONAL IMPACT
PRELIMINARY
Division Engineer
Local Input Points
(out of 100 - 15% of
total score)
REGIONAL IMPACT
FINAL
Division Engineer
Local Input Points
(out of 100 - 15% of
total score)
DIVISION NEEDS
Division Engineer
Methodology Points
(Criteria Points)
DIVISION NEEDS
PRELIMINARY
Division Engineer
Local Input Points
(out of 100 - 25% of
total score)
Comments
(Use this section to note reason if local
point assignment does not align with
project ranking using methodology
points.)
A150869 AviationDivision
Needs
TDF - Person County
Executive
Extend runway 500' to 6,500 ft total
length(takeoff length); includes former
projects 2432 Environmental
Assessment/Preliminary Engineering;
2429 Land acquisition Rwy 24; and
2433/2434 Runway 24 Safety Area
Extension, Relocate SR 1131 and
Relocate Localizer, 200' extension on
Rwy 6 and 300' extension
0500 - Runway
Length/Width $ 7,623,000 N/A N/A 39.97 Kerr-Tar RPO Person Yes 2.00 100
A130319 AviationDivision
Needs
TDF - Person County
Executive
Extend runway to 7,000 ft. (Takeoff
Length) (includes Project Request
Numbers: 3140 ) (evaluated separately
from A150869, but including A150869
bundled projects)
0500 - Runway
Length/Width10,107,000$ N/A N/A 39.23 Kerr-Tar RPO Person Yes 2.00 100
A150871 AviationDivision
Needs
TDF - Person County
Executive
Strengthen Runway, Taxiway, and
Apron Pavements to 90,000# for
Critical Air Freight Aircraft. The runway,
apron and majority of the taxiways
were last overlaid in 2003; Taxiway A
West and Taxiway H were constructed
in 2007. The design strength for these
pavements was 30,000# SWG, 68.000#
DWG. The pavement PCI's range from
67 (Fair) on the runway, 74
(Satisfactory) on the taxiways, and 67
(Fair) on the apron. The airport
currently has operations by aircraft in
excess of the pavement design
strength.
0605 -
Pavement
Strength -
Runway
$ 7,110,000 N/A N/A 34.74 Kerr-Tar RPO Person Yes 2.00 0 Not competitive.
A130311 AviationDivision
Needs
HNZ - Oxford-
Henderson
Construct a new 50' x 60' corporate
hangar, as well as apron, taxilane, and
access road. (includes Project Request
Numbers: 3067 )
1900 - Hangars $ 567,000 N/A N/A 24.51 Kerr-Tar RPO Granville Yes 0.80 0 Not competitive.
A130310 AviationDivision
Needs
HNZ - Oxford-
Henderson
Construct a new 100' X 120' corporate
hangar and associated apron. (includes
Project Request Numbers: 2896 )
1900 - Hangars $ 576,000 N/A N/A 24.34 Kerr-Tar RPO Granville Yes 0.80 0 Not competitive.
A130316 AviationDivision
Needs
TDF - Person County
Executive
Expand existing 2,000 terminal building
to +/-5,000 sq ft. Building was
constructed in mid-1980s. Passenger
levels are projected to increase ~40%
over next 20 years and terminal needs
to be expanded to accommodate
increased activity at TDF. Expand
terminal auto parking in conjunction
with Project 2439 to expand terminal
building. Expand 6in waterline from SR
1131 to terminal area. Associated with
project 2439. Current terminal is
served by well.
(includes PRN: 2440/2439/2444 )
1315 - General
Aviation
Terminal
Building:
Construct
Addition to
Existing
$ 1,700,820 N/A N/A 24.03 Kerr-Tar RPO Person Yes 0.80 0 Not competitive.
A150872 AviationDivision
Needs
HNZ - Oxford-
Henderson
Construct a New Parallel Taxiway
(Project Request Number 3462);
Construct a new terminal area
apron(Project Request Number 3463);
Construct a new terminal building
(Project Request Number 3464);Access
Road and Parking for new terminal
(Project Request Number 3465).
Project includes Project Request
Numbers: 3462,3463,3464,3465
1305 - General
Aviation
Terminal
Building: New
Construction
$ 5,674,500 N/A N/A 22.67 Kerr-Tar RPO Granville Yes 0.80 0 Not competitive.
P4.0 Division 5 DE Methodology Rankings Draft Division Point Assignments (from Division 5 Planning Engineer 10/10/16)Kerr-Tar Projects
1 of 4
Text highlighted in yellow=Kerr-Tar Project assigned points in Kerr-Tar Division Projects Local Points Assignment Table
*=Project Given Preliminary Division Engineer Local Input Points
*
*
13
A130318 AviationDivision
Needs
TDF - Person County
Executive
Construct T-Hangar and Executive
Hangar. All existing hangars at TDF are
occupied. The Airport needs new
hangars to support economic
development.
(includes Project Request Number:
3139)
1900 - Hangars $ 1,530,000 N/A N/A 20.48 Kerr-Tar RPO Person Yes 0.80 0 Not competitive.
H111010-E HighwayRegional
ImpactUS 501 (Madison Blvd)
NC 157, Johnson
Street, Hurdle
Mills Road, South
Main Street
Improve Intersection10 - Improve
Intersection $ 1,774,000 N/A 49.19 36.89 Kerr-Tar RPO Person Yes 1.80 0 0 1.55 0
Included in corridor segment B which is
getting points tentatively funded in regional
tier.
H111010-G HighwayRegional
ImpactUS 501 (Madison Blvd) Carver Drive Improve Intersection
10 - Improve
Intersection $ 668,000 N/A 48.52 36.10 Kerr-Tar RPO Person Yes 1.50 0 0 1.55 0
Included in corridor segment C which is
getting points tentatively funded in regional
tier.
H111010-D HighwayRegional
ImpactUS 501 (Madison Blvd)
US 158 (Oxford
Road)Improve Intersection
10 - Improve
Intersection $ 668,000 N/A 47.40 34.49 Kerr-Tar RPO Person Yes 1.65 0 0 1.60 0 Safety project at same location.
H090247 HighwayRegional
ImpactUS 401 , NC 39
NC 56/581 (Nash
Street) in in
Louisburg
SR 1229 (Main
Street)
US 401-NC 39 (Bickett Boulevard), NC
56/581 (Nash Street) to SR 1229 (Main
Street). Widen to Multi-Lanes.
1 - Widen
Existing
Roadway
$ 6,897,000 N/A 44.32 34.45 Kerr-Tar RPO Franklin Yes 1.75 100 100 1.90 0Anticipate funding Tentatively funded in
regional tier.
H111010-C HighwayRegional
ImpactUS 501 (Madison Blvd) Morehead Street
NC 49 / North
Main Street
Replace 5 Lane Facility with 4 Lane
Facility with Planted Median. Reduce
Number intersections; Add Sidewalks
to Both Sides of the Road Where they
Are Missing. Includes intersection
improvements at Carver Drive.
11 - Access
Management $ 11,736,000 N/A 45.10 34.00 Kerr-Tar RPO Person Yes 1.65 100 96 1.70 0
Anticipate funding Tentatively funded in
regional tier. Points reduced to make points
available for additional projects.
H111010-B HighwayRegional
ImpactUS 501 (Madison Blvd) NC 157
Morehead
Street
Replace 5 Lane Facility with 4 Lane
Facility with Planted Median. Reduce
Number intersections; Add Sidewalks
to Both Sides of the Road Where they
Are Missing. Includes intersection
improvements at NC 157 / Johnson
Street / Hurdle Mills Road / South Main
Street AND NC 49 (Leasburg
Road/Chub Lake Street).
11 - Access
Management $ 10,966,000 N/A 44.68 33.53 Kerr-Tar RPO Person Yes 1.65 100 98 1.70 0
Anticipate funding Tentatively funded in
regional tier. Points reduced to make points
available for additional projects.
H111010-F HighwayRegional
ImpactUS 501 (Madison Blvd)
NC 49 (Leasburg
Road/Chub Lake
Street)
Improve Intersection10 - Improve
Intersection $ 1,216,000 N/A 44.99 33.27 Kerr-Tar RPO Person Yes 1.65 0 0 1.45 0
Included in corridor segment B which is
getting points tentatively funded in regional
tier.
H111053 HighwayRegional
ImpactUS 401 East Nash Street
Burke
Boulevard
Replace 5-Lane Facility with 4-Lane
Facility including Planted Median,
Sidewalks and Bike Lane. the Objective
Is to Improve
the Facility to Delay the Need For
Another Bypass of Louisburg.
11 - Access
Management $ 13,900,000 N/A 41.05 31.23 Kerr-Tar RPO Franklin Yes 1.55 0 0 1.65 100 Not competitive in regional tier.
H111010-A HighwayRegional
ImpactUS 501 (Madison Blvd) Weeks Drive NC 157
Replace 5 Lane Facility with 4 Lane
Facility with Planted Median. Reduce
Number intersections; Add Sidewalks
to Both Sides of the Road Where they
Are Missing. Includes intersection
improvements at US 158 (Oxford
Road).
11 - Access
Management $ 9,921,000 N/A 41.55 30.56 Kerr-Tar RPO Person Yes 1.65 0 0 1.60 100
Not competitive in regional tier. Completes
corridor project.
H140487-C HighwayRegional
ImpactNC 56
West Lyon Station
Road
Realign West Lyon Station Road at NC-
56 Intersection
21 - Realign
Multiple
Intersections
$ 2,369,000 N/A 40.12 30.21Kerr-Tar RPO,
Capital Area MPOGranville Yes 1.70 0 0 1.80 100 Not competitive in regional.
H140496 HighwayRegional
ImpactUS 401
SR 1103 (Flat
Rock Church Road
/ Clifton Pond
Road)
SR 1700 (Fox
Park Road) at
Louisburg
Modernize Roadway (Similiar Moving
Ahead Project)
16 - Modernize
Roadway $ 6,139,000 N/A 36.78 28.98
Capital Area MPO,
Kerr-Tar RPOFranklin Yes 1.25 0 0 1.45 100 Not competitive in regional.
H090765 HighwayRegional
ImpactUS 15
US 158 (Oxford
Outer Loop)Chewning Road Widen to Multi-Lanes
1 - Widen
Existing
Roadway
$ 28,441,000 N/A 37.59 28.09 Kerr-Tar RPO Granville Yes 0.60 0 0 1.00 0Not competitive in regional. Potentially too
expensive to fund in division.
H090195-D HighwayRegional
ImpactUS 401
SR 1103 (Flat
Rock Church Road
/ Clifton Pond
Road)
SR 1700 (Fox
Park Road) at
Louisburg
Widen to Multi-Lanes
1 - Widen
Existing
Roadway
$ 34,810,000 N/A 35.43 27.54Capital Area MPO,
Kerr-Tar RPOFranklin Yes 1.00 0 0 1.45 0
Not competitive in regional. Potentially too
expensive to fund in division.
H140487-A HighwayRegional
ImpactNC 56 33rd Street
East of Butner
Town Limit (as
shown in NC 56
corridor study)
Widen to 4 lanes with a median
1 - Widen
Existing
Roadway
$ 21,699,000 N/A 36.06 27.50Capital Area MPO,
Kerr-Tar RPOGranville Yes 1.05 0 0 1.15 0
Not competitive in regional. Potentially too
expensive to fund in division.
H150970 HighwayRegional
Impact
NC 96 BUS(Broad
Street/Linden Ave)Industry Drive
North of 3rd
Street
Road Diet on NC 96 from Industry Drive
to North of 3rd Street
1 - Widen
Existing
Roadway
$ 2,364,000 N/A 36.31 27.06 Kerr-Tar RPO Granville Yes 1.00 0 0 1.05 100 Not competitive in regional.
H090097 HighwayRegional
ImpactUS 1 BUS US 1 Bypass
SR 1267
(Dabney Drive)Widen to Multi-Lanes
1 - Widen
Existing
Roadway
$ 36,087,000 N/A 35.02 26.48 Kerr-Tar RPO Vance Yes 0.65 0 0 1.10 0Not competitive in regional. Potentially too
expensive to fund in division.
H090813 HighwayRegional
ImpactNC 56 Franklinton Bypass
US 401/NC 56
in Louisburg
Section B Widen NC 56 to Four Lanes
from Franklinton Bypass to US 401/NC
56 in Louisburg.
1 - Widen
Existing
Roadway
$ 48,730,000 N/A 32.71 25.41Capital Area MPO,
Kerr-Tar RPOFranklin Yes 1.00 0 0 1.10 0
Not competitive in regional. Too expensive
to fund in division.
2 of 4
*
*
**
*
14
H090782 HighwayDivision
NeedsSR 1001 Henderson Warrenton
Widen to 12-Foot Lanes Rom
Henderson to Warrenton.
16 - Modernize
Roadway $ 13,546,000 N/A N/A 23.81 Kerr-Tar RPO
Warren,
VanceYes 0.90 0 Not competitive.
H150969 HighwayDivision
NeedsNew Route
NC 56/West Lyon
Station Road
New
Road/Proposed
project
H141323
This project is a segment of former
project H111042. Construct a new road
adjacent to I-85 in accordance with the
Butner Gateway Small Area Plan (the
second segment is the project
H150963).
5 - Construct
Roadway on
New Location
$ 10,021,000 N/A N/A 23.69 Kerr-Tar RPO Granville Yes 1.00 0 Not competitive.
H150761 HighwayRegional
ImpactUS 15
Belltown Rd., SR
1133Industry Drive
Widen 1.5 miles of US-15 from
Belltown Rd (near I-85 near Walmart in
Oxford) to Industry Drive
1 - Widen
Existing
Roadway
$ 16,654,000 N/A 28.88 22.41 Kerr-Tar RPO Granville Yes 1.05 0 0 1.25 0 Not competitive.
H149004 HighwayRegional
ImpactUS 158
US 158 Loop at
Williamsboro
Street in Oxford
Crest Road in
HendersonWiden to Multi-Lanes
1 - Widen
Existing
Roadway
$ 108,884,000 N/A 29.26 21.62 Kerr-Tar RPOVance,
GranvilleYes 0.30 0 0 0.30 0 Not competitive.
H150963 HighwayDivision
NeedsNew Route Gate 2 Road
New
Road/Proposed
project
H141323
This project is a segment of former
project H111042. Construct a new
road adjacent to I-85 in accordance
with the Butner Gateway Small Area
Plan.
5 - Construct
Roadway on
New Location
$ 12,997,000 N/A N/A 19.33 Kerr-Tar RPO Granville Yes 1.00 0 Not competitive.
H090819-A HighwayDivision
Needs
New Route -
Henderson Western
Outer Loop
SR 1101 (Old
County Home
Road)
US 1 Business
(Raleigh Road)
Construct 2 Lane Roadway, Part on
New Location. Continuation of the
Western Outer Loop.
6 - Widen
Existing
Roadway and
Construct Part
on New
Location
$ 27,886,000 N/A N/A 18.92 Kerr-Tar RPO Vance Yes 1.10 0 Not competitive.
H090077 HighwayStatewide
Mobility
US 158 (Oxford Outer
Loop)
US 158 Business
West of Oxford
US 158 Business
East of OxfordWiden to Multi-Lanes.
1 - Widen
Existing
Roadway
$ 50,526,000 30.45 24.89 18.61 Kerr-Tar RPO Granville Yes 0.60 0 0 0.75 0 Not competitive.
H149005 HighwayRegional
ImpactUS 1 , US 158
Satterwhite Point
Road
Ridgeway
Drewry RoadWiden to Multi-Lanes
1 - Widen
Existing
Roadway
$ 107,029,000 N/A 25.03 18.47 Kerr-Tar RPOVance,
WarrenYes 0.30 0 0 0.30 0 Not competitive.
H141323 HighwayDivision
NeedsNew Route East Lyon Station 26th Street
Improve existing roadway and
construct new overpass over I-85 and
new roadway from overpass to 26th
Street
6 - Widen
Existing
Roadway and
Construct Part
on New
Location
$ 20,300,000 N/A N/A 18.05Kerr-Tar RPO,
Capital Area MPOGranville Yes 0.80 0 Not competitive.
H090449 HighwayDivision
NeedsNew Route
SR 1126 (Poplar
Creek Road)
SR 1128 (Ruin
Creek Road)
SR 1126 (Poplar Creek Road) to SR
1128 (Ruin Creek Road). Two Lane
Service Road on New Location.
5 - Construct
Roadway on
New Location
$ 16,264,000 N/A N/A 15.77 Kerr-Tar RPO Vance Yes 0.40 0 Not competitive.
H090823 HighwayRegional
ImpactUS 401
Franklin County
LineWarrenton
Widening US 401 from the Franklin
County Line to Warrenton
1 - Widen
Existing
Roadway
$ 106,392,000 N/A 18.80 14.45 Kerr-Tar RPO Warren Yes 0.30 0 0 0.50 0 Not competitive.
H090387 HighwayDivision
Needs
SR 1195 (Industry
Drive), SR 1646
SR 1166 (Hillsboro
Street)
NC 96 (Linden
Avenue)
SR 1166 (Hillsboro Street) to NC 96
(Linden Avenue). Widen to Multi-Lanes,
Some New Location.
6 - Widen
Existing
Roadway and
Construct Part
on New
Location
$ 31,592,000 N/A N/A 14.41 Kerr-Tar RPO Granville Yes 0.85 0 Not competitive.
H090825 HighwayDivision
Needs
SR 1346 (New Route -
Younger Road)
SR 1333 (Chub
Lake Road)
SR 1364 (Carver
Drive)
Extend Younger Road (SR 1346) 0.6
Mile from Chub Lake Road Road (SR
1333) to Carver Drive
5 - Construct
Roadway on
New Location
$ 7,525,000 N/A N/A 12.83 Kerr-Tar RPO Person Yes 0.65 0 Not competitive.
H090073-C HighwayRegional
ImpactUS 501
SR 1329 (Old NC
501)
North of
Virginia State
Line
Widen to Multi-Lanes
1 - Widen
Existing
Roadway
$ 29,083,000 N/A 16.94 12.78 Kerr-Tar RPO Person Yes 0.40 0 0 0.50 0 Not competitive.
H090819-B HighwayDivision
Needs
New Route -
Henderson Western
Outer Loop
US 1 Business
(Raleigh Road)NC 39
Construct 2 Lane Roadway, Part on
New Location. Continuation of the
Western Outer Loop.
6 - Widen
Existing
Roadway and
Construct Part
on New
Location
$ 27,364,000 N/A N/A 12.66 Kerr-Tar RPO Vance Yes 0.80 0 Not competitive.
H090152 HighwayStatewide
MobilityUS 158
SR 1159 (Thee
Hester Road) West
of Roxboro
Oxford Outer
Loop
Widen to Multi-Lanes with Bypass of
Roxboro on New Location,
6 - Widen
Existing
Roadway and
Construct Part
on New
Location
$ 493,732,000 22.15 16.34 12.26 Kerr-Tar RPOPerson,
GranvilleYes 0.40 0 0 0.50 0 Not competitive.
H090017 HighwayStatewide
MobilityI-85 US 1 Provide Additional Traffic Movements
8 - Improve
Interchange $ 45,100,000 27.55 20.21 11.55 Kerr-Tar RPO Vance Yes 0.70 0 0 0.70 0 Not competitive.
H090073-B HighwayRegional
ImpactUS 501
SR 1521 (Halifax
Road)
SR 1329 (Old
NC 501)
Widen to Multi-Lanes, Part on New
Location
6 - Widen
Existing
Roadway and
Construct Part
on New
Location
$ 42,591,000 N/A 14.27 10.73 Kerr-Tar RPO Person Yes 0.40 0 0 0.50 0 Not competitive.
H090154 HighwayStatewide
MobilityUS 158
I-85 in Warren
County
SR 1405 East of
Littleton in
Halifax County
Widen to Multi-Lanes with Bypasses of
Norlina, Macon and Littleton on New
Location.
6 - Widen
Existing
Roadway and
Construct Part
on New
Location
$ 160,800,000 24.05 14.45 10.28Kerr-Tar RPO,
Peanut Belt RPO
Warren,
HalifaxYes 0.25 0 0 0.30 0 Not competitive.
3 of 4
15
H090828 HighwayDivision
NeedsSR 1151 US 1
Warren County
Hub Site
Upgrade SR 1151 from US 1 to Warren
County Hub Site on Manson-Axtell
Road (SR 1100). Construction of a
Connector Road from US 401 South of
Warrenton Connecting to 158 Business
on New Location.
6 - Widen
Existing
Roadway and
Construct Part
on New
Location
$ 10,465,000 N/A N/A 3.46 Kerr-Tar RPO Warren Yes 0.30 0 Not competitive.
T130114 TransitRegional
ImpactHenderson
Expansion Vehicle-KARTS is requesting
1 expansion LTV. In order to meet
demand KARTS will have to continue
increasing operational capacity by 2
units annually.
1 - Expansion
Vehicle $ 5,600 N/A 52.05 38.13 Kerr-Tar RPO Vance Yes 2.00 0 11 0
Anticipate funding Tentatively funded in
regional tier. Points reduced to provide
points for additional projects.
T130115 TransitRegional
ImpactHenderson
Expansion Vehicle-KARTS is requesting
1 expansion LTV. In order to meet
demand KARTS will have to continue
increasing operational capacity by 2
units annually.
1 - Expansion
Vehicle $ 5,600 N/A 52.05 38.13 Kerr-Tar RPO Vance Yes 2.00 0 10 0
Anticipate funding Tentatively funded in
regional tier. Points reduced to provide
points for additional projects.
T150709 TransitDivision
NeedsRoxboro
Construct 15 bus shelters along PATS
route corridor. The Bus shelter stops
are: Cleveland Lane, Brookstone/Shale
Circle, Walmart, Weeks Drive, Madison
Square Center, Person Memorial
hospital, Piedmont Community College,
Oaks Apartments, Pine Ridge
Apartments, Roses/Food Lion, Person
Plaza, Person Industries, Long
Memorial Church Lot, Courthouse, and
the Library.
2 - Facility $ 11,250 N/A N/A 19.44 Kerr-Tar RPO Person Yes 0.80 0 Not competitive.
T150699 TransitRegional
ImpactRoxboro
Expansion Vehicle-PATS requests 1
expansion LTV. In order to meet
demand, PATS will have to continue
increasing operational capacity.
1 - Expansion
Vehicle $ 6,200 N/A 26.03 18.90 Kerr-Tar RPO Person Yes 1.40 0 0 0
Not competitive at regional tier. Will
consider assigning division tier points to
regional non-highway projects when
preliminary regional programming is
released.
4 of 4
16
KERR-TAR DIVISION PROJECTS Local Points Assignment (Kerr-Tar P4.0 Subcommittee approved draft division level projects at meeting on 9-9-16, updated 10/4/16)
SPOT ID TIER ROUTE DESCRIPTION COUNTIESREGION SCORE
DIVISION SCORE
KTRPO METHODOLOGY
SCORE
DIVISION KTRPO PROJECT
RANKING SCORE
KTRPO LOCAL POINTS
ASSIGNMENT
H090195-DRegional Impact
(Cascade to Division)US 401
Widen to Multi-Lanes-from SR 1103 (Flat Rock Church Road Clifton Pond Rd) to SR 1700 (Fox Park Road) at Louisburg
Franklin 35.43 27.54 80 107.54 4555% in CAMPO; 55 points donate to CAMPO
H140496Regional Impact
(Cascade to Division)US 401
Modernize Roadway (Similiar Moving Ahead Project) fromSR 1103 (Flat Rock Church Road / Clifton Pond Road) to SR 1700 (Fox Park Road) at Louisburg
Franklin 36.78 28.98 70.00 98.98 4555% in CAMPO; 55 points donate to CAMPO
H150970Regional Impact
(Cascade to Division)
NC 96 BUS(Broad Street/Linden Ave), from Industry Drive to North of 3rd Street
Road Diet on NC 96 from Industry Drive to North of 3rd Street Granville 36.31 27.06 90 117.06 100
H140487-CRegional Impact
(Cascade to Division)NC 56 Realign West Lyon Station Road at NC-56 Intersection Granville 40.12 30.21 85 115.21 78
100%KTRPO- 10/4/16 Alex Rickard, CAMPO & David Wasserman, NCDOT SPOT Office
H111010-ARegional Impact
(Cascade to Division)US 501 (Madison
Blvd)
From Weeks Drive to NC 157. Replace 5 Lane Facility with 4 Lane Facility with Planted Median. Reduce Number intersections; Add Sidewalks to Both Sides of the Road Where they Are Missing. Includes intersection improvements at US 158 (Oxford Road).
Person 41.55 30.56 100.00 130.56 100
A130319 Division Needs TDF - Person
County ExecutiveExtend runway to 7,000 ft. (Takeoff Length) (includes Project Request Numbers: 3140 )
Person N/A 39.23 90.00 129.23 100
H090819-A Division NeedsNew Route - Henderson
Western Outer
Construct 2 Lane Roadway, Part on New Location. Continuation of the Western Outer Loop. From SR 1101 (OldCounty Home Road) to US 1 Business (Raleigh Road). Vance N/A 18.92 100 118.92 100
H090017
Statewide Mobility/Scored as
Regional (Cascade to Division)
I-85 I-85 from US 1, Improve Interchange. Provide additional traffic
movementsVance 20.21 11.55 45 56.55 100
H090782 Division Needs SR 1001 Widen to 12-Foot Lanes from Henderson to Warrenton.Warren, Vance
N/A 23.81 65 88.81 100
H090154
Statewide Mobility/Scored as
Regional (Cascade to Division)
US 158 Widen to Multi-Lanes with Bypasses of Norlina, Macon and Littleton on New Location. From I-85 in Warren County to SR 1405 East of Litttleton in Halifax County.
Warren, Halifax
14.45 10.28 70 80.28 96
96% Warren, 4% Halifax-4 points donate to Peanut Belt
H111053Regional Impact
(Cascade to Division)US401
Replace 5-Lane Facility with 4-Lane Facility including Planted Median, Sidewalks and Bike Lane. The Objective Is to Improvethe Facility to Delay the Need For Another Bypass of Louisburg(East Nash St. to Burke Blvd)
Franklin 41.05 31.23 100 131.23 100
H111010-GRegional Impact
(Cascade to Division)US 501 (Madison
Blvd)Carver Drive-Improve Intersection Person 48.52 36.10 85 121.10 100
A150869 Division NeedsTDF - Person
County Executive
Extend runway 500' to 6,500 ft total length(takeoff length); includes former projects 2432 Environmental Assessment/Preliminary Engineering; 2429 Land acquisition Rwy 24; and 2433/2434 Runway 24 Safety Area Extension, Relocate SR 1131 & Relocate Localizer, 200' extension on Rwy 6 and 300' extension
Person N/A 39.97 75 114.97 100
Franklin County Project
Granville County Project
Person County Project
Vance County Project
Warren County Project
Top 3 Next Highest scoring Projects regardless of County
Total Points=1186+114(donate to CAMPO, Peanut Belt)=1300
100
17
18
(Sample Resolution for Counties)
A RESOLUTION FOR ADOPTION OF THE
NC LAKES DISTRICT REGIONAL BIKE PLAN
WHEREAS, NCDOT's Bicycle and Pedestrian Division provides funding and technical assistance
to develop comprehensive regional bicycle plans, and
WHEREAS, Kerr-Tar Regional Council of Governments Regional Transportation Planning
Organization (KTRPO) initiated the NC Lakes District Regional Bike Plan, including the counties
of Franklin, Granville, Person, Vance and Warren; and
WHEREAS, the NCDOT provided funding for the Kerr-Tar area for a regional bicycle plan due to
its history of coordination and collaboration on land use, transportation, and economic development
issues; and
WHEREAS, __________ County recognizes a need to promote alternative modes of travel to
reduce congestion, improve air quality, increase tourism, promote recreation, improve health, and
increase safety for existing bicyclists and motorists; and
WHEREAS, the NC Lakes District Regional Bike Plan and its supporting text were developed with
input from a wide range of constituents and public input from residents to reflect local conditions
and preferences; and
WHEREAS, ________ County will consider implementation of the NC Lakes District Regional
Bike Plan through the recommended implementation strategies as listed in the plan; and
WHEREAS, representatives from Franklin, Granville, Person, Vance and Warren Counties
participated on the NC Lakes District Regional Bike Plan Steering Committee.
NOW, THEREFORE BE IT RESOLVED that the _________ County Board of Commissioners
adopts the NC Lakes District Regional Bike Plan on this, the ____ day of ________________,
2016.
A motion was made by ___________________ and seconded by _________________ for adoption
of the resolution, and upon being put to a vote was duly adopted, on this, the ______ day of
________________, 2016.
__________________________
_________ County, Chairman
__________________________
________ County, Clerk
19
A RESOLUTION FOR ADOPTION OF THE
NC LAKES DISTRICT REGIONAL BIKE PLAN
WHEREAS, NCDOT's Bicycle and Pedestrian Division provides funding and technical assistance to
develop comprehensive regional bicycle plans, and
WHEREAS, Kerr-Tar Regional Council of Governments Regional Transportation Planning Organization
(KTRPO) initiated the NC Lakes District Regional Bike Plan, including the counties of Franklin, Granville,
Person, Vance and Warren; and
WHEREAS, the NCDOT provided funding for the Kerr-Tar area for a regional bicycle plan due to its
history of coordination and collaboration on land use, transportation, and economic development issues; and
WHEREAS, KTRPO recognizes a need to promote alternative modes of travel to reduce congestion,
improve air quality, increase tourism, promote recreation, improve health, and increase safety for existing
bicyclists and motorists; and
WHEREAS, the NC Lakes District Regional Bike Plan and its supporting text were developed with input
from a wide range of constituents and public input from residents to reflect local conditions and preferences;
and
WHEREAS, KTRPO will consider implementation of the NC Lakes District Regional Bike Plan through
the recommended implementation strategies as listed in the plan; and
WHEREAS, representatives from Franklin, Granville, Person, Vance and Warren Counties participated on
the NC Lakes District Regional Bike Plan Steering Committee.
NOW, THEREFORE BE IT RESOLVED that the Kerr-Tar Regional Council of Governments Regional
Transportation Planning Organization (KTRPO) Transportation Advisory Committee and Technical
Coordinating Committee hereby approves and adopts the NC Lakes District Regional Bike Plan on this, the
____ day of ________________, 2016.
A motion was made by ___________________ and seconded by _________________ for adoption of the
resolution, and upon being put to a vote was duly adopted, on this, the ______ day of ________________,
2016.
Mike Ciriello, Chair, Kerr-Tar RPO TCC
Sidney Dunston, Vice Chair, Kerr-Tar RPO TAC
Ann Stroobant, Secretary, Kerr-Tar RPO TAC/TCC