Curriculum vitae Kerolls Mousa Zaky Address : El Goubra Muscat / P.O Box 1917 P.C 130. Tel : (+968)96788263 Email : [email protected]

Transcript of Kerolls Mousa Zaky

Page 1: Kerolls Mousa Zaky

Curriculum vitae

Kerolls Mousa ZakyAddress :  El Goubra Muscat / P.O Box 1917 P.C 130.Tel : (+968)96788263 E‐mail :  [email protected]

Page 2: Kerolls Mousa Zaky

Career objectiveProjects ‐ Development

I am seeking a suitable Architectural/Development position in a reputable project/development  firm, preferably an international firm for a full time employment to integrate with the process of growth for this form.

Personal Information Date of Birth : July 26th, 1984.Marital Status : Married.Nationality : Egyptian.Resident of : Muscat – Oman.

Page 3: Kerolls Mousa Zaky

Professional Experience

Professional Job time line 

MimarConsultation

OrascomDevelopment 

Muiya Tourism Development 

July 2006 to  Aug 2007  Sep  2007 to  April 2009  May 2009 till today 

Page 4: Kerolls Mousa Zaky

Muriya Tourism Development 

May 2008 – Till now

JOB RESPOSBILITY  PROJECTS – DEVELOPMENT ( Design leading )*  PREPARE DESIGN BRIEF FOR THE PROJECT INCLUDING LIAISING WITH OTHER DISCIPLINE TO EMPLOY CONSULTANTS *  PARTICIPATED IN PLANNING, REVIEWING BOTH TECHNICAL AND COMPLIANCE, COORDINATING AND SUPERVISING THE WORK OF THE CONSULTANTS IN EACH PROJECT *  REVIEWING THE CONTRACTS AGAINST THE PROJECTS DELIVERABLES, AND RECOMMENDING PAYMENT OF INVOICES. *   MANAGING THE “REQUEST FOR PROPOSAL” OF THE DEVELOPMENT COMPETITIONS/NEW DESIGN REQUESTS AFTER COMMUNICATING WITH THE RELATED FIRMS/CONSULTANTS.*   REVIEW THE DESIGN PACKAGES (ARCHITECTURAL, ID, LIGHTING & LANDSCAPING) AS TECHNICAL COORDINATOR OF ‐ ARCHITECTURE & LANDSCAPE. *   COORDINATING AND LIAISING WITH CONSULTANTS OF ALL THE INTERNAL MANAGERIAL DECISIONS, COMMENTS, ‐ AND/OR SPECIFIC INSTRUCTIONS. *  PREPARE COMPLETION REPORT, PROGRESS REPORT AND PROJECT PRESENTATION REPORT

Junior ArchitectMay 2009 

Senior ArchitectJune 2010 

Architect Manager July 2013

Muriya was established in Oman in March 2006, and investing In four major projects in Oman namely  ‘Jebel Sifa’ and ‘Salalah Beach’’ – two integrated tourism complexes, City Walk in Muscat and an excusive eco‐lodge on As Soudah Island. 

Page 5: Kerolls Mousa Zaky

Muriya Tourism Development 

May 2008 – Till now

JOB RESPOSBILITY  PROJECTS – DEVELOPMENT ( Design leading )*  PREPARE DESIGN BRIEF FOR THE PROJECT INCLUDING LIAISING WITH OTHER DISCIPLINE TO EMPLOY CONSULTANTS *  PARTICIPATED IN PLANNING, REVIEWING BOTH TECHNICAL AND COMPLIANCE, COORDINATING AND SUPERVISING THE WORK OF THE CONSULTANTS IN EACH PROJECT *  REVIEWING THE CONTRACTS AGAINST THE PROJECTS DELIVERABLES, AND RECOMMENDING PAYMENT OF INVOICES. *   MANAGING THE “REQUEST FOR PROPOSAL” OF THE DEVELOPMENT COMPETITIONS/NEW DESIGN REQUESTS AFTER COMMUNICATING WITH THE RELATED FIRMS/CONSULTANTS.*   REVIEW THE DESIGN PACKAGES (ARCHITECTURAL, ID, LIGHTING & LANDSCAPING) AS TECHNICAL COORDINATOR OF ‐ ARCHITECTURE & LANDSCAPE. *   COORDINATING AND LIAISING WITH CONSULTANTS OF ALL THE INTERNAL MANAGERIAL DECISIONS, COMMENTS, ‐ AND/OR SPECIFIC INSTRUCTIONS. *  PREPARE COMPLETION REPORT, PROGRESS REPORT AND PROJECT PRESENTATION REPORT

Junior ArchitectMay 2009 

Senior ArchitectJune 2010 

Architect Manager July 2013

Muriya was established in Oman in March 2006, and investing In four major projects in Oman namely  ‘Jebel Sifa’ and ‘Salalah Beach’’ – two integrated tourism complexes, City Walk in Muscat and an excusive eco‐lodge on As Soudah Island. 

Page 6: Kerolls Mousa Zaky

Muriya Tourism Development 

May 2008 – Till now

JOB RESPOSBILITY  PROJECTS – DEVELOPMENT ( Design leading )

Muriya was established in Oman in March 2006, and investing In four major projects in Oman namely  ‘Jebel Sifa’ and ‘Salalah Beach’’ – two integrated tourism complexes, City Walk in Muscat and an excusive eco‐lodge on As Soudah Island. 

• Design and implement agreed strategy, systems, controls and programs that support The achievement of these objectives. 

• Attends all the meetings related to the project(s) under his design management• Closely monitor the work progress and report to the “Top management” 

for necessary advice/action (as needed) Ensure “correctness/completeness” of the Consultant(s) payment applications, and recommend further action

• Acquaint himself thoroughly with the Contract Documents, and keep updated copy of the same, with necessary records

• Closely monitor the “performance/abidance” of the Consultants and recommend action (when necessary)

• Closely monitor all Submittals, Variation Requests and Site Instruction, and make suitable amendments to ensure soft cost budget(s) are maintained

• Manage the performance and compliance of the Consultants, according to the Scope of Services and Contractual Obligations and Standards

Junior ArchitectMay 2009 

Senior ArchitectJune 2010 

Architect Manager July 2013

Page 7: Kerolls Mousa Zaky

Muriya Tourism Development 

May 2008 – Till now

JOB RESPOSBILITY  

• Closely monitor deliverables program, and make recommendation in areas of slippage• Ensure prompt presentation of material submittals by Consultants;

make approval recommendation • Follow‐up with, Consultants, to ensure that all permit approvals are obtained for 

the smooth execution of the works, and to avoid delay to the program. • Coordinate and work very closely with different departments who have

a direct/indirect link to the project(s), such as Development, Construction,Marketing and Commercial.

• Advice and assist Director, Design on any poor performance remedial action, review of any claims, variation orders and program issues for further action or recommendationto higher management

• Plan, lead and monitor the assigned project(s) to ensure that the design is delivered within agreed time, cost and specification

• Checking Consultants payment certificates• Oversee the timely submittal of all Design materials and especially those of final appearance

finishes that require the top management approval. 

Page 8: Kerolls Mousa Zaky

Juweira Hotel Start design at  June 2009 and handover at March 2013

www.juweirahotel.com/

Marina Sifa & Salalah       Start design at  July 2008 and handover at Jan 2010 

http://www.muriya.om/jebel‐sifah/marina/

Project act as a design leading till Handover

Page 9: Kerolls Mousa Zaky

Al Fanar HotelStill under construction Expect to open by 12th of Dec220  Rooms 4  starts hotel4  outlets ( main Restaurant + specialty restaurant + Beach Bar + pool Bar )SPA + GYMItalian club (amphitheater + Restaurant )Kids + Junior club   

Rotana Salalah Hotel Start design at  July 2008 and handover at Jan 2010 

https://www.rotana.com/rotanahotelandresorts/oman/salalah/salalahrotanaresort

Project act as a design leading till Handover

Page 10: Kerolls Mousa Zaky

OrascomDevelopment 

Orascom for hotels and development is a reputable leading firm in tourist development, responsible for small to medium scale projects in diversity of functions residential, resorts and hotels.The firm is responsible for projects in Switzerland, Dubai, Jordon and Egypt.

JOB RESPOSBILITY  PROJECTS – DEVELOPMENT ( Design leading )* BRIEF FOR THE PROJECT INCLUDING LIAISING WITH OTHER DISCIPLINE TO EMPLOY CONSULTANTS DELIVERING CLIENT REQUIREMENTS* SUPPORTING THE SALES DIVISION (PROVIDING ALL REQUIRED TECHNICAL ASSISTANCE OR CLARIFICATION * DEMANDED THROUGH THE SELLING PROCESS) * COORDINATING BETWEEN SITE AND CLIENT REQUIREMENTS* COORDINATING BETWEEN ARCHITECTURAL, STRUCTURAL AND E/M REQUIREMENTS.INITIATING MODIFIED FLOOR PLANS, ELEVATIONS, SECTIONS AND DETAILS AS PER CLIENT REQUIREMENTS.* QUANTITY SURVEYING FOR EXTRA WORK.* PREPARING LANDSCAPE PROPOSALS FOR CLIENTS.* PREPARING SPECIAL DESIGNS FOR ELITE CLIENTS.* PREPARING INTERNAL ARCHITECTURAL TREATMENTS ALTERNATIVES TO FULFILL CLIENT NEEDS.* CORRESPONDENCE WITH EXTERNAL ENTITIES (DESIGNERS, SUPPLIERS...) CONCERNING DESIGN DEVELOPMENT AND DETAILS INITIATION. * INSPECTION AND HANDING OVER HIGH LUXURY UNITS & VILLAS.FOLLOWING UP CLIENT COMMENTS AFTER DELIVERY.

Page 11: Kerolls Mousa Zaky

Real state Villas zones white villas 

Golf Villas Italian compound Nubian Villas 

Marina El GounaMarina Abu tiqnew Marina 

Project act as a Real state supporting segment 

Page 12: Kerolls Mousa Zaky

Design team * ARCHITECTURE SITE CONSULTANT ENGINEERING IN THE PROJECT OVERLOOK ALL WORK FROM FOUNDATION INJECTION, SHOT CONCRETE WALLS, STEEL WORK, FINISHINGWORK …ETC* REVISION BOQ AND CALCULATE THE ACTUAL MATERIAL WHICH USED.* COMPLETED ALL GOVERNMENT PERMEATIONS AND REVISE TO GOES WITH CITADEL STYLE. (COLORS, SHAPES, SAFETY, ETC)*REVISE SHOP DRAWING OF CONTRACTURE IN FILED OF CIVIL & ARCHITECTURE 

MimarConsultation

July 2006 to  Aug 2007 

Page 13: Kerolls Mousa Zaky

Sun Mall ( Al Gala ) handover at Feb 2007

Renovation of the jewelry gallery In citadel of Cairo 

Project act as a Real state supporting segment 

Luxor airport building renvationAIS building in Luxor under Canadian contractor team  

and modernization of Luxor navigation tower

Page 14: Kerolls Mousa Zaky

(2008 ) PPM Course in Cadd Centre – Polyglot Institute –Muscat Oman 

1. PPM definitions for 40 hours.2. Primavera + Microsoft project for 30 hours.

(2001‐2006) Faculty of Engineering Ain Shams University, Egypt 

Latest university degree: Bachelor  .Major: Architecture  Grade: GoodGraduation project: Marina in Damit Grade: Good.

Saint Mary language school, Cairo, Egypt ‐ Egyptian School Certificate ‐Major: Scientific (Mathematics).

Linguistic Skills ‐ Arabic:               Mother tongue‐ English:              Excellent

Education & courses :   

Computer skills 

Page 15: Kerolls Mousa Zaky

Hope that I become a member of your respective firm 

THANK YOU