Kenny Tew Simon Oh
Transcript of Kenny Tew Simon Oh
A Platform of Big Data Solution ( eData.sg )
Above ground activities real-time monitoringUnder ground activities real-time monitoring
Developed by Magicsoft Asia Systems Pte Ltd
Kenny Tew
Simon Oh
®
Singapore Company (established 1997)
Developed own technologies with local support in Singapore, Malaysia, Indonesia & China
About Us
MAGICSOFT
Flying School Systems
Construction Monitoring Solutions
ElectronicMedical
Systems (EMR)
Tele-health Monitoring
System
Asset Management
Systems
Shipyard QRMS System
Research Lab Management
System
Construction
Project Management
Made Complete
OVERVIEW®
Facilities ManagementConstruction PhaseDesign Phase
for All Construction
BIM-Enabled
Tunnel/Excavation Monitoring
Planning Phase
SAFETY- Risk Assessment with Artifical Intelligence- ePermit To Work- Live Monitoring- Incident Management- Access Monitoring
Project Management
BIM Scheduling
PBU Integration with CCTV
ROADMAP®
®
Overview
Under Ground Activities Monitoring
Above Ground Activities Monitoring
>1millions sensors’ reading
®
PBU
Immediate Management/Analysis Reports
Real-time BIM-enabled construction system that allows the contractors to collect, consolidate and manage on-site data with ease. The system utilizes the Smartphone mobility and Web extensibility to help engineers in achieving work efficiency and accuracy.
Project Engineers (mobile)
Safety Checklist
Non conformance List / Punch list / Defect
Notification / Alert( SMS / Email / Skype )
SystemsAdmin/ Clerk/ Accounts/ HR
CTMS MobileQR Code to
identify BIM Object information
Risk Assessment
Permit to Works (e-Sign)
Workflow Engine
Worker Attendance (EPSS)
Overview®
Users
Thomson MRT Line projects
>2000 users, project director, supervisor, site engineer, sub-con supervisor, geotechnical consultant, authorityofficers, safety officers, project managers, site engineers, WSHO, WSHC, tunnel specialist, etc.
®
Operating Sytem : CentOSDatabase Tier
Redis is an open source (BSD licensed), in-memory data structurestore. Its used for key value store in our environment.
MongoDB is an object-oriented, simple, dynamic, and scalableNoSQL database. Used to implement a data store that provides highperformance and high availability.Application Tier
Nginx is open source software for web serving, reverse proxying,caching, load balancing, media streaming, and more. In ourenvironment its used for Load Balancer HTTP Request and First SSLterminationSSLSSL (Secure Sockets Layer) is the standard security technology forestablishing an encrypted link between a web server and a browser.
WebappCTMS ensures high availability and scalability of the Webapp by utilizinga load-balanced and horizontally-scalable scheme.MiddlewareMiddleware manages connectivity to various back-end resources andcreate a connection pool to provide fast end efficient access.Gearman used for chaining function connector for the service or theapplication.
Microservice is an architecture pattern that structures the application asa composition of loosely-coupled services. Microservices allow us to addmultiple workers (microservices) for multiple tasks.
Architecture®
e-Permit To Work SystemSupervisor to check and apply PTW Safety Assessor to assess and endorse
Maincon Rep to check
WSH Officer to Verify PTW
Project Manager Approve
PILES OF PAPERWORK
Project Collaboration
Inspection
Supervision
Fabrication
Order Tracking
BIM Server
Worker
Management and
Attendance (EPSS)
Mobile/Desktop
Devices
Safety
ChecklistNon
conformance
List / Punch list /
Defect
Inventory
Managemen
t (QR Code)
Permit to
Work (e-Sign)
Reporting
Risk Assessment
®
IFC Model
Construction Dashboard
Status Tracking of Permits & Checklists for Follow-UpDisplays Customised Overview of Project Status
Real Time CCTV & Site Monitoring
CCTV
Site Office
CCTV Console
CCTV Images Used in CTMS Auditing
CCTV
CCTV
- Alert trigger when permits happen at close locations and same times (CCTV)
- Showing alert due to overlapping of processes (CCTV)
ePTW - Risk Assessment Management
- Link the processes to BIM
Before BIM processes
After BIM processes
ePTW – Before & After BIM Processes
Streamlined
Construction
Project Management
INTEGRATED DIGITAL DELIVERY
DIGITAL DESIGN DIGITAL CONSTRUCTION
DIGITAL MANUFACTURING &
FABRICATION
DIGITAL ASSET DELIVERY &
MANAGEMENT
e.g. KPITo shorten target construction period from 32 months to 28 months
e.g. KPIEarly confirmation
of design
e.g. KPIReduce cycle time
e.g. KPIReduce shop
drawing approval latency
e.g. KPIFaster resolution
of defects
INTEGRATED DIGITAL DELIVERY
Goods Received Installation
Inspection
PO is created within CTMS based on BIM object selected.
Fabrication
DO is generated in CTMS when deliverables are ready and tagged with QR code.
2
CTMS
PO/DO Updates
BIMModel Server
1
3
4
BIM Digital Delivery®
Notifications
VIEW MORE
2018-09-18 09:34 DO H28210-1A has been issued.2018-09-17 17:10 PO 209280 has been issued.2018-09-17 17:03 Inspection pending.2018-09-17 14:29 PO 209279 has been issued.2018-09 17 11:45 DO H28193 has been issued.
NOTICE
NOTICE
ACTION
NOTICE
NOTICE
Show: TODAY
DASHBOARD®
DASHBOARD®
Processes
&
Methodology
BIG DATA
BIG DATA is high volume, high velocity, high variety information assets that require new forms of processing to enable enhanced decision making, insight discovery and process optimisation
DATAVELOCITY
DATAVARIETY
DATAVOLUME
Real Time
Near Time
Periodic
Batch
Semi-structured
Structured
Unstructured
All the above
MB GB TB PB
DATA CHARACTERISTICS FROM VARIOUS SOURCES IN PROJECT
PERFORMANCE & INTEGRATION
USABILITY & PRODUCTIVITY
ANALYTICS
BIG DATA (COLLECT, PROCESS, ANALYTIC)
COBie, Forge, BIM360, Bentley, Trimble Connect, BIM Authoring Tools- Risk Assessment prevent overlapping works or define
sequence of works- PO/DO (QR code inside selected element)- Omiclass / Uniclass standardize the definition- Schedule and Cost base on BIM ID
IFC
Integrated/Analyzed further with (design data) in CTMS
BIM INTEGRATION®
BIM Collaboration Platform
CTMS
IFC/COBie
Direct Access to Trimble Connect, BimSync, BIM360Allow CTMS Users To Access BIM File Real-time At Project Site Via Mobile Devices
Design
Tools
Cloud
Platform
CTMS
Modules
Others
Permit to
Work
Inspections
Checklist
Investigation
Reports
Punch List /
Defects
Incident
Reports
Toolbox
Meeting
i-Observe
(Feedback)
Gondola
Tracker
CCTV
Status of
Works
®
Safety Management
With
Artificial Intelligence
e-PERMIT TO WORK
Challenges Faced in Construction
• Monitoring worker movement to prevent unauthorised accessto work areas for safety.
• Ensuring that safety equipment are exactly where they aresupposed to be at all times.
• Ensuring that PPE is worn at all times.• Environmental factors are not often taken into safety
measurements.
• Risk assessment level not accurately reflected whenparameters change.
• Difficulty in using historical data for collective experienceapplication.
• Lack of integration with current processes and differentsystems.
• Processes still manual and not digitized due to fear of data being used against owners as evidence.
• Insufficient structured data for analysis.• Lack of awareness of BIM benefits and importance.• Inadequate government funding.
Identify Activity Hazard1
Evaluate Risk & Control Measures2
ePTWePTW
PTW
Implement Permit to WorkWith Risk Controls
3
Risk Assessment Matrix
Risk Evaluation Form
Current Risk Assessment Process
Artificial Intelligence In Risk Assessment
BIM
1234::
Sequence of Work
IncompatibleWorks
ManpowerQualifications
Risk Assessment
Equipment HealthCheck Records
Lacking timely information1
Drawbacks of Current Process
Artificial Intelligence In Risk Assessment
Too Reliant on Human Processing & Experience 2
Drawbacks of Current Process
Inaccuracy in Implementing Risk Controls3
“Safety barrier & signage erected to prevent unauthorized entry”
Risk Control
Risk Level
Artificial Intelligence In Risk Assessment
Risk Assessment Matrix
BIM1234::
Sequence of Work
ALERTS
IncompatibleWorks
ManpowerQualifications
Assessor Decisions
Image/VideoAnalysis
SUGGESTIONS
®
OPERATIONALSETUP MANAGE
HistoricalRA Data
ePTWePTW
ePTW Reports
Decisions feed back to AI
Artificial Intelligence in Risk Assessment( with Scoring & Weightage via TensorFlow 2.0 )
Overview for AI Engine on RA®
Master Risk Assessment Register
Mapping Process for Risk Assessment
Master Register
• Activity1. Excavation2. Lifting Operation3. Scaffold Works4. Hot Works5. Electrical Works:
• Hazards1. Slip, Trip & Fall2. Struck by Falling Object3. Fire/Explosion4. Burns5. Health – Dust & Fumes6. Health – Work Fatigue7. Health – Heat Stress:
• Risk Controls1. E – Avoid Hot Works2. Engr - Provide adequate
lighting at workplace3. A - Provide & use
suitable flashback arrestors
4. A - Provide suitable adequate fire extinguisher/ fire blankets, etc.
5. PPE – Provide safety and use as fall restraint equipment
:
1 Risk Assessment2
Activity : Hot WorksHazard : Fire/ExplosionRisk Controls:
1. E – Avoid Hot Works2. Engr - Provide adequate
lighting at workplace3. A - Provide & use
suitable flashback arrestors
4. A - Provide suitable adequate fire extinguisher/ fire blankets, etc.
:::
Risk Score: 4 Risk Assessment Level: Medium
Implement to Permit to Work3
HOT WORKS PERMITValid From : 07/02/2019 8:00AM
To : 07/02/2019 5:00PM
Checks by Safety Assessor:
1. Adequate lighting at workplace?Yes No
2. Suitable flashback arrestors provided?
Yes No
3. Provide suitable adequate fire extinguisher/ fire blankets, etc.
Yes No:::
Safety Assessor: Tan A K
Signature:
Risk Assessment Level: MEDIUM
PTW Enhancements(Implementation & Real-time Monitoring)
Permit to Work
HOT WORKS PERMITValid From : 07/02/2019 8:00AM
To : 07/02/2019 5:00PM
Checks by Safety Assessor:
1. Adequate lighting at workplace?Yes No
2. Suitable flashback arrestors provided?
Yes No
3. Provide suitable adequate fire extinguisher/ fire blankets, etc.
Yes No
Safety Assessor: Tan A K
Signature:
Risk Assessment Level: MEDIUM
‘Live’ Risk Assessment:Alerts triggered when risk level changes.
Sensor Readings:• Noise• Health of Worker• Air Quality• Lighting• Temperature• Thermal Camera• Weather
Video Analytics:• Helmet detection• No-man zone• People counting to prevent exceeding
load bearing limit or evacuation constraints
Tracking via Beacon:• Workers• Safety Equipment
WORKPLACE SAFETY AND HEALTH ACT (CHAPTER 354A)
Collective Experiences:• Historical data of
previous incidents
Options affect weightage of predefined risk controls.
Monitoring human behaviour and ensuring availability of vital assets for safety
Constant monitoring for protection of workers
Environmental factors that can affect work conditions
Equipment Inspection Records
Incompatible & Sequence of Works
‘Live’ Assessment for Risk
Permit to Work
HOT WORKS PERMITValid From : 07/02/2019 8:00AM
To : 07/02/2019 5:00PM
Checks by Safety Assessor:
1. Adequate lighting at workplace?Yes No
2. Suitable flashback arrestors provided?
Yes No
3. Provide suitable adequate fire extinguisher/ fire blankets, etc.
Yes No:::
Safety Assessor: Tan A K
Signature:
Risk Assessment Level: MEDIUM
Change in RA level
®
CorrectiveAction
REVISE RISK ASSESSMENT
UPDATE MASTER REGISTER?
Post Process For Risk Assessment
Permit to Work
HOT WORKS PERMITValid From : 07/02/2019 8:00AM
To : 07/02/2019 5:00PM
Checks by Safety Assessor:
1. Adequate lighting at workplace?Yes No
2. Suitable flashback arrestors provided?
Yes No
3. Provide suitable adequate fire extinguisher/ fire blankets, etc.
Yes No:::
Safety Assessor: Tan A K
Signature:
Risk Assessment Level: MEDIUM
OUTCOMES:1. Any incidents?2. iObserves?
®
Risk Assessment-Integrated
• Preliminary Risk Assessment for ePTW done without AI• Quick indication of ePTW with higher risk levels• Google Cloud Hosted
®
Video Analytics for Safety Monitoring
Industry 4.0 Ready: Beacon & NFC
Cost effective means of tracking of workers around the work site to prevent unauthorised access
For Rescue & Recovery Ensuring vital assets are at specific locations at
all times
Use Case for Beacon:
Bluetooth Beacon Tracker - Asset and Person tracking using small Bluetooth beacons
Use Cases for NFC:
1. Smart NFC Fire Extinguisher Monitoring System2. Mobile Vehicle Inspection Using NFC Tags
• Low Cost• Updatable• Easily detectable even in dirty
environments
Beacon: How It Works
Beacon Gateway 1
Beacon Gateway 2
Beacon Gateway 3
Internet SignalBluetooth Signal
WORK SITE
1. Worker’s Location, body temperature
1. Change in Asset Position2. Loss in Beacon Signal
Asset withBeacon Tag
Worker with Beacon Tag
Wi-Fi enabled Beacon Gateways can triangulate and uploadinformation on assets and workers statuses.
Worker Health Monitoring
Heart Rate Monitor
Altitude Measurement
Internet SignalBluetooth Signal
1. Worker’s Heart Rate2. Sudden Change in Worker’s Position
Beacon Gateway 1
Beacon Gateway 2
Beacon Gateway 3Bluetooth Enabled Watch Can be tracked using Beacons
Steps Tracker
Hot Works Monitoring
Internet Signal
1. Trigger alert if high temperature detected after job ends.2. Trigger alert if high temperature iscontinuously detected
Thermal camera monitors preset
temperature range
Sends alerts when threshold is breached
Partner: BOSCH i-Site
Partner: RealWear
WORKER MANAGEMENT
Integrating
Human Resources
& Authority
Cannot verify immediately
No Tracking ofEmployment History
No Risk Alert if Equipment Certificate is Expired
X
X
No Report Analysis for Certification, Workers’ Info, etc.
XOvertime Post Risksto Certain Works
Worker’s Permit Validity
XHiring of Criminal or Illegal Workers
X
No Valid Insurance
X
Problems to Address
X
MOM & CTMS Application Program Interface
Interface Design (upload/download)
MOMDatabase
CTMSDatabase
Worker Management
Module
Stage 1 Query and verify
Worker Induction Module
Worker Attendance
Certification
Stage 2
Upload valid Equipment
Certification
Upload Letter of
Appointment
Upload and certify
Store Valid Permits for Safety
Reason
Working Hours / Training
Certification
Work Injury Compensation
MOM & Application Program Interface®
Access Monitoring
Electronic Gantry
Biometric Device
Employee Verification & Timesheet
®
Query & Verification
CCTV Camera
Verification Process can Trigger Alerts
SCREENSHOT®
Workers’ Credit System
• Allows a consistent and regular assessment of workers• Gives a quick view of personal areas to improve• Reduces time required to assess workers• Current health status, last checkup done, etc
9
3
7
-1
-2
5
1
8
-10 -8 -6 -4 -2 0 2 4 6 8 10
Avg Hours Worked
Certifications
Punctuality
Incidents
Violations
Medical Leave
iObserves
Health Status
Ratings for 2019 JAN
Bridging
The
Gaps
ROADMAP®
The Drivers of BIM (CTMS)
Pre-Construction Stage On-Site Construction Stage
Construction Planning & Management
Asset Delivery & Management
On-Site Coordination
Design Concept
BIM Modular Design
Coordination to Overall Design
BIM (platform)
®
Pre-Construction Stage
Platform BIM
Models
Stage 1 Design Phase- Project Site Requirement- Units Mix, Massing Models- Height Control (Floor to Floor Height
Orientation Setbacks)- Structure Concept- M&E Systems- Others
Stage 2 Submission Phase Stage 2aPlanning Permission Submission Phase
DC Submission to Technical Department- Detailed Unit Layout- Specification- Technical Compliance- Others
Internal Meeting
Feedback/Update
External Meeting
Final Update
Stage NDefine tasks & Schedule
••••
Property Developers/Owners (Different Departments)
Architect/Engineers/Contractors/PPVC Specialist
®
•••
Internal Meeting
Feedback/Update
External Meeting
Final Update
BIM Model *
Model Asset [ID] * Timber Swing Door 1 Panel [903005]
Aquaville Residences Unit Type A
Change Request *
Deliverable *
Assign To *
Date Due *
Need to adjust door by another 15cm away from window.
Height Control (Design Phase)
Tan Bock Seng (Choon Brothers P/L)
18/01/2019
SUBMIT CANCEL
BIM CHANGE REQUEST®
BIM Model *
Latest Version 1.1901280945
Aquaville Residences Unit Type A
BIM Update *
To Be Verified by * Jimmy Lee (Song Ho Property Mgmt)
SUBMIT CANCEL
RFC No * AQV-2019-RFC-028
BIM UPDATE®
BIM Overall Schedule
DESIGN PHASE JAN FEB MAR APR MAY JUN JUL AUG
Site Requirement
Units Mix
Massing Models
Height Control
Orientation
Structure Concept
M&E System
Current Progress
2
1
4
1
1
4
7
Phase Deadline# Open Requests
8COMPLETED
2DELAYS
3AI ADJUSTED
2BOTTLENECKS
QUICK STATS SCHEDULE DEVIATION
14DAYSAHEAD
MAR APR MAY JUN JUL
20
10
0
-10
-20
SCHEDULE ACTIONS
02 Jul 13:00
Expected delay due to halt in task 22.
02 Jul 12:12
Possible bottleneck due to task 25 affecting task 26 at similar location.
®
45
39
5
1 1 1
29
20
9
0 1 2
8
2 3 3 2
0
R A ISE D C OMPLET ED ASSIG N ED UN ASSIG N ED DUE SOON OV ER DUE
Project 1 Project 2 Project 3
Summary
30%
15%20%
20%
15% Engineering
Mechanical
Design
Electrical
Furnishing
Current CategoriesProject 1
45Raised
5Assigned
1Due Soon
39Completed
1Unassigned
1Overdue
3High Priority
1Normal Priority
2Low Priority
SELECT PROJECT
Progress Updates
Purchase Order (PO)
PO > DO > GR > Installation > Inspection
Delivery Order (DO)
Good Received(GR)
InstallationInspection
PBU INTEGRATION WITH CCTV
Fewer Errors
Better Cost Control
Better Workflow Control Win More Projects
ROI – Benefits – Impact
Better Predictability
Real Time Data for Management & Decision Making
Tangible benefit by reducing waiting with whole workforce for PTW approval for works.
100 workers x 52 weeks x 6days x 30min = 15,600 man-hours =
7 man-years Per Project Lower Construction Cost
Thomson East-Coast Line: Geotechnical consultant preparing geotechnical reports
23 stations x 5 consultants x 52 weeks x 2days x 4 hours = 47,840 man-hours
=21 Man-years
Our Mission Statement
• Provide Real-Time Update Information
• Provide End-to-End Monitoring Platform
• Create AI Models That Are Helpful to Industries (Require Domain Knowledge for The Models)
• Create Cost-Effective Solutions for Monitoring Safety of the Work Environment
• Promote the Use of BIM
• Interface with Many Useful IoT Sensors
Q&A