Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2...

25
Yahoo! Sports: Sprint 100 & Beyond Keith Nottonson [email protected]

Transcript of Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2...

Page 1: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

Yahoo! Sports: Sprint 100 & BeyondKeith Nottonson

[email protected]

Page 2: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved
Page 3: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

• Unique adaptations of a long running Scrum team ‘in the wild’ and the transition to a more Lean process

• The human and technological lessons associated with ever more frequent code deployments

• How co-located events for distributed teams promote innovation and revitalization

• The importance of internal data quality in order to deliver classes of services while reducing time to market

Page 4: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

A pitbull, a peacock, a lemur, two bears, twoelephants, a golden retriever, a dodo bird, badger, ashark, a liger, Godzilla, and a cigarette-smoking chimpwith OCD and a gambling problem walk into a bar…

Page 5: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

Team: 10 dev, 3 qa, 2 ops, 3 pmLocation: Sunnyvale & Santa MonicaStandups : MWF 11 AMIteration: 1 week cycle, planning TH 11 AMSprint Backlog: Prioritized, no estimatesVelocity: Tickets & Time to MarketSports Dates

Page 6: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

DAILY RELEASES DURING THE WORLD CUP

Page 7: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved
Page 8: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved
Page 9: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

Better flowSmaller PiecesCulture Shift

Page 10: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

Average Time to Resolution - Site

74.3

32.0 34.830.6

90.2

13.019.2

41.2

158.6

12.4

37.6

18.2

33.4

19.2

43.4

16.0

33.8

21.4

54.4

21.8

8.311.8

25.8

17.216.4

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

Day

s

Page 11: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

Sports Team Velocity

Page 12: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

THE SPORTS HACKTACULAR

Page 13: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved
Page 14: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved
Page 15: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved
Page 16: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

Tool, Product, HackTool: something used internally, little ued, little launch riskProduct prototype: the functional beginnings of an idea, will need to be iterated on later, not releasable without further workHack: new feature or implementation method, small enough to launch in the next two releases, perhaps refactoring or using new technology

Page 17: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

THE GREAT BUG SWEEP

Page 18: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

Number of Open Sports Bugzilla Tickets by YearOpen includes New, Reopened, & Accepted

0 1 2 8 16

165

232

740

967

1170

1257

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

Page 19: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

Number of Open Tickets by Priority

0

200

400

600

800

1000

1200

1400

1600

1800

P1 P2 P3 P4 P5 No Priority

Page 20: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

Hypothesis

Hypothesis, by adjusting priority on open bugs to reflect duration open rather then ranked order:

• it will be easier to plan and prioritize in flight work

• the priority field can be used to represent time to fix/resolve rather than a historical priority made at a point in time long in the past

• we can communicate clearly to our partners, and teach them to communicate clearly back at us

Page 21: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

Average Lead Time by Priority

11.916.2

39.1

49.1

38.9

55.4

118.2

126.3

13.6

20.3

44.3

53.4

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

P1 Resolved P1 Verified P2 Resolved P2 Verified P3 Resolved P3 Verified P4 Resolved P4 Verified No Priority Resolved

No Priority Verfied

Average Resolved

Average Verified

Page 22: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

The Great Bug Closure

Page 23: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

Goals of the Great Bug Sweep

• Enact true P1 prioritization

• Move from Weeks and 5 year bug resolution times to Hours and 1.5 year

• Create Flow P1 and P2 classes of service and Scrum (Planned) P3, P4 and P5 swim lanes

• Reduce open tickets to ones that may actually be resolved

Page 24: Keith Nottonson · 2019-12-16 · Average Lead Time by Priority 11.9 16.2 39.1 49.1 38.9 55.4 118.2 126.3 13.6 20.3 44.3 53.4 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 P1 Resolved

You have to take risks. You have to venture beyondyour comfort zone. If something does not work thefirst time, you have to try again. If one thing does notwork, you have to try something else. You have to letthem feel pain. You have to keep it fun. And youhave to keep giving energy and love, because fallingdown hurts, but learning to run is freedom.